ACKNOWLEDGEMENT RECEIPT

Document / Report no – SSE – RCY 22501 – AR – 007

Date: 23/ 01 2018

We hereby acknowledge the receipt of documents from you. The documents received
are as follows:

1) Weekly safety walk through flow chart.

2) Existing Site condition Report.


3) Royal commission Pipe line & Utility Corridors Manual (Construction contractor
should collect from their Relevant Industries)
4) Permit closure flow chart
5) Work permit implementation flow chart

We -------------------------------------------------------------- , Accept to follow All the Instructions


strictly, which is mentioned in above documents.

Received & Accepted by Issued by


Name Name
Designation Designation
Entity Name Entity Name
Contact No & Contact No &
E mail ID E mail ID

Signature Signature
API – Inspection service provide to Industries Corridor pipeline
 Carried on-stream inspection which industries pipeline placed on the RCY –
Industries Corridor pipeline.
1. Find out abnormalities
2. Excess vibration
3. Support misplacement and displacement
4. Drain point ground clearance
5. Vegetation
6. Valve leakages
7. Flange joint crevice corrosion
8. CUI – corrosion under insulation
 NDT – Inspection result interpretation
1. UTG – Industries pipeline Ultrasonic inspection report
2. Intelligent pigging inspection report
3. GUT – Guided wave ultrasonic test report
4. Thermography for measuring heat loss on Insulated pipelines
5. Radiography interpretation for welded joints
 Industries Audit - Guidelines for compliance Audit for Inspection of Industries
Piping systems in the RC Pipelines Corridors.
1. Ensure Industries follow the RCY guidelines
2. Ensure Industries corridor pipelines safe and secure
3. Regularly update pipeline owner ship verification
 Daily patrolling RCY – Industries Corridor-HIP & LIP
1. Avoid encouragement inside pipeline corridors
2. Avoid un-authority working inside industries pipeline corridors
Daily Patrolling Inspection Check list along with the HIP/LIP Industries corridors
pipelines

S.NO OBSERVATION YES NO REMARKS


1 Whom work inside HIP/LIP pipeline corridors ,
Industries / Contractors having valid permit,
signature from ICD or other department
2 Whom work inside HIP/LIP pipeline corridors
Industries / Contractors having any safety
violations
3 Whom work inside HIP/LIP pipeline corridors
Industries / Contractors doing against of work
permit scope
4 Whom work inside HIP/LIP pipeline corridors
Industries / Contractors crossing other industries
utilities / pipeline weather they
convey/permission to the concern industries
5 Whom work inside HIP/LIP pipeline corridors
Industries / Contractors proceed there work as
per RCY engineering approval drawings
6 Whom work inside HIP/LIP pipeline corridors
Industries / Contractors opening of utilities
manhole weather they convey/permission to the
concern department
7 Whom work inside HIP/LIP pipeline corridors
Industries / Contractors opening of utilities
manhole weather they convey/permission to the
concern department
Active contractors’ in pipeline corridors in HIP/LIP

S.NO ACTIVE CONTACTORS ZONE LOCATION INSPECTION


TEAM
HIP
1 KABBANI - YANPET Zone -1 King fahad road Team-1-7582
2 L&T - FARABI Zone-2 T-4-Petrolaan Team-1-7582
UIPS Zone-2 Team-1-7582
3 AL-ESSA - ARAMCO Zone-2 T-5-Massna Team-1-7582
ghaz
4 Abdulla Fouad -ARAMCO Zone-2 T-5-Massna Team-1-7582
ghaz
5 DPL- YASREF Zone-3 T-6 to T-8 Team -2 -9181
6 SITCO Zone-4 T-9 Team -2 -9181
7 Nesma TATA Zone-4 Yanbu-2 Team -2 -9181
LIP
1 EPPM – Al- Khaiyat LIP-1 Al- Khaiyat Team-1-7582
Factory Factory
2 OLIYAN DISCAN - TARKIS LIP-1 Team-1-7582
3 UIPS LIP-2 Team -2 -9181