You are on page 1of 233

CONSTRUCTION OF CARDIOLOGY UNIT (BALANCE WORKS)

TEACHING HOSPITAL - KURUNEGALA

STAGE 01 - CIVIL AND ELECTRICAL WORKS

ENGINEER'S ESTIMATE

BILL No. 01 - PRELIMINARIES

RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
Rs. Cts. Rs. Cts.

GENERAL NOTES

This work is a continuation of a partially Note.


completed construction works of a five storied
building. The Tenderer is thoroughly advised
to visit the proposed worksite. It is the
Tenderer's responsibility to asserting the
existing working conditions, governing factors
to access to the site, the extent of working
space, storage area, working with the day to
day functioning of the Building, etc and rating
the BOQ.

Arrangements shall be made by the Tenderer Note.


to dismantle all temporary and false
constructions and fabrications and remove all
rubbish and debris away from the work site.

MODE OF PAYMENTS.

(a). The contractor shall be paid sum quoted Note.


satisfactory completion for items. 1A.01,
1A.02, 1A.03, 1A.04, 1A.05, 1A.14 and 1A.22.

(b). The contractor shall be paid in equal Note.


monthly installments over the contract period
upto the maximum quoted for items 1A.08,
1A.13, 1A.15, 1A.16, 1A.17 and 1A.21

1
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
Rs. Cts. Rs. Cts.
(c). The contractor shall be paid 75% of the Note.
sum quoted on satisfactory completion, 15%
of the sum quoted in monthly installments
over the contractor period and balance 10%
on completion of work & after removal debris
from site, for items. 1A.06, 1A.07, 1A.09,
1A.10, 1A.11 and 1A.18

1A.01 Allow lump sum for providing performance L. Sum 112,500.00


bond for the contract.

1A.02 Allow lump sum for providing mobilization L. Sum 45,000.00


advance bond.

1A.03 Allow lump sum for insurance of property, L. Sum 62,500.00


materials and works at site.

1A.04 Allow lump sum for third party insurance. L. Sum 62,500.00

1A.05 Allow lump sum for insurance against L. Sum 62,500.00


accidents and injury to workman.

1A.06 Allow lump sum for construct furnish and L. Sum 100,000.00
maintain temporary building for site
Engineer's staff including sanitary facilities
(size 8m x 4m)
.
1A.07 Allow lump sum for providing furniture and L. Sum 150,000.00
items for Engineer's office as follows. (Items
undermentioned are to be provided for the
use of consultants office during the
construction period and will be returned to the
contractor after the contract is over)

(a). 2.5X1.5m conference table with 08


conference chairs
(b) One No. of 1.5X1.2m writing table
(c) 02 Nos. of 1.2X0.75m writing tables.
(d) 06 Nos. of Plastic Arm chairs
(e) 01 Nos. of steel filing cupboard.
(f) 01 Nos. of steel filing cabinet
(g) 01 Nos. of Lockable cupboard
(h) 06 Nos. of Safety Helmets
(j) 06 Nos. of pairs of gum boots

2
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
Rs. Cts. Rs. Cts.

1A.08 Allow lump sum for providing communication L. Sum 270,000.00


& computer facilities consisting followings.
(Items undermentioned are to be provided for
the use of consultants office during the
construction period and will be returned to the
contractor after the contract is over)

(a). Minimum 'Pentium IV, 1600Mhz' speed


computer with 1 Nos. of printer (Laser or
Bubble Jet) and 17" coloured Monitor.
(b). Telephone and fax facilities for contractual
communication purposes (in sharing basis is
also accepted).
Rate to include for provision of continuous
service of the above equipments.

1A.09 Allow lump sum for construct, equip and L. Sum 25,000.00
maintain temporary building for contractors
office including sanitary facilities.

1A.10 Allow lump sum for construct, equip and L. Sum 25,000.00
maintain temporary sheds for contractor's
staff accommodation including sanitary
facilities.

1A.11 Allow lump sum for construct furnish and L. Sum 35,000.00
maintain temporary building for contractor's
workers including sanitary facilities

1A.12 Allow provisional sum for giving notices, P.Sum. 10,000.00


obtain permits and the payment of fees in
compliance with the requirements of
Government, semi Government, local
Government authorities or other public
authorities.

1A.13 Allow lump sum for provision of progress L. Sum 15,000.00


charts, schedules, shop drawings etc.

3
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
Rs. Cts. Rs. Cts.

1A.14 Allow lump sum for provision of Two sets of L. Sum 15,000.00
As-Built drawings each consisting of 1 set of
transparencies and 2 sets of blue prints for
the following works.

a) Electrical power supply


b) Water supply
c) Sewerage and waste water lines
d) Air conditioning and pipe medical gas
e) Fire detection and fire protection

1A.15 Allow lump sum for setting out of any balance L. Sum 10,000.00
work.

1A.16 Allow lump sum for supplying of water for use L. Sum 100,000.00
in the work.

1A.17 Allow lump sum for supplying electricity for L. Sum 100,000.00
use in the work.

1A.18 Allow lump sum for application of safety L. Sum 600,000.00


procedures to safeguard people and
properties in surrounding areas of working
site by providing protective netting with heavy
duty GI pipe frame structure around the
building. Rate shall include for marinating the
same throughout the construction period and
removal after completion.

1A.19 Allow Provisional sum for providing necessary P.Sum. 20,000.00


warning notices, night lights etc.

1A.20 Allow Provisional sum for supplying P.Sum. 50,000.00


specimens and samples of materials for
carryout cost and approvals.

1A.21 Allow lump sum for protecting and safe L. Sum 180,000.00
guarding the work, materials, plants and
machineries against damages, trespass.

1A.22 Allow lump sum for dismantle all temporary L. Sum 15,000.00
and false constructions, removal of rubbish
and debris from the hospital premises as
directed by the Engineer.

4
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
Rs. Cts. Rs. Cts.
1A.23 Allow provisional sum for supplying all P.Sum. 500,000.00
materials, fabrications and fixing of temporary
GI sheet fence using 3m high corrugated GI
sheets, with 50mm diameter GI pipe frame
work. Rate to include for providing gates,
openings, doors etc at required places and
removal at the completion. (Approximate
periphery is 150m)

1A.24 Allow provisional sum for any shifting of P.Sum. 250,000.00


existing electrical, water supply, waste or
sewer lines, removing of existing structures
and other unforeseen works

1A.25 Allow provisional sum for providing P.Sum. 2,430,000.00


construction management services. The
following requirements shall be made
throughout the contract period in full time
basis. All details CVs, payment details should
be provided by the Tenderer.

1. One Resident Engineer of B.Sc. Qualified


with minimum Five years experience in
building constructions works.

2. One Technical Officer of N.D.T., N.D.E.S,


H.N.D.E. or equivalent qualification with
minimum five years experience in building
construction works.

3. Two Work Supervisors of N.C.T. or


equivalent qualification with minimum Three
years experience in building construction
works.

Total of Preliminaries carried to Main Summary (Page 165 ) 5,245,000.00

5
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
Rs. Cts. Rs. Cts.

6
CONSTRUCTION OF CARDIOLOGY UNIT (BALANCE WORKS)
TEACHING HOSPITAL - KURUNEGALA

STAGE 01 - CIVIL AND ELECTRICAL WORKS

ENGINEER'S ESTIMATE

BILL No. 02 - SITE PREPARATION

RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
Rs. Cts. Rs. Cts.

2A - DEMOLISHER AND EARTH WORKS

All debris coming from the demolishing


works should be cleared away from the site
premises as directed and therefore the
items should be rated accordingly
considering one kilometer haul.

2A.1 Demolishing of block masonry in the m3 36.00 357.00 12,852.00


existing boundary wall and clearing away
debris as directed.

2A.2 Demolishing of existing rubble foundation m3 3.00 556.50 1,669.50


for column foundations and clearing away
debris as directed

2A.3 Cutting, leveling and removal of heap of L.Sum 45,000.00


debris stocked at Mara trees area to the
pavement level and clearing away debris
and excavated materials as directed
(approximate value 150 m3)

2A.4 Cutting and leveling of earth around the m3 75.00 370.00 27,750.00
building to the level of pavement and
clearing away debris and excavated
materials as directed ( Approximate area is
375 m2 which is to be cut averagely
200mm depth)

2A.5 Cutting, uprooting and stacking of "Mara" L.Sum 20,000.00


trees (2 Nos.) having 2m - 4m girth
measured 1m above ground level including
filling of any excavation with available soil

.
Total of Demolisher & Earth Works carried to Summary of Bill No. 02 107,271.50
(Page 53)
6
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
Rs. Cts. Rs. Cts.

7
CONSTRUCTION OF CARDIOLOGY UNIT (BALANCE WORKS)
TEACHING HOSPITAL - KURUNEGALA

STAGE 01 - CIVIL AND ELECTRICAL WORKS

ENGINEER'S ESTIMATE

BILL No. 02 - SITE PREPARATION

RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
Rs. Cts. Rs. Cts.

2B - CONSTRUCTION OF BOUNDARY WALL

2B1 - EXCAVATOR

Rate shall include for; Note


(a) Leveling bottom of trenches and
keeping sides plumb.
(b) Back filling with selected excavated
material and well consolidating.
(c) Disposal of surplus excavated material
as directed.

2B1.1 Excavation for foundation for boundary wall m3 20.00 355.00 7,100.00
at rear side of building, depth not exceeding
1.5m in any material except rock required
blasting part return fill in & well rammed
surplus disposed away from site

Total of Excavator carried to Bill Summary (Page 11) 7,100.00

2B2 - CONCRETOR

All concrete works should be compacted Note


well and should be free of honeycombs or
other surface irregularities.

Rates shall include for the cost for mixing, Note


handling, hoisting, laying, compacting,
curing, necessary formworking and making
good after removal of formwork.

7
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
Rs. Cts. Rs. Cts.
Unless otherwise specified, all formworks Note
and reinforcements are measured
separately.

2B2.1 1:3:6 (40mm) cement concrete for screed. m3 2.50 8,679.00 21,697.50

2B2.2 1:2:4 (20mm) cement concrete for m3 10.50 9,820.00 103,110.00


200X200mm reinforced concrete columns,
column footings and plinth beam for block
work.

Formworks

All necessary boarding, supporting, Note


erecting, framing, cutting angles, skirting or
removal, cleaning, wetting & treating before
placing concrete.

2B2.3 Supplying and fixing of 20mm thick Rubber m2 70.00 655.00 45,850.00
or equivalent timber formworks of approved
quality including necessary joists and
props.

Reinforcements

Rate shall include for cutting, bending, Note


fabricating, placing in position, holding and
supporting including temporary fixing
supports, hangers, space bars, chairs,
laps, binding wires and waste.

Reinforcement having minimum Note


characteristic strength of 460 N/mm2 for Tor
(Yield) steel and 250N/mm2 for Mild steel.

2B2.4 Supplying and laying of Tor steel bars for Kg 400.00 132.00 52,800.00
foundation and column.

2B2.5 Supplying and laying at mild steel bars for


Kg 80.00 130.50 10,440.00
stirrups.

Total of Concretor carried to Bill Summary (Page 11) 233,897.50

8
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
Rs. Cts. Rs. Cts.

2B3 - MASONRY WORKS

Rates include for all joggles, cramps, Note


dowels, ties, templates, rough & fair cutting,
forming splays, angles, reveals & setting,
joining, fixing in position and pointing,
protecting & cleaning down

2B3.1 Random rubble masonry in 1:5 cement m3 25.00 5,320.00 133,000.00


sand mortar in wall foundation. Rate to
include for keeping weep holes at every 2m
intervals

Total of Masonry Works carried to Bill Summary (Page 11) 133,000.00

2B4 - BLOCK WORK

Rate shall include for all rough & fair Note


cuttings, plumbing, reveals, rough arches,
raking out all joints for pointing plastering,
cutting chases, making good at the
completion.

2B4.1 150mm thick block masonry using solid m2 120.00 1,340.00 160,800.00
blocks in 1:5 cement & sand mortar. Rate
to include for keeping 12mm contraction
joints in every 5m intervals.

Total of Block Layer carried to Bill Summary (Page 11) 160,800.00

2B5 - PLASTERER

Rate shall include for all temporary rules, Note


screeds, etc., for racking out joints of new
brick work or new concrete for key, making
good around pipes, sanitary fittings and
similar fixtures.

9
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
Rs. Cts. Rs. Cts.

Rate to include for the cost for scaffoldings Note


where necessary.

2B5.1 15mm thick 1:1:5 cement lime sand plaster m2 250.00 351.00 87,750.00
finished semi rough with wooden floating

2B5.2 Preparing of 150mm wide coping in 1:4 m 71.00 450.00 31,950.00


cement mortar on boundary wall finished
semi rough.

2B5.3 20mm thick 1;3 cement sand rendering with m2 42.00 480.50 20,181.00
normal cement floating coat for plinth of
boundary wall.

Total of Plasterer carried to Bill Summary (Page 11) 139,881.00

2B6 - PAINTER

All alkali resisting primers & weathersheild Note


paint quality & colours shall be approved by
the Engineer.

2B6.1 Painting walls with one coat of alkali m2 270.00 223.00 60,210.00
resisting primer and 2 coats of
weathershield paint including preparing
surface of new work

Total of Painter carried to Bill Summary (Page 11) 60,210.00

2B7 - RUBBLE PACKING

2B7.1 Supplying of 100 - 150mm rubble and m3 1.00 4,750.00 4,750.00


packing around weep holes as directed

Total of Painter carried to Bill Summary (Page 11) 4,750.00

10
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
Rs. Cts. Rs. Cts.

11
CONSTRUCTION OF CARDIOLOGY UNIT (BALANCE WORKS)
TEACHING HOSPITAL - KURUNEGALA

STAGE 01 - CIVIL AND ELECTRICAL WORKS

SUMMARY OF BILL No. 02B - CONSTRUCTION OF BOUNDARY WALL

AMOUNT
Sub Bill No. DESCRIPTION
Rs. Cts.

2B.1 EXCAVATOR 7,100.00

2B.2 CONCRETOR 233,897.50

2B.3 MASONRY WORKS 133,000.00

2B.4 BLOCK WORK 160,800.00

2B.5 PLASTERER 139,881.00


2B.6 PAINTER 60,210.00

2B.7 RUBBLE PACKING 4,750.00

TOTAL OF SUB SUMMARY 2B CARRIED TO SUMMARY OF 739,638.50


BILL No.02 (Page 53)

11
CONSTRUCTION OF CARDIOLOGY UNIT (BALANCE WORKS)
TEACHING HOSPITAL - KURUNEGALA

STAGE 01 - CIVIL AND ELECTRICAL WORKS

ENGINEER'S ESTIMATE

BILL No. 02 - SITE PREPARATION

RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
Rs. Cts. Rs. Cts.

2C. EXTERNAL DRAIN WORKS

2C1- CONCRETE DRAINS

All concrete works should be compacted Note


well and should be free of honeycombs or
other surface irregularities.

Rates shall include for the cost for mixing, Note


handling, hoisting, laying, compacting,
curing, necessary formworking and
making good after removal of formwork.

Unless otherwise specified, all formworks Note


and reinforcements are measured
separately.

2C1.1 Construction of 300mm wide 225mm to m 125.00 4,400.00 550,000.00


500mm depth concrete drain with 100mm
thick 1:2:4 (20) concrete base and
100mm thick side walls including
excavation, back filling and compaction,
formworking with suitable materials with
supports, reinforcing with 10mm tor steel
'U' bar at 150mm spacing and 6mm mild
steel distribution bars at 150mm spacing,
casting and compacting, curing, etc,
finishing internal areas and all exposed
areas with 12mm thick 1:3 cement sand
rendering with cement floating. Rate to
include for forming of 50X38mm size
groove for placing of cover gratings and
forming of expansion joints. (Cover grating
paid separately)

12
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
Rs. Cts. Rs. Cts.

2C1.2 Construction of 450mm wide 500mm to m 61.00 7,500.00 457,500.00


1000mm depth concrete drain with
125mm thick 1:2:4 (20) concrete base
and 125mm thick side walls including
excavation, back filling and compaction,
formworking with suitable materials with
supports, reinforcing with 10mm tor steel
'U' bar at 125mm spacing and 10mm Tor
steel distribution bars at 200mm spacing,
casting and compacting, curing, etc,
finishing internal areas and all exposed
areas with 12mm thick 1:3 cement sand
rendering with cement floating. Rate to
include for forming of 75X150 size groove
for placing of 150mm thick cover slab and
forming of expansion joints. (Cover slab
paid separately)

2C1.3 Construction and placing of 600X600X150 Nos. 102 1,200.00 122,400.00


size reinforced concrete cover slab using
1:2:4 (20) cement concrete as per drawing
including formworking, reinforcing with
12mm tor steel bars at 125mm spacing
both ways for top and bottom layers,
placing and compaction of concrete,
curing and placing in position. Rate to
include for preparation of top surface of
cover slab smoothly.

