Section I - HT Works
To Collection 7,674,000.00
Supply, laying and testing and commissioning of 33kV, 3C, 240 Sq.mm XLPE, Al.
(E), FRLS PVC outer sheathed cable confirming to IS 7098 - Part II and as per
2.2
specifications. Cables shall be laid in hume pipes/ cable trays or ready made
trenches.
Supply Rmt 25 25 25 1,834.00 45,850.00
Installation Rmt 25 25 25 100.00 2,500.00
0
Supply, fixing , testing and commissioning of outdoor type end termination : 33kV,
2.2a
3C, 240 Sq.mm XLPE, Al.(E) as per specifications
Supply No. 4 4 4 19,805.00 79,220.00
Installation No. 4 4 4 2,500.00 10,000.00
0
Supply, laying , testing and commissioning of 33kV, 3C, 185 Sq.mm XLPE, Al.(E),
FRPS PVC outer sheathed cable confirming to IS 7098 - Part II and as per
2.3
specifications. Cable shall be laid in hume pipes/ cable trays or ready made
trenches.
Supply Rmt 150 150 150 1,436.00 215,400.00
Installation Rmt 150 150 150 80.00 12,000.00
0
Supply, fixing, testing and commissioning of outdoor type end termination : 33kV,
2.3a
3C, 185 Sq.mm XLPE, Al.(E) as per specifications
Supply No. 8 8 8 14,990.00 119,920.00
Installation No. 8 8 8 1,750.00 14,000.00
0
2.4 Supply and fixing 33 kV cable route markers including civil works as per standards.
Supply No. 4 4 4 300.00 1,200.00
Installation No. 4 4 4 50.00 200.00
0
Note for item nos 2.2 & 2.3 : Hume pipes, cable trays, and trenches shall be
measured seperately under relevant items
To Collection 500,290.00
Supply, laying, testing and commissioning of XLPE insulated, FLRS PVC outer
sheathed , screened shielded steel armoured copper conductor cables confirming
3.0
to IS 7098 - Part I as per specifications. Cable shall laid in hume pipes/cable trays
or ready made trenches
3.1 24C x 2.5 sq.mm
Supply Rmt 350 350 350 487.00 170,450.00
Installation Rmt 350 350 350 15.00 5,250.00
Page 1 of 40
LBF UBF GF BLOCK A BLOCK B
S.No DESCRIPTION UNIT Tr. Yard Qty Qty Rate Amount
A B1 B2 B3 P1 P2 P3 P4 A B1 B2 B3 P1 P2 P3 P4 A B1 B2 B3 P1 P2 P3 P4 FF SF TF FF FF SF SF EF NF TF FF SF TF FF FF SF SF EF TF
0
3.1a End Termination
Supply No. 16 16 16 300.00 4,800.00
Installation No. 16 16 16 60.00 960.00
0
3.2 10C x 2.5 sq.mm
Supply Rmt 500 500 500 233.00 116,500.00
Installation Rmt 500 500 500 15.00 7,500.00
0
3.2a End Termination
Supply No. 24 24 24 175.00 4,200.00
Installation No. 24 24 24 30.00 720.00
0
3.3 4C x 4 sq.mm
Supply Rmt 220 220 220 173.00 38,060.00
Installation Rmt 220 220 220 10.00 2,200.00
0
3.3a End Termination
Supply No. 14 14 14 125.00 1,750.00
Installation No. 14 14 14 25.00 350.00
0
3.4 2C x 2.5 sq.mm
Supply Rmt 150 150 150 86.00 12,900.00
Installation Rmt 150 150 150 6.00 900.00
0
3.4a End Termination
Supply No. 8 8 8 100.00 800.00
Installation No. 8 8 8 15.00 120.00
0
Note for item nos 3.1, 3.2, 3.3, & 3.4 : Hume pipes, cable trays, and trenches shall
be measured seperately under relevant items
To Collection 367,460.00
4.0 Transformer
Storage, installation , testing and commmissioning of 2000 kVA, 33KV / 433 V - Oil
type( ONAN), out door Transformer and associated equipments of required ratings
4.1
as per relevant IEC/IS specifications with OLTC and RTCC Panels as per
specifications.
