Professional Documents
Culture Documents
Highlights of Discussion/Instructions:
A. GUIDELINES
Agreements:
1. There must be a plan which will be approved by the Director of the DPWH.
2. The word National will be removed. It’ll be National Right of Way.
3. The signatory of ARD for Technical will be transferred to RD.
4. Parcellary map not for approval, for reference only.
5. Manual of authorities will not be included in the prefatory statement.
6. GSD to look for other reference for this policy.
7. ROW will be added as a suffix in the end of the survey number. (“PSD-XX-yyyyyy-
ROW”)
8. In Section 4(a):
a. The word “shall be approved by authorized representative of the agency” will be
retained. In case of DPWH, it shall be the Regional Director.
b. Add the “properly indicated the phase ROW” in Section 4(a).
9. In Section 4(b):
a. Add the phrase “which shall be valid for 6 months”. Remove the Survey
Authority sentence on the last part.
b. Add the words “lot number, area”.
10. Rephrase Section 4 and its subtitle
11. In section 5, add survey symbol “PSD-XX-yyyyyy-(ROW)”
Agreements:
C. Agreement: Clarification on the subject of the policy. Delete GE Index Cards. Change to
GE Profile. Digitized the GE Profile. Obsolete the index cards.