2C1.4 75mm thick 1:3:6:(25) cement concrete m2 20.00 750.00 15,000.00


screed under drain base as directed.

Total of Concrete Drains carried to Bill Summary (Page 14) 1,144,900.00

2C2 - STEEL WORKS

13
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
Rs. Cts. Rs. Cts.
2C2.1 Supplying all materials, fabricating and Nos. 210 950.00 199,500.00
placing of 400X600 size steel cover
gratings using 38X38mm size heavy duty
GI box bars as per drawing. Rate to
include for all necessary cuttings,
bendings, grinding, sizing, welding,
placing and painting with two coats of anti-
corrosive paints and two cotas of enamal
paints.

Total of Iron Work carried to Bill Summary (Page 14) 199,500.00

14
CONSTRUCTION OF CARDIOLOGY UNIT (BALANCE WORKS)
TEACHING HOSPITAL - KURUNEGALA

STAGE 01 - CIVIL AND ELECTRICAL WORKS

SUMMARY OF BILL No. 02C - DRAIN WORKS WORKS

AMOUNT
Sub Bill No. DESCRIPTION
Rs. Cts.

2C.1 CONCRETE DRAIN WORKS 1,144,900.00

2C.2 STEEL WORKS 199,500.00

TOTAL OF SUB SUMMARY 2C CARRIED TO SUMMARY OF 1,344,400.00


BILL No.02 (Pagr 53)

14
CONSTRUCTION OF CARDIOLOGY UNIT (BALANCE WORKS)
TEACHING HOSPITAL - KURUNEGALA

STAGE 01 - CIVIL AND ELECTRICAL WORKS

ENGINEER'S ESTIMATE

BILL No. 02 - SITE PREPARATION

RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
Rs. Cts. Rs. Cts.

2D - CHAIN LINK FENCE

2D1 - DEMOLISHER

All debris coming from the demolishing


works should be cleared away from the
site premises as directed and therefore the
items should be rated accordingly
considering one kilometer haul.

2D1.1 Preparation of 450X450X450 size pockets Nos. 10 120.00 1,200.00


in existing rubble masonry foundation to
insert GI pipe posts. Rate to include for
clearing away debris. (GI posts paid
separately)

2D1.2 Removing of existing fence posts with m 42.00 77.00 3,234.00


barbed wire fence. Rate including clearing
along the fence, rolling barbed wires and
handing over to client.

Total of Demolisher carried to Bill Summary (Page 19) 4,434.00

2D2 - EXCAVATOR

Rate shall include for; Note

(a) Leveling bottom of trenches and


keeping sides plumb.

(b) Back filling with selected excavated


material and well consolidating.

(c) Disposal of surplus excavated material


as directed.

15
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
Rs. Cts. Rs. Cts.

2D1.1 Excavation for foundation for chain link m3 20.00 355.00 7,100.00
fence depth not exceeding 1.5m in any
material except rock required blasting part
return fill in & well rammed surplus
disposed away from site

Total of Excavator carried to Sub Summary (Page 19) 7,100.00

2D3- CONCRETOR

All concrete works should be compacted Note


well and should be free of honeycombs or
other surface irregularities.

Rates shall include for the cost for mixing, Note


handling, hoisting, laying, compacting,
curing, necessary formworking and
making good after removal of formwork.

Unless otherwise specified, all formworks Note


and reinforcements are measured
separately.

2D3.1 1:2:4 (20mm) cement concrete for pockets m3 2.00 10,881.00 21,762.00
of GI posts

2D3.2 100X150mm size plain concrete beam for m3 2.00 13,500.00 27,000.00
embedding chain link with the foundation
using 1:2:4 (20mm) cement concrete

Formworks

All necessary boarding, supporting, Note


erecting, framing, cutting angles, skirting
or removal, cleaning, wetting & treating
before placing concrete.

2D3.3 Supplying and fixing of 20mm thick m2 13.00 655.00 8,515.00


Rubber or equivalent timber formworks of
approved quality including necessary joists
and props.

16
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
Rs. Cts. Rs. Cts.

Total of Concretor carried to Bill Summary (Page 19) 57,277.00

2D4 - MASONRY WORKS

Rates include for all joggles, cramps, Note


dowels, ties, templates, rough & fair
cutting, forming splays, angles, reveals &
setting, joining, fixing in position and
pointing, protecting & cleaning down

2D4.1 Random rubble masonry in 1:5 cement m3 10.00 5,320.00 53,200.00


sand mortar in wall foundation. Rate to
include for keeping weep holes at every
2m intervals

2D4.2 Supplying of 100 - 150mm rubble and m3 1.00 4,750.00 4,750.00


packing around weep holes as directed

Total of Masonry Works carried to Bill Summary (Page 19) 57,950.00

2D5 - STEEL WORK

Rate to include for all necessary cuttings, Note


bendings, grinding, sizing, welding,
placing, jointing and painting with two
coats of anti-corrosive paints and two
coats of enamel paints.

Rate to include for the cost for scaffoldings Note


where necessary.

2D5.1 Supplying and fixing of 50mm dia. heavy Nos. 17 2,500.00 42,500.00
duty GI pipe as vertical fence posts in
2.4m intervals (approximately). Clear
height of the post from the foundation is
2.0m and additional 0.35 m length to be
embedded into the concrete pockets. Rate
to include for painting GI posts with two
coats of anti corrosive paints and two
coats of enamel paints.

17
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
Rs. Cts. Rs. Cts.
2D5.2 Supplying and fixing of 20mm dia. Heavy m 80.00 300.00 24,000.00
duty GI pipes as horizontal pipe to top
and bottom of the fence including welding
to vertical post. Rate to include for painting
GI posts with two coats of anti corrosive
paints and two coats of enamel paints.

2D5.3 Supplying and fixing of 12mm x 6mm flat m 40.00 52.00 2,080.00
iron welded to GI posts at mid point of
chain link including drilling holes in 0.5m
interval. Rate to include for painting GI
posts with two coats of anti corrosive
paints and two coats of enamel paints.

2D5.4 Supplying and fixing of 89mm x 10mm Nos. 80 22.00 1,760.00


size nut & bolts to fix the chain links
including drilling holes in stand pipe.

2D5.5 Supplying and fixing of approved quality m2 80.00 600.00 48,000.00


PVC coated chain links with standard
mesh size 50X50mm in gauge 8 PVC
coated wire (Having 4.2mm dia.
galvanized core wire) of 2.0m height in
green colour binding with PVC coated wire
in every 1.0m intervals as directed
additionally required bolts, nuts, flat iron
strips, etc. Rate to include for painting all
exposed areas of steel members with two
coats of anti corrosive paints and two
coats of enamel paints.

2D5.6 Supplying and fixing of PVC end cap Nos. 17 50.00 850.00
suitable to the top of 50mm dia stand
pipe.

Total of Plasterer carried to Bill Summary (Page 19) 119,190.00

18
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
Rs. Cts. Rs. Cts.

19
CONSTRUCTION OF CARDIOLOGY UNIT (BALANCE WORKS)
TEACHING HOSPITAL - KURUNEGALA

STAGE 01 - CIVIL AND ELECTRICAL WORKS

SUMMARY OF BILL No. 02D - CHAIN LINK FENCE

AMOUNT
Sub Bill No. DESCRIPTION
Rs. Cts.

2D.1 DEMOLISHER 4,434.00

2D.2 EXCAVATOR 7,100.00

2D.3 CONCRETOR 57,277.00


2D.4 MASONRY WORKS 57,950.00

2D.5 STEEL WORKS 119,190.00

TOTAL OF SUB SUMMARY 2D CARRIED TO SUMMARY OF 245,951.00


BILL No.02 (Page 53)

19
CONSTRUCTION OF CARDIOLOGY UNIT (BALANCE WORKS)
TEACHING HOSPITAL - KURUNEGALA

STAGE 01 - CIVIL AND ELECTRICAL WORKS

ENGINEER'S ESTIMATE

BILL No. 02 - SITE PREPARATION

RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
Rs. Cts. Rs. Cts.

2E - CONSTRUCTION OF ENTRANCE PORCH

2E1 - EXCAVATOR

Rate shall include for; Note

(a) Leveling bottom of trenches and


keeping sides plumb.

(b) Back filling with selected excavated


material and well consolidating.

(c) Disposal of surplus excavated


material as directed.

2E1.1 Excavation for foundation for column m3 11.00 355.00 3,905.00


fittings of fence, depth not exceeding 1.5m
in any material except rock required
blasting part return fill in & well rammed
surplus disposed away from site

2E1.2 Supplying and filling & spreading of m3 4.00 950.00 3,800.00


selected and approved quality earth,
watering as required & compacting well
in 75mm layers. (Rate to include for
transport.)

Total of Excavator carried to Bill Summary (Page 25) 7,705.00

2E2- CONCRETOR

20
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
Rs. Cts. Rs. Cts.
All concrete works should be compacted Note
well and should be free of honeycombs or
other surface irregularities.

Rates shall include for the cost for mixing, Note


handling, hoisting, laying, compacting,
curing, necessary formworking and
making good after removal of formwork.

Unless otherwise specified, all formworks Note


and reinforcements are measured
separately.

2E2.1 1:3:6 (40mm) Cement Concrete for screed m3 1.00 8,679.00 8,679.00
concrete for foundations

2E2.2 1:2:4 (20mm) cement concrete for column m3 4.00 9,820.00 39,280.00
footing and shaft

2E2.3 - Do - for slab (150mm thick) m3 3.80 9,820.00 37,316.00

2E2.4 - Do - for beams m3 2.80 9,820.00 27,496.00

2E2.5 100mm thick 1:2½:5 (25) cement concrete m3 4.00 8,570.00 34,280.00
for floor of porch including placing of
50X50 GI mesh. Rate to include for
placing and compacting and making
slopes.

Formworks

All necessary boarding, supporting, Note


erecting, framing, cutting angles, skirting
or removal, cleaning, wetting & treating
before placing concrete.

Supplying and fixing of 12mm thick


Plywood sheet or equivalent formworks of
approved quality including necessary
joists and props for the followings.

2E2.6 For column footing, shafts and foundation m2 26.00 755.00 19,630.00

2E2.7 For beams m2 20.00 850.00 17,000.00

21
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
Rs. Cts. Rs. Cts.

2E2.8 For slab m2 27.00 850.00 22,950.00

Reinforcements

Rate shall include for cutting, bending, Note


fabricating, placing in position, holding
and supporting including temporary fixing
supports, hangers, space bars, chairs,
laps, binding wires and waste.

Reinforcement having minimum Note


characteristic strength of 460 N/mm2 for
Tor (Yield) steel and 250N/mm2 for Mild
steel.

Tor Steel

2E2.9 Supplying and laying of Tor steel bars for Kg 250.00 132.00 33,000.00
column footing and column shaft.

2E2.10 - Do - for beams Kg 152.00 132.00 20,064.00

2E2.11 - Do - for slab Kg 500.00 132.00 66,000.00

Mild Steel

2E2.12 Supplying and laying of Mild steel bars for Kg 52.00 130.00 6,760.00
column shaft.

2E2.13 - Do - for beams Kg 60.00 130.00 7,800.00

Total of Concretor carried to Bill Summary (Page 25) 340,255.00

2E3 - MASONRY WORKS

Rates include for all joggles, cramps, Note


dowels, ties, templates, rough & fair
cutting, forming splays, angles, reveals &
setting, joining, fixing in position and
pointing, protecting & cleaning down

22
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
Rs. Cts. Rs. Cts.

2E3.1 Random rubble masonry in 1:5 cement m3 3.00 5,623.00 16,869.00


sand mortar in wall foundation. Rate to
include for keeping weep holes at every
2m intervals

Total of Masonry Works carried to Bill Summary (Page 25) 16,869.00

2E4 - BRICK LAYER

Rate shall include for all rough & fair Note


cuttings, plumbing, reveals, rough
arches, raking out all joints for pointing
plastering, cutting chases, making good at
the completion.

2E4.1 112 mm thick brick walls in 1:5 cement m2 10.00 995.50 9,955.00
sand mortar.

Total of Brick Layer carried to Bill Summary (Page 25) 9,955.00

2E5 - PLASTERER

Rate shall include for all temporary rules, Note


screeds, etc., for racking out joints of new
brick work or new concrete for key,
making good around pipes, sanitary
fittings and similar fixtures.

Rate to include for the cost for Note


scaffoldings where necessary.

2E5.1 15mm thick 1:1:5 cement lime sand soffit m2 35.00 490.00 17,150.00
plaster to slab soffit, sides and soffits of
beams, finishing smooth with lime putty

2E5.2 15mm thick 1:1:5 cement lime sand m2 45.00 351.00 15,795.00
plaster finished semi rough with wooden
floating

Total of Plasterer carried to Bill Summary (Page 25) 32,945.00

2E6 - PAVIOR

23
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
Rs. Cts. Rs. Cts.

Rate shall include for temporary rules, all Note


normal cutting arises, rounded angle,
making good around pipes, sanitary
fittings & other fixtures, cleaning down
upon completion. The contractor shall
submit samples & other relevant
information to the Engineer for prior
approval.

Rate shall include for curing whenever Note


necessary as directed by the Engineer.

2E6.1 Supplying and laying of homogeneous m2 35.00 2,712.00 94,920.00


locally manufactured dark colour rustic
finished tiles of approved quality, colour
and size fixed with straight joints in both
ways including all angles, corners and
100mm high skirting with 20mm thick 1:3
cement sand mortar bedding. Rate to
include for filling grooves with tile grout to
match to the colour of tiles. Samples of
tiles should be submitted to Engineer for
his approval before laying.

Total of Pavior carried to Bill Summary (Page 25) 94,920.00

2E7 - PAINTER

All alkali resisting primers & weathersheild Note


paint quality & colours shall be approved
by the Engineer.

2E7.1 Painting walls with one coat of alkali m2 80.00 223.00 17,840.00
resisting primer and 2 coats of
weathershield paint including preparing
surface of new work

Total of Painter carried to Bill Summary (Page 25) 17,840.00

2E8 - STEEL WORK

24
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
Rs. Cts. Rs. Cts.
2E8.1 Allow provisional sum for supplying and P.Sum 15,000.00
fixing of GI hand rails on parapet wall over
porch are slab as directed

Total of Steel Works carried to Bill Summary (Page 25) 15,000.00

25
CONSTRUCTION OF CARDIOLOGY UNIT (BALANCE WORKS)
TEACHING HOSPITAL - KURUNEGALA

STAGE 01 - CIVIL AND ELECTRICAL WORKS

SUMMARY OF BILL No. 02E - CONSTRUCTION OF ENTRANCE PORCH

AMOUNT
Sub Bill No. DESCRIPTION
Rs. Cts.

2E.1 EXCAVATOR 7,705.00

2E.2 CONCRETOR 340,255.00

2E.3 MASONRY WORKS 16,869.00


2E.4 BRICK LAYER 9,955.00

2E.5 PLASTERER 32,945.00

2E.6 PAVIOR 94,920.00

2E.7 PAINTER 17,840.00

2E.8 STEEL WORKS 15,000.00

TOTAL OF SUB SUMMARY 2E CARRIED TO SUMMARY OF 535,489.00


BILL No.02 (Pagr 53)

25
CONSTRUCTION OF CARDIOLOGY UNIT (BALANCE WORKS)
TEACHING HOSPITAL - KURUNEGALA

STAGE 01 - CIVIL AND ELECTRICAL WORKS

ENGINEER'S ESTIMATE

BILL No. 02 - SITE PREPARATION

RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
Rs. Cts. Rs. Cts.

2F - CONSTRUCTION OF BOX CULVERT

2F1 - EXCAVATOR

Rate shall include for; Note


(a) Leveling bottom of excavation level
(b) Back filling with selected excavated
material and well consolidating.
(c) Disposal of surplus excavated material
as directed.

2E1.1 Excavation for foundation for culvert depth m3 12.00 355.00 4,260.00
not exceeding 1.5m in any material except
rock required blasting part return fill in &
well rammed surplus disposed away from
site

2E1.2 Supplying and filling & spreading of selected m3 5.00 950.00 4,750.00
and approved quality earth, watering as
required & compacting well in 75mm
layers. (Rate to include for transport and
piling.)

