TABLE: Column Forces


Story Column Load Case/Combo P M2 M3
Story5 C11 1.4D+1.7L Max -9.2363 0.2605 0.3118
Story5 C11 1.4D+1.7L Max -8.3835 1.0424 -0.2723
Story4 C11 1.4D+1.7L Max -22.0571 0.7719 0.2557
Story4 C11 1.4D+1.7L Max -21.2043 0.5904 -0.1851
Story3 C11 1.4D+1.7L Max -35.369 0.3979 0.2491
Story3 C11 1.4D+1.7L Max -34.5163 0.7775 -0.1953
Story2 C11 1.4D+1.7L Max -49.1514 0.4549 0.2038
Story2 C11 1.4D+1.7L Max -48.2987 0.6892 -0.1734
Story1 C11 1.4D+1.7L Max -63.773 0.7733 0.0668
Story1 C11 1.4D+1.7L Max -62.8477 0.7519 0.0989
UNIVERSIDAD SEÑOR DE SIPÁN CONCRETO ARMADO I
INGENIERIA CIVIL
UNIVERSIDAD SEÑOR DE SIPÁN CONCRETO ARMADO I
INGENIERIA CIVIL

TABLE: Column Forces


Story Column Load Case/Combo P M2 M3
Story5 C11 1.25(D+L)+SX Max -4.3881 1.5927 7.9276
Story5 C11 1.25(D+L)+SX Max -3.6267 2.5328 8.1324
Story5 C11 1.25(D+L)+SY Max -7.7855 3.7829 1.0747
Story5 C11 1.25(D+L)+SY Max -7.0241 5.14 0.6606
Story4 C11 1.25(D+L)+SX Max -10.929 1.8426 7.3471
Story4 C11 1.25(D+L)+SX Max -10.1676 1.6531 6.9965
Story4 C11 1.25(D+L)+SY Max -18.4694 4.0118 0.9665
Story4 C11 1.25(D+L)+SY Max -17.708 3.7911 0.6014
Story3 C11 1.25(D+L)+SX Max -18.7947 1.5524 7.048
Story3 C11 1.25(D+L)+SX Max -18.0333 1.8107 6.717
Story3 C11 1.25(D+L)+SY Max -29.6703 3.9128 0.9274
Story3 C11 1.25(D+L)+SY Max -28.9089 3.9576 0.56
Story2 C11 1.25(D+L)+SX Max -28.2147 1.4245 5.8039
Story2 C11 1.25(D+L)+SX Max -27.4533 1.4578 5.3592
Story2 C11 1.25(D+L)+SY Max -41.4009 3.706 0.7598
Story2 C11 1.25(D+L)+SY Max -40.6395 3.1277 0.43
Story1 C11 1.25(D+L)+SX Max -40.0279 1.1935 2.8094
Story1 C11 1.25(D+L)+SX Max -39.2017 0.9498 2.3973
Story1 C11 1.25(D+L)+SY Max -54.0284 2.857 0.3407
Story1 C11 1.25(D+L)+SY Max -53.2022 1.5191 0.1724
UNIVERSIDAD SEÑOR DE SIPÁN CONCRETO ARMADO I
INGENIERIA CIVIL

