Data Request or Query
Request for all available core photos and downhole surveys

I am having some trouble reconciling the data in the ‘Rock Type’ column of the borehole data with the 3D geology
model provided. I have populated a spreadsheet attached, if someone on site could check the green cells, and fill in
the yellow and orange for me, that would be very helpful.
I also note that these geology surfaces do not extend the full width of the planned pits and behind planned walls
(see screenshot on sheet), I just want to double check that there is not a larger scale model that encompasses all of
the planned stage 7 pit to the northwest and the stage 6 pit to the south?

Query regarding location of completed diamond drill holes. I have mapped these and there is a large discrepancy in
the locations compared to the planned drillholes. Please review sheet and update collar location details if required.

The point load test results from during core logging drilling program have not been provided. Please pass on
PSM recent report
Up to date as built topo (most recent we have is -5mRL, 22/2/18)
Sheet Link

Query: Litho Units

Query: As drilled vs planned


Response
23/10/18 Link to core photos received. Photos of core samples are not included, trays show core after sample removal. Downho
29/10/18 Link to data folder received. Same set of core photos (no sample photos) and full set of downhole surveys received
Units provided as 3D geo model
surfaces (These will be used for Lithology description
stability models)

RTC Lahar (Pyroclastic)


RTM Crystal Tuff (Pyroclastic)
SLS Tephra
VAF Andesite Fragmental
VBA Basaltic Andesite
Veins (as per screen shot below) Typically Quartz based veins?
VPF Pyroclastic Flow Deposit

Info required to process data


Info useful for reporting
Units Logged
Which of the 3D geo models surfaces (in
in 'Rock Type'
column B) do these align with? If none, please
on Borehole
indicate as such.
Logs

Bx
Fgo
Hbx
Pct
Ptc
Ptf
Ptm
Qbv
Qbx Veins
Qcv Veins
Rba
Rtq
Scg
Slc
Sls SLS
Smd
Soil
Ssl
Ssq
VAB
Vaf VAF
Vba VBA

Note: The following were not logged from 2018 drillholes, but are mentioned in nomenclature files
Van
Vdp
Vbx
Ptq
QSV
Lithology description

Breccia
Fault Gouge
Hydrothermal Breccia
*maybe typo for ptc? Only 2 intervals in 1 drillhole
Conglomerates
Volcanic Mudstone
Volcanic Sandstone
*maybe typo for Qbx or Qcv? Only 1 interval in 1 drillhole
Quartz ± Chalcedony ± Adularia Breccia Vein
Calcite ± Quartz ± Chalcedony ± Adularia Breccia Vein
Basaltic Andesite
Lithic Tuff
Conglomerate
Clay Soil, Saprolite, Aluvium, Colluvium
Tephra
Mudstone
Soil
Siltstone
Silica Sinter
* only logged in GT18ARN02, 15 intervals
Andesite Fragmental
Basaltic Andesite

8 drillholes, but are mentioned in nomenclature files


Andesite
Rhyodacite
Volcanic Breccia
Volcanic Sandstone and Conglomerate
Quartz ± Chalcedony ± Adularia Vein
Query 1:
Can you please confirm the collar locations as below (taken from headers of logging sheets)

Hole ID Collar E Collar N Collar RL Collar Azi Collar Incl Collar Total Depth
DD18ARN0586 753313.13 173408.34 92 270.1 -55.1 279.7 *Perhaps typo: 735313.1?
GT18ARN01 735224.5 172719.5 95 240 -50 270
GT18ARN02 735244.2 172727.2 95 66.4 -59.9 260
GT18ARN03 735289.9 172551.1 95 80 -79.4 260
GT18ARN04 735289.9 172551.1 95 80 -79.4 260 *Appears to have been missed, sa
GT18ARN05 735367.55 172578.56 125 110 -69.8 245
GT18ARN06 735283.83 172562.31 113 192.7 -65 242.2
GT18ARN07 735136.72 173764.36 128 240.5 -50 100.1

Query 2:
There has been a signifcant change from the drill holes shown in planned presentation we have compared to as drilled (see scr
blue is as drilled, red was planned). Only 2 holes appear to have been drilled as planned (GT18ARN01 = AR18_04 and GT18A
Please advise if correct.
typo: 735313.1?

to have been missed, same as GT18ARN03, please provide collar location

ared to as drilled (see screenshots below,