2E1.3 Supplying and filling & spreading of selected m3 6.00 2,400.00 14,400.00
sand, watering & compacting for bedding
for concreting

Total of Excavator carried to Bill Summary (Page 30) 23,410.00

2F2- CONCRETOR

All concrete works should be compacted Note


well and should be free of honeycombs or
other surface irregularities.

26
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
Rs. Cts. Rs. Cts.

Rates shall include for the cost for mixing, Note


handling, hoisting, laying, compacting,
curing, necessary formworking and making
good after removal of formwork.

Unless otherwise specified, all formworks Note


and reinforcements are measured
separately.

2F2.1 1:3:6 (40mm) Cement Concrete for screed m3 2.00 8,679.00 17,358.00
concrete for culvert base and guard wall
base

2F2.2 1:2:4 (20mm) cement concrete for culvert m3 2.50 10,881.00 27,202.50
base

2F2.3 - Do - for culvert walls m3 6.00 10,881.00 65,286.00

2F2.4 - Do - culvert slab m3 2.50 10,881.00 27,202.50

2F2.5 - Do - wing walls m3 0.50 10,881.00 5,440.50

Formworks

All necessary boarding, supporting, Note


erecting, framing, cutting angles, skirting or
removal, cleaning, wetting & treating before
placing concrete.

Supplying and fixing of 12mm thick Plywood


sheet or equivalent formworks of approved
quality including necessary joists and props
for the followings.

2F2.6 For culvert base, walls and wing walls m2 60.00 850.00 51,000.00

2F2.7 For culvert slab m2 18.00 850.00 15,300.00

Reinforcements

27
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
Rs. Cts. Rs. Cts.
Rate shall include for cutting, bending, Note
fabricating, placing in position, holding and
supporting including temporary fixing
supports, hangers, space bars, chairs, laps,
binding wires and waste.

Reinforcement having minimum Note


characteristic strength of 460 N/mm2 for Tor
(Yield) steel and 250N/mm2 for Mild steel.

Tor Steel

2F2.7 Supplying and laying of Tor steel bars for Kg 900.00 132.00 118,800.00
culvert base, walls and slab

Total of Concretor carried to Bill Summary (Page 30) 327,589.50

2F3 - MASONRY WORKS

Rates include for all joggles, cramps, Note


dowels, ties, templates, rough & fair cutting,
forming splays, angles, reveals & setting,
joining, fixing in position and pointing,
protecting & cleaning down

2F3.1 Random rubble masonry in 1:5 cement m3 5.00 5,420.00 27,100.00


sand mortar in wing walls. Rate to include
for keeping weep holes

2F3.2 Random rubble masonry in 1:5 cement m3 5.00 5,320.00 26,600.00


sand mortar in guard walls.

2F3.3 Supplying of 100 - 150mm rubble and m3 1.50 4,750.00 7,125.00


packing around weep holes and other
necessary areas as directed

Total of Masonry Works carried to Bill Summary (Page 30) 60,825.00

2F4 - PLASTERER

28
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
Rs. Cts. Rs. Cts.

Rate shall include for all temporary rules, Note


screeds, etc., for racking out joints of new
brick work or new concrete for key, making
good around pipes, sanitary fittings and
similar fixtures.

Rate to include for the cost for scaffoldings Note


where necessary.

2F4.1 15mm thick 1:5 cement sand plaster m2 18.00 320.00 5,760.00
finishing semi rough with wooden floating

Total of Plasterer carried to Bill Summary (Page 30) 5,760.00

2F5 - MISCELLANEOUS

2F5.1 Allow provisional sum for necessary curbs, P. Sum 15,000.00


turfing, etc as required.

Total of Miscellaneous carried to Bill Summary (Page 30) 15,000.00

29
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
Rs. Cts. Rs. Cts.

30
CONSTRUCTION OF CARDIOLOGY UNIT (BALANCE WORKS)
TEACHING HOSPITAL - KURUNEGALA

STAGE 01 - CIVIL AND ELECTRICAL WORKS

SUMMARY OF BILL No. 02F - CONSTRUCTION OF BOX CULVERT

AMOUNT
Sub Bill No. DESCRIPTION
Rs. Cts.

2F.1 EXCAVATOR 23,410.00


2F.2 CONCRETOR 327,589.50
2F.3 MASONRY WORKS 60,825.00
2F.4 PLASTERER 5,760.00
2F.5 MISCELLANEOUS 15,000.00

TOTAL OF SUB SUMMARY 2F CARRIED TO SUMMARY OF 432,584.50


BILL No.02 (Page 53)

30
CONSTRUCTION OF CARDIOLOGY UNIT (BALANCE WORKS)
TEACHING HOSPITAL - KURUNEGALA

STAGE 01 - CIVIL AND ELECTRICAL WORKS

ENGINEER'S ESTIMATE

BILL No. 02 - SITE PREPARATION

Rate Amount
Item Description Unit Qty Rs.
Rs. Cts. Cts.

2G - PREMIX WORKS

2G.01 Removing of top soil up to 150mm L.Sum 35,000.00


average depth for preparation of sub
base area (Approximate area - 680m2)

2G.02 Compaction of formed sub base layer m2 680.00 30.00 20,400.00


using 10-12 Ton vibrating roller with
minimum 8 passes. Rate to include for
watering if necessary.

2G.03 Supplying, spreading , laying of m3 10.00 950.00 9,500.00


approved quality earth, watering as
required and compacting with 10 -12
vibrating roller in required areas

2G.04 Supplying, piling and laying of dense m2 680.00 1,450.00 986,000.00


graded aggregate coarse (ABC),
watering and compacting to form
150mm thick compacted base layer
using 8-10 tons vibrating roller as
directed by the Engineer.
(Measurements are taken in compacted
volume basis). Degree of compaction
should be not less than 100% of
Maximum Dry Density (MDD) of the
Proctor Compaction Test as specified in
BS 1377 part I.

31
Rate Amount
Item Description Unit Qty Rs.
Rs. Cts. Cts.
2G.05 Supplying & spreading of MC30 (45%) m2 680.00 100.00 68,000.00
Cut Back Bitumen for primer coat on
compacted ABC layer in dry weather in
a rate of application of 1 - 1.5 Liter/ m 2
as directed by the Engineer. Prior to the
application of MC30, top surface of
compacted ABC layer should be well
brushed to remove all dust.

2G.06 Supplying and laying of 'Type 2' (Max. Ton 88.00 9,000.00 792,000.00
size of 12.5mm aggregates) hot mix
asphalt concrete wearing course,
(minimum uncompacted laying
thickness shall be 63mm) and
compacting of same according to the
Road Development Authority (RDA)
standards and specifications as directed
by the Engineer. Rate to include for
transporting to site and pilling at site.)

2G.07 Allow lump sum for pouring of water L.Sum 1,000.00


after 4hrs of compaction of ABC layer.

2G.08 Supplying and applying of Tac coat m3 680.00 90.00 61,200.00


using bitumen Grade CRS1. Rate of
application should be 0.5 l/m2

2G.09 Supplying & laying pre cast concrete m 120.00 655.00 78,600.00
kerb stones with 75mm thick 1:3:6
(25mm) concrete bedding including 1.2
cement sand joint bedding. Rate to
include for necessary excavations, back
fillings and surplus disposal.

2G.10 Allow provisional sum for forming drain P. Sum 10,000.00


holes through the Kerb stones and
keeping slopes of the wearing surface
towards the drain holes to drain the rain
water accumulated in premixed area

2G.11 Preparing surfaces and painting of kerb m2 50.00 144.50 7,225.00


stones with two coats of enamel paints.

32
Rate Amount
Item Description Unit Qty Rs.
Rs. Cts. Cts.

2G.12 Allow provisional sum for road signs, P.Sum 25,000.00


sign boards, etc as directed.

Total of Premix Works carried to Main Summary (Page 53 ) 2,093,925.00

33
CONSTRUCTION OF CARDIOLOGY UNIT (BALANCE WORKS)
TEACHING HOSPITAL - KURUNEGALA

STAGE 01 - CIVIL AND ELECTRICAL WORKS

ENGINEER'S ESTIMATE

BILL No. 02 - SITE PREPARATION

RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
Rs. Cts. Rs. Cts.

2H - CONSTRUCTION OF ROOMS FOR GENERATOR, MEDICAL GAS STORE,


PUMP HOUSE AND TRANSFORMER

2H1 - EXCAVATOR

Rate shall include for; Note

(a) Leveling bottom of trenches and


keeping sides plumb.

(b) Back filling with selected


excavated material and well
consolidating.

(c) Disposal of surplus excavated


material as directed.

2H1.1 Excavation for foundation for depth not m3 80.00 355.00 28,400.00
exceeding 1.5m in any material except
rock required blasting part return fill in
& well rammed surplus disposed away
from site

2H1.2 Supplying and filling & spreading of m3 40.00 950.00 38,000.00


selected and approved quality earth,
watering as required & compacting
well in 75mm layers. (Rate to include
for transport.)

Total of Excavator carried to Bill Summary (Page 52) 66,400.00

2H2- CONCRETOR

33
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
Rs. Cts. Rs. Cts.
All concrete works should be Note
compacted well and should be free of
honeycombs or other surface
irregularities.

Rates shall include for the cost for Note


mixing, handling, hoisting, laying,
compacting, curing, necessary
formworking and making good after
removal of formwork.

Unless otherwise specified, all Note


formworks and reinforcements are
measured separately.

2H2.1 1:3:6 (40mm) Cement Concrete for m3 2.50 8,679.00 21,697.50


screed concrete for foundations

2H2.2 1:2:4 (20mm) cement concrete for m3 20.00 9,820.00 196,400.00


column footings and shafts up to 1st
floor level

2H2.3 - Do - for stair case up to 1st floor slab m3 3.00 10,881.00 32,643.00
level

2H2.4 - Do - for slab for 1st floor m3 12.00 9,820.00 117,840.00

2H2.5 - Do - for beams in 1st floor slab m3 6.00 9,820.00 58,920.00

2H2.6 - Do - for columns above 1st floor to m3 4.00 10,115.00 40,460.00


2nd floor level

2H2.7 - Do - for stair case from 1st floor to m3 3.00 10,115.00 30,345.00
2nd floor slab level

2H2.8 - Do - for slab for 2nd floor m3 15.00 10,115.00 151,725.00

2H2.9 - Do - for beams in 2nd floor slab m3 6.00 10,115.00 60,690.00

2H2.10 Construction of 100mm thick 300mm m 40.00 1,250.00 50,000.00


high concrete facia board using 1:2:4
(20) cement concrete at the edges of
1st floor slab including fromworks &
formwork supports

2H2.11 - Do - for 2nd floor slabs m 40.00 1,310.00 52,400.00

34
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
Rs. Cts. Rs. Cts.
2H2.12 225x150mm lintels in 1:2:4 (20mm) m 20.00 640.00 12,800.00
cement concrete at 1st floor level.
Rate to include for formwork &
Reinforcements.

2H2.13 - Do - at 2nd floor level m 20.00 680.00 13,600.00

2H2.14 112x150mm lintels in 1:2:4 (20mm) m 8.00 525.00 4,200.00


cement concrete at 1st floor level.
Rate to include for formwork &
Reinforcements.

2H2.15 - Do - at 2nd floor level m 8.00 555.00 4,440.00

Formworks

All necessary boarding, supporting, Note


erecting, framing, cutting angles,
skirting or removal, cleaning, wetting &
treating before placing concrete.

Supplying and fixing of 12mm thick


Plywood sheet or equivalent
formworks of approved quality
including necessary joists and props
for the followings.

2H2.16 For column footings and shafts up to m2 90.00 755.00 67,950.00


1st floor level

2H2.17 - Do - for stair case up to 1st floor slab m2 9.00 755.00 6,795.00
level including footings

2H2.18 - Do - for slab for 1st floor m2 100.00 755.00 75,500.00

2H2.19 - Do - for beams in 1st floor slab m2 70.00 755.00 52,850.00

2H2.20 - Do - for columns above 1st floor to m2 50.00 778.00 38,900.00


2nd floor level

2H2.21 - Do - for stair case from 1st floor to m2 9.00 778.00 7,002.00
2nd floor slab level

2H2.22 - Do - for slab for 2nd floor m2 100.00 778.00 77,800.00

2H2.23 - Do - for beams in 2nd floor slab m2 70.00 778.00 54,460.00

35
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
Rs. Cts. Rs. Cts.

Reinforcements

Rate shall include for cutting, bending, Note


fabricating, placing in position, holding
and supporting including temporary
fixing supports, hangers, space bars,
chairs, laps, binding wires and waste.

Reinforcement having minimum Note


characteristic strength of 460 N/mm2
for Tor (Yield) steel and 250N/mm2 for
Mild steel.

Tor Steel

2H2.24 For column footings and shafts up to kg 2,800.00 132.50 371,000.00


1st floor level

2H2.25 - Do - for stair case up to 1st floor slab kg 360.00 132.50 47,700.00
level

2H2.26 - Do - for slab for 1st floor kg 1,440.00 132.50 190,800.00

2H2.27 - Do - for beams in 1st floor slab kg 720.00 132.50 95,400.00

2H2.28 - Do - for stair case from 1st floor to kg 360.00 137.50 49,500.00
2nd floor slab level

2H2.29 - Do - for column shafts above 1st kg 480.00 137.50 66,000.00


floor to 2nd floor level

2H2.30 - Do - for slab for 2nd floor kg 1,440.00 137.50 198,000.00

2H2.31 - Do - for beams in 2nd floor slab kg 720.00 137.50 99,000.00

Mild Steel

36
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
Rs. Cts. Rs. Cts.
2H2.30 For column footings and shafts up to kg 80.00 130.50 10,440.00
1st floor level

2H2.31 - Do - for beams in 1st floor slab kg 200.00 130.50 26,100.00

2H2.32 - Do - for column shafts above 1st kg 80.00 133.00 10,640.00


floor to 2nd floor level

2H2.33 - Do - for beams in 2nd floor slab kg 80.00 133.00 10,640.00

Total of Concretor carried to Bill Summary (Page 52) 2,404,637.50

2H3 - MASONRY WORKS

Rates include for all joggles, cramps, Note


dowels, ties, templates, rough & fair
cutting, forming splays, angles, reveals
& setting, joining, fixing in position and
pointing, protecting & cleaning down

2H3.1 Random rubble masonry in 1:5 cement m3 48.00 5,320.00 255,360.00


sand mortar in wall foundation.

Total of Masonry Works carried to Bill Summary (Page 52) 255,360.00

2H4 - BRICK LAYER

Rate shall include for all rough & fair Note


cuttings, plumbing, reveals, rough
arches, raking out all joints for pointing
plastering, cutting chases, making
good at the completion.

Ground floor

2H4.1 225mm brick work in 1:5 cement sand m3 30.00 7,808.00 234,240.00
mortar in walls

2H4.2 112mm brick work in 1:5 cement sand m2 50.00 932.00 46,600.00
mortar in walls

37
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
Rs. Cts. Rs. Cts.
First floor

2H4.3 225mm brick work in 1:5 cement sand m3 30.00 8,199.00 245,970.00
mortar in walls

2H4.4 112mm brick work in 1:5 cement sand m2 80.00 979.00 78,320.00
mortar in walls

Total of Brick Layer carried to Bill Summary (Page 52) 605,130.00

2H5 - ALUMINIUM FABRICATOR

Following Aluminum fabrications shall Note


be supplied with all hardware furniture
& fittings of approved quality.

All Aluminium sections should be Note


powder coated (60 - 70 microns thick
powder coating layer) heavy duty
sections confirms relevant
standards. All handles and locks
should be heavy duty and the type,
make and quality should be approved
by the Engineer. Locks should be
mortise type locks

All hinges shall be heavy quality Note


stainless steel hinges & all other
accessories shall be heavy duty
approved quality.

Rates for all aluminium doors and Note


windows shall include for all necessary
hinges, door handles, door locks,
window stays, glazed weather strips,
moisture sealant, and other necessary
accessories of approved quality of the
Engineer.

All door or window units consist of Note


complete set of frames and sashes.

38
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
Rs. Cts. Rs. Cts.
The Contractor shall submit to the Note
Engineer the shop drawings, technical
data, samples & other relevant
information obtained from the
manufacturer for the Engineer's
approval. Contractor should obtain the
prior approval of the Engineer for the
type, colour and the quality of the
Aluminium sections and other
accessories prior to the application.

