POWER GRID CORPORATION OF INDIA LIMITED DOC NO.

: MR/CF/BAY/03/R-2 DATED : 01/08/07


CORPORATE OPERATION SERVICES SUB STATION :
BAY NO :
PRE-COMMISSIONING OF BAY / FEEDER FEEDER / BAY IDENTIFICATION NO :
COMMISSIONING FORMATS DATE OF TESTING :

I REGION :

II ERECTION START DATE : III ERECTION COMPLETION DATE :

IV DATE OF ENERGIZATION :

V FEEDER NAME :

VI VOLTAGE LEVEL :

VII DETAILS OF EQUIPMENTS INVOLVED :

EQUIPMENT R - PHASE Y - PHASE B - PHASE


ID NO SL NO ID NO SL NO ID NO SL NO
CT

CVT

LA
BREAKER

TRANSFORMER
REACTOR
ISOLATOR

EARTH
SWITCH

LINE TRAP

PAGE 1 OF 15 BAY/ FEEDER


POWER GRID CORPORATION OF INDIA LIMITED DOC NO. : MR/CF/BAY/03/R-2 DATED : 01/08/07
CORPORATE OPERATION SERVICES SUB STATION :
BAY NO :
PRE-COMMISSIONING OF BAY / FEEDER FEEDER / BAY IDENTIFICATION NO :
COMMISSIONING FORMATS DATE OF TESTING :

VIII DETAILS OF CR PANEL AND PLCC

PANEL IDENTIFICATION IDENTIFICATION IDENTIFICATION


DETAILS NAME NUMBER NAME NUMBER NAME NUMBER
CONTROL
PANEL
RELAY
PANEL
PLCC PANEL

RTU PANEL

RECORDING IDENTIFICATION
INSTRUMENTS NAME NUMBER
FAULT LOCATOR
EVENT LOGGER
DISTURBANCE RECORDER
TIME SYNCRONISATION
STRIP CHART RECORDER

IX PROTOCOL DOCUMENTATION

EQUIPMENT IDENTIFIC- ALL ALL TEST RESULTS JOINT PROTOCALS OF THE


ATION NO PRE-COMMISSIONING ARE WITHIN THE EQUIPMENT INVOLVED IN
TESTS CARRIED OUT LIMIT OF TOLERANCE CHARGING ARE DOCUMEN-
AS PER FQP TED AND SIGNED BY ALL
YES/ NO YES/ NO CONCERNED YES/NO
CT

CVT

LA
BREAKER

TRANSFORMER
REACTOR
ISOLATOR

PAGE 2 OF 15 BAY/ FEEDER


POWER GRID CORPORATION OF INDIA LIMITED DOC NO. : MR/CF/BAY/03/R-2 DATED : 01/08/07
CORPORATE OPERATION SERVICES SUB STATION :
BAY NO :
PRE-COMMISSIONING OF BAY / FEEDER FEEDER / BAY IDENTIFICATION NO :
COMMISSIONING FORMATS DATE OF TESTING :

EQUIPMENT IDENTIFIC- ALL ALL TEST RESULTS JOINT PROTOCALS OF THE


ATION NO PRE-COMMISSIONING ARE WITHIN THE EQUIPMENT INVOLVED IN
TESTS CARRIED OUT LIMIT OF TOLERANCE CHARGING ARE DOCUMEN-
AS PER FQP TED AND SIGNED BY ALL
YES/ NO YES/ NO CONCERNED YES/NO
EARTH
SWITCH

LINE TRAP

CONTROL
PANEL

RELAY
PANEL

PLCC

RTU
PANEL

PAGE 3 OF 15 BAY/ FEEDER


POWER GRID CORPORATION OF INDIA LIMITED DOC NO. : MR/CF/BAY/03/R-2 DATED : 01/08/07
CORPORATE OPERATION SERVICES SUB STATION :
BAY NO :
PRE-COMMISSIONING OF BAY / FEEDER FEEDER / BAY IDENTIFICATION NO :
COMMISSIONING FORMATS DATE OF TESTING :