TABLE: Column Forces


Story Column Load Case/Combo P M2 M3
Story5 C11 1.25(D+L)-SX Max -4.3881 1.5927 7.9276
Story5 C11 1.25(D+L)-SX Max -3.6267 2.5328 8.1324
Story5 C11 1.25(D+L)-SY Max -7.7855 3.7829 1.0747
Story5 C11 1.25(D+L)-SY Max -7.0241 5.14 0.6606
Story4 C11 1.25(D+L)-SX Max -10.929 1.8426 7.3471
Story4 C11 1.25(D+L)-SX Max -10.1676 1.6531 6.9965
Story4 C11 1.25(D+L)-SY Max -18.4694 4.0118 0.9665
Story4 C11 1.25(D+L)-SY Max -17.708 3.7911 0.6014
Story3 C11 1.25(D+L)-SX Max -18.7947 1.5524 7.048
Story3 C11 1.25(D+L)-SX Max -18.0333 1.8107 6.717
Story3 C11 1.25(D+L)-SY Max -29.6703 3.9128 0.9274
Story3 C11 1.25(D+L)-SY Max -28.9089 3.9576 0.56
Story2 C11 1.25(D+L)-SX Max -28.2147 1.4245 5.8039
Story2 C11 1.25(D+L)-SX Max -27.4533 1.4578 5.3592
Story2 C11 1.25(D+L)-SY Max -41.4009 3.706 0.7598
Story2 C11 1.25(D+L)-SY Max -40.6395 3.1277 0.43
Story1 C11 1.25(D+L)-SX Max -40.0279 1.1935 2.8094
Story1 C11 1.25(D+L)-SX Max -39.2017 0.9498 2.3973
Story1 C11 1.25(D+L)-SY Max -54.0284 2.857 0.3407
Story1 C11 1.25(D+L)-SY Max -53.2022 1.5191 0.1724
UNIVERSIDAD SEÑOR DE SIPÁN CONCRETO ARMADO I
INGENIERIA CIVIL

TABLE: Column Forces


Story Column Load Case/Combo P M2 M3
Story5 C11 0.9D+SX Max -1.8558 1.3103 7.7817
Story5 C11 0.9D+SX Max -1.3076 2.0079 8.2368
Story5 C11 0.9D+SY Max -5.2532 3.5005 0.9288
Story5 C11 0.9D+SY Max -4.705 4.6151 0.765
Story4 C11 0.9D+SX Max -4.3028 1.3463 7.2267
Story4 C11 0.9D+SX Max -3.7546 1.1256 7.0697
Story4 C11 0.9D+SY Max -11.8432 3.5155 0.8461
Story4 C11 0.9D+SY Max -11.295 3.2636 0.6746
Story3 C11 0.9D+SX Max -7.9144 1.3162 6.9331
Story3 C11 0.9D+SX Max -7.3662 1.1956 6.7913
Story3 C11 0.9D+SY Max -18.79 3.6766 0.8124
Story3 C11 0.9D+SY Max -18.2417 3.3425 0.6344
Story2 C11 0.9D+SX Max -12.9471 1.2217 5.711
Story2 C11 0.9D+SX Max -12.3989 0.852 5.4245
Story2 C11 0.9D+SY Max -26.1334 3.5033 0.6669
Story2 C11 0.9D+SY Max -25.5852 2.5218 0.4953
Story1 C11 0.9D+SX Max -20.0932 0.6924 2.7786
Story1 C11 0.9D+SX Max -19.4984 0.275 2.4311
Story1 C11 0.9D+SY Max -34.0937 2.3559 0.3099
Story1 C11 0.9D+SY Max -33.4989 0.8443 0.2063
UNIVERSIDAD SEÑOR DE SIPÁN CONCRETO ARMADO I
INGENIERIA CIVIL

TABLE: Column Forces


Story Column Load Case/Combo P M2 M3
Story5 C11 0.9D-SX Max -1.8558 1.3103 7.7817
Story5 C11 0.9D-SX Max -1.3076 2.0079 8.2368
Story5 C11 0.9D-SY Max -5.2532 3.5005 0.9288
Story5 C11 0.9D-SY Max -4.705 4.6151 0.765
Story4 C11 0.9D-SX Max -4.3028 1.3463 7.2267
Story4 C11 0.9D-SX Max -3.7546 1.1256 7.0697
Story4 C11 0.9D-SY Max -11.8432 3.5155 0.8461
Story4 C11 0.9D-SY Max -11.295 3.2636 0.6746
Story3 C11 0.9D-SX Max -7.9144 1.3162 6.9331
Story3 C11 0.9D-SX Max -7.3662 1.1956 6.7913
Story3 C11 0.9D-SY Max -18.79 3.6766 0.8124
Story3 C11 0.9D-SY Max -18.2417 3.3425 0.6344
Story2 C11 0.9D-SX Max -12.9471 1.2217 5.711
Story2 C11 0.9D-SX Max -12.3989 0.852 5.4245
Story2 C11 0.9D-SY Max -26.1334 3.5033 0.6669
Story2 C11 0.9D-SY Max -25.5852 2.5218 0.4953
Story1 C11 0.9D-SX Max -20.0932 0.6924 2.7786
Story1 C11 0.9D-SX Max -19.4984 0.275 2.4311
Story1 C11 0.9D-SY Max -34.0937 2.3559 0.3099
Story1 C11 0.9D-SY Max -33.4989 0.8443 0.2063
UNIVERSIDAD SEÑOR DE SIPÁN CONCRETO ARMADO I
INGENIERIA CIVIL

