Contract Nos.: RDAISEEP/CONT-S4


Project Names:Construction of Extension of
Southern Expressway, Section 4 - Mattala to Contracor's Design Submission(CDS)
Hambantota via Andarawewa
FSDI
Part A: To be Prepared by Contractor
To: Engineer's Representative Mr.Dong Wei

Title of Submission : Submission of Working Drawing for Underpass at CH71 +500(Rev .1)

Submission Ref. No. : CHEC/CDS/00729/A


Outgoing Log No. : CHEC/RDAISEEP/CONT/S4/01 .23/0/002463
Description Of Contents:
This bears reference to your review comments on Contractor's submission (Ref. No. :
CHEC/RDA/SEEP/CONT/S4/01 .23/0/002327) dated 22nd Mar. 2017.

We incorporate your comments and resubmit the Working Drawing for Underpass at CH71 +500(Rev.1) for your review and
approval.

Your highly response will be highly appreciated .

Appendix 1: Working Drawing for Underpass at CH71 +500(Rev.1)


.

REQUIRED INFORMATION DETAILS PROVIDED


Works Discipline Submission of Working Drawing for Underpass at CH71 +500(Rev.1)
Sub-contractor N/A
Design Manager Shi Fulu
Nature of Works (Permanent I Temporary) Permanent
Applicable Standard As specified in Specifications I
Design Drawings Provided (Yes I No) Yes I

Design Calculations Provided (Yes I No) No


Purpose of Submission: For Approval
From : Contractor's Representative

~ ~\
Name : Yang Senyan
D•teo 24tt.~
Signature : ...~~ N/A I Shi Fulu I Sheng Hong Zhuan
Sub-contractor ] Originator J Checked By
Distribution/ Rem<!lrks :
I

Part B: To be completed by Engineer


A - Review & in line with 8 - Reviewed with comments C - Fails to comply R- Returned &
with the Contract incorporate comments & and resubmit Not reviewed
proceed

Comments (Enter below for each item separately or insert N/A)

Title IName: Signature Date ~--


ROAD DEVELOPMENT AUTHORITY
MINISTRY OF PORTS AND HIGHWAYS
DEMOCRATIC SOCIALIST REPUBLIC OF SRI LANKA

CONTRACT NO.: RDA/SEEP/CONT-S4

EXTENSION OFSOUTHERN EXPRESSWAY SECTION – 4(ESEP-S4) FROMMATTALA TO


HAMBANTOTA VIA ANDARAWEWA

WORKING DRAWINGS FOR UNDERPASS AT CH 71+500


(REV.1)

CHINA HARBOUR ENGINEERING COMPANY LTD.


24 MAR 2017
General Notes 4 Porous Backfilling
Backfilling shall be carried out with material as instructed by
1 Dimensions
the Engineer, placed in uniform layers not exceeding 0.15m in
The inner width of underpass is 1 cell-5.0mx3.5m; The length is un-compacted depth and thoroughly compacted. Each layer of
33.26m. backfill material, if dry, shall be wetted uniformly to moisture
content as instructed by the Engineer to obtain a density
2 Materials
comparable with the density of the adjacent undisturbed
2.1 Concrete material.
Main body of the underpass: Concrete Class 30 5 Foundation treatment
Headwalls, wingwalls, etc: Concrete Class 30
The allowable bearing capacity of the soil beneath must be no
Leveling concrete Concrete Class 15
less than 250 kPa,soil replacement must be adopted ,the
2.2 Reinforcing Steel Bars baselayer treatment refer to the drawing NO.SEEP/S4/04/05/80.
Reinforcing bar shall be of Grade 500B with yield strength (fy)
of 500MPa.
6 Placing of Embankment
3 Excavation
Only when the backfill completed in accordance with the
The width of the excavation shall be equal to the total width of requirements placing of embankment will be continued.
the underpass. But it is necessary to consider working space
required for the temporary works including fixing form work for
outs side walls of underpass in the Construction Drawings.

When the preparation works for bedding are completed, the


contractor shall confirm that the bottom shall be firm over its
full length and width, to the satisfaction of the Engineer.

After the compaction, provide adequate support for the


underpass.

Excavations for foundations shall be adequately supported at all


times with Temporary works, shoring, sheeting and bracings.

The sheeting and other excavation supports shall be removed as


filling proceeds.

The prepared surface shall provide a firm foundation of uniform


density throughout the length of the underpass.