X CHECK OF BAY MARSELLING KIOSK

DETAILS IDENTIFICATION NUMBER REMARKS , IF ANY

ILLUMINATION AND HEATER OK/NOT OK OK/NOT OK OK/NOT OK


5 /15 AMP SOCKET
ALL SPECIFIED FUSES IN POSITION
EARTHING AT 2 LOCATION
ALL CABLES TIGHTNESS
ALL CABLES ARE PROPERLY GLANDED
ALL CABLES HAVE IDENTIFICATION NO
ALL CORES HAVE IDENTIFICATION NO
SHIELDING WIRES ARE EARTHED
FREE FROM DUST AND DAMAGE
DOOR HINGES AND LOCKING
PAINTS
UNUSED HOLES ARE SEALED

XI AVAILABILITY OF THE FOLLOWING

DETAILS STATUS REMARKS


YES/NO TEMPORARY ARRANGEMENT,IF ANY

1 FIRE FIGHTING SYSTEM COMMISSIONED

A FIRE PROTECTION INCLUDING ALARMS YES/NO

B FIRE HYDRANT SYSTEM YES/NO

C FIRE DELUGE (SPINKLER) SYSTEM YES/NO

2 PORTABLE FIRE EXTINGUSHERS ARE


IN POSITION YES/NO

3 FIRE TENDERS CAN BE MADE AVAILABLE FOR ANY


EVENTUALITY YES/NO TEL NO:

4 ALL EQUIPMENT ERECTION AS PER GENERAL


ARRANGEMENT DRAWING ISSUED BY ENGG. YES / NO

5 EQUIPMENT IDENTIFICATION NAME PLATE


ARE PROPERLY FIXED YES / NO

6 ALL BUSPOST INSULATORS ARE CLEANED AND


FREE FROM DUST / DIRT FOREIGN MATERIALS ETC. YES / NO

7 ALL EARTHING POINTS HAVE BEEN EARTHED YES / NO

PAGE 4 OF 15 BAY/ FEEDER


POWER GRID CORPORATION OF INDIA LIMITED DOC NO. : MR/CF/BAY/03/R-2 DATED : 01/08/07
CORPORATE OPERATION SERVICES SUB STATION :
BAY NO :
PRE-COMMISSIONING OF BAY / FEEDER FEEDER / BAY IDENTIFICATION NO :
COMMISSIONING FORMATS DATE OF TESTING :

DETAILS STATUS REMARKS


YES/NO TEMPORARY ARRANGEMENT,IF ANY
8 ALL NUTS AND BOLTS OF BUS BAR ARE TIGHTENED
CORRECTLY AS PER SPECIFIED TORQUE YES / NO

9 ALL CLAMPS AND CONNECTORS ARE AS PER THE


DRAWINGS ISSUES BY ENGG. DEPT AND
CORRECTLY TIGHTENED AS PER SPECIFIED TORQUE YES / NO

10 ANY PAINT REMOVED / SCRATCHED IN


YARD EQUIPMENTS HAVE BEEN TOUCHED UP YES / NO

11 BAY IDENTIFICATION AND DESIGNATION PLATE


ARE ON POSITION WITH R,Y, B PHASE MARKING YES / NO

12 GRAVEL FILLING IN THE YARD (IF DESIGNED)


HAS BEEN DONE YES / NO

13 THE LADDERS / TOOLS / VEHICLES / WORKBENCH


/ TEMPORARY EARTHING ETC. REMOVED FROM
THE AREA WHICH IS TO BE ENERGIZED YES / NO

14 DC EMERGENCY LIGHT IN OPERATION AND IN AUTO YES / NO

15 DG SET IS AVAILABLE AND IN OPERATION YES / NO

16 SWITCHING SEQUENSES WITH PROCEDURES ARE


DOCUMENTED AND AVAILABLE IN THE CONTROL
ROOM YES / NO

17 REGULAR OPERATION IN THE CONTROL ROOM IS


MANNED ROUND THE CLOCK WITH REGULAR
OPERATION STAFF YES / NO

18 ALL PTW ISSUED EARLIER ARE CANCELLED AND


NOTHING ARE PENDING YES / NO

19 OPERATION DATA LOG SHEETS, PTW AND OTHER


STANDARD FORMATS OF POWERGRID ARE
AVAILABLE FOR REGULAR OPERATION YES / NO
YES
20 / NO CHARGING CLEARANCE IS RECEIVED FROM GRID
OPERATION CPCC / IOCC / REB VIDE MSG NO : ___________ TIME :___________ DATED
XII MEASUREMENT OF EARTH RESISTANCE HAS BEEN
CARRIED OUT AND THE EARTH RESISTANCE ARE
TABULATED