COLUMNA C-1: CARGAS Y MOMENTOS DE DISEÑO

PISO COMBINACION Pux Puy Mux Muy Pu ex ey


1.4D+1.7L 9.24 Tn 8.38 Tn 1.04 Tn.m 0.31 Tn.m 17.62 Tn 0.059 m 0.02 m
1.25(D+L)+S 7.79 Tn 7.02 Tn 14.81 Tn 0.292 m 0.46 m
5º PISO

5.14 Tn.m 8.13 Tn.m


1.25(D+L)-S 7.79 Tn 7.02 Tn 5.14 Tn.m 8.13 Tn.m 14.81 Tn 0.292 m 0.46 m
0.9D+S 5.25 Tn 4.71 Tn 4.62 Tn.m 8.24 Tn.m 9.96 Tn 0.262 m 0.47 m
0.9D-S 5.25 Tn 4.71 Tn 4.62 Tn.m 8.24 Tn.m 9.96 Tn 0.262 m 0.47 m
1.4D+1.7L 22.06 Tn 21.20 Tn 0.77 Tn.m 0.26 Tn.m 43.26 Tn 0.018 m 0.01 m
1.25(D+L)+S 18.47 Tn 17.71 Tn 36.18 Tn 0.093 m 0.17 m
4º PISO

4.01 Tn.m 7.35 Tn.m


1.25(D+L)-S 18.47 Tn 17.71 Tn 4.01 Tn.m 7.35 Tn.m 36.18 Tn 0.093 m 0.17 m
0.9D+S 11.84 Tn 11.30 Tn 3.68 Tn.m 6.93 Tn.m 23.14 Tn 0.085 m 0.16 m
0.9D-S 11.84 Tn 11.30 Tn 3.68 Tn.m 6.93 Tn.m 23.14 Tn 0.085 m 0.16 m
1.4D+1.7L 35.37 Tn 34.52 Tn 0.78 Tn.m 0.25 Tn.m 69.89 Tn 0.011 m 0.00 m
1.25(D+L)+S 29.67 Tn 28.91 Tn 58.58 Tn 0.057 m 0.10 m
3º PISO

3.96 Tn.m 7.05 Tn.m


1.25(D+L)-S 29.67 Tn 28.91 Tn 3.96 Tn.m 7.05 Tn.m 58.58 Tn 0.057 m 0.10 m
0.9D+S 18.79 Tn 18.24 Tn 3.68 Tn.m 6.93 Tn.m 37.03 Tn 0.053 m 0.10 m
0.9D-S 18.79 Tn 18.24 Tn 3.68 Tn.m 6.93 Tn.m 37.03 Tn 0.053 m 0.10 m
1.4D+1.7L 49.15 Tn 48.30 Tn 0.69 Tn.m 0.20 Tn.m 97.45 Tn 0.007 m 0.00 m
1.25(D+L)+S 41.40 Tn 40.64 Tn 82.04 Tn 0.038 m 0.06 m
2º PISO