Supply No. 4 4 4
Installation No. 4 4 4 40,000.00 160,000.00
Supply and fixing of Danger Boards 33kV (Stove enamelled) as per APTRANSCO
4.2
standards.
Supply No. 4 4 4 200.00 800.00
Installation No. 4 4 4 50.00 200.00
0
Supply and fixing of one gate 2.4 mm wide (min) side hung to match the chain link
4.4
fence including necessary hinges locking arrangements, etc., complete.
Supply Kgs 210 210 210 100 21,000.00
Installation Kgs 210 210 210 20 4,200.00
Supply and fixing of 2 nos of round bottom fire buckets Fire buckets of with stand
4.6
filled with fine river sand and red painted duly marked as FIRE
Supply No. 2 2 2 835.00 1,670.00
Installation No. 2 2 2 50.00 100.00
To Collection 701,970.00
Page 2 of 40
LBF UBF GF BLOCK A BLOCK B
S.No DESCRIPTION UNIT Tr. Yard Qty Qty Rate Amount
A B1 B2 B3 P1 P2 P3 P4 A B1 B2 B3 P1 P2 P3 P4 A B1 B2 B3 P1 P2 P3 P4 FF SF TF FF FF SF SF EF NF TF FF SF TF FF FF SF SF EF TF
Section II - LT Switchgear
To Collection 347,000.00
Page 3 of 40
LBF UBF GF BLOCK A BLOCK B
S.No DESCRIPTION UNIT Tr. Yard Qty Qty Rate Amount
A B1 B2 B3 P1 P2 P3 P4 A B1 B2 B3 P1 P2 P3 P4 A B1 B2 B3 P1 P2 P3 P4 FF SF TF FF FF SF SF EF NF TF FF SF TF FF FF SF SF EF TF
Supply No 1
Installation No 1 3,000.00 3,000.00
To Collection 54,000.00
A Sandwitch type bus duct : Aluminium, 1600 Amps, 25KA for Power
b Vertical Bend
Supply No. RO 12,000.00
Installation No. RO 600.00
c Fixing Bracket
Supply sets 12 800.00 9,600.00
Installation sets 12 150.00 1,800.00
e End Covers
Supply No. 1 47,450.00 47,450.00
Installation No. 1 1,000.00 1,000.00
f Floor seal
Supply No. 12 2,300.00 27,600.00
Installation No. 12 150.00 1,800.00
b Vertical Bend
Supply No. RO 7,250.00
Installation No. RO 500.00
c Fixing Bracket
Supply sets 6 800.00 4,800.00
Installation sets 6 150.00 900.00
To Collection 1,735,150.00
e End Covers.
Supply No. 1 34,050.00 34,050.00
Installation No. 1 800.00 800.00
Page 4 of 40
LBF UBF GF BLOCK A BLOCK B
S.No DESCRIPTION UNIT Tr. Yard Qty Qty Rate Amount
A B1 B2 B3 P1 P2 P3 P4 A B1 B2 B3 P1 P2 P3 P4 A B1 B2 B3 P1 P2 P3 P4 FF SF TF FF FF SF SF EF NF TF FF SF TF FF FF SF SF EF TF
f Floor seal
Supply No. 6 1,800.00 10,800.00
Installation No. 6 150.00 900.00
b Vertical Bend
Supply No. RO 7,250.00
Installation No. RO 500.00
c Fixing Bracket
Supply sets 10 800.00 8,000.00
Installation sets 10 150.00 1,500.00
e End Covers.