PAGE 5 OF 15 BAY/ FEEDER


POWER GRID CORPORATION OF INDIA LIMITED DOC NO. : MR/CF/BAY/03/R-2 DATED : 01/08/07
CORPORATE OPERATION SERVICES SUB STATION :
BAY NO :
PRE-COMMISSIONING OF BAY / FEEDER FEEDER / BAY IDENTIFICATION NO :
COMMISSIONING FORMATS DATE OF TESTING :

SL. LOCATION DISTANCE BETWEEN RESISTANCE


NO DESCRIPTION ELECTRODE
LOCATION - 1
LOCATION - 2
LOCATION - 3
LOCATION - 4
LOCATION - 5
LOCATION - 6

XIII CONTACT RESISTANCE MEASUREMENT

THE CONTACT RESISTANCE MEASUREMENT HAS TO BE CARRIED OUT IN TOTALITY


MAXIMUM LIMIT PER CONNECTION 5 MICRO-OHMS
TYPICAL CIRCUIT DIAGRAM DRAW CIRCUIT DIAGRAM
(FOR THE CIRCUIT TO BE ENERGIZED )

R - PHASE
A SL. RESISTANCECURRENT VALUE NOS OF RESISTANCE
NO BETWEEN (MIN 200A) JOINTS PER JOINTS
1 A-B MICRO-OHMS
2 B-C MICRO-OHMS
3 B-D MICRO-OHMS
4 B-G MICRO-OHMS
5 G-E MICRO-OHMS
6 G-F MICRO-OHMS
7 G-H MICRO-OHMS
Y - PHASE
B SL. RESISTANCECURRENT VALUE NOS OF RESISTANCE
NO BETWEEN (MIN 200A) JOINTS PER JOINTS
1 A-B MICRO-OHMS
2 B-C MICRO-OHMS
3 B-D MICRO-OHMS
4 B-G MICRO-OHMS
5 G-E MICRO-OHMS
6 G-F MICRO-OHMS
7 G-H MICRO-OHMS

PAGE 6 OF 15 BAY/ FEEDER


POWER GRID CORPORATION OF INDIA LIMITED DOC NO. : MR/CF/BAY/03/R-2 DATED : 01/08/07
CORPORATE OPERATION SERVICES SUB STATION :
BAY NO :
PRE-COMMISSIONING OF BAY / FEEDER FEEDER / BAY IDENTIFICATION NO :
COMMISSIONING FORMATS DATE OF TESTING :

B - PHASE
C SL. RESISTANCECURRENT VALUE NOS OF RESISTANCE
NO BETWEEN (MIN 200A) JOINTS PER JOINTS
1 A-B MICRO-OHMS
2 B-C MICRO-OHMS
3 B-D MICRO-OHMS
4 B-G MICRO-OHMS
5 G-E MICRO-OHMS
6 G-F MICRO-OHMS
7 G-H MICRO-OHMS

XIV A MEASUREMENT OF SOIL RESISTIVITY DONE EARLIER PRIOR TO COMMISSIONING


MAY BE TABULATED

DATE : DISTANCE BETWEEN SOIL REMARK


ELECTRODE RESISTIVITY

B CHECK THE MINIMUN CLEARANCE BETWEEN LIVE PARTS W.R.T GROUNG AND BETWEEN LIVE PARTS .
VOLTAGE PHASE TO PHASE TO REMARK , IF ANY
GROUND PHASE
132 kV 1270 mm 1473 mm
220 kV 2082 mm 2368 mm
400 kV 3065 mm 5750 mm

NOTE : ALL THE CLEARANCE BETWEEN PHASES & PHASE TO GROUND ARE
CHECKED AS PER THE
DRGS. ISSUES BY ENGG. DEPT.