3.71 Tn.m 5.80 Tn.m


1.25(D+L)-S 41.40 Tn 40.64 Tn 3.71 Tn.m 5.80 Tn.m 82.04 Tn 0.038 m 0.06 m
0.9D+S 26.13 Tn 25.59 Tn 3.50 Tn.m 5.71 Tn.m 51.72 Tn 0.036 m 0.06 m
0.9D-S 26.13 Tn 25.59 Tn 3.50 Tn.m 5.71 Tn.m 51.72 Tn 0.036 m 0.06 m
1.4D+1.7L 63.77 Tn 62.85 Tn 0.77 Tn.m 0.10 Tn.m 126.62 Tn 0.006 m 0.00 m
1.25(D+L)+S 54.03 Tn 53.20 Tn 107.23 Tn 0.023 m 0.02 m
1º PISO

2.86 Tn.m 2.81 Tn.m


1.25(D+L)-S 54.03 Tn 53.20 Tn 2.86 Tn.m 2.81 Tn.m 107.23 Tn 0.023 m 0.02 m
0.9D+S 34.09 Tn 33.50 Tn 2.36 Tn.m 2.78 Tn.m 67.59 Tn 0.019 m 0.02 m
0.9D-S 34.09 Tn 33.50 Tn 2.36 Tn.m 2.78 Tn.m 67.59 Tn 0.019 m 0.02 m
UNIVERSIDAD SEÑOR DE SIPÁN CONCRETO ARMADO I
INGENIERIA CIVIL

DISEÑO DE PIMER PISO

DISEÑO PARA EL PRIMER PISO


Del predimensionamiento tenemos:
b= 0.25 m rec= 4.00 cm
h= 0.40 m f'c = 210 Kg/cm2
Cargas: Pu = 126.62 Tn fy = 4200 Kg/cm2
Mux= 2.86 Tn.m ɸest= 3/8 '' estribo
Muy= 2.81 Tn.m ɸb= 3/4 '' diametro asumido

Asx
𝑀𝑢�/𝑀𝑢
𝑦= 1.02 entonces: Asx = 1.02 *Asy
1ɸ 5/8 '' + 2ɸ 1 ''
asumimos una cuantia de: ρ = 2.0 % Asy
0ɸ 5/8 '' + 0ɸ 1 ''
area de refuerzo = As = b*h*ρ = 20.00 cm2 0.40 m
0ɸ 5/8 '' + 0ɸ 1 ''
As = 1.02 *Asy + Asy
Asy = 9.92 cm2 1ɸ 5/8 '' + 2ɸ 1 ''
Asx= 10.08 cm2 Ast = 24.227 cm2
0.25 m

Aplicación de la formula de Bresler 𝑃𝑛�=0.85∗�^′ 𝑐∗(𝐴𝑔−𝐴�)+𝐴�∗�𝑦

Pno = 275.93 Tn

Determinaiocion de Pnx
ρ= 0.0242
Rn = 0.049 𝑅𝑛=𝑀𝑛�/(�^′ Carga resistente
𝑐∗𝐴𝑔∗ℎ)
ɣ = 0.705
1/𝑃𝑛=1/𝑃𝑛�+1/𝑃𝑛𝑦−1/
𝑃𝑛�
Entrando a la grafica del SP-17 para refuerzo en
4 caras, se tiene Pn = 142.40 Tn
ɣ= 0.6 → Kn = 0.86 Pu = 99.68 Tn
ɣ = 0.705 → Kn = 0.87 1.1Pu = 139.28 Tn AUMENTAR SECCION
ɣ= 0.8 → Kn = 0.88

K𝑛=𝑃𝑛�/ → Pnx = 182.80 Tn


(�^′ 𝑐∗𝐴𝑔)
Determinacion de Pny
ρ= 0.0242
Rn = 0.076
ɣ = 0.528

ɣ = 0.528 → Kn = 0.92

K𝑛=𝑃𝑛𝑦/ → Pny = 193.20 Tn


(�^′ 𝑐∗𝐴𝑔)
UNIVERSIDAD SEÑOR DE SIPÁN CONCRETO ARMADO I
INGENIERIA CIVIL

DISEÑO DE SEGUNDO PISO

DISEÑO PARA EL SEGUNDO PISO


Del predimensionamiento tenemos:
b= 0.25 m rec= 4.00 cm
h= 0.40 m f'c = 210 Kg/cm2
Cargas: Pu = 97.45 Tn fy = 4200 Kg/cm2
Mux= 3.71 Tn.m ɸest= 3/8 '' estribo
Muy= 5.80 Tn.m ɸb= 3/4 '' diametro asumido