Supply No. 1 34,050.00 34,050.00
Installation No. 1 800.00 800.00
f Floor seal
Supply No. 18 1,800.00 32,400.00
Installation No. 18 150.00 2,700.00
To Collection 1,833,400.00
A Air insulated type bus duct : Aluminium, 1250 Amps, 25 KA for Power
b Vertical Bend
Supply No. RO 5,500.00
Installation No. RO 600.00
c Fixing Bracket
Supply sets 11 700.00 7,700.00
Installation sets 11 150.00 1,650.00
e End Covers.
Supply No. 1 39,225.00 39,225.00
Installation No. 1 1,000.00 1,000.00
f Floor seal
Supply No. 11 2,850.00 31,350.00
Installation No. 11 150.00 1,650.00
B Air insulated type bus duct : Aluminium, 400 Amps, 25 KA for Lighting
b Vertical Bend
Supply No. RO 2,000.00
Installation No. RO 350.00
c Fixing Bracket
Supply sets 11 575.00 6,325.00
Page 5 of 40
LBF UBF GF BLOCK A BLOCK B
S.No DESCRIPTION UNIT Tr. Yard Qty Qty Rate Amount
A B1 B2 B3 P1 P2 P3 P4 A B1 B2 B3 P1 P2 P3 P4 A B1 B2 B3 P1 P2 P3 P4 FF SF TF FF FF SF SF EF NF TF FF SF TF FF FF SF SF EF TF
Installation sets 11 100.00 1,100.00
To Collection 1,982,850.00
f Floor seal
Supply No. 11 2,200.00 24,200.00
Installation No. 11 150.00 1,650.00
To Collection 45,125.00
4.0 Air Insulated bus duct -Conventional Type : outdoor : Aluminium, 3200A, 65 KA
a Straight Run
Supply Rmt 20 28,000.00 560,000.00
Installation Rmt 20 1,500.00 30,000.00
b Vertical Bend
Supply No. 8 7,000.00 56,000.00
Installation No. 8 750.00 6,000.00
Terminal flange with adopter box and extention of bus bar for terminating the bus
d
duct.
Supply No. 8 73,500.00 588,000.00
Installation No. 8 1,500.00 12,000.00
5.0 Air Insulated bus duct -Conventional Type : outdoor : Aluminium, 2500A, 40 KA
a Straight Run
Supply Rmt 80 21,500.00 1,720,000.00
Installation Rmt 80 1,200.00 96,000.00
b Vertical Bend
Supply No. 16 5,350.00 85,600.00
Installation No. 16 750.00 12,000.00
Terminal flange with adopter box and extention of bus bar for terminating the bus
d
duct.
Supply No. 16 58,000.00 928,000.00
Installation No. 16 1,250.00 20,000.00
To Collection 4,113,600.00
Page 6 of 40
LBF UBF GF BLOCK A BLOCK B
S.No DESCRIPTION UNIT Tr. Yard Qty Qty Rate Amount
A B1 B2 B3 P1 P2 P3 P4 A B1 B2 B3 P1 P2 P3 P4 A B1 B2 B3 P1 P2 P3 P4 FF SF TF FF FF SF SF EF NF TF FF SF TF FF FF SF SF EF TF
100A, MCCB,TP
Supply No 1 4,900.00 4,900.00
Installation No 1 100.00 100.00
COS, 100A, 4P
Supply No 1 7,500.00 7,500.00
Installation No 1 100.00 100.00
To Collection 419,470.00
To Collection 15,400.00
Supply, laying , testing and commissioning of XLPE PVC insulated, FRLS outer
sheathed , steel armoured, aluminium conductor 3 Core, 3.5 Core and 4 core
1.0
cables confiriming to IS 7098 - Part I. Cables shall be laid in hume pipes/cable
trays or ready made trenches .