2H5.1 Supplying all materials, fabricating and m2 2.70 7,200.00 19,440.00


fixing of 76mm wide aluminium framed
1050X2550mm size fully paneled
single sash side hung door of type D11
as per drawing, with Aluminium door
frame with 450mm louvers on top,
paneling with 9mm thick Melamine
Boards as per attached drawings. Rate
to include for providing approved type
door locks, Aluminium door handles,
stainless steel hinges and other
necessary accessories.

Supplying all materials, fabricating and m2 7.90 7,500.00 59,250.00


fixing of 750 X 2100mm in size side
hung ordinary finished Fiber Glass
Door sash of type D12 as per drawing
with Aluminium door frame with
aluminium door handles and hinges,
aluminium barrel bolts and other
necessary accessories.

39
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
Rs. Cts. Rs. Cts.
2H5.3 Supplying all materials, fabricating and m2 14.00 7,800.00 109,200.00
fixing of aluminium framed 1200 X
1050 mm size glazed side hung type
casement window of type W11 with
600mm louvers on top, glazing with
5mm thick tinted glasses as per
drawings. Rate to include for providing
approved type window stays,
aluminium hinges, locks, etc.

2H5.4 Supplying all materials, fabricating and m2 1.00 8,850.00 8,850.00


fixing of aluminium framed 900 X 1050
mm size glazed center pivot type
fanlight of type FL1 with 600mm
louvers on top, glazing with 5mm thick
tinted glasses as per drawings. Rate to
include for providing approved type
window stays, aluminium hinges,
locks, etc.

Total of Aluminium works carried to Sub Summary 196,740.00


(Page 52)

2H6 - STEEL FABRICATOR

Rate shall include for all necessary Note


cuttings, bendings, sizing, shaping,
drilling, welding riveting, bolting,
grinding, fixing arrangements to walls/
floor or slab/beam soffits, etc.

2H6.1 Supplying all materials, fabricating and m2 30.00 2,750.00 82,500.00


fixing in position of steel diamond
shaped collapsible door with all
accessories including channels,
wheels, guides, handles, locking
arrangements, etc, with all connecting
works as per drawings. Rate to include
for painting all steel works with two
coats of anticorrosive paints and two
coats of enamel paint.

40
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
Rs. Cts. Rs. Cts.
2H6.2 Supplying all materials, fabricating and m2 15.00 1,850.00 27,750.00
fixing of welded Diamond shaped iron
grill consisting of 6mmX20mm flat iron
frame, 6mm mild steel rods at 75 mm
centers in both ways to form 75mm X
150mm diamond shaped grill. Rate to
include for necessary Brass screws,
and application of two coats of
approved quality echin primer and two
coats of approved colour enamel paint.

2H6.3 Supplying all materials, fabricating and m 40.00 2,250.00 90,000.00


fixing of GI hand rail using 50mm dia.
Heavy duty GI pipe uprights (900mm
high) and grab railing and 25mm
heavy duty GI pipe intermediate
bracings as per drawing. Rate to
include for necessary base plates,
anchor bolts, etc and application of
two coats of approved quality echin
primer and two coats of approved
colour enamel paint.

Total of Excavator carried to Bill Summary (Page 52) 200,250.00

2H7 - PLASTERER

Rate shall include for all temporary Note


rules, screeds, etc., for racking out
joints of new brick work or new
concrete for key, making good around
pipes, sanitary fittings and similar
fixtures.

Rate to include for the cost for Note


scaffoldings where necessary.

2H7.1 15mm thick 1:1:5 cement lime sand m2 170.00 490.00 83,300.00
soffit plaster to slab soffit, sides and
soffits of beams, sides and soffit of
stair way, finishing smooth with lime
putty up to 1st floor slab level

41
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
Rs. Cts. Rs. Cts.
2H7.2 - Do - for above 1st floor to 2nd floor m2 170.00 505.00 85,850.00
level

2H7.3 15mm thick 1:1:5 cement lime sand m2 200.00 418.00 83,600.00
internal wall plaster finishing smooth
with lime putty up to 1st floor slab level

2H7.4 - Do - for above 1st floor to 2nd floor m2 200.00 431.00 86,200.00
level

2H7.5 15mm thick 1:1:5 cement lime sand m2 120.00 351.00 42,120.00
external wall plaster finishing semi
rough with wooden floating up to 1st
floor slab level

2H7.6 - Do - for above 1st floor to 2nd floor m2 120.00 369.00 44,280.00
level

2H7.7 100mm thick 1:2:4 (20) cement floor m2 90.00 1,800.00 162,000.00
concrete placing with 1000 gauge
polythene and 50X50mm GI welded
mesh finishing smooth with mechanical
power trowel.

2H7.8 20mm thick 1:3 cement sand rendering m2 12.00 480.50 5,766.00
finishing smooth with colour cement
floating coat in staircase area

2H7.9 20mm thick 1:3 cement sand rendering m2 90.00 480.50 43,245.00
finishing smooth with colour cement
floating coat in 1st floor level

2H7.10 20mm thick 1:3 cement sand m2 90.00 495.00 44,550.00


protective rendering on top of 2nd floor
slab finishing smooth with colour
cement floating coat

2H7.11 12mmX100mm skirting in 1:3 cement m 100.0 190.00 19,000.00


mortar projected form wall and finished
smooth with coloured cement floating
in ground floor including staircase

2H7.12 - Do - in upper floor m 100.0 196.00 19,600.00

42
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
Rs. Cts. Rs. Cts.

Total of Plasterer carried to Bill Summary (Page 52) 719,511.00

2H8 - PAVIOR

Rate shall include for temporary rules, Note


all normal cutting arises, rounded
angle, making good around pipes,
sanitary fittings & other fixtures,
cleaning down upon completion. The
contractor shall submit samples &
other relevant information to the
Engineer for prior approval.

Rate shall include for curing whenever Note


necessary as directed by the Engineer.

2H8.1 Supplying and laying of homogeneous m2 35.00 2,504.00 87,640.00


locally manufactured non skid ceramic
floor tiles of approved quality, colour
and size fixed with straight joints in
both ways including all angles, corners
and 100mm high skirting with 20mm
thick 1:3 cement sand mortar bedding.
Rate to include for filling grooves with
polymer modified tile grout to match to
the colour of tiles. Samples of tiles
should be submitted to Engineer for his
approval before laying.

43
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
Rs. Cts. Rs. Cts.
2H8.2 Supplying and fixing of 200X300mm m2 130.00 1,835.00 238,550.00
size locally manufactured glazed wall
tiles of approved quality and colour,
with all specials fixed with straight
joints in both ways including all angles
and corners. Rate to include for raking
plaster and bedding in 12mm thick 1:3
cement sand mortar. Joints shall be
filled with polymer modified tile grout.
Samples of tiles should be submitted
to Engineer for his approval before
laying.

Total of Pavior carried to Bill Summary (Page 52) 326,190.00

2H9 - WATER PROOFING WORKS

2H9.1 Applying of "XYPEX" or equivalent m2 50.00 1,750.00 87,500.00


(Approved by the Engineer) crystalline
cement based water proofing
treatment as per the manufactures
specifications (minimum two layers)
over the toilet floor areas including
600mm height on walls. Rate to
include for, clearing the surfaces, water
proofing of all edges and corners,
laying necessary leveling screeds,
grouting etc, and for all other
connecting works as directed by the
Engineer.

2H9.2 - Do - on top of 2nd floor slab m2 100.00 1,850.00 185,000.00

Total of Water Proofing carried to Bill Summary (Page 52) 272,500.00

2H10 - PAINTER & DECORATOR

44
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
Rs. Cts. Rs. Cts.
Rate shall include for all preparation of Note
surface cleaning down smoothing,
protection of floors, door & window
fittings upon completion and for
scaffoldings where necessary.

All emulsion, enamel & weathersheild Note


paint quality & colours shall be
approved by the Engineer.

All painting shall be measured in net Note


painted area only.

2H10.1 Preparing surface of the wall & m2 370.00 145.00 53,650.00


applying two coats of primer and two
coats of emulsion paint on new plaster
in ground floor level including slab
soffies

2H10.2 - Do - in 1st floor level m2 370.00 152.00 56,240.00

2H10.3 Preparing surface & applying two coats m2 120.00 223.00 26,760.00
of alkali resisting primer two coats of
weathersheld paint on external wall
plaster

2H10.4 - Do - in 1st floor level m2 120.00 234.00 28,080.00

Total of Painting carried to Bill Summary (Page 52) 164,730.00

2H11 - PLUMBER

Unless otherwise specified separately Note


in the bill of quantities, all rates shall
include for necessary excavations &
back fillings.

45
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
Rs. Cts. Rs. Cts.
Unless otherwise specified all water Note
supply & drainage fittings and specials
such as bends, tees, sockets reducers
etc, shall be included in the relevant
items and should accordingly be rated.
Rates also included the minor reaper
works involved in the completion of
such item.

Unless otherwise specified all PVC Note


pipes for water supply should be of
type 1000 & all waste water and
sewer pipes should be of type 600.
Rate for all pipe laying shall include for
pressure testing as specified and pipe
works should not be covered up before
pressure testing.

2H11.1 Allow provisional sum for connection P. Sum 7,500.00


water lines to main water supply

Water Supply Lines

Supplying and laying of Type 1000


PVC pipes with all specials for the
followings in water supply network

2H11.2 20mm dia. pipes m 100.0 75.00 7,500.00

2H11.3 25mm dia. pipes m 50.0 135.50 6,775.00

2H11.4 50mm dia. pipes m 20.0 410.00 8,200.00

2H11.5 Supplying and fixing of 20mm Brass Nos. 2.0 725.00 1,450.00
gate valve (Pegler or equivalent) with
all accessories.

2H11.6 Supplying and fixing of 12mm dia. Nos. 3.0 275.00 825.00
Plastic bib tap of approved quality
(Watertec or equivalent) with all
specials

46
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
Rs. Cts. Rs. Cts.

2H11.7 Supplying and fixing of pedestal type No. 1 7,500.00 7,500.00


550mmX375mm (Large) white wash
basin of approved quality (Indian
make), with approved quality heavy
duty chromium plated pillar cock,
waste plug and chain, cleaning eye to
waste line and all other connecting
works complete to working order.

2H11.8 Supplying and fixing of squatting type No. 1 2,750.00 2,750.00


water closet (Indian make) with foot
rests of approved quality including trap
and other necessary accessories all
complete to working order.

2H11.9 Supplying and fixing of approved No. 1 2,930.00 2,930.00


quality high level plastic flushing
cistern including psyphonic system,
flush pipes, brackets and other
necessary accessories all complete to
working order.

2H11.10 Supplying and fixing of approved No. 1 950.00 950.00


quality 150mm dia Chromium plated
adjustable type shower rose with
accessories.

2H11.11 Supplying and fixing of approved No. 1 300.00 300.00


quality chromium plated soap holder

2H11.12 Supplying and fixing of 450 mm long No. 1 750.00 750.00


Chromium plated box type towel rail
with all accessories.

2H11.13 Supplying and fixing of squire shaped No. 1 1,650.00 1,650.00


plastic framed high quality bathroom
mirror with all accessories.

2H11.14 Supplying and fixing of 150X150mm No. 1 1,744.50 1,744.50


plastic floor trap with gratings including
connecting works

2H11.15 Supplying and laying of 110mm Dia. m 10.00 1,610.00 16,100.00


PVC pipes (Type 600) with all specials
in vertical stack.

47
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
Rs. Cts. Rs. Cts.

2H11.16 Supplying and fixing of 110mm PVC Nos. 3 400.00 1,200.00


drainage elbow

2H11.17 Supplying and fixing of 110mm PVC No. 1 670.00 670.00


drainage elbow with cleaning eye.

2H11.18 Supplying and laying of 110mm Dia. m 15.00 1,750.00 26,250.00


PVC pipes (Type 600) with all specials
from manholes to final disposal
system. Rate to include for excavation
for pipe trenches and backfilling with
sand bedding.

2H11.16 Supplying and fixing of 50mm Type m 15.00 290.00 4,350.00


600 PVC pipes for drainage line with
specials

2H11.16 - Do - but 63mm dia. m 15.00 465.00 6,975.00

2H11.19 Constructing of 600mm X 600mm size No. 1 8,500.00 8,500.00


(internally) up to 600mm deep
manhole constructed with 100mm thick
1:3:6 (25mm) cement concrete base
slab, 225mm thick brick outer walls in
1:5 cement sand mortar, 75mm thick
1:2:4 (20) reinforced concrete slab
reinforced with 12mm thick tor steel
bars in both ways and plastering of all
internal and external exposed walls
and roof slab with12mm thick 1:3
cement sand mortar finished smooth
with neat cement floating. Rate to
include for excavation, back filling,
giving necessary connections and
forming necessary channels at the
bottom of manhole.

Total of Water Supply carried to Bill Summary (Page 52) 114,869.50

48
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
Rs. Cts. Rs. Cts.

2H12 - ELECTRICAL INSTALLATION

1 Rates in Bill of Quantities shall include all necessary materials (Cables, conduits, PVC
sunk box, bulbs, switches etc.) and labour required to complete the electrical installation
to good working order.

2 Except where specifically stated, all costs associated with provision of all holes,
openings, chases, ducts and other builders' work required for installation and make them
good, shall be included in the rates.

3 Where reference is made to certain manufactures' products and items identified by


registered trade marks, this has been done for the sole purpose of defining and
establishing standards of quality and performance and not with the intention of restricting
the procurement of material or fitting to a particular manufacturer.

4 Testing and commissioning of the electrical installation is to be carried out by the


contractor and inspection report submitted according to the requirements of the power
supply Authority. Cost of such testing and reports to be included in the rates. As built
electrical drawing to be submitted.

5 All types of light fittings, fans, switch gear etc shall be approved by the Engineer
prior to installation, by providing a sample.
6 Electrical Items (MCB, RCCB etc.) without an accredited agent in SriLanka shall not be
accepted and guarantee cards (Fans etc.) should be provided from Accredited agent
when necessary. MCB shall be minimum 5kA breaking capacity.

7 All wiring shall be in PVC conduits.

2H12.1 Allow provisional sum for necessary P.Sum 20,000.00


cables and main distribution board
according to site conditions and as
directed

Consumer Unit

49
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
Rs. Cts. Rs. Cts.
Supply & Installation of following
surface mounted consumer units,
consumer units shall include incoming
miniature circuit breakers (MCB),
residual current devices (RCCB),
outgoing miniature circuit breakers
(MCB), neutral & earth busbars,
terminals and all other required
accessories. Breaking Capacity of
MCB should be 6kA.

Make of MCB, RCCB and Switch


Isolator, etc shall be ABB, F&G, Hager,
Merlin Gerin or equivalent make
approved by the Electrical Engineer.

2H12.1 Consumer Unit ( CU 1 )

Supply & Installation of following No. 1 11,500.00 11,500.00


surface mounted consumer unit to
comply with BS complete with all fixing
earthing, live bus bar and Neutral bar
etc. Consumer unit comprising of,

1 No 32A 2P MCCB
1 No 30mA sensitivity 40A 2 pole
RCCB
6 No of ways (6A - 16A)
{MCB, RCCB shall be European or
Japanese make}

2H12.2 15A Socket Outlets

Supply & installation of following 15A Nos. 2 375.00 750.00


shuttered switched sunken socket
outlets.

2H12.3 Wiring of 15A Socket outlets.

50
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
Rs. Cts. Rs. Cts.
Wring (Including supply of earth wire & Nos. 2 1,100.00 2,200.00
all other material required ) of above
sunken socket outlet using approved
type 2.5mm2 PVC/PVC copper cable
drawn through securely fixed
concealed PVC conduit.

2H12.4 5A Socket Outlets

Supply & installation of following 5A


sunken shuttered switched socket
outlet

(i) Single Socket Outlet Nos. 8 350.00 2,800.00

2H12.5 Wiring of 5A Socket outlets

Wring (Including supply of earth wire & Nos. 8 750.00 6,000.00


all other material required ) of above
socket outlet using approved type
1mm2 PVC/PVC copper cable drawn
through securely fixed concealed
PVC conduit.

2H12.6 Light Fittings

Light fittings shall be of the highest


quality and each type of light fitting
shall be subjected to the approval of
the Electrical Engineer.

Bulbs & accessories shall be of Philips


or equivalent make approved by the
Engineer.

All the accessories shall comply with


the relevant British/ IEC standards.

2H12.7 Supply and installation of surface Nos. 10 1,500.00 15,000.00


mounted/ceiling hanging and reflector
type fluorescent lamp fitting comprising
1x36W fluorescent lamp, magnetic
ballast, power factor correction
capacitors and all other accessories
required

51
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
Rs. Cts. Rs. Cts.