XV CHECKING OF INTERLOCKS :
PLEASE REFER THE RELEVENT PLANT CIRCUIT DIADRAM FOR CHECKING
THE INTERLOCKS OF VARIOUS EQUIPMENTS TO BE ENERGIZED.
ALL ISOLATORS AND GROUND SWITCHES
INTERLOCKINGS ARE CHECKED AS PER THE
DOCUMENT NO CF/ISO/08 YES NO PLEASE GIVE REASONS
IF NO
IF NOT REPEAT THE TESTING ON INTERLOCKS YES NO

XVI TRIP TEST


ALL BREAKERS ARE TESTED AND ALL THE TRIPTEST
AS PER THE REQUIRED PLANT CIRCUIT DIAGRAMS
ARE CARRIED OUT AS PER THE DOCUMENT
NO CF/CB/05 YES NO

PAGE 7 OF 15 BAY/ FEEDER


POWER GRID CORPORATION OF INDIA LIMITED DOC NO. : MR/CF/BAY/03/R-2 DATED : 01/08/07
CORPORATE OPERATION SERVICES SUB STATION :
BAY NO :
PRE-COMMISSIONING OF BAY / FEEDER FEEDER / BAY IDENTIFICATION NO :
COMMISSIONING FORMATS DATE OF TESTING :

XVII PRIMARY INJECTION TEST

PAGE 8 OF 15 BAY/ FEEDER


POWER GRID CORPORATION OF INDIA LIMITED DOC NO. : MR/CF/BAY/03/R-2 DATED : 01/08/07
CORPORATE OPERATION SERVICES SUB STATION :
BAY NO :
PRE-COMMISSIONING OF BAY / FEEDER FEEDER / BAY IDENTIFICATION NO :
COMMISSIONING FORMATS DATE OF TESTING :

CORE - 1
Connection for Measured MEASURED SECONDARY CURRENTS(MA)
Primary Primary Phases
injection currents(A) I1 I2 I3 I4 I5
R-Ph
Y-PH
R-N B-Ph
Neutral
Earth
R-Ph
Y-PH
Y-N B-Ph
Neutral
Earth
R-Ph
Y-PH
B-N B-Ph
Neutral
Earth
R-Ph
Y-PH
R-Y B-Ph
Neutral
Earth
R-Ph
Y-PH
Y-B B-Ph
Neutral
Earth

Note 1. When current is injected in R-N , please check that no current is present in Y,B and earth leads
2. Similarly for all other injections ensure non-avilability of current in non - injected phases .

PAGE 9 OF 15 BAY/ FEEDER


POWER GRID CORPORATION OF INDIA LIMITED DOC NO. : MR/CF/BAY/03/R-2 DATED : 01/08/07
CORPORATE OPERATION SERVICES SUB STATION :
BAY NO :
PRE-COMMISSIONING OF BAY / FEEDER FEEDER / BAY IDENTIFICATION NO :
COMMISSIONING FORMATS DATE OF TESTING :

CORE - 2
Connection for Measured MEASURED SECONDARY CURRENTS(MA)
Primary Primary Phases
injection currents(A) I1 I2 I3 I4 I5
R-Ph
Y-PH
R-N B-Ph
Neutral
Earth
R-Ph
Y-PH
Y-N B-Ph
Neutral
Earth
R-Ph
Y-PH
B-N B-Ph
Neutral
Earth
R-Ph
Y-PH
R-Y B-Ph
Neutral
Earth
R-Ph
Y-PH
Y-B B-Ph
Neutral
Earth

Note 1. When current is injected in R-N , please check that no current is present in Y,B and earth leads
2. Similarly for all other injections ensure non-avilability of current in non - injected phases .

PAGE 10 OF 15 BAY/ FEEDER


POWER GRID CORPORATION OF INDIA LIMITED DOC NO. : MR/CF/BAY/03/R-2 DATED : 01/08/07
CORPORATE OPERATION SERVICES SUB STATION :
BAY NO :
PRE-COMMISSIONING OF BAY / FEEDER FEEDER / BAY IDENTIFICATION NO :
COMMISSIONING FORMATS DATE OF TESTING :