1.1 3.5C x 400 sq.mm (XLPE)
Supply Rmt 11500 1,110.00 12,765,000.00
Installation Rmt 11500 35.00 402,500.00
Page 7 of 40
LBF UBF GF BLOCK A BLOCK B
S.No DESCRIPTION UNIT Tr. Yard Qty Qty Rate Amount
A B1 B2 B3 P1 P2 P3 P4 A B1 B2 B3 P1 P2 P3 P4 A B1 B2 B3 P1 P2 P3 P4 FF SF TF FF FF SF SF EF NF TF FF SF TF FF FF SF SF EF TF
To Collection 16,819,600.00
Note for item nos 1.1, 1.2, 1.3, 1.4, 1.5, 1.6, 1.7, 1.8 & 1.9 : Hume pipes, cable
trays, and trenches shall be measured seperately under relevant items
To Collection 313,915.00
Page 8 of 40
LBF UBF GF BLOCK A BLOCK B
S.No DESCRIPTION UNIT Tr. Yard Qty Qty Rate Amount
A B1 B2 B3 P1 P2 P3 P4 A B1 B2 B3 P1 P2 P3 P4 A B1 B2 B3 P1 P2 P3 P4 FF SF TF FF FF SF SF EF NF TF FF SF TF FF FF SF SF EF TF
Installation Rmt 160 15.00 2,400.00
2.3 6C x 4 sq.mm -
Supply Rmt 160 196.00 31,360.00
Installation Rmt 160 10.00 1,600.00
To Collection 261,620.00
Note for item nos 2.1, 2.2, 2.3, & 2.4 : Hume pipes, cable trays, and trenches shall
be measured seperately under relevant items
To Collection 2,000.00
Section - IV - Sub main, circuit main, light point wiring and power receptacles.
Page 9 of 40
LBF UBF GF BLOCK A BLOCK B
S.No DESCRIPTION UNIT Tr. Yard Qty Qty Rate Amount
A B1 B2 B3 P1 P2 P3 P4 A B1 B2 B3 P1 P2 P3 P4 A B1 B2 B3 P1 P2 P3 P4 FF SF TF FF FF SF SF EF NF TF FF SF TF FF FF SF SF EF TF
Supply and Wiring of Submains / Circuit mains in concealed or surface FRLS PVC
conduit system. The wiring shall be carried out using FRLS PVC insulated,
1.0 multistrand copper conductor cables for phase, neutral and earth. The cost of
conduit shall include necessary accessories, fixing hardware complete with
complete civil works.
1.1 3 runs of 2.5 sq.mm copper wire in 19 mm dia,2 mm thk PVC conduit.
Supply Rmt 4000 68.00 272,000.00
Installation Rmt 4000 8.00 32,000.00
To Collection 906,350.00
4.7 Eight to Twelve light point controlled by 6A MCB, Cost of MCB to exclude
Supply No. 175 2,160.00 378,000.00
Installation No. 175 350.00 61,250.00
Stair case lighting for landing and mid-landing for (GF-9Th floor) 8-10
4.13 lights(landing) controlled from 6A MCB,8-10 Lights(Mid landing) controlled from 6A
MCB with complete civil work, Cost of MCB to exclude and complete civil works.
Page 10 of 40
LBF UBF GF BLOCK A BLOCK B
S.No DESCRIPTION UNIT Tr. Yard Qty Qty Rate Amount
A B1 B2 B3 P1 P2 P3 P4 A B1 B2 B3 P1 P2 P3 P4 A B1 B2 B3 P1 P2 P3 P4 FF SF TF FF FF SF SF EF NF TF FF SF TF FF FF SF SF EF TF
Installation Set 2 1,500.00 3,000.00
To Collection 1,012,175.00
Stair case lighting for landing and mid-landing for (GF-7Th floor) 7-9 Lights(landing)
4.14 controlled from 6A MCB,7-9 Lights(Mid landing) controlled from 6A MCB with
complete civil work, Cost of MCB to exclude .
Supply Set 5 3,870.00 19,350.00
Installation Set 5 1,350.00 6,750.00
To Collection 26,100.00
32 A Industrial type- three phase - 415 V, power socket outlet with MCB control
5.4
housed in polycorbonate enclosure with plug top - outdoor type.