2H12.8 Supply and installation of surface Nos. 4 1,250.00 5,000.00


mounted/ceiling hanging and reflector
type fluorescent lamp fitting comprising
1x18W fluorescent lamp, magnetic
ballast, power factor correction
capacitors and all other accessories
required

2H12.9 Light Point Wiring

Wiring and installation (including Nos. 14 800.00 11,200.00


supply of all materials with switch) of
the above light points using approved
type PVC insulated PVC sheathed 1
mm2 copper cable drawn through
securely fixed concealed PVC conduit .

2H12.10 Ceiling Fans

Supply and installation of 1423mm Nos. 3 5,600.00 16,800.00


sweep ceiling fan complete with
regulator, fan hook and all other
accessories required. Guarantee cards
shall be provided from accredited
agent before installation. KDK,
NATIONAL or equivalent make
approved by the Electrical engineer.

2H12.11 Fan Point Wiring

52
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
Rs. Cts. Rs. Cts.
Wiring & installation (Including supply Nos. 3 1,020.00 3,060.00
of all material, earth wire & switch) of
the above ceiling fans using approved
type 1 mm2 PVC/PVC copper cable &
earth wire drawn through securely
concealed and fixed PVC conduits.

2H12.12 Earthing

Supply and Installation of earth L. Sum 4,500.00


electrode with 16mm2 earth wire from
consumer unit to earth electrode. Earth
electrode shall be of 50mm dia. GI
pipe of length 2m or more. Earth
resistance shall be less than 5 Ohms
tested on a dry day.

Total of Electrical Works carried to Bill Summary (Page 52) 98,810.00

53
CONSTRUCTION OF CARDIOLOGY UNIT (BALANCE WORKS)
TEACHING HOSPITAL - KURUNEGALA

STAGE 01 - CIVIL AND ELECTRICAL WORKS

SUMMARY OF BILL No. 2H - CONSTRUCTION OF ROOMS FOR GENERATOR, MEDICAL GAS


STORE, PUMP HOUSE AND TRANSFORMER

AMOUNT
Sub Bill No. DESCRIPTION
Rs. Cts.

2G.1 EXCAVATOR 66,400.00


2G.2 CONCRETOR 2,404,637.50
2G.3 MASONRY WORKS 255,360.00
2G.4 BRICK LAYER 605,130.00
2G.5 ALUMINIUM WORKS 196,740.00
2G.6 STEEL FABRICATOR 200,250.00
2G.7 PLASTERER 719,511.00
2G.8 PAVIOR 326,190.00
2G.9 WATER PROOFING WORKS 272,500.00
2G.10 PAINTER & DECORATOR 164,730.00
2G.11 PLUMBER 114,869.50
2G.12 ELECTRICAL INSTALLATION 98,810.00

TOTAL OF SUB SUMMARY 2F CARRIED TO SUMMARY OF 5,425,128.00


BILL No.53

52
CONSTRUCTION OF CARDIOLOGY UNIT (BALANCE WORKS)
TEACHING HOSPITAL - KURUNEGALA

STAGE 01 - CIVIL AND ELECTRICAL WORKS

SUMMARY OF BILL No. 02 - SITE PREPARATION

AMOUNT
Sub Bill No. DESCRIPTION
Rs. Cts.

2A DEMOLISHER & EARTH WORKS 107,271.50


2B CONSTRUCTION OF BOUNDARY WALL 739,638.50
2C EXTERNAL DRAIN WORKS 1,344,400.00
2D CHAIN LINK FENCE 245,951.00
2E CONSTRUCTION OF ENTRNCE PORCH 535,489.00
2F CONSTRUCTION OF BOX CULVERT 432,584.50
2G PRIMIX WORKS 2,093,925.00

2H CONSTRUCTION OF ROOMS 5,425,128.00

TOTAL OF BILL No.02 CARRIED TO MAIN SUMMARY


(Page 165) 10,924,387.50

53
CONSTRUCTION OF CARDIOLOGY UNIT (BALANCE WORKS)
TEACHING HOSPITAL - KURUNEGALA

STAGE 01 - CIVIL AND ELECTRICAL WORKS

ENGINEER'S ESTIMATE

BILL NO.03 - CIVIL WORKS

RATE AMOUNT
ITEM DESCRIPTION UNIT QTY. Rs. Cts. Rs. Cts.

This work is a continuation of a


partially completed construction works
of a five storied building. This Bill
covers the completion of the balance
works of the building. Tenderer should
pay his attention to working
conditions, extent of working space
and storage, etc and rate the BOQ
accordingly.

3A - PREPARATION OF EXISTING BUILDING

3A.01 Excavation for miscellaneous works to m3 5.00 350.00 1,750.00


a depth not exceeding 1.5m and
clearing away surplus as directed.

3A.02 Filling inside the building by borrowed m3 42.00 950.00 39,900.00


approved quality hard earth up to
bottom level of the floor concrete
including spreading, watering and
ramming using a mechanical vibrator
in 75mm layers. Rate to include for
transporting to the site and piling.

3A.03 Allow lump sum for cleaning of the L.Sum 10,000.00


inside of the building including
removing bushes and small plants,
loose materials, construction wastes,
demolished items, etc and clearing
away debris as directed.

54
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY. Rs. Cts. Rs. Cts.
3A.04 Allow provisional sum for following P.Sum 100,000.00
works which are to be carried out
under the direction of the Engineer at
the improvements stage itself
including clearing away debris as
directed.

(a). Demolishing of loose portions of


existing floor concrete
(b). Chipping of improper and
unaligned portions of existing beams,
columns, slabs, brick walls, etc.
finishing purposes.
(c). Brushing, removing, washing and
cleaning of existing beams, columns,
slabs, brick walls, etc. finishing
purposes.
(d). Dewatering, washing and cleaning
of concrete sump and lift wells.

3A.05 Allow provisional sum for any P.Sum 50,000.00


unforeseen preparation works which is
required at improvements stage.

Total of Preparation of Existing Building to Summary (Page 108) 201,650.00

3B - CONCRETOR

Unless otherwise stated all concrete Note.


work shall be :-

(a) Grade or mix proportions as


specified

(b) All structural concrete shall be


made dense with a vibrator as
directed.

(c) All concrete shall be free of


hunnycombs or other irregularities.

Unless otherwise specified in the Note


respective items, all formwork and
reinforcement measured separately.

55
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY. Rs. Cts. Rs. Cts.
Rates shall include for plant for Note
mixing, handling, carry out tests as
specifications, hoisting, depositing,
compacting, curing and making good
after removal of formwork etc.

Floor Concrete

Plain cement concrete of 1:2½:5


(25mm) including any formwork
necessary for the followings

3B.01 75mm thick floor concrete in required m2 31.00 815.00 25,265.00


areas. Rate shall include for laying of
Gauge 1000 polythene layer in
advance of pouring concrete

1:2:4 (20) Cement Concrete

1:2:4 (20mm) cement concrete for the


followings (Formworks and
reinforcements paid separately)

3B.02 Columns in Ground floor m3 5.00 9,820.00 49,100.00

3B.03 Beams in Ground floor m3 7.00 9,820.00 68,740.00

3B.04 Columns in First floor m3 5.00 10,115.00 50,575.00

3B.05 Beams in First floor m3 7.00 10,115.00 70,805.00

3B.06 Columns in Second floor m3 5.00 10,311.00 51,555.00

3B.07 Beams in Second floor m3 7.00 10,311.00 72,177.00

3B.08 Columns in Third floor m3 5.00 10,508.00 52,540.00

3B.09 Beams in Third floor m3 7.00 10,508.00 73,556.00

3B.10 Columns in Forth floor m3 5.00 10,704.00 53,520.00

3B.11 Beams in Forth floor m3 7.00 10,704.00 74,928.00

56
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY. Rs. Cts. Rs. Cts.

3B.12 Columns in Fifth floor m3 5.00 10,900.00 54,500.00

3B.13 Beams in Fifth floor m3 5.00 10,900.00 54,500.00

3B.14 Columns and beams in Machine m3 6.00 11,097.00 66,582.00


Room floor

3B.15 Roof Slab in Machine Room m3 8.00 11,097.00 88,776.00

Lintels

225 X 150mm lintels in 1:2:4 (20mm)


cement concrete for the followings
including necessary formworks.
(Reinforcements paid separately)

3B.16 In Ground floor m 15.00 640.00 9,600.00

3B.17 In First floor m 15.00 653.00 9,795.00

3B.18 In Second floor m 15.00 666.00 9,990.00

3B.19 In Third floor m 150.00 678.00 101,700.00

3B.20 In Forth floor m 130.00 691.00 89,830.00

3B.21 In Fifth floor m 200.00 704.00 140,800.00

3B.22 In Machine Room floor m 20.00 717.00 14,340.00

112 X 150mm lintels in 1:2:4 (20mm)


cement concrete for the followings
including necessary formworks.
(Reinforcements paid separately)

3B.23 In Ground floor m 8.00 525.00 4,200.00

3B.24 In First floor m 8.00 535.50 4,284.00

3B.25 In Second floor m 40.00 546.00 21,840.00

3B.26 In Third floor m 15.00 556.50 8,347.50

57
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY. Rs. Cts. Rs. Cts.
3B.27 In Forth floor m 30.00 567.00 17,010.00

3B.28 In Fifth floor m 40.00 577.50 23,100.00

3B.29 In Machine Room floor m 30.00 588.00 17,640.00

Concrete for raising of toilet floor level

1:2:4 (20mm) plane cement concrete


for raising of floor levels as required
including necessary form works for the
followings. Rate to include for leveling
and keeping slopes as directed.

3B.30 In Ground floor m3 3.00 10,311.00 30,933.00

3B.31 In First floor m3 4.00 10,620.00 42,480.00

3B.32 In Second floor m3 4.00 10,827.00 43,308.00

3B.33 In Third floor m3 4.00 11,239.00 44,956.00

3B.34 In Forth floor m3 4.00 11,445.00 45,780.00

3B.35 In Fifth floor m3 7.00 11,651.00 81,557.00

Formwork

Rate shall include for:- Note

All necessary boarding, supporting,


erecting, framing, cutting angles,
skirting or removal, cleaning, wetting
& treating before placing concrete.

Formwork is measured as the nett


contact surface measurement
between concrete & formwork

58
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY. Rs. Cts. Rs. Cts.

12mm thick Plywood or other Note


equivalent quality approved type of
shuttering for the followings. Mould oil
should be applied to formwork
surfaces before using.

3B.36 Columns in Ground floor m2 25.00 775.00 19,375.00

3B.37 Beams in Ground floor m2 12.00 775.00 9,300.00

3B.38 Columns in First floor m2 25.00 790.00 19,750.00

3B.39 Beams in First floor m2 12.00 790.00 9,480.00

3B.40 Columns in Second floor m2 25.00 806.00 20,150.00

3B.41 Beams in Second floor m2 12.00 806.00 9,672.00

3B.42 Columns in Third floor m2 25.00 821.50 20,537.50

3B.43 Beams in Third floor m2 12.00 821.50 9,858.00

3B.44 Columns in Forth floor m2 25.00 837.00 20,925.00

3B.45 Beams in Forth floor m2 12.00 837.00 10,044.00

3B.46 Columns in Fifth floor m2 35.00 852.50 29,837.50

3B.47 Beams in Fifth floor m2 20.00 852.50 17,050.00

3B.48 Columns in Machine Room floor m2 20.00 868.00 17,360.00

3B.49 Beams in Machine Room floor m2 25.00 868.00 21,700.00

Reinforcement

Rate shall include for cutting, bending, Note


fabricating, placing in position, holding
and supporting including temporary
fixing supports, hangers, space bars,
chairs, laps, binding wires and waste.

59
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY. Rs. Cts. Rs. Cts.

High yield steel and mild steel bars Note


use for construction.

Reinforcement as per B.S. 4499 or Note


4461 having minimum characteristic
strength of 460 N/mm2 for Tor (Yield)
steel and 250N/mm2 for Mild steel.

Tor Steel for the followings

3B.50 In Columns in Ground floor kg 125.00 132.50 16,562.50

3B.51 In Beams in Ground floor kg 120.00 132.50 15,900.00

3B.52 In Columns in First floor kg 125.00 135.00 16,875.00

3B.53 In Beams in First floor kg 120.00 135.00 16,200.00

3B.54 In Columns in Second floor kg 125.00 138.00 17,250.00

3B.55 In Beams in Second floor kg 120.00 138.00 16,560.00

3B.56 In Columns in Third floor kg 125.00 140.50 17,562.50

3B.57 In Beams in Third floor kg 120.00 140.50 16,860.00

3B.58 In Columns in Forth floor kg 125.00 143.00 17,875.00

3B.59 In Beams in Forth floor kg 120.00 143.00 17,160.00

3B.60 In Columns in Fifth floor kg 125.00 146.00 18,250.00

3B.61 In Beams in Fifth floor kg 120.00 146.00 17,520.00

3B.62 In Columns and beams in Machine kg 75.00 149.00 11,175.00


Room floor

3B.63 Roof Slab in Machine Room kg 140.00 149.00 20,860.00

60
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY. Rs. Cts. Rs. Cts.
3B.64 In 225 X 150mm lintels in Ground floor kg 50.00 132.50 6,625.00

3B.65 - Do - in First floor kg 50.00 135.00 6,750.00

3B.66 - Do - in Second floor kg 50.00 138.00 6,900.00

3B.67 - Do - in Third floor kg 50.00 140.50 7,025.00

3B.68 - Do - in Forth floor kg 500.00 143.00 71,500.00

3B.69 - Do - in Fifth floor kg 600.00 146.00 87,600.00

3B.70 In Machine Room floor kg 60.00 149.00 8,940.00

3B.71 In 112 X 150mm lintels in Ground floor kg 30.00 132.50 3,975.00

3B.72 - Do - in First floor kg 30.00 135.00 4,050.00

3B.73 - Do - in Second floor kg 30.00 138.00 4,140.00

3B.74 - Do - in Third floor kg 30.00 140.50 4,215.00

3B.75 - Do - in Forth floor kg 30.00 143.00 4,290.00

3B.76 - Do - in Fifth floor kg 60.00 146.00 8,760.00

3B.77 In Machine Room floor kg 10.00 149.00 1,490.00

Mild Steel for the followings

3B.78 In Columns in Ground floor kg 15.00 130.50 1,957.50

3B.79 In Beams in Ground floor kg 15.00 130.50 1,957.50

3B.80 In Columns in First floor kg 15.00 133.00 1,995.00

3B.81 In Beams in First floor kg 15.00 133.00 1,995.00

3B.82 In Columns in Second floor kg 15.00 135.50 2,032.50

3B.83 In Beams in Second floor kg 30.00 135.50 4,065.00

61
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY. Rs. Cts. Rs. Cts.

3B.84 In Columns in Third floor kg 15.00 138.00 2,070.00

3B.85 In Beams in Third floor kg 30.00 138.00 4,140.00

3B.86 In Columns in Forth floor kg 30.00 141.50 4,245.00

3B.87 In Beams in Forth floor kg 30.00 141.50 4,245.00

3B.88 In Columns in Fifth floor kg 30.00 144.00 4,320.00

3B.89 In Beams in Fifth floor kg 30.00 144.00 4,320.00

3B.90 In Columns and beams in Machine kg 15.00 146.50 2,197.50


Room floor

3B.91 In Roof Slab in Machine Room kg 15.00 146.50 2,197.50

3B.92 In 225 X 150mm lintels in Ground floor kg 5.00 130.50 652.50

3B.93 - Do - in First floor kg 5.00 133.00 665.00

3B.94 - Do - in Second floor kg 5.00 135.50 677.50

3B.95 - Do - in Third floor kg 5.00 138.00 690.00

3B.96 - Do - in Forth floor kg 5.00 141.50 707.50

3B.97 - Do - in Fifth floor kg 70.00 144.00 10,080.00

3B.98 In Machine Room floor kg 10.00 146.50 1,465.00

3B.99 In 112 X 150mm lintels in Ground floor kg 5.00 130.50 652.50

3B.100 - Do - in First floor kg 5.00 133.00 665.00

3B.101 - Do - in Second floor kg 20.00 135.50 2,710.00

3B.102 - Do - in Third floor kg 10.00 138.00 1,380.00

3B.103 - Do - in Forth floor kg 10.00 141.50 1,415.00

62
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY. Rs. Cts. Rs. Cts.
3B.104 - Do - in Fifth floor kg 15.00 144.00 2,160.00

3B.105 In Machine Room floor kg 5.00 146.50 732.50

Total of Concretor carried to Summary (Page 108) 2,432,908.50

3C - MASONRY WORKS

Rates include for all joggles, cramps, Note


dowels, ties, templates, rough & fair
cutting, forming splays, angles,
reveals & setting, joining, fixing in
position and pointing, protecting &
cleaning down

3C.1 Random rubble masonry in 1:5 m3 3.00 5,623.00 16,869.00


cement sand mortar in wall
foundation. Rate to include for
keeping weep holes at every 2m
intervals

Total of Masonry Works carried to Summary (Page 108) 16,869.00

3D - BRICK WORK

Brick should be of superior quality Note.


subject to take prior approval by the
Engineer.