CORE - 3
PRIMARY Measured MEASURED SECONDARY CURRENTS(MA)
INJECTION Primary
CONFIGUR. currents(A) I1 | I2 | I3 | I4 | I5 | I6 | I7 | I8 | I9 | I10 | I11
| R-Ph | | | | | | | | | |
| Y-Ph | | | | | | | | | |
R-N | B-Ph | | | | | | | | | |
|Neutral | | | | | | | | | |
| Earth | | | | | | | | | |
| R-Ph | | | | | | | | | |
| Y-Ph | | | | | | | | | |
Y-N | B-Ph | | | | | | | | | |
|Neutral | | | | | | | | | |
| Earth | | | | | | | | | |
| R-Ph | | | | | | | | | |
| Y-Ph | | | | | | | | | |
B-N | B-Ph | | | | | | | | | |
|Neutral | | | | | | | | | |
| Earth | | | | | | | | | |
| R-Ph | | | | | | | | | |
| Y-Ph | | | | | | | | | |
R-Y | B-Ph | | | | | | | | | |
|Neutral | | | | | | | | | |
| Earth | | | | | | | | | |
| R-Ph | | | | | | | | | |
| Y-Ph | | | | | | | | | |
Y-B | B-Ph | | | | | | | | | |
|Neutral | | | | | | | | | |
| Earth | | | | | | | | | |

Note 1. When current is injected in R-N , please check that no current is present in Y,B and earth leads
2. Similarly for all other injections ensure non-avilability of current in non - injected phases .

PAGE 11 OF 15 BAY/ FEEDER


POWER GRID CORPORATION OF INDIA LIMITED DOC NO. : MR/CF/BAY/03/R-2 DATED : 01/08/07
CORPORATE OPERATION SERVICES SUB STATION :
BAY NO :
PRE-COMMISSIONING OF BAY / FEEDER FEEDER / BAY IDENTIFICATION NO :
COMMISSIONING FORMATS DATE OF TESTING :

CORE - 4
PRIMARY Measured MEASURED SECONDARY CURRENTS(MA)
INJECTION Primary
CONFIGUR. currents(A) I1 | I2 | I3 I4 | I5 | I6 I7 I8 I9
| R-Ph | | | |
| Y-Ph | | | |
R-N | B-Ph | | | |
|Neutral | | | |
| Earth | | | |
| R-Ph | | | |
| Y-Ph | | | |
Y-N | B-Ph | | | |
|Neutral | | | |
| Earth | | | |
| R-Ph | | | |
| Y-Ph | | | |
B-N | B-Ph | | | |
|Neutral | | | |
| Earth | | | |
| R-Ph | | | |
| Y-Ph | | | |
R-Y | B-Ph | | | |
|Neutral | | | |
| Earth | | | |
| R-Ph | | | |
| Y-Ph | | | |
Y-B | B-Ph | | | |
|Neutral | | | |
| Earth | | | |

Note 1. When current is injected in R-N , please check that no current is present in Y,B and earth leads
2. Similarly for all other injections ensure non-avilability of current in non - injected phases .

PAGE 12 OF 15 BAY/ FEEDER


POWER GRID CORPORATION OF INDIA LIMITED DOC NO. : MR/CF/BAY/03/R-2 DATED : 01/08/07
CORPORATE OPERATION SERVICES SUB STATION :
BAY NO :
PRE-COMMISSIONING OF BAY / FEEDER FEEDER / BAY IDENTIFICATION NO :
COMMISSIONING FORMATS DATE OF TESTING :

CORE - 5
PRIMARY Measured MEASURED SECONDARY CURRENTS(MA)
INJECTION Primary
CONFIGUR. currents(A) I1 | I2 | I3 I4 | I5 | I6 I7 I8 I9
| R-Ph | | | |
| Y-Ph | | | |
R-N | B-Ph | | | |
|Neutral | | | |
| Earth | | | |
| R-Ph | | | |
| Y-Ph | | | |
Y-N | B-Ph | | | |
|Neutral | | | |
| Earth | | | |
| R-Ph | | | |
| Y-Ph | | | |
B-N | B-Ph | | | |
|Neutral | | | |
| Earth | | | |
| R-Ph | | | |
| Y-Ph | | | |
R-Y | B-Ph | | | |
|Neutral | | | |
| Earth | | | |
| R-Ph | | | |
| Y-Ph | | | |
Y-B | B-Ph | | | |
|Neutral | | | |
| Earth | | | |

Note 1. When current is injected in R-N , please check that no current is present in Y,B and earth leads
2. Similarly for all other injections ensure non-avilability of current in non - injected phases .