Supply No. 4 3,410.00 13,640.00
Installation No. 4 75.00 300.00
To Collection 65,335.00
Storage, installation, testing and commissioning with all required asscessories for
connecting for the following Light fixtures.
1.1 Downlighter with 1x18W CFL lamps. (Toilets)
Supply No 410
Installation No 410 60.00 24,600.00
1.3 1xTLD 36W lamp fitting. (Basements Parking/AHU Rooms, Electrical Rooms)
Supply No 780
Installation No 780 75.00 58,500.00
1.4 2xTLD 36W lamp fitting. (Basements Drive way/Main Electrical Room)
Supply No 420
Installation No 420 75.00 31,500.00
Page 11 of 40
LBF UBF GF BLOCK A BLOCK B
S.No DESCRIPTION UNIT Tr. Yard Qty Qty Rate Amount
A B1 B2 B3 P1 P2 P3 P4 A B1 B2 B3 P1 P2 P3 P4 A B1 B2 B3 P1 P2 P3 P4 FF SF TF FF FF SF SF EF NF TF FF SF TF FF FF SF SF EF TF
1.7 1x11W CFL lamp (Mirror light).
Supply No 320
Installation No 320 60.00 19,200.00
To Collection 223,700.00
To Collection 16,340.00
Pipe Earth Electrode using 38 mm dia class B GI pipe complete as per IS 3043
1.1 with salt, charcoal, brick masonary chamber with heavy duty RCC cover complete.
Plate Earth Electrode using 19 mm dia Class B GI pipe and copper plate of size
1.2 600 x 600 x 3 mm thick with salt, charcoal, brick masonary chamber with heavy
duty RCC cover complete..
Supply No 16 8,825.00 141,200.00
Installation No 16 850.00 13,600.00
Maintenance free earth electrode with 3 Nos stainless steel cladded copper pipe
1.3 with ground enhancing material, earth station chamber, heavy duty chamber cover,
cable / strip termination terminals etc., complete.
Supply No. RO 15,600.00
Installation No. RO 1,000.00
To Collection 572,800.00
Page 12 of 40
LBF UBF GF BLOCK A BLOCK B
S.No DESCRIPTION UNIT Tr. Yard Qty Qty Rate Amount
A B1 B2 B3 P1 P2 P3 P4 A B1 B2 B3 P1 P2 P3 P4 A B1 B2 B3 P1 P2 P3 P4 FF SF TF FF FF SF SF EF NF TF FF SF TF FF FF SF SF EF TF
Installation Rmt 2300 25.00 57,500.00
To Collection 2,126,600.00
Earth disconnector box with disconntable link for isolation & testing for lightning
2.9
protection and equipotential bonding.
Supply No. 4 750.00 3,000.00
Installation No. 4 50.00 200.00
To Collection 3,200.00
Early Streamer Emission Lightning protection with lightning event counter, like
3.1
NFC-17-102 or equal as per IS-2309 1969, 7689
Supply No. 4 148,075.00 592,300.00
Installation No. 4 7,500.00 30,000.00
To Collection 622,300.00
Supply and providing of Ladder type cable tray with all necessary hardwares and
5.0 MS supports duly painted with 2 coats of primer and 2 coat of approved enamel
paint and as per specifications
Prefabricated - cable trays - made out of 2 mm thick galvised sheet
5.1 Size of Cable Tray :1000 mm x 50 mm
Supply Rmt 750 805.00 603,750.00
Page 13 of 40
LBF UBF GF BLOCK A BLOCK B
S.No DESCRIPTION UNIT Tr. Yard Qty Qty Rate Amount
A B1 B2 B3 P1 P2 P3 P4 A B1 B2 B3 P1 P2 P3 P4 A B1 B2 B3 P1 P2 P3 P4 FF SF TF FF FF SF SF EF NF TF FF SF TF FF FF SF SF EF TF
Installation Rmt 750 75.00 56,250.00
Supply and providing of RCC hume pipes with collars including excavation of
7.0
required depth , back filling and making the surface as good as required.
