You are on page 1of 1

REMARKS

PRINCIPAL PARTICULARS
Length (LOA) 115.02 m
Length (Lpp) 104.00 m
Breadth (mld) 19.20 m
Depth (mld) Upper Deck 13.40 m
Depth (mld) Freeboard Deck 8.00 m
Draft (mld) Scantling 7.40 m
Draft (Summer Ext) 7.368 m
Upper Cargo Hold Upper Cargo Hold 2 Upper Cargo Hold 1
Gross Tonnage 7624 t
Deadweight 8212 t
Main Engine 1 set B&W 8L35MC
Heeling Tank
FPT (C)
MCO 4300 kW (5850 PS) x 200 rpm
Lower Cargo Hold Lower Cargo Hold 2 Lower Cargo Hold 1
CSO 3655 kW (4870 PS) x 189 rpm
Service Speed (with 10% S.M.) 13.80 kn
WBT FOT FOT WBT
Trial Max Speed 16.41 kn
Classification NK, NS*, MNS*

Out Reach 6.00 m

Out Reach 4.00 m Out Reach 4.00 m CLOSING DEVICES


Nav Bridge Deck Cargo Handling 1 Closing appliance Location
2 Aft ramp Upper deck
Comp Deck 3 Access hatch C.Hold 2 Upper deck
DP DP
4 Cargo Hold 2 Hatch Upper deck
5 Access hatch C.Hold 1 Upper deck
Radio Rm
6 Cargo Hold 1 Hatch Upper deck
7 Access to Bosun Store Upper deck
Eng Room
Wheel House 8 Ramp access to C.Hold 1 Freebd deck
Funnel
9 Partition C.Holds 1&2 Freebd deck
Batt Rm

Dck Ctr

Min R 4.00 m
DP DP

MANHOLES
1 Heeling tk manholes (P&S) Freebd deck
2 No. 3 WBT manholes (P&S) Tank top
Out Reach 4.00 m
3 No. 1 DOT manholes (P&S) Tank top
Out Reach 4.00 m
Upper Deck 4 No. 2 FOT manholes (P&S) Tank top
Captain's Deck Out Reach 6.00 m
5 No. 2 WBT manholes (P&S) Tank top
Accom
Ladder Closing Devices
6 No. 1 FOT manholes (P&S) Tank top
Paint
7 No 1 WBT manholes (P&S) Tank top
DP Laundry Store
Toilet
C/Eng

Spare 2/Eng 1/Eng Aircon


Mach
C/Eng
No 2

Room
LR

WC
Bathroom

Lavatory

Eng Room 2/ Off Bath Cargo Hold 2 Cargo Hold 1


Room
Eng Room
No 1 Prov Store

Sail (C)
No 1
LR

Capt Fire Spare (B)


No 2 Prov Store

Station
EE Rm C/Ope C/Off
Toilet
Capt

Veg.
Sail (B)
Spare (A)
Spare (B)
DP
Fish & Meat
Tally
Room Deck
Store

Accom
Ladder

Freeboard Deck
Bridge Deck
Heeling Tank (P)
Closing Devices
DP
No 4 LR
No 1 Oil

y
Oil (B)

Oil (A)

e wa
Elec

Slop
3rd Eng
CO2 Bottle Room

Gen Office CL CL
Cargo Hold 2 Cargo Hold 1

Eng Room
FPT (C) FPT (C)

CL CL
AB/SM (A)
AB/SM (C)

AB/SM (B)
WC

Engine Room
C/Cook
Hosp

3rd Off.
No 3 LR

Control Room
No 5 LR

Workshop

DP
ay
w

No 6 LR
p
am
R

Heeling Tank (S)

Boat Deck
Tank Top
Life Boat Fan Rm
No 2 Fix BT Manholes
BW
No 2 WBT (P)
No 3 Fix BT (P)
No 3 WBT (P)

FWT (P) BW
Mess Man No 1 WBT (P)
Rating's Mess

Galley No 2 DOT (P)


No 2 FOT (P) No 1 FOT (P) MV SAN RAFAEL UNO
BSOT No 1 DOT (P)
Bosun CL
Void Space

BW

BT

Eng Room Aft Peak Tank LOST No 1 Fix BT (C) FPT (C)
Sailor (A) FSB
CL
FBT No 1 DOT (S)
No 2 DOT (S)
Duct Room No 1 FOT (S)
No 2 FOT (S)
Officer's Mess No 1 WBT (S)
Lavatory FWT (S) BW

No 3 WBT (S)

Life Boat
No 3 Fix BT (S)
No 2 WBT (S)
INTERNAL AND EXTERNAL
BW
Fan Rm
CLOSING EQUIPMENT

You might also like