Excavated materials shall not be deposited in the drainage


channel but if suitable shall be utilized as backfill or
embankment.
Employer CONSULTANT Scale 5 Project Title EXTENSION OF SOUTHERN EXPRESSWAY SECTION - 4 (ESEP-S4)
DEMOCRATIC SOCIALIST REPUBLIC OF SRI LANKA Designed FROM MATTALA TO HAMBANTOTA VIA ANDARAWEWA
4
MINISTRY OF HIGHER EDUCATION & HIGHWAYS
Drawn 3 Drawing Title
FSDI
Checked 2 PLAN & LONGITUDINAL SECTION FOR UNDERPASS AT CH 71+500
ROAD DEVELOPMENT AUTHORITY 中 铁 第 一 勘 察 设 计 院 集 团 有 限 公 司 中国港湾工程有限责任公司
PROJECT DIRECTOR - EXTENSION OF SOUTHERN EXPRESSWAY Approved Drawing No. Sheet No. REV
1
No 74 Kaduwela Road, Battaramula. SEEP/S4/04/05/39 1/9 1
Tel : 0112871601 Fax : 0112889361 Email : adb34@slt.lk Date 2017-03-24 REV DESCRIPTION
Employer CONSULTANT Scale 5 Project Title EXTENSION OF SOUTHERN EXPRESSWAY SECTION - 4 (ESEP-S4)
DEMOCRATIC SOCIALIST REPUBLIC OF SRI LANKA Designed FROM MATTALA TO HAMBANTOTA VIA ANDARAWEWA
4
MINISTRY OF HIGHER EDUCATION & HIGHWAYS
Drawn 3 Drawing Title
FSDI CROSS SECTION FOR UNDERPASS AT CH 71+500
Checked 2
ROAD DEVELOPMENT AUTHORITY 中 铁 第 一 勘 察 设 计 院 集 团 有 限 公 司 中国港湾工程有限责任公司
PROJECT DIRECTOR - EXTENSION OF SOUTHERN EXPRESSWAY Approved Drawing No. Sheet No. REV
1
No 74 Kaduwela Road, Battaramula.
Date
SEEP/S4/04/05/39 2/9 1
Tel : 0112871601 Fax : 0112889361 Email : adb34@slt.lk 2017-03-24 REV DESCRIPTION
Employer CONSULTANT Scale 5 Project Title EXTENSION OF SOUTHERN EXPRESSWAY SECTION - 4 (ESEP-S4)
DEMOCRATIC SOCIALIST REPUBLIC OF SRI LANKA Designed FROM MATTALA TO HAMBANTOTA VIA ANDARAWEWA
4
MINISTRY OF HIGHER EDUCATION & HIGHWAYS
Drawn 3 Drawing Title
FSDI SIDE DITCH FOR UNDERPASS AT CH 71+500
Checked 2
ROAD DEVELOPMENT AUTHORITY 中 铁 第 一 勘 察 设 计 院 集 团 有 限 公 司 中国港湾工程有限责任公司
PROJECT DIRECTOR - EXTENSION OF SOUTHERN EXPRESSWAY Approved Drawing No. Sheet No. REV
1
No 74 Kaduwela Road, Battaramula.
Date
SEEP/S4/04/05/39 3/9 1
Tel : 0112871601 Fax : 0112889361 Email : adb34@slt.lk 2017-03-24 REV DESCRIPTION
Employer CONSULTANT Scale 5 Project Title EXTENSION OF SOUTHERN EXPRESSWAY SECTION - 4 (ESEP-S4)
DEMOCRATIC SOCIALIST REPUBLIC OF SRI LANKA Designed FROM MATTALA TO HAMBANTOTA VIA ANDARAWEWA
4
MINISTRY OF HIGHER EDUCATION & HIGHWAYS
Drawn 3 Drawing Title
FSDI REINFORCEMENT FOR UNDERPASS AT CH 71+500
Checked 2
ROAD DEVELOPMENT AUTHORITY 中 铁 第 一 勘 察 设 计 院 集 团 有 限 公 司 中国港湾工程有限责任公司
PROJECT DIRECTOR - EXTENSION OF SOUTHERN EXPRESSWAY Approved Drawing No. Sheet No. REV
1
No 74 Kaduwela Road, Battaramula. SEEP/S4/04/05/39 4/9 1
Tel : 0112871601 Fax : 0112889361 Email : adb34@slt.lk Date 2017-03-24 REV DESCRIPTION
Employer CONSULTANT Scale 5 Project Title EXTENSION OF SOUTHERN EXPRESSWAY SECTION - 4 (ESEP-S4)
DEMOCRATIC SOCIALIST REPUBLIC OF SRI LANKA Designed FROM MATTALA TO HAMBANTOTA VIA ANDARAWEWA
4
MINISTRY OF HIGHER EDUCATION & HIGHWAYS