Rate to include for all rough and fair Note.


cutting, plumbing angles, forming
rebated reveals, rough arches raking
out joints for painting, plastering etc.,
cutting chases, making good and
sundry items of like nature.

63
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY. Rs. Cts. Rs. Cts.

225mm thick Brick Works

225mm brick work in 1:5 cement sand


mortar in walls in the following

3D.01 In Ground floor m3 3.00 9,808.00 29,424.00

3D.02 In First floor m3 20.00 10,928.00 218,560.00

3D.03 In Second floor m3 43.00 10,495.00 451,285.00

3D.04 In Third floor m3 190.00 10,789.00 2,049,910.00

3D.05 In Forth floor m3 170.00 11,083.00 1,884,110.00

3D.06 In Fifth floor m3 210.00 11,337.00 2,380,770.00

3D.07 In Machine Room floor m3 50.00 11,672.00 583,600.00

112mm thick Brick Works

112mm brick work in 1:5 cement sand


mortar in walls in the following

3D.08 In Ground floor m2 75.00 995.50 74,662.50

3D.09 In First floor m2 10.00 1,045.00 10,450.00

3D.10 In Second floor m2 400.00 1,065.00 426,000.00

3D.11 In Third floor m2 90.00 1,095.00 98,550.00

3D.12 In Forth floor m2 50.00 1,125.00 56,250.00

3D.13 In Fifth floor m2 15.00 1,155.00 17,325.00

3D.14 In Machine Room floor m2 10.00 1,185.00 11,850.00

Total of Brick work carried to Summary (Page 108 ) 8,292,746.50

64
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY. Rs. Cts. Rs. Cts.

3E - PLASTERER

Rates to be included for all temporary Note.


rules, screeds, grounds etc. for raking
out joints of new brick work or hacking
new concrete for key internal and
coved angles, joints between new &
old plastering, arises, quirks,
intersections between curved or
irregular

Rates to include for the cost for Note.


scaffoldings and curing.

All reveals and corners are not Note.


measured separately and are deemed
to be included in the respective BOQ
items.

Slab Sofits and Beam Plasters

15mm thick 1:1:5 cement, lime & sand


plaster finishing smooth with lime
putty including slab soffits, beam sides
and soffits with reveals.

3E.01 In First floor slab and beams m2 120.00 490.00 58,800.00

3E.02 In Second floor slab and beams m2 50.00 505.00 25,250.00

3E.03 In Third floor slab and beams m2 250.00 519.00 129,750.00

3E.04 In Forth floor slab and beams m2 700.00 534.00 373,800.00

3E.05 In Fifth floor slab and beams m2 200.00 549.00 109,800.00

3E.06 In Machine Room floor slab and m2 120.00 563.50 67,620.00


beams

65
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY. Rs. Cts. Rs. Cts.
3E.07 In Machine Room roof slab and m2 60.00 578.00 34,680.00
beams

Internal Wall Plaster

15mm thick 1:1:5 cement, lime & sand


wall plaster for internal walls finishing
smooth with lime putty including all
reveals and corners, for the
followings.

3E.08 In walls in Ground Floor level m2 175.00 418.00 73,150.00

3E.09 In walls in First Floor level m2 130.00 431.00 56,030.00

3E.10 In walls in Second Floor level m2 1103.00 443.00 488,629.00

3E.11 In walls in Third Floor level m2 1600.00 456.00 729,600.00

3E.12 In walls in Forth Floor level m2 1700.00 468.00 795,600.00

3E.13 In walls in Fifth Floor level m2 1400.00 481.00 673,400.00

3E.14 In walls in Machine Room level m2 400.00 493.00 197,200.00

3E.15 In walls above Machine Room roof m2 200.00 506.00 101,200.00


slab level

External Wall Plaster

15mm thick 1:1:5 cement, lime & sand


wall plaster for external walls finishing
semi-rough with wooden floating
including all reveals and corners, for
the followings.

3E.16 In walls in Ground Floor level m2 40.00 351.00 14,040.00

3E.17 In walls in First Floor level m2 130.00 369.00 47,970.00

3E.18 In walls in Second Floor level m2 300.00 386.00 115,800.00

66
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY. Rs. Cts. Rs. Cts.
3E.19 In walls in Third Floor level m2 450.00 404.00 181,800.00

3E.20 In walls in Forth Floor level m2 425.00 421.00 178,925.00

3E.21 In walls in Fifth Floor level m2 550.00 439.00 241,450.00

3E.22 In walls in Machine Room level m2 200.00 456.00 91,200.00

3E.23 In walls above Machine Room roof m2 100.00 474.00 47,400.00


slab level

Floor Rendering

12mm thick 1:3 cement & sand


rendering for finishing smooth with
cement floating including all reveals
and corners, for the followings.

3E.24 In Ground Floor m2 12.00 526.00 6,312.00

3E.25 In First Floor m2 10.00 542.00 5,420.00

3E.26 In Second Floor m2 10.00 558.00 5,580.00

3E.27 In Third Floor m2 10.00 573.00 5,730.00

3E.28 In Forth Floor m2 10.00 589.00 5,890.00

3E.29 In Fifth Floor m2 10.00 605.00 6,050.00

3E.30 In Machine Room floor m2 20.00 621.00 12,420.00

3E.31 In Machine Room roof slab m2 20.00 636.50 12,730.00

Skirtings

12mmX100mm size skirtings in 1:3


cement & sand mortar projected from
wall plaster finishing smooth with
cement floating including, for the
followings.

67
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY. Rs. Cts. Rs. Cts.
3E.32 In Ground Floor m2 14.00 190.00 2,660.00

3E.33 In First Floor m2 13.00 196.00 2,548.00

3E.34 In Second Floor m2 13.00 201.00 2,613.00

3E.35 In Third Floor m2 13.00 207.00 2,691.00

3E.36 In Forth Floor m2 13.00 213.00 2,769.00

3E.37 In Fifth Floor m2 13.00 219.00 2,847.00

3E.38 In Machine Room floor m2 25.00 224.00 5,600.00

3E.39 In Machine Room roof slab m2 25.00 226.50 5,662.50

Lift Core Plastering

15mm thick 1:1:5 cement, lime & sand


wall plaster for lift core finishing semi-
rough with wooden floating including
all reveals and corners, for the
following levels.

3E.40 In Ground Floor level m2 24.00 351.00 8,424.00

3E.41 In First Floor level m2 24.00 369.00 8,856.00

3E.42 In Second Floor level m2 24.00 386.00 9,264.00

3E.43 In Third Floor level m2 24.00 404.00 9,696.00

3E.44 In Forth Floor level m2 24.00 421.00 10,104.00

3E.45 In Fifth Floor level m2 30.00 439.00 13,170.00

Total of Plasterer carried to Summary (Page 108) 4,980,130.50

3F - PAVIOR

68
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY. Rs. Cts. Rs. Cts.
Rate shall include for :

All temporary rules, screeds, grounds Note


etc. all normal cutting, arises, rounded
angles and edges and the like,
bedding and pointing making good
between different surfaces & between
new and old work, making good
around pipes, sanitary fitting, and
other fixtures cleaning down and
protecting upon completion.

General Notes for Floor and Wall Tile finishing

All floor and wall tiles should be Note


locally manufactured and should be
of approved quality, colour, texture
and size. The samples for all tile
varieties should be submitted to the
Engineer/ Architect for the prior
approval. No laying of any of the tiles
to be used will be allowed without
prior approval.

All tile laying should be in straight Note


joints in both ways including all
shapes, corner and angles.

All wall and floor tiling should be set in Note


12mm thick 1:3 cement sand mortar
bedding and fixed with neat cement
floating

All tile joints shall be pointed with Note


polymer modified coloured tile grout to
match with tiles.

FLOOR TILING

Floor Tiling of Corridor Areas

Supplying and laying of homogeneous Note


and non-skid type dark colour floor
tiles for corridors in following areas

69
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY. Rs. Cts. Rs. Cts.

3F.01 In Ground Floor m2 220.00 2,504.00 550,880.00

3F.02 In First Floor m2 180.00 2,554.00 459,720.00

3F.03 In Second Floor m2 90.00 2,604.00 234,360.00

3F.04 In Third Floor m2 170.00 2,654.00 451,180.00

3F.05 In Forth Floor m2 180.00 2,704.00 486,720.00

3F.06 In Fifth Floor m2 120.00 2,754.00 330,480.00

Supplying and fixing of 100mm high


tile skirtings for the above areas using
the same quality tile

3F.07 In Ground Floor m 200.00 290.00 58,000.00

3F.08 In First Floor m 105.00 296.00 31,080.00

3F.09 In Second Floor m 100.00 302.00 30,200.00

3F.10 In Third Floor m 110.00 309.00 33,990.00

3F.11 In Forth Floor m 115.00 315.00 36,225.00

3F.12 In Fifth Floor m 90.00 321.00 28,890.00

Floor Tiling of Toilet Areas

Supplying and laying of homogeneous Note


and non-skid type light colour floor
tiles for Toilets Floors in followings.

3F.13 In Ground Floor m2 85.00 2,608.00 221,680.00

3F.14 In First Floor m2 70.00 2,660.00 186,200.00

70
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY. Rs. Cts. Rs. Cts.
3F.15 In Second Floor m2 70.00 2,712.00 189,840.00

3F.16 In Third Floor m2 60.00 2,764.50 165,870.00

3F.17 In Forth Floor m2 70.00 2,816.50 197,155.00

3F.18 In Fifth Floor m2 50.00 2,869.00 143,450.00

Floor Tiling of Stair Case Areas

Supplying and laying of homogeneous Note


and non-skid type light colour Step
tiles including nosing tiles for
Staircases in followings.

3F.19 In Ground Floor m2 35.00 3,049.00 106,715.00

3F.20 In First Floor m2 50.00 3,110.00 155,500.00

3F.21 In Second Floor m2 50.00 3,171.00 158,550.00

3F.22 In Third Floor m2 50.00 3,232.00 161,600.00

3F.23 In Forth Floor m2 50.00 3,293.00 164,650.00

3F.24 In Fifth Floor m2 40.00 3,354.00 134,160.00

Supplying and fixing of 100mm high


tile skirtings for the above areas using
the same quality tile

3F.25 In Ground Floor m 45.00 310.00 13,950.00

3F.26 In First Floor m 55.00 316.00 17,380.00

3F.27 In Second Floor m 55.00 322.00 17,710.00

3F.28 In Third Floor m 55.00 329.00 18,095.00

3F.29 In Forth Floor m 55.00 335.00 18,425.00

3F.30 In Fifth Floor m 40.00 341.00 13,640.00

71
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY. Rs. Cts. Rs. Cts.

Floor Tiling of patients Areas (Areas except Corridors, Toilets and Stairs)

Supplying and laying of homogeneous Note


and non-skid type light colour Floor
tiles for the internal area in followings.

3F.31 In Ground Floor m2 500.00 2,608.00 1,304,000.00

3F.32 In First Floor m2 390.00 2,660.00 1,037,400.00

3F.33 In Second Floor m2 390.00 2,712.00 1,057,680.00

3F.34 In Third Floor m2 400.00 2,764.50 1,105,800.00

3F.35 In Forth Floor m2 400.00 2,816.50 1,126,600.00

3F.36 In Fifth Floor m2 450.00 2,869.00 1,291,050.00

Supplying and fixing of 100mm high


tile skirtings for the above areas using
the same quality tile

3F.37 In Ground Floor m 120.00 300.00 36,000.00

3F.38 In First Floor m 105.00 306.00 32,130.00

3F.39 In Second Floor m 105.00 312.00 32,760.00

3F.40 In Third Floor m 110.00 319.00 35,090.00

3F.41 In Forth Floor m 110.00 325.00 35,750.00

3F.42 In Fifth Floor m 80.00 331.00 26,480.00

WALL TILING

Wall Tiling of Toilet Walls

Supplying and laying of glazed wall Note


tiles for toilet walls in followings.

72
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY. Rs. Cts. Rs. Cts.
3F.25 In Ground Floor m2 105.00 1,835.00 192,675.00

3F.26 In First Floor m2 130.00 1,878.00 244,140.00

3F.27 In Second Floor m2 130.00 1,908.00 248,040.00

3F.28 In Third Floor m2 120.00 1,945.00 233,400.00

3F.29 In Forth Floor m2 100.00 1,982.00 198,200.00

3F.30 In Fifth Floor m2 90.00 2,019.00 181,710.00

Wall Tiling of Wards, Theaters and other Patients Areas

Supplying and laying of glazed wall


tiles for walls of Wards, Theaters,
ICUs, Radiology Rooms and other
patients areas in followings.

3F.31 In Ground Floor m2 400.00 1,835.00 734,000.00

3F.32 In First Floor m2 120.00 1,878.00 225,360.00

3F.33 In Second Floor m2 25.00 1,908.00 47,700.00

3F.34 In Third Floor m2 25.00 1,945.00 48,625.00

3F.35 In Forth Floor m2 50.00 1,982.00 99,100.00

3F.36 In Fifth Floor m2 550.00 2,019.00 1,110,450.00

Wall Tiling of Corridors

Supplying and laying of glazed wall


tiles for walls of Corridors in
followings.

73
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY. Rs. Cts. Rs. Cts.
3F.37 In Ground Floor m2 200.00 1,835.00 367,000.00

3F.38 In First Floor m2 80.00 1,878.00 150,240.00

3F.39 In Second Floor m2 120.00 1,908.00 228,960.00

3F.40 In Third Floor m2 125.00 1,945.00 243,125.00

3F.41 In Forth Floor m2 190.00 1,982.00 376,580.00

3F.42 In Fifth Floor m2 200.00 2,019.00 403,800.00

GRANITE WORKS

Granite Work Tops.

All granite materials should be Note


locally manufactured and should be
of approved quality, colour, texture
and size. The samples of granite
materials should be submitted to the
Engineer/ Architect for the prior
approval. No laying of any of the
granite materials to be used will be
allowed without prior approval.

All granite laying should be seamless Note


in both ways including all shapes,
corner and angles.

All granite works should be set in Note


12mm thick 1:3 cement sand mortar
bedding and fixed with neat cement
floating

3F.43 Supplying and fixing of light color


polished granite tops (seamless) on
working tables (Working table paid
separately).

74
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY. Rs. Cts. Rs. Cts.

3F.44 In Ground Floor m2 15.00 9,000.00 135,000.00

3F.45 In First Floor m2 15.00 9,025.00 135,375.00

3F.46 In Second Floor m2 15.00 9,050.00 135,750.00

3F.47 In Third Floor m2 15.00 9,075.00 136,125.00

3F.48 In Forth Floor m2 15.00 9,100.00 136,500.00

3F.49 In Fifth Floor m2 15.00 9,125.00 136,875.00

Total of Pavior carried to Summary (Page 108) 18,085,765.00

3G - ROOFER & ROOF PLUMBER

Steel work

All steel to be used in the work shall Note


comply with the relevant British
Standards & to the specifications.

All steel shall be new & each member Note


shall be free from any built- weld or
other forms of splice for the full length
between joints shown in or indicated
in the drawings unless such splice
shall have been shown in the
approved drawings.

The contractor shall submit the Note


specification for the steel which he
proposed to use and obtain prior
approval from the Engineer before
commencement of ordering of steel
and fabrication.

Drawings

75
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY. Rs. Cts. Rs. Cts.
Before any steel work is fabricated the Note
contractor shall obtain the Engineer's
approval of the proposed details of
fabrications. For this purpose, two
copies of shop drawings for each work
shall be submitted to the Engineer not
less than 14 days before
commencement of fabrications.

Inspections

All steel work shall be subjected for Note


inspection by the Engineer. The steel
works shall not be moved from the
place of fabrication nor shall it be
primed or painted until the approval of
the Engineer has been obtained for
the fabrication of steel work.

Welding

No welding shall be done until Note


approval of the prepared surface has
been obtained. All welding shall be
carried out under the supervision of
qualified persons.