Asx
𝑀𝑢�/𝑀𝑢
𝑦= 0.64 entonces: Asx = 0.64 *Asy
1ɸ 5/8 '' + 2ɸ 1 ''
asumimos una cuantia de: ρ = 2.0 % Asy
0ɸ 5/8 '' + 0ɸ 1 ''
area de refuerzo = As = b*h*ρ = 20.00 cm2 0.40 m
0ɸ 5/8 '' + 0ɸ 1 ''
As = 0.64 *Asy + Asy
Asy = 12.21 cm2 1ɸ 5/8 '' + 2ɸ 1 ''
Asx= 7.79 cm2 Ast = 24.227 cm2
0.25 m

Aplicación de la formula de Bresler 𝑃𝑛�=0.85∗�^′ 𝑐∗(𝐴𝑔−𝐴�)+𝐴�∗�𝑦

Pno = 275.93 Tn

Determinaiocion de Pnx
ρ= 0.0242
Rn = 0.063 𝑅𝑛=𝑀𝑛�/(�^′ Carga resistente
𝑐∗𝐴𝑔∗ℎ)
ɣ = 0.705
1/𝑃𝑛=1/𝑃𝑛�+1/𝑃𝑛𝑦−1/
𝑃𝑛�
Entrando a la grafica del SP-17 para refuerzo en
4 caras, se tiene Pn = 137.83 Tn
ɣ= 0.8 → Kn = 0.86 Pu = 96.48 Tn
ɣ = 0.705 → Kn = 0.841 1.1Pu = 107.20 Tn AUMENTAR SECCION
ɣ= 0.9 → Kn = 0.88

K𝑛=𝑃𝑛�/ → Pnx = 176.60 Tn


(�^′ 𝑐∗𝐴𝑔)
Determinacion de Pny
ρ= 0.0242
Rn = 0.158
ɣ = 0.528

ɣ = 0.528 → Kn = 0.913

K𝑛=𝑃𝑛𝑦/ → Pny = 191.68 Tn


(�^′ 𝑐∗𝐴𝑔)
UNIVERSIDAD SEÑOR DE SIPÁN CONCRETO ARMADO I
INGENIERIA CIVIL

DISEÑO DE TERCER PISO

DISEÑO PARA EL TERCER PISO


Del predimensionamiento tenemos:

b= 0.25 m rec= 4.00 cm


h= 0.40 m f'c = 210 Kg/cm2
Cargas: Pu = 69.89 Tn fy = 4200 Kg/cm2
Mux= 3.96 Tn.m ɸest= 3/8 '' estribo
Muy= 7.05 Tn.m ɸb= 5/8 '' diametro asumido

Asx
𝑀𝑢�/𝑀𝑢
𝑦= 0.56 entonces: Asx = 0.56 *Asy
1ɸ 5/8 '' + 2ɸ 1 ''
asumimos una cuantia de: ρ = 2.00 % Asy
1ɸ 5/8 '' + 0ɸ 1 ''
area de refuerzo = As = b*h*ρ = 20.00 cm2 0.40 m
1ɸ 5/8 '' + 0ɸ 1 ''
As = 0.56 *Asy + Asy
Asy = 12.81 cm2 1ɸ 5/8 '' + 2ɸ 1 ''
Asx= 7.19 cm2 Ast = 28.186 cm2
0.25 m