Drawn 3 Drawing Title
FSDI REINFORCEMENT FOR UNDERPASS AT CH 71+500
Checked 2
ROAD DEVELOPMENT AUTHORITY 中 铁 第 一 勘 察 设 计 院 集 团 有 限 公 司 中国港湾工程有限责任公司
PROJECT DIRECTOR - EXTENSION OF SOUTHERN EXPRESSWAY Approved Drawing No. Sheet No. REV
1
No 74 Kaduwela Road, Battaramula.
Date
SEEP/S4/04/05/39 5/9 1
Tel : 0112871601 Fax : 0112889361 Email : adb34@slt.lk 2017-03-24 REV DESCRIPTION
Employer CONSULTANT Scale 5 Project Title EXTENSION OF SOUTHERN EXPRESSWAY SECTION - 4 (ESEP-S4)
DEMOCRATIC SOCIALIST REPUBLIC OF SRI LANKA Designed FROM MATTALA TO HAMBANTOTA VIA ANDARAWEWA
4
MINISTRY OF HIGHER EDUCATION & HIGHWAYS
Drawn 3 Drawing Title
FSDI REINFORCEMENT FOR UNDERPASS AT CH 71+500
Checked 2
ROAD DEVELOPMENT AUTHORITY 中 铁 第 一 勘 察 设 计 院 集 团 有 限 公 司 中国港湾工程有限责任公司
PROJECT DIRECTOR - EXTENSION OF SOUTHERN EXPRESSWAY Approved Drawing No. Sheet No. REV
1
No 74 Kaduwela Road, Battaramula.
Date
SEEP/S4/04/05/39 6/9 1
Tel : 0112871601 Fax : 0112889361 Email : adb34@slt.lk 2017-03-24 REV DESCRIPTION
Employer CONSULTANT Scale 5 Project Title EXTENSION OF SOUTHERN EXPRESSWAY SECTION - 4 (ESEP-S4)
DEMOCRATIC SOCIALIST REPUBLIC OF SRI LANKA Designed FROM MATTALA TO HAMBANTOTA VIA ANDARAWEWA
4
MINISTRY OF HIGHER EDUCATION & HIGHWAYS
Drawn 3 Drawing Title
FSDI REINFORCEMENT FOR WINGWALL AT CH 71+500
Checked 2
ROAD DEVELOPMENT AUTHORITY 中 铁 第 一 勘 察 设 计 院 集 团 有 限 公 司 中国港湾工程有限责任公司
PROJECT DIRECTOR - EXTENSION OF SOUTHERN EXPRESSWAY Approved Drawing No. Sheet No. REV
1
No 74 Kaduwela Road, Battaramula.
Date
SEEP/S4/04/05/39 7/9 1
Tel : 0112871601 Fax : 0112889361 Email : adb34@slt.lk 2017-03-24 REV DESCRIPTION
Employer CONSULTANT Scale 5 Project Title EXTENSION OF SOUTHERN EXPRESSWAY SECTION - 4 (ESEP-S4)
DEMOCRATIC SOCIALIST REPUBLIC OF SRI LANKA Designed FROM MATTALA TO HAMBANTOTA VIA ANDARAWEWA
4
MINISTRY OF HIGHER EDUCATION & HIGHWAYS
Drawn 3 Drawing Title
FSDI REINFORCEMENT FOR WINGWALL AT CH 71+500
Checked 2
ROAD DEVELOPMENT AUTHORITY 中 铁 第 一 勘 察 设 计 院 集 团 有 限 公 司 中国港湾工程有限责任公司
PROJECT DIRECTOR - EXTENSION OF SOUTHERN EXPRESSWAY Approved Drawing No. Sheet No. REV
1
No 74 Kaduwela Road, Battaramula.
Date
SEEP/S4/04/05/39 8/9 1
Tel : 0112871601 Fax : 0112889361 Email : adb34@slt.lk 2017-03-24 REV DESCRIPTION
Employer CONSULTANT Scale 5 Project Title EXTENSION OF SOUTHERN EXPRESSWAY SECTION - 4 (ESEP-S4)
DEMOCRATIC SOCIALIST REPUBLIC OF SRI LANKA Designed FROM MATTALA TO HAMBANTOTA VIA ANDARAWEWA
4
MINISTRY OF HIGHER EDUCATION & HIGHWAYS
Drawn 3 Drawing Title
FSDI REINFORCEMENT FOR INLET&OUTLET AT CH 71+500
Checked 2
ROAD DEVELOPMENT AUTHORITY 中 铁 第 一 勘 察 设 计 院 集 团 有 限 公 司 中国港湾工程有限责任公司
PROJECT DIRECTOR - EXTENSION OF SOUTHERN EXPRESSWAY Approved Drawing No. Sheet No. REV
1
No 74 Kaduwela Road, Battaramula.
Date
SEEP/S4/04/05/39 9/9 1
Tel : 0112871601 Fax : 0112889361 Email : adb34@slt.lk 2017-03-24 REV DESCRIPTION