Base plates, sole plates, gussets Note


plates, splices, bolts, nuts, ties, etc.
have not been measured separately
but the weights of such attachments is
deemed to have been included in
weight of respective items indicated in
in the BOQ

Refer drawings for fabrication and Note


fixing details of trusses, beams,
purlins etc.

All steel works should be applied two Note


coats of coloured anticorrosive paints
(two different colours for two coats)
and two coats of enamel paints.

76
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY. Rs. Cts. Rs. Cts.
Rates to include for the cost for Note
scaffoldings, supplying arrangement in
erections.

Rate shall include for all necessary Note


cuttings, drillings, bolting, reverting,
welding, grinding, delivering,
unloading, hoisting, erecting and fixing
in position, leveling, plumbing and
preparation, submission and getting
approval of all shop drawings.

Steel section Types which are to be Note


used for the followings are as follows

Roof Trusses

3G.01 Supplying, fabricating, erecting and kg. 10600.00 185.00 1,961,000.00


fixing in positions of steel parallel code
trusses of for roof frame as per
drawings with necessary accessories.

3G.04 Supplying, preparing and fixing of kg. 250.00 200.00 50,000.00


minor steel sections as required
including angle irons, "C" sections, etc
including all connecting works.

Purlins

3G.05 Supplying and fixing of 15020 high m 440.00 550.00 242,000.00


tensile lip channel purlins with all
accessories having the following
properties.

Size - 150X63X16.5 mm size


Minimum section thickness -2.0mm
Linear Density - 4.55kg/m
Grade - AS1397/ G450 Z200
(Minimum Yield Strength - 450MPa
200g/m2 Coating mass

(Manufacture specifications should be


submitted to the Engineer for prior
approval)

77
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY. Rs. Cts. Rs. Cts.

Heat Proof Layer

3G.06 Supplying & fixing of 50mm thick m2 1100.00 450.00 495,000.00


16Kg/m3 density glass woolen heat
proof layer with double sided
Aluminium Insulation foil with
approved quality GI net to under side
the roof sheet including all connected
works.

(Manufacture specifications should be


submitted to the Engineer for prior
approval)

Zn/Al Type Roofing

All Zn/Al materials shall be comply Note.


with the relevant standards

All Zn/Al materials shall be of 0.47mm Note.


thick colour bonded sheets. Colour
and the profile of the sheet should be
approved by the Engineer/ Architect
prior to installation/ ordering.

Rate to be include for all necessary Note.


accessories like screws, clips, ridging
strips, hip strips, valley gutters, etc,
and deemed to have been included in
the BOQ item.

3G.07 Supply and laying of Zn/Al roofing m2 1100.00 1,100.00 1,210,000.00


sheets over the roof frame work
(framework paid separately) including
all accessories.

(Manufacture specifications of the


sheets should be submitted to the
Engineer for prior approval)

78
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY. Rs. Cts. Rs. Cts.

Roof plumber

3G.08 Allow provisional sum for preparation P.Sum 100,000.00


of existing concrete gutters and down
pipes and giving connections to those
as directed by the Engineer

Total of Roofer & Roof Plumber carried to Summary (Page 108) 4,058,000.00

3H - ALUMINIUM WORKS

Material

All aluminium sections shall be Note


Natural aluminium alloy sections with
powder coatings having minimum
coating thickness of 60 - 70 Microns

All aluminium sections shall present Note


clear, straight and sharply defined
lines. They shall be free from defects
impairing strength, appearance and
durability.

All aluminium sections shall be Note


designed to suit the required standard

For each fabrications, a shop drawing Note


shall be furnished to the Engineer,
Fourteen days prior to the installation
commencement and should get the
approval for the same.

79
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY. Rs. Cts. Rs. Cts.

All details and specifications of the Note


screws, bolts, nuts, rivets, hinges,
glazing and paneling materials, locks,
handles, floor hinges, spring hinges,
door closers, crash bars, kick plates,
trolley guards and other accessories
requires for each fabrications have
been given in the schedules in
respective drawing and rates shall be
quoted after streak reference of detail
drawings of doors, windows and
partitions.

The fabrication and installation of all Note


aluminium work must be carried out
by specialist tradesman.

All dimensions shown on the drawings Note


shall be verified by actual site
measurement before fabrication and
installation. Any cutting to enlarge the
size of opening and any filleting
behind frames required after
installation shall be executed by the
contractor at his own expense.

Rates to include for supplying all Note


materials, cuttings, bending, grinding,
drilling, assembling, bolting, riveting,
nailing, fixing in position of aluminium
framed doors, windows, fanlights,
partition units complete with sealant,
glazing screws, beadings, locks,
fasteners, gasket, hardware and
fittings all complete as per detail
drawings

Aluminium Framed Galzed and Paneled Partitions.

80
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY. Rs. Cts. Rs. Cts.
Rates for the following petitions shall Note.
be included for the doors if it is
included in the drawings.

Refer relevant drawings for more Note.


information

Supplying all materials, fabricating


and fixing of aluminium framed
glazed and paneled partition of "Type
P1" with door sash as per drawing
including all accessories mentioned in
the schedule.

3H.01 In Ground Floor level m2 8.50 5,750.00 48,875.00

Supplying all materials, fabricating


and fixing of aluminium framed
glazed and paneled partition of "Type
P2" as per drawing including all
accessories mentioned in the
schedule.

3H.02 In Ground Floor level m2 11.50 4,250.00 48,875.00

Supplying all materials, fabricating


and fixing of aluminium framed
glazed and paneled partition of "Type
P3" with door sash as per drawing
including all accessories mentioned in
the schedule.

3H.03 In Ground Floor level m2 35.60 5,500.00 195,800.00

Supplying all materials, fabricating


and fixing of aluminium framed
glazed and paneled partition of "Type
P4" with double sash swing door sash
as per drawing including all
accessories mentioned in the
schedule.

3H.04 In First Floor level m2 18.90 7,250.00 137,025.00

81
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY. Rs. Cts. Rs. Cts.

Supplying all materials, fabricating


and fixing of aluminium framed
glazed and paneled partition of "Type
P5" as per drawing including all
accessories mentioned in the
schedule.

3H.05 In First Floor level m2 6.50 4,250.00 27,625.00

Supplying all materials, fabricating


and fixing of aluminium framed
glazed and paneled partition of "Type
P6" with openings as per drawing
including all accessories mentioned in
the schedule. (Measured without
openings)

3H.06 In First Floor level m2 18.60 3,750.00 69,750.00

Supplying all materials, fabricating


and fixing of aluminium framed
glazed and paneled partition of "Type
P7" with openings as per drawing
including all accessories mentioned in
the schedule. (Measured without
openings)

3H.07 In First Floor level m2 37.00 3,500.00 129,500.00

3H.08 In Forth Floor level m2 37.00 3,500.00 129,500.00

Supplying all materials, fabricating


and fixing of aluminium framed
glazed and paneled partition of "Type
P7I" with openings as per drawing
including all accessories mentioned in
the schedule. (Measured without
openings)

3H.09 In Second Floor level m2 36.00 3,500.00 126,000.00

3H.10 In Third Floor level m2 36.00 3,500.00 126,000.00

82
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY. Rs. Cts. Rs. Cts.
Supplying all materials, fabricating
and fixing of aluminium framed
glazed and paneled partition of "Type
P8" with openings as per drawing
including all accessories mentioned in
the schedule. (Measured without
openings)

3H.11 In Second Floor level m2 18.60 3,750.00 69,750.00

3H.12 In Third Floor level m2 18.60 3,750.00 69,750.00

Supplying all materials, fabricating


and fixing of aluminium framed
glazed and paneled partition of "Type
P8I" with openings as per drawing
including all accessories mentioned in
the schedule. (Measured without
openings)

3H.13 In Forth Floor level m2 10.50 3,900.00 40,950.00

Supplying all materials, fabricating


and fixing of aluminium framed
glazed and paneled partition of "Type
P9" with 4 Nos. of door sashes as per
drawing including all accessories
mentioned in the schedule.

3H.14 In Second Floor level m2 32.60 6,000.00 195,600.00

Supplying all materials, fabricating


and fixing of aluminium framed
glazed and paneled partition of "Type
P10" as per drawing including all
accessories mentioned in the
schedule.

3H.15 In Forth Floor level m2 19.60 4,000.00 78,400.00

83
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY. Rs. Cts. Rs. Cts.
Supplying all materials, fabricating
and fixing of aluminium framed
glazed and paneled partition of "Type
P11" with door sash as per drawing
including all accessories mentioned in
the schedule.

3H.16 In Ground Floor level m2 9.70 6,250.00 60,625.00

Supplying all materials, fabricating


and fixing of aluminium framed
glazed and paneled partition of "Type
P12" as per drawing including all
accessories mentioned in the
schedule.

3H.17 In Ground Floor level m2 9.70 4,500.00 43,650.00

Supplying all materials, fabricating


and fixing of aluminium framed
glazed and paneled partition of "Type
P13" with door sash as per drawing
including all accessories mentioned in
the schedule.

3H.18 In Ground Floor level m2 6.70 6,750.00 45,225.00

Supplying all materials, fabricating


and fixing of aluminium framed
glazed and paneled partition of "Type
P14" as per drawing including all
accessories mentioned in the
schedule.

3H.19 In Ground Floor level m2 25.60 3,750.00 96,000.00

84
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY. Rs. Cts. Rs. Cts.
Supplying all materials, fabricating
and fixing of aluminium framed
glazed and paneled partition of "Type
5P1" as per drawing including all
accessories mentioned in the
schedule.

3H.20 In Fifth Floor level m2 17.80 4,750.00 84,550.00

Supplying all materials, fabricating


and fixing of aluminium framed
glazed and paneled partition of "Type
5P2" as per drawing including all
accessories mentioned in the
schedule.

3H.21 In Fifth Floor level m2 4.20 5,250.00 22,050.00

Supplying all materials, fabricating


and fixing of aluminium framed
glazed and paneled partition of "Type
5P3" with door sash as per drawing
including all accessories mentioned in
the schedule.

3H.22 In Fifth Floor level m2 6.70 6,750.00 45,225.00

Supplying all materials, fabricating


and fixing of aluminium framed
glazed and paneled partition of "Type
5P4" as per drawing including all
accessories mentioned in the
schedule.

3H.23 In Fifth Floor level m2 13.10 4,250.00 55,675.00

Supplying all materials, fabricating


and fixing of aluminium framed
glazed and paneled partition of "Type
5P5" as per drawing including all
accessories mentioned in the
schedule.

3H.24 In Fifth Floor level m2 5.80 4,750.00 27,550.00

85
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY. Rs. Cts. Rs. Cts.

Supplying all materials, fabricating


and fixing of aluminium framed
glazed and paneled partition of "Type
5P6" with door sash as per drawing
including all accessories mentioned in
the schedule.

3H.25 In Fifth Floor level m2 17.80 5,750.00 102,350.00

Supplying all materials, fabricating


and fixing of aluminium framed
glazed and paneled partition of "Type
5P7" with door sash as per drawing
including all accessories mentioned in
the schedule.

3H.26 In Fifth Floor level m2 6.60 6,250.00 41,250.00

Supplying all materials, fabricating


and fixing of aluminium framed
glazed and paneled partition of "Type
5P8" as per drawing including all
accessories mentioned in the
schedule.

3H.27 In Fifth Floor level m2 6.40 4,750.00 30,400.00

Supplying all materials, fabricating


and fixing of aluminium framed
glazed and paneled partition of "Type
5P9" as per drawing including all
accessories mentioned in the
schedule.

3H.28 In Fifth Floor level m2 9.90 4,750.00 47,025.00

Supplying all materials, fabricating


and fixing of aluminium framed
glazed and paneled partition of "Type
5P10" with door sash as per drawing
including all accessories mentioned in
the schedule.

86
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY. Rs. Cts. Rs. Cts.

3H.29 In Fifth Floor level m2 9.00 6,000.00 54,000.00

Supplying all materials, fabricating


and fixing of aluminium framed
glazed and paneled partition of "Type
5P11" as per drawing including all
accessories mentioned in the
schedule.

3H.30 In Fifth Floor level m2 8.70 4,750.00 41,325.00

Supplying all materials, fabricating


and fixing of aluminium framed
glazed and paneled partition of "Type
5P12" as per drawing including all
accessories mentioned in the
schedule.

3H.31 In Fifth Floor level m2 11.20 4,500.00 50,400.00

Supplying all materials, fabricating


and fixing of aluminium framed
glazed and paneled partition of "Type
5P13" with door sash as per drawing
including all accessories mentioned in
the schedule.

3H.32 In Fifth Floor level m2 8.30 6,000.00 49,800.00

Supplying all materials, fabricating


and fixing of aluminium framed
glazed and paneled partition of "Type
5P14" with door sash as per drawing
including all accessories mentioned in
the schedule.

3H.33 In Fifth Floor level m2 4.90 6,750.00 33,075.00

87
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY. Rs. Cts. Rs. Cts.
Supplying all materials, fabricating
and fixing of aluminium framed
glazed and paneled partition of "Type
PH" with door sash as per drawing
including all accessories mentioned in
the schedule.

3H.34 In First Floor level m2 44.00 3,500.00 154,000.00

3H.35 In Second Floor level m2 47.00 3,500.00 164,500.00

3H.36 In Third Floor level m2 48.00 3,500.00 168,000.00

3H.37 In Forth Floor level m2 46.00 3,500.00 161,000.00

Aluminium Framed Doors

Refer relevant drawings for more Note.


information

Aluminium framed fully glazed/ Glazed


and paneled/ fully paneled doors of
side hung or swing type as specified
in the following BOQ items, relevant
drawings and schedules.

Supplying all materials, fabricating


and fixing of aluminium framed
double sashed fully glazed swing door
of "Type AD1" as per drawing
including all accessories mentioned in
the schedule.

3H.38 In Ground Floor level m2 7.50 9,500.00 71,250.00

Supplying all materials, fabricating


and fixing of aluminium framed
double sashed glazed and paneled
swing door of "Type D1" as per
drawing including all accessories
mentioned in the schedule.

3H.39 In Ground Floor level m2 19.00 9,500.00 180,500.00

88
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY. Rs. Cts. Rs. Cts.

Supplying all materials, fabricating


and fixing of aluminium framed
double sashed glazed and paneled
swing door of "Type D2" as per
drawing including all accessories
mentioned in the schedule.

3H.40 In Ground Floor level m2 12.00 9,750.00 117,000.00

Supplying all materials, fabricating


and fixing of aluminium framed
double sashed glazed and paneled
swing door of "Type D2-S" as per
drawing including all accessories
mentioned in the schedule.

3H.41 In Ground Floor level m2 6.00 10,250.00 61,500.00

3H.42 In First Floor level m2 12.00 10,250.00 123,000.00

3H.43 In Second Floor level m2 12.00 10,250.00 123,000.00

3H.44 In Third Floor level m2 6.00 10,250.00 61,500.00

3H.45 In Forth Floor level m2 6.00 10,250.00 61,500.00

Allow provisional sum for supplying all


materials, fabricating and fixing of
Lead equivalent double sashed swing
door of "Type D2-L" to X-ray rooms
as per drawing including all
accessories mentioned in the
schedule.

3H.46 In Ground Floor level P.Sum 150,000.00

3H.47 In Third Floor level P.Sum 150,000.00

89
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY. Rs. Cts. Rs. Cts.
Supplying all materials, fabricating
and fixing of aluminium framed
double sashed glazed and paneled
door of "Type D3" as per drawing
including all accessories mentioned in
the schedule.

3H.48 In Ground Floor level m2 3.75 8,750.00 32,812.50

3H.49 In Third Floor level m2 3.75 8,750.00 32,812.50

3H.50 In Forth Floor level m2 7.50 8,750.00 65,625.00

Supplying all materials, fabricating


and fixing of aluminium framed
double sashed glazed and paneled
door of "Type D5" as per drawing
including all accessories mentioned in
the schedule.

3H.51 In Ground Floor level m2 3.00 8,000.00 24,000.00

Supplying all materials, fabricating


and fixing of aluminium framed single
sashed glazed and paneled door of
"Type D6" as per drawing including
all accessories mentioned in the
schedule.

3H.52 In First Floor level m2 15.00 7,000.00 105,000.00

Supplying all materials, fabricating


and fixing of Fiberglass framed 32mm
thick single sashed fiberglass door of
"Type D7" as per drawing including
all accessories mentioned in the
schedule.