Aplicación de la formula de Bresler 𝑃𝑛�=0.85∗�^′ 𝑐∗(𝐴𝑔−𝐴�)+𝐴�∗�𝑦

Pno = 291.85 Tn

Determinaiocion de Pnx
ρ= 0.0282
Rn = 0.067 𝑅𝑛=𝑀𝑛�/(�^′ Carga resistente
𝑐∗𝐴𝑔∗ℎ)
ɣ = 0.713
1/𝑃𝑛=1/𝑃𝑛�+1/𝑃𝑛𝑦−1/
𝑃𝑛�
Entrando a la grafica del SP-17 para refuerzo en
4 caras, se tiene Pn = 130.65 Tn
Pu = 91.46 Tn
ɣ = 0.713 → Kn = 0.88 1.1Pu = 76.87 Tn O.K

SOLO CON LA CUANTIA MINIMA


K𝑛=𝑃𝑛�/ → Pnx = 184.80 Tn
(�^′ 𝑐∗𝐴𝑔)
Determinacion de Pny
ρ= 0.0282
Rn = 0.192
ɣ = 0.540

ɣ = 0.540 → Kn = 0.84

K𝑛=𝑃𝑛𝑦/
(�^′ 𝑐∗𝐴𝑔)
UNIVERSIDAD SEÑOR DE SIPÁN CONCRETO ARMADO I
INGENIERIA CIVIL

K𝑛=𝑃𝑛𝑦/ → Pny = 176.40 Tn


(�^′ 𝑐∗𝐴𝑔)
UNIVERSIDAD SEÑOR DE SIPÁN CONCRETO ARMADO I
INGENIERIA CIVIL

DISEÑO DE CUARTO PISO

DISEÑO PARA EL CUARTO PISO


Del predimensionamiento tenemos:

b= 0.25 m rec= 4.00 cm


h= 0.40 m f'c = 210 Kg/cm2
Cargas: Pu = 43.26 Tn fy = 4200 Kg/cm2
Mux= 4.01 Tn.m ɸest= 3/8 '' estribo
Muy= 7.35 Tn.m ɸb= 5/8 '' diametro asumido

Asx
𝑀𝑢�/𝑀𝑢
𝑦= 0.55 entonces: Asx = 0.55 *Asy
1ɸ 5/8 '' + 2ɸ 1 ''
asumimos una cuantia de: ρ = 2.00 % Asy
1ɸ 5/8 '' + 0ɸ 1 ''
area de refuerzo = As = b*h*ρ = 20.00 cm2 0.40 m
1ɸ 5/8 '' + 0ɸ 1 ''
As = 0.55 *Asy + Asy
Asy = 12.94 cm2 1ɸ 5/8 '' + 2ɸ 1 ''
Asx= 7.06 cm2 Ast = 28.186 cm2
0.25 m

Aplicación de la formula de Bresler 𝑃𝑛�=0.85∗�^′ 𝑐∗(𝐴𝑔−𝐴�)+𝐴�∗�𝑦

Pno = 291.85 Tn

Determinaiocion de Pnx
ρ= 0.0282
Rn = 0.068 𝑅𝑛=𝑀𝑛�/(�^′ Carga resistente
𝑐∗𝐴𝑔∗ℎ)
ɣ = 0.713
1/𝑃𝑛=1/𝑃𝑛�+1/𝑃𝑛𝑦−1/
𝑃𝑛�
Entrando a la grafica del SP-17 para refuerzo en
4 caras, se tiene Pn = 130.65 Tn
Pu = 91.46 Tn
ɣ = 0.713 → Kn = 0.88 1.1Pu = 47.59 Tn O.K

SOLO CON LA CUANTIA MINIMA


K𝑛=𝑃𝑛�/ → Pnx = 184.80 Tn
(�^′ 𝑐∗𝐴𝑔)
Determinacion de Pny
ρ= 0.0282
Rn = 0.200
ɣ = 0.540
UNIVERSIDAD SEÑOR DE SIPÁN CONCRETO ARMADO I
INGENIERIA CIVIL

