Agenda:
• Revisit why we need to do this project
• Discuss updates to the design
• Provide update on the garden area of the ravine
• Review the next steps
• Solicit community questions and comments
Timeline Overview
Project Design
Public Outreach
Preliminary
Engineering Community Advisory Committee Project
Seven
Report community Provided feedback on garden area
Update
August 2016 meetings held of the ravine November
March – May August – October 2018 27, 2018
2018 Revised Design
Project redesign after receiving
public input
June – November 2018
Albany Water Board
Background
Below-Grade Chemical
Storage Area
Chemical
Delivery and
Stairwell
Below-Grade
Disinfection
Contact Tanks
Introduction to the
New Concept
Connection to the 3rd Avenue Sewer
Recommended Alternative
New Regulator at Ganesvoort
Beaver Creek Sewer Existing Conditions
Previous Concept Layout Dry Weather Conditions
Concept Layout Typical Wet Weather Conditions
Concept Layout Extreme Wet Weather Conditions
Screening Chamber
Perspective looking downstream
Screening Chamber
Perspective looking upstream
Upgrades to the Treatment Plant Screens
Project Benefits
Traffic Considerations
Loop road concept could provide
additional parking and control
day-time traffic patterns
Traffic Considerations
Building size has
been significantly
reduced as solids
will now be
handled at the
Treatment Plant
Site Considerations
Impervious areas
at the facility have
also been
significantly
reduced to
minimize impacts
Site Considerations
Reflection & Learning
Garden Update
Since April
http://www.iconshelters.com/sites/default/files/styles/product_images/public/import/MP20X24M-P4~3586~62606.jpg?itok=8WYuDlMT
Classroom Elements
Outdoor Chalkboard & Seating
https://s-media-cache-ak0.pinimg.com/736x/f2/2a/ae/f22aae4496ca101d52cb207d5749bba6.jpg
Outdoor Chalkboard & Seating
https://i.pinimg.com/originals/b8/6e/c4/b86ec4602b1c85f80ed5251c04149f66.jpg
Nature Inspired Play
Log Balance Beam
https://www.playlsi.com/contentassets/5d300ce27bb44e67b3e1dc5ab365b252/ip-logbalancebeam_screen.jpg?width=905&height=450&mode=max
Log Crawl Tunnel
https://www.playlsi.com/contentassets/c4fdc8321485484c8dcac854362a9e7a/ip-log-crawl-tunnel_screen.jpg?width=905&height=450&mode=max
Log Steppers Rock Climber
https://www.playlsi.com/contentassets/07e23332a2e64c53906db354c2a9e7e4/ps-ps_log- https://www.playlsi.com/contentassets/0e2af2ebeaeb43508a324f21092abdea/ip-thepeaknaturalclimber_screen.jpg?width=905&height=450&mode=max
stepper_screen.jpg?width=905&height=450&mode=max
https://www.buckandsons.com/wp-content/uploads/2015/01/commercial-patio-pavers.jpg
Paver Labyrinth
100-Year Floodplain