Supply and providing of Waterproof closures ( compound ) to fill leftout gaps after
8.0
laying of cables.
Supply Sq.M RO 15,000.00
Installation Sq.M RO 2,000.00
To Collection 2,041,500.00
Supply and providing of MS Chequered plates of 6mm thick for closure of cable
9.0 trenches / shafts etc.,as required with 2 coats of primer and 1 coat of approved
enamel paint.
Supply Sq.M 100 3,750.00 375,000.00
Installation Sq.M 100 650.00 65,000.00
11.0 Supply and providing of Rubber mat 1100V grade ISI approved size of 2 m x 1m
Supply No. 15 1,750.00 26,250.00
Installation No. 15 100.00 1,500.00
To Collection 490,250.00
Page 14 of 40
LBF UBF GF BLOCK A BLOCK B
S.No DESCRIPTION UNIT Tr. Yard Qty Qty Rate Amount
A B1 B2 B3 P1 P2 P3 P4 A B1 B2 B3 P1 P2 P3 P4 A B1 B2 B3 P1 P2 P3 P4 FF SF TF FF FF SF SF EF NF TF FF SF TF FF FF SF SF EF TF
Installation Cmt RO 2,000.00
Excavation, back filling and concreting for foundations of equipments/HT panels etc
b
- RCC vide drawings.
Supply Cmt RO 15,000.00
Installation Cmt RO 2,000.00
Providing and laying of 230 mm thick wall for a height of 1.5 mtrs above the ground
level and depth below the ground of 0.75 mtrs with 450 mm thick CRS masonary
c with 100 mm thick PCC (1:4:8 )and with plastering ( 1:6 ), two coats of white wash
including cost and conveyance of all material, labour charges etc., complete as per
directions of Engineer.
Supply Rmtrs RO 7,000.00
Installation Rmtrs RO 1,000.00
Supply, fabrication and installation of steel of suitable angles/ channels/ flats with 2
15.0
coats of primer and 2 coat of approved paint.
Supply Kgs. 6000 57.50 345,000.00
Installation Kgs. 6000 7.50 45,000.00
Camouflaging for MCB DBs made out of 1.6 mm thick CRCA sheet duly powder
16.0
coated
Supply Sq.M 15 1,000.00 15,000.00
Installation Sq.M 15 100.00 1,500.00
Supply LS 1
Installation LS 1 400,000.00 400,000.00
To Collection 500,000.00
Page 15 of 40
LBF UBF GF BLOCK A BLOCK B
S.No DESCRIPTION UNIT Tr. Yard Qty Qty Rate Amount
A B1 B2 B3 P1 P2 P3 P4 A B1 B2 B3 P1 P2 P3 P4 A B1 B2 B3 P1 P2 P3 P4 FF SF TF FF FF SF SF EF NF TF FF SF TF FF FF SF SF EF TF
S.No DESCRIPTION UNIT Qty Rate Amount
Excavation in all type of soils of suitable width and 450 mm depth of cable trenches
and back filled with the brick laid lengthwise on both sides of cable, duly filling with
22.0
fine sand and placing the brick widthwise over the cable for the following number
of cables
a single cable
Supply Rmtr RO
Installation Rmtr RO 200.00
b Two cables
Supply Rmtr RO
Installation Rmtr RO 220.00
c Three cables
Supply Rmtr RO
Installation Rmtr RO 260.00
d Four cables
Supply Rmtr RO
Installation Rmtr RO 260.00
e Five cables
Supply Rmtr RO
Installation Rmtr RO 290.00
To Collection -
Excavation in all type of soils of suitable width and 750 mm depth of cable
trenches and back filled with the brick laid lengthwise on both sides of cable, duly
