Professional Documents
Culture Documents
Government of I n d i a
Dated: J u l y 1 9 t h , 2 0 1 8
To
2. The Principal Secretaries/ Secretaries of all States/ UTs Public Works Department
4. The Director General {Border Roads), Seema Sadak Bhawan, Ring Road, New Delhi-
110010.
New D e l h i - 1 1 0 075.
Properties a l o n g N a t i o n a l Highways - a m e n d m e n t s .
The Ministry has issued Guidelines/ Norms for granting access permissions to the
fuel stations and other properties along National Highways vide Circular No. RW / N H -
revision. As per existing Guidelines, the Oil Companies/ property owners have to engage
2. Pending issue of the revised guidelines on the subject, it has been decided that
the layout plans/drawing etc. may be prepared by the Oil companies/ Property Owners
at their own or by engaging any architect/ consultant of their choice. As such, para 4 of
The applicant shall submit a self- The Oil Companies I Applicants I Property Owner
certified proposal for seeking access shall submit a self-certified proposal for seeking
for all the documents submitted with drawings/ layouts of the proposed locations/
the application. The oil Companies nearby details and other features of Fuel Station/
Ministry, in preparation of drawings/ conformity with the Norms. The Oil companies/
layouts of the proposed locations and Applicants/ Property owners may also engage any
Page 1 of 2
No R W - N H - 3 3 0 3 2 / 0 1 / 2 0 1 7
Government of India
Complexes and such other facilities so company/ owner. The authorized representative
that these are in conformity with the of the oil company/ applicant/ owner of the
Norms. The Architects/ Consultants property shall be fully responsible for correctness
will also ensure video recordings of the documents submitted with the proposal
(before ft after completion of the and execution of the work as per the approved
construction work) and that the work drawing, including its video recording (before ft
drawings, failing which action will be case the execution of the access is not carried
initiated to blacklist such Architects/ out as per the norm, the fuel station may be de-
3. The contents of this Circular may be brought to the notice of all concerned for
necessary compliance.
Yours faithfully,
(ji..�i-\ i
(Raj Kumar)
Copy to:
2. PPS to DG (RD) a SS
PPS to AS&FA
4. PS to ADG-1
PS to JS (T)/ JS ( H ) / JS ( LA & ( ) / JS ( E i C )
Page 2 of 2