PAGE 13 OF 15 BAY/ FEEDER


POWER GRID CORPORATION OF INDIA LIMITED DOC NO. : MR/CF/BAY/03/R-2 DATED : 01/08/07
CORPORATE OPERATION SERVICES SUB STATION :
BAY NO :
PRE-COMMISSIONING OF BAY / FEEDER FEEDER / BAY IDENTIFICATION NO :
COMMISSIONING FORMATS DATE OF TESTING :

XVIII FINAL TRIP TEST


THE TRIP TEST MUST BE REPEATED PRIOR TO ENERGIZATION
AS PER APPROVED SCHEME.

A DC SOURSE 1 OFF

SL. PROTECTION SIMULATION METHOD CB TRIP RESPONCE REMARK


NO TYPE MAIN TIE
I MAIN - I
II MAIN - II
III OVER VOLTAGE
IV CARRIER INTER
TRIPPING
V LBB
VI BUS BAR
VII TEE DIFFERENTIAL
VIII DIFFERENTIAL
IX RESTRICTED EARTH
FAULT
X BACK UP O/C & E/F
XI OVERFLUXING
XII OTI TRIP
XIII WTI TRIP
XIV BUCHHOLZ TRIP (MAIN )
XV BUCHHOLZ TRIP (OLTC)
XVI PRD
XVII AUTO-RECLOSE - R Ø
XVIII AUTO-RECLOSE - Y Ø
XIX AUTO-RECLOSE - B Ø

B DC SOURSE 2 OFF

SL. PROTECTION SIMULATION METHOD CB TRIP RESPONCE REMARK


NO TYPE MAIN TIE
I MAIN - I
II MAIN - II
III OVER VOLTAGE
IV CARRIER INTER
TRIPPING
V LBB
VI BUS BAR
VII TEE DIFFERENTIAL
VIII DIFFERENTIAL
IX RESTRICTED EARTH
FAULT
X BACK UP O/C & E/F

PAGE 14 OF 15 BAY/ FEEDER


POWER GRID CORPORATION OF INDIA LIMITED DOC NO. : MR/CF/BAY/03/R-2 DATED : 01/08/07
CORPORATE OPERATION SERVICES SUB STATION :
BAY NO :
PRE-COMMISSIONING OF BAY / FEEDER FEEDER / BAY IDENTIFICATION NO :
COMMISSIONING FORMATS DATE OF TESTING :

SL. PROTECTION SIMULATION METHOD CB TRIP RESPONCE REMARK


NO TYPE MAIN TIE
XI OVERFLUXING
XII OTI TRIP
XIII WTI TRIP
XIV BUCHHOLZ TRIP (MAIN )
XV BUCHHOLZ TRIP (OLTC)
XVI PRD
XVII AUTO-RECLOSE - R Ø
XVIII AUTO-RECLOSE - Y Ø
XIX AUTO-RECLOSE - B Ø

OPERATIONAL CONSTRAINTS IF ANY


1
2
3
4
5

XIX FINAL DOCUMENTATION REVIEW :

A FINAL DOCUMENT OF PRE-COMMISSIONING CHECKS


REVIEWED AND APPROVED YES NO

B DOCUMENTS REGARDING SPARES,EQUIPMENT, O & M


MANNUALS ETC AVAILABLE AT SITE FOR O & M YES NO
PURPOSE

C AFTER MODIFICATION, IF ANY, "AS BUILT DRAWINGS"


ARE AVAILABLE AT SITE YES NO

D THE ABOVE BAY / FEEDER IS CLEARED FOR HIGH


VOLTAGE ENERGIZATION YES NO

SIGNATURE : SIGNATURE : SIGNATURE : SIGNATURE :


NAME : NAME : NAME : NAME :
DESIGNATION : DESIGNATION : DESIGNATION : DESIGNATION :
ORGANISATION : ORGANISATION :
( SUPPLIER REPRESENTATIVE ) ( ERECTION AGENCY ) (POWERGRID SITE I/C) ( POWERGRID COMM TEAM )

PAGE 15 OF 15 BAY/ FEEDER