THE MOSQUE

1. Foundation Trench
a) Excavation of trench not more than 1m depth - N15,000
b) Excavation of Column Bases. - N6,000
N21,000

2. Twisted Iron ReBars in Columns and Column Bases


a) 10 Lengths of 12mm bars at 2500/1 - N25,000
b) 3 Lengths of 10mm bars at 1500/1 - N4,500
e) Iron Bender - N8,000
N37,500

3. Concrete In Foundation Footing


a) 20 Tonnes of Stone Dust - N68,000
b) 20 Tonnes of ¾ Gravels - N68,000
c) 8 Bags of Cement at 2550/1 - N20,400
d) Labourers - N16,000
N172,400

4. Block work In Foundation up to DPC


a) Approximately 150 pcs of 9’’ Hollow Blocks at 180/1 - N27,000
b) 5 Bags of Cement at 2550/1 - N12,750
c) Bricklayers - N13,000
N52,750

5. Laterite and Hardcore Filling


Allow for - N15,000

6. Concrete In Ground Floor Slab


a) Sawn Formwork to Edges of Blocks - N10,000
b) Concrete
i) 10 Bags of Cement at 2550/1 - N25,500
ii) Labourers - N16,000
N51,500

7. Blocks Work on Ground Floor Slab


a) 350 no of 9” blocks at 180/1 - N 63, 000
b) 8 Bags of cement at 2550/1 - N 20, 400
c) Bricklayers - N 17, 000
N100,400
8. Lintels and Columns
a) Carpenters and Nails - N 15, 000
b) Twisted Iron Bars in Lintels and Columns
i. 10 lengths of y12 mm at 2500/1 - N 25, 000
ii. 3 lengths of y10 mm at N1500/1 - N 4,500
iii. Iron Benders - N 10, 000
c) Concrete in Lintels and Columns
i. 6 bags of cement at N2550/bag - N 15,300
ii. Labourers - N 8, 000
N 77,800

9. Parapet Headcourse
a) Twisted Iron Bars in Headcourse
i. 4 lengths of y12 mm at 2500/1 - N 10,000
ii. 2 lengths of y10 mm at 1500/1 - N 3, 000
iii. Iron Benders - N 6, 000
b) Carpenters - N10,000
c) Concrete in Headcourse
i. 4 bags of cement at 2550/1 - N10,200
ii. Labourers - N 8, 000
d) 12m of Polysterine Fascia at 4400/m - N52,800
N100,000

10. Rafter and Noggins


a) 15 No of 2x6x12 hardwood at 650/1 - N 9,750
b) 40 no of 2x4x12 at 450/1 - N18,000
c) 40 NO of 2x3x12 at 300/1 - N 12,000
d) 4 “ Nails - N 10, 000
e) Carpenters - N 15, 000
N 64,750

11. Stone Coated Roof Tiles


a) Approximately 40 m2 of Roof panels at 4200/m2 - N 168, 000
b) About 10m of ridge cap at 2800/m - N 28, 000
c) 5kg of screw Nails at 3000/kg - N 15, 000
e) Finishing kits at 4000/1 - N 4, 000
f) Installation and transportation - N 8, 000
N 223, 000