23.0
filling with fine sand and placing the brick widthwise over the cable for the following
number of cables
a single cable
Supply Rmtr RO
Installation Rmtr RO 210.00
b Two cables
Supply Rmtr RO
Installation Rmtr RO 250.00
c Three cables
Supply Rmtr RO
Installation Rmtr RO 290.00
d Four cables
Supply Rmtr RO
Installation Rmtr RO 290.00
e Five cables
Supply Rmtr RO
Installation Rmtr RO 330.00
To Collection -
5 Page B 2.7/5 -
6 Page B 2.7/6 -
To Collection 3,938,250.00
Page 16 of 40
Davis Langdon & Seah Consulting India Pvt Ltd BILL 2.SUM/17
4 Page B 2.4/5 Section IV - Sub main, circuit main, light point wiring 2,009,960.00
and power receptacles
Section II - LT Switchgear
Page 19 of 40
S.No DESCRIPTION UNIT LOCATION BLOCK FLOOR GRID Qty Qty Rate
Installation No LMR Block B1 Terrace 1 6,000.00
Page 20 of 40
S.No DESCRIPTION UNIT LOCATION BLOCK FLOOR GRID Qty Qty Rate
Installation No Electrical Room Block A UBF 1 1,500.00
To Collection
RISING MAINS
A Sandwitch type bus duct : Aluminium, 1600 Amps, 25KA for Power
Page 21 of 40
S.No DESCRIPTION UNIT LOCATION BLOCK FLOOR GRID Qty Qty Rate
b Vertical Bend
Supply No. RO 12,000.00
Installation No. RO 600.00
c Fixing Bracket
Supply sets 12 800.00
Installation sets 12 150.00
e End Covers
Supply No. 1 47,450.00
Installation No. 1 1,000.00
f Floor seal
Supply No. 12 2,300.00
Installation No. 12 150.00
b Vertical Bend
Supply No. RO 7,250.00
Page 22 of 40
S.No DESCRIPTION UNIT LOCATION BLOCK FLOOR GRID Qty Qty Rate
Installation No. RO 500.00
c Fixing Bracket
Supply sets 6 800.00
Installation sets 6 150.00
To Collection
e End Covers.
Supply No. 1 34,050.00
Installation No. 1 800.00
f Floor seal
Supply No. 6 1,800.00
Installation No. 6 150.00
b Vertical Bend
Page 23 of 40
S.No DESCRIPTION UNIT LOCATION BLOCK FLOOR GRID Qty Qty Rate
Supply No. RO 7,250.00
Installation No. RO 500.00
c Fixing Bracket
Supply sets 10 800.00
Installation sets 10 150.00
e End Covers.
Supply No. 1 34,050.00
Installation No. 1 800.00
f Floor seal
Supply No. 18 1,800.00
Installation No. 18 150.00
To Collection
A Air insulated type bus duct : Aluminium, 1250 Amps, 25 KA for Power
b Vertical Bend
Supply No. RO 5,500.00
Page 24 of 40
S.No DESCRIPTION UNIT LOCATION BLOCK FLOOR GRID Qty Qty Rate
Installation No. RO 600.00
c Fixing Bracket
Supply sets 11 700.00
Installation sets 11 150.00
e End Covers.
Supply No. 1 39,225.00
Installation No. 1 1,000.00
f Floor seal
Supply No. 11 2,850.00
Installation No. 11 150.00
B Air insulated type bus duct : Aluminium, 400 Amps, 25 KA for Lighting
b Vertical Bend
Supply No. RO 2,000.00
Installation No. RO 350.00
c Fixing Bracket
Supply sets 11 575.00
Installation sets 11 100.00
Page 25 of 40
S.No DESCRIPTION UNIT LOCATION BLOCK FLOOR GRID Qty Qty Rate
d Tap off boxes 100A,25kA, with kWH meter
Supply No. 10 31,300.00
Installation No. 10 500.00
To Collection
e End Covers.