ɣ = 0.540 → Kn = 0.84

K𝑛=𝑃𝑛𝑦/ → Pny = 176.40 Tn


(�^′ 𝑐∗𝐴𝑔)
UNIVERSIDAD SEÑOR DE SIPÁN CONCRETO ARMADO I
INGENIERIA CIVIL

DISEÑO DE QUINTO PISO

DISEÑO PARA EL QUINTO PISO


Del predimensionamiento tenemos:

b= 0.25 m rec= 4.00 cm


h= 0.40 m f'c = 210 Kg/cm2
Cargas: Pu = 17.62 Tn fy = 4200 Kg/cm2
Mux= 5.14 Tn.m ɸest= 3/8 '' estribo
Muy= 8.24 Tn.m ɸb= 5/8 '' diametro asumido

Asx
𝑀𝑢�/𝑀𝑢
𝑦= 0.62 entonces: Asx = 0.62 *Asy
1ɸ 5/8 '' + 2ɸ 1 ''
asumimos una cuantia de: ρ = 2.00 % Asy
1ɸ 5/8 '' + 0ɸ 1 ''
area de refuerzo = As = b*h*ρ = 20.00 cm2 0.40 m
1ɸ 5/8 '' + 0ɸ 1 ''
As = 0.62 *Asy + Asy
Asy = 12.32 cm2 1ɸ 5/8 '' + 2ɸ 1 ''
Asx= 7.68 cm2 Ast = 28.19 cm2
0.25 m

Aplicación de la formula de Bresler 𝑃𝑛�=0.85∗�^′ 𝑐∗(𝐴𝑔−𝐴�)+𝐴�∗�𝑦

Pno = 291.85 Tn

Determinacion de Pnx
ρ= 0.0282
Rn = 0.087 𝑅𝑛=𝑀𝑛�/(�^′ Carga resistente
𝑐∗𝐴𝑔∗ℎ)
ɣ = 0.713
1/𝑃𝑛=1/𝑃𝑛�+1/𝑃𝑛𝑦−1/
𝑃𝑛�
Entrando a la grafica del SP-17 para refuerzo en
4 caras, se tiene Pn = 89.37 Tn
ɣ= 0.8 → Kn = 0.82 Pu = 62.56 Tn
ɣ = 0.713 → Kn = 0.541 1.1Pu = 19.38 Tn O.K
ɣ= 0.9 → Kn = 1.14
SOLO CON LA CUANTIA MINIMA
K𝑛=𝑃𝑛�/ → Pnx = 113.53 Tn
(�^′ 𝑐∗𝐴𝑔)
Determinacion de Pny
ρ= 0.0282
Rn = 0.224
ɣ = 0.540

ɣ = 0.540 → Kn = 0.82

K𝑛=𝑃𝑛𝑦/ → Pny = 172.20 Tn


(�^′ 𝑐∗𝐴𝑔)
UNIVERSIDAD SEÑOR DE SIPÁN CONCRETO ARMADO I
INGENIERIA CIVIL

ESTRIBOS DE PRIMER PISO

Según norma E-060 y E.030


- Zona de confinamiento Hc = 3.00 m
Lo = Hc/6 = 0.50 m
Lo = t (col.) 0.40 m
Lo = 0.50 m

So = 8*db(menor) 0.13 m
So = s/2 0.13 m
So = 0.10 m

espaciamiento adoptado So = 0.10 m


long. Adoptada (mayor) Lo = 0.20 m (entero)

- Fuera de la zona de confinamiento


S = 16 db (menor) 0.25 m
S= 48 ds (estribo) 0.46 m
S=s 0.25 m

espaciamiento adoptado s= 0.25 m

1 @ 0.05 + 2 @ 0.10 , rto @ 0.25 A/S

ESTRIBOS DE SEGUNDO PISO

Según norma E-060 y E.030


- Zona de confinamiento Hc = 2.80 m
Lo = Hc/6 = 0.47 m
Lo = t (col.) 0.40 m
Lo = 0.50 m

So = 8*db(menor) 0.13 m
So = s/2 0.13 m
So = 0.10 m

espaciamiento adoptado So = 0.10 m


long. Adoptada (mayor) Lo = 0.20 m (entero)