Supply No. 1 18,775.00
Installation No. 1 500.00
f Floor seal
Supply No. 11 2,200.00
Installation No. 11 150.00
To Collection
a Straight Run
Supply Rmt 20 28,000.00
Installation Rmt 20 1,500.00
b Vertical Bend
Supply No. 8 7,000.00
Installation No. 8 750.00
Terminal flange with adopter box and extention of bus bar for
d
terminating the bus duct.
Supply No. 8 73,500.00
Page 26 of 40
S.No DESCRIPTION UNIT LOCATION BLOCK FLOOR GRID Qty Qty Rate
Installation No. 8 1,500.00
a Straight Run
Supply Rmt 80 21,500.00
Installation Rmt 80 1,200.00
b Vertical Bend
Supply No. 16 5,350.00
Installation No. 16 750.00
Terminal flange with adopter box and extention of bus bar for
d
terminating the bus duct.
Supply No. 16 58,000.00
Installation No. 16 1,250.00
To Collection
Page 27 of 40
S.No DESCRIPTION UNIT LOCATION BLOCK FLOOR GRID Qty Qty Rate
Installation Nos 27 30.00
100A, MCCB,TP
Supply No 1 4,900.00
Installation No 1 100.00
COS, 100A, 4P
Supply No 1 7,500.00
Installation No 1 100.00
supply
Supply No 1 261,000.00
Installation No 1 10,000.00
To Collection
Page 28 of 40
S.No DESCRIPTION UNIT LOCATION BLOCK FLOOR GRID Qty Qty Rate
8.0 Push button stations.
PB Station:Off Push Button with lockable key,IP-55 on and with 1 mtr
high pedestal
Supply No. 14 1,000.00
Installation No. 14 100.00
To Collection
Page 29 of 40
NC - ELECTRICAL - TRACKING
Amount
40,000.00
75,000.00
75,000.00
90,000.00
6,000.00
6,000.00
Page 30 of 40
Amount
6,000.00
6,000.00
5,000.00
3,000.00
35,000.00
7,000.00
24,000.00
3,000.00
Page 31 of 40
Amount
1,500.00
3,000.00
1,500.00
3,000.00
1,000.00
10,000.00
54,000.00
Page 32 of 40
Amount
723,800.00
44,000.00
9,600.00
1,800.00
615,000.00
6,500.00
47,450.00
1,000.00
27,600.00
1,800.00
231,400.00
19,500.00
Page 33 of 40
Amount
4,800.00
900.00
1,735,150.00
369,000.00
3,900.00
34,050.00
800.00
10,800.00
900.00
95,000.00
2,500.00
605,200.00
51,000.00
Page 34 of 40
Amount
8,000.00
1,500.00
572,800.00
8,000.00
34,050.00
800.00
32,400.00
2,700.00
1,833,400.00
778,050.00
42,000.00
Page 35 of 40
Amount
7,700.00
1,650.00
417,000.00
6,000.00
39,225.00
1,000.00
31,350.00
1,650.00
310,800.00
21,000.00
6,325.00
1,100.00
Page 36 of 40
Amount
313,000.00
5,000.00
1,982,850.00
18,775.00
500.00
24,200.00
1,650.00
45,125.00
560,000.00
30,000.00
56,000.00
6,000.00
588,000.00
Page 37 of 40
Amount
12,000.00
1,720,000.00
96,000.00
85,600.00
12,000.00
928,000.00
20,000.00
4,113,600.00
48,840.00
4,400.00
8,280.00
270.00
35,370.00
Page 38 of 40
Amount
810.00
31,240.00
4,260.00
4,900.00
100.00
7,500.00
100.00
1,395.00
60.00
885.00
60.00
-
261,000.00
10,000.00
419,470.00
Page 39 of 40
Amount
14,000.00
1,400.00
15,400.00
Page 40 of 40