- Fuera de la zona de confinamiento


S = 16 db (menor) 0.25 m
S= 48 ds (estribo) 0.46 m
S=s 0.25 m

espaciamiento adoptado s= 0.25 m

1 @ 0.05 + 2 @ 0.10 , rto @ 0.25 A/S


UNIVERSIDAD SEÑOR DE SIPÁN CONCRETO ARMADO I
INGENIERIA CIVIL

ESTRIBOS DE TECER PISO

Según norma E-060 y E.030


- Zona de confinamiento Hc = 2.80 m
Lo = Hc/6 = 0.47 m
Lo = t (col.) 0.40 m
Lo = 0.50 m

So = 8*db(menor) 0.13 m
So = s/2 0.13 m
So = 0.10 m

espaciamiento adoptado So = 0.10 m


long. Adoptada (mayor) Lo = 0.20 m (entero)

- Fuera de la zona de confinamiento


S = 16 db (menor) 0.25 m
S= 48 ds (estribo) 0.46 m
S=s 0.25 m

espaciamiento adoptado s= 0.25 m

1 @ 0.05 + 2 @ 0.10 , rto @ 0.25 A/S

CUARTO PISO

Según norma E-060 y E.030


- Zona de confinamiento Hc = 2.80 m
Lo = Hc/6 = 0.47 m
Lo = t (col.) 0.40 m
Lo = 0.50 m

So = 8*db(menor) 0.13 m
So = s/2 0.13 m
So = 0.10 m

espaciamiento adoptado So = 0.10 m


long. Adoptada (mayor) Lo = 0.20 m (entero)

- Fuera de la zona de confinamiento


S = 16 db (menor) 0.25 m
S= 48 ds (estribo) 0.46 m
S=s 0.25 m

espaciamiento adoptado s= 0.25 m

1 @ 0.05 + 2 @ 0.10 , rto @ 0.25 A/S


UNIVERSIDAD SEÑOR DE SIPÁN CONCRETO ARMADO I
INGENIERIA CIVIL

ESTRIBOS DE QUINTO PISO

Según norma E-060 y E.030


- Zona de confinamiento Hc = 3.00 m
Lo = Hc/6 = 0.50 m
Lo = t (col.) 0.40 m
Lo = 0.50 m

So = 8*db(menor) 0.13 m
So = s/2 0.13 m
So = 0.10 m

espaciamiento adoptado So = 0.10 m


long. Adoptada (mayor) Lo = 0.20 m (entero)

- Fuera de la zona de confinamiento


S = 16 db (menor) 0.25 m
S= 48 ds (estribo) 0.46 m
S=s 0.25 m

espaciamiento adoptado s= 0.25 m

1 @ 0.05 + 2 @ 0.10 , rto @ 0.25 A/S


UNIVERSIDAD SEÑOR DE SIPÁN CONCRETO ARMADO I
INGENIERIA CIVIL
UNIVERSIDAD SEÑOR DE SIPÁN CONCRETO ARMADO I
INGENIERIA CIVIL
UNIVERSIDAD SEÑOR DE SIPÁN CONCRETO ARMADO I
INGENIERIA CIVIL
UNIVERSIDAD SEÑOR DE SIPÁN CONCRETO ARMADO I
INGENIERIA CIVIL
UNIVERSIDAD SEÑOR DE SIPÁN CONCRETO ARMADO I
INGENIERIA CIVIL
UNIVERSIDAD SEÑOR DE SIPÁN CONCRETO ARMADO I
INGENIERIA CIVIL
UNIVERSIDAD SEÑOR DE SIPÁN CONCRETO ARMADO I
INGENIERIA CIVIL
UNIVERSIDAD SEÑOR DE SIPÁN CONCRETO ARMADO I
INGENIERIA CIVIL
UNIVERSIDAD SEÑOR DE SIPÁN CONCRETO ARMADO I
INGENIERIA CIVIL

You might also like