3H.53 In First Floor level m2 2.60 6,250.00 16,250.00

3H.54 In Second Floor level m2 5.20 6,250.00 32,500.00

90
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY. Rs. Cts. Rs. Cts.
3H.55 In Third Floor level m2 2.60 6,250.00 16,250.00

3H.56 In Forth Floor level m2 2.60 6,250.00 16,250.00

Supplying all materials, fabricating


and fixing of Aluminium framed single
sashed 32mm thick ordinary finished
plywood door of "Type D8" as per
drawing including all accessories
mentioned in the schedule.

3H.57 In Ground Floor level m2 28.00 5,750.00 161,000.00

3H.58 In First Floor level m2 10.00 5,750.00 57,500.00

3H.59 In Second Floor level m2 18.00 5,750.00 103,500.00

3H.60 In Third Floor level m2 20.00 5,750.00 115,000.00

3H.61 In Forth Floor level m2 22.00 5,750.00 126,500.00

Supplying all materials, fabricating


and fixing of Fiberglass framed 32mm
thick single sashed fiberglass door of
"Type D9" as per drawing including
all accessories mentioned in the
schedule.

3H.62 In Ground Floor level m2 11.90 6,000.00 71,400.00

3H.63 In First Floor level m2 27.50 6,000.00 165,000.00

3H.64 In Second Floor level m2 23.80 6,000.00 142,800.00

3H.65 In Third Floor level m2 18.70 6,000.00 112,200.00

3H.66 In Forth Floor level m2 27.20 6,000.00 163,200.00

91
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY. Rs. Cts. Rs. Cts.
Supplying all materials, fabricating
and fixing of aluminium framed
double sashed glazed and paneled
door of "Type D10" as per drawing
including all accessories mentioned in
the schedule.

3H.67 In Ground Floor level m2 2.30 7,000.00 16,100.00

3H.68 Supplying all materials, fabricating m2 46.00 10,500.00 483,000.00


and fixing of fiber glass framed 32mm
thick double sash fiberglass door of
"Type 5D1" with embedded Red
Balaw or equivalent approved quality
timber members including viewing
glasses as per drawing including all
accessories mentioned in the
schedule excluding double action
spring hinges (Double action spring
hinges paid separately).

3H.69 Supplying all materials, fabricating m2 3.00 12,250.00 36,750.00


and fixing of fiber glass framed 32mm
thick single sash fiberglass door of
"Type 5D2" with embedded Red
Balaw or equivalent approved quality
timber members as per drawing
including all accessories mentioned in
the schedule.

92
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY. Rs. Cts. Rs. Cts.
3H.70 Supplying all materials, fabricating m2 6.70 14,600.00 97,820.00
and fixing of fiber glass framed 32mm
thick double sash fiberglass door of
"Type 5D3" with embedded Red
Balaw or equivalent approved quality
timber members including viewing
glasses as per drawing including all
accessories mentioned in the
schedule excluding double action
spring hinges (Double action spring
hinges paid separately).

3H.71 Supplying all materials, fabricating m2 27.40 13,900.00 380,860.00


and fixing of fiber glass framed 32mm
thick single sash fiberglass door of
"Type 5D4" with embedded Red
Balaw or equivalent approved quality
timber members as per drawing
including all accessories mentioned in
the schedule.

3H.72 Supplying all materials, fabricating m2 10.00 7,250.00 72,500.00


and fixing of Aluminium framed 32mm
thick single sash fiberglass door of
"Type 5D5" with embedded Red
Balaw or equivalent approved quality
timber members as per drawing
including all accessories mentioned in
the schedule.

Double Action Spring Hinges

The Bidder should take actions to Note


submit the samples of double action
spring hinges with the manufactures
specification at least 3 months before
the commencement of Aluminium
works.

Bidder should provided a minimum Note


five years warranty from the
manufacture

93
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY. Rs. Cts. Rs. Cts.

3H.73 Supplying of "Yale" or equivalent Nos. 45 25,000.00 1,125,000.00


heavy duty fully stainless steel
approved quality double action spring
hinges and fixing to fiberglass doors to
be fixed to 5th floor (Theatres) with all
accessories.

Aluminium Framed Windows

Refer relevant drawings for more Note.


information

Aluminium framed glazed windows of


side hung/ top hung, type as specified
in the following BOQ items, relevant
drawings and schedules.

Supplying all materials, fabricating


and fixing of aluminium framed
glazed window of "Type W1" with top
louvers as per drawing including all
accessories mentioned in the
schedule.

3H.74 In Ground Floor level m2 31.50 7,150.00 225,225.00

3H.75 In First Floor level m2 39.90 7,150.00 285,285.00

3H.76 In Second Floor level m2 53.55 7,150.00 382,882.50

3H.77 In Third Floor level m2 59.85 7,150.00 427,927.50

3H.78 In Forth Floor level m2 55.65 7,150.00 397,897.50

3H.79 In Fifth Floor level m2 43.05 7,150.00 307,807.50

94
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY. Rs. Cts. Rs. Cts.

Supplying all materials, fabricating


and fixing of aluminium framed
glazed window of "Type W2" with
side louvers as per drawing including
all accessories mentioned in the
schedule.

3H.80 In Ground Floor level m2 13.80 9,550.00 131,790.00

3H.81 In First Floor level m2 16.80 9,550.00 160,440.00

3H.82 In Second Floor level m2 9.60 9,550.00 91,680.00

3H.83 In Third Floor level m2 8.40 9,550.00 80,220.00

3H.84 In Forth Floor level m2 9.00 9,550.00 85,950.00

3H.85 In Fifth Floor level m2 15.60 9,550.00 148,980.00

Supplying all materials, fabricating


and fixing of aluminium framed
glazed window of "Type W4" with top
hung sashes as per drawing including
all accessories mentioned in the
schedule.

3H.86 In First Floor level m2 5.35 6,500.00 34,775.00

Supplying all materials, fabricating


and fixing of aluminium framed
glazed window of "Type W5" with top
hung sashes as per drawing including
all accessories mentioned in the
schedule.

3H.87 In Second Floor level m2 7.50 6,250.00 46,875.00

3H.88 In Third Floor level m2 7.50 6,250.00 46,875.00

3H.89 In Forth Floor level m2 7.50 6,250.00 46,875.00

95
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY. Rs. Cts. Rs. Cts.

3H.90 In Fifth Floor level m2 7.50 6,250.00 46,875.00

Supplying all materials, fabricating


and fixing of aluminium framed
glazed window of "Type W6" with top
hung sashes as per drawing including
all accessories mentioned in the
schedule.

3H.91 In First Floor level m2 3.90 6,500.00 25,350.00

3H.92 In Second Floor level m2 3.90 6,500.00 25,350.00

3H.93 In Third Floor level m2 3.90 6,500.00 25,350.00

3H.94 In Forth Floor level m2 3.90 6,500.00 25,350.00

3H.95 In Fifth Floor level m2 3.90 6,500.00 25,350.00

Total of Metal works carried to Summary (Page 108) 11,017,065.00

3J - PAINTER & DECORATOR

Rate shall include for :


Preparation of surfaces cleaning Note
down, smoothing, knotting, sloping
etc., protection of floors and fittings,
removing and replacing doors &
windows furniture in necessary and
cleaning of doors, windows, etc upon
completion.

All emulsion/ enamel/ weathershield Note


paints, primers and fillers shall be of
approved make (CIC or equivalent)
approved by Engineer

Rate to include for the cost for the Note


scaffoldings.

96
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY. Rs. Cts. Rs. Cts.
All paintings should be done with roller Note
brush

All reveal painting areas are included Note


in the respective BOQ items.

PRIMARY PREPARATION

3J.01 Preparation of unevenly plastered slab m2 2500.00 200.00 500,000.00


soffits and beam sides & soffits with
acrylic wall filler paste in order to have
a fair base surface for painting
including sand papering form ground
floor to fifth floor levels

3J.02 - Do - for columns m2 500.00 200.00 100,000.00

3J.03 - Do - for walls m2 300.00 200.00 60,000.00

INTERNAL PAINTING

(This is including for internal walls,


internal faces of beams, internal slab
soffits, reveals, isolated columns and
partition walls)

Rate should include for preparing Note


surface with applying of primer coats
of approved variety and applying of
two or more full coats of emulsion or
enamel paint of approved colour and
quality as described.

Internal Painting with Emulsion Paint

3J.04 In Ground Floor m2 1182.00 168.00 198,576.00

3J.05 In First Floor m2 950.00 171.00 162,450.00

3J.06 In Second Floor m2 2100.00 175.00 367,500.00

97
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY. Rs. Cts. Rs. Cts.
3J.07 In Third Floor m2 2100.00 178.00 373,800.00

3J.08 In Forth Floor m2 2200.00 181.00 398,200.00

3J.09 In Fifth Floor m2 75.00 184.00 13,800.00

3J.10 In Machine Room Floor m2 65.00 187.00 12,155.00

3J.11 Above Machine Room Floor m2 60.00 190.00 11,400.00

Internal Painting with Enamel Paint

3J.12 In Ground Floor m2 30.00 195.00 5,850.00

3J.13 In First Floor m2 25.00 199.00 4,975.00

3J.14 In Second Floor m2 25.00 203.00 5,075.00

3J.15 In Third Floor m2 25.00 207.00 5,175.00

3J.16 In Forth Floor m2 25.00 211.00 5,275.00

3J.17 In Fifth Floor m2 20.00 215.00 4,300.00

EPOXY PAINTING

(This is including for selected internal


walls, internal faces of beams,
internal slab soffits, reveals, isolated
columns and partition walls of theatre
and other septic areas)

Rate should include for preparing Note


surface, applying of primer coats and
applying of top coats as per the
manufactures specifications.

3J.20 In Ground Floor m2 200.00 420.00 84,000.00

3J.21 In First Floor m2 100.00 428.00 42,800.00

98
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY. Rs. Cts. Rs. Cts.
3J.22 In Second Floor m2 50.00 436.00 21,800.00

3J.23 In Third Floor m2 50.00 444.00 22,200.00

3J.24 In Forth Floor m2 50.00 452.00 22,600.00

3J.25 In Fifth Floor m2 50.00 460.00 23,000.00

EXTERNAL PAINTING

(includes all external walls, all external


side faces of beams, external slab
soffits, external isolated columns and
partitions)

Rate including preparing surface with Note


applying of two alkali resisting primer
coats of approved variety and
applying of two or more full coats of
weathershield paint of approved
colour and quality as described.

3J.26 In Ground Floor m2 425.00 300.00 127,500.00

3J.27 In First Floor m2 550.00 309.00 169,950.00

3J.28 In Second Floor m2 550.00 318.00 174,900.00

3J.29 In Third Floor m2 450.00 327.00 147,150.00

3J.30 In Forth Floor m2 425.00 336.00 142,800.00

3J.31 In Fifth Floor m2 550.00 345.00 189,750.00

3J.32 In Machine Room Floor m2 200.00 354.00 70,800.00

3J.33 Above Machine Room Floor m2 60.00 363.00 21,780.00

ASBESTOS CEILING PAINTING

99
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY. Rs. Cts. Rs. Cts.
(includes all external and internal
ceiling)

Rate including preparing surface with Note


applying of primer coats of approved
variety and applying of two or more
full coats of emulsion paint of
approved colour and quality on ceiling
sheets and applying one coat of wood
primer and two coats of enamel paints
to timber beadings and mouldings

3J.34 In Fifth Floor level m2 150.00 220.00 33,000.00

Total of Painter & Decorator carried to Summary (Page 108) 3,522,561.00

3K - MISCELLANEOUS

3K1 - CEILING WORKS

Stainless Steel Ceiling Works

All stainless steel and other metal Note


materials to be used for this item
should be approved by the Engineer
prior to the commencement

Rates to include for all necessary Note


cutting, bending, grinding, welding,
buffing, polishing, hoisting, placing. All
welded joints shall be seamless.

Rate to include for necessary Note


formworks and false works and for
scaffoldings

All welded joints of the stainless steel Note


panels in the visible surface from the
floor should be seamless.

100
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY. Rs. Cts. Rs. Cts.
The installation of ceiling should be Note
done in compliance of the details
layout of ceiling and the tenderer
should rate the BOQ item with the
provisions for all openings provided in
the drawing

Shop drawings should be provided by Note


the Tenderer 14 days prior to the
commencement of installation and
should get the Engineer's prior
approval for the same.

3K1.A Supplying all materials, fabricating m2 390.00 13,500.00 5,265,000.00


and fixing of stainless steel sheet
ceiling at fifth floor level, one side
polished to non-glare finish (exposed
to floor) as per drawings, using
2.5mm thick stainless steel sheets,
brackets and other necessary
stainless steel accessories. The
ceiling panel shall be supported by a
substructure made out of heavily
galvanized mild steel angle irons.
Panels at the coves of the rooms shall
be curved and should be free of joints
and panel surface shall be free of any
projections or cavities.

Mineral Fiber Ceiling Works

All materials to be used for this item Note


should be approved by the Engineer
prior to the commencement

Shop drawings should be provided by Note


the Tenderer 14 days prior to the
commencement of installation and
should get the Engineer's prior
approval for the same.

101
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY. Rs. Cts. Rs. Cts.
The installation of ceiling should be Note
done in compliance of the details
layout of ceiling and the tenderer
should rate the BOQ item with the
provisions for all openings provided in
the drawing

Rate shall be included for scaffoldings Note

3K1.B Supplying of all materials & and m2 800.00 2,550.00 2,040,000.00


installation of flat "Mineral Fiber "
ceiling with suitable heavy duty
alumunium framework which to be
approved by the Engineer from
ground floor level to fifth floor level.
The ceiling system shall consist of
Imported 600mmX600mm X12mm
white colour panels, interlock type and
aluminium framewrok shall be in
600mmX600mm grid system to be
suspended to the roof frame using
9mm dia. threaded wires/ adjustable
rods with brackets and other
necessary accessories. approved
quality plastic/ rubber cove moulding
should be fixed at the all wall edges.

Asbestos Ceiling Works

All Timber used under following items Note


should be of approved qualities and
thoroughly seasoned, sawn square &
free from sap, shaky or ate edges.

102
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY. Rs. Cts. Rs. Cts.
All timber shall be free from decayed Note
& insect attacks.

No application of any description shall Note


be applied as any timber unless and
until the timber is approved by the
Engineer

Rate shall include for the application Note


of two coats of approved quality wood
preservatives before placing the
timber, but after getting the approval of
Engineer for the same.

Rate to include for cutting, notching, Note


drilling, sunking, trimming, joining
edges and including fixing in position
completing with all nails, spikes and
screws and priming to joints and ends
and application of two coats of
approved quality wood preservatives

Rates to include for the cost for Note


scaffoldings

103
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY. Rs. Cts. Rs. Cts.
3K1.C Supplying of all materials & fixing of m2 250.00 1,525.00 381,250.00
flat asbestos ceiling at fifth floor level
fixed with timber frame work of
50mmX100mm timber joists and
50mmX50mm timber bearers using
Red Gum, Malaysian Hard Wood or
other approved quality imported
timber with 40mm x 12mm timber
beddings & 40mm x 40mm timber
cove moldings of approved quality and
pattern using Mahogany or Halmilla
timber fixed to ceiling with brass
screw nails at 300 mm intervals.

3K2 - HAND RAILS

All stainless steel and other metal Note


materials to be used for this item
should be approved by the Engineer
prior to the commencement

Rates to include for all necessary Note


cutting, bending, grinding, welding,
buffing, polishing, hoisting, placing. All
welded joints shall be seamless.

Rate to include for necessary Note


scaffoldings

Shop drawings should be provided by Note


the Tenderer 14 days prior to the
commencement of installation and
sould get the Engineer's prior approval
for the same.

104
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY. Rs. Cts. Rs. Cts.
Supplying of all materials, fabricating
and fixing of 900mm high stailnless
steel hand rail type 01 fixed to floor in
following locations, using 25mm dia.
heavy duty stainless steel pipe
uprights and intermediate bracings
and 40mm dia. heavy duty stainless
steel pipe railing including all
necessary base plates, stailnless steel
anchor bolts, etc as per detailed
drawing.

3K2.1 In Ground Floor m 15.00 4,600.00 69,000.00

3K2.2 In First Floor m 20.00 4,625.00 92,500.00

3K2.3 In Second Floor m 20.00 4,650.00 93,000.00

3K2.4 In Third Floor m 20.00 4,675.00 93,500.00

3K2.5 In Forth Floor m 20.00 4,700.00 94,000.00

3K2.6 In Fifth Floor m 20.00 4,725.00 94,500.00

3K2.7 Above Fifth Floor m 30.00 4,750.00 142,500.00

Supplying of all materials, fabricating


and fixing of 300mm high stailnless
steel hand rail type 02 (Grab Rail)
fixed to side of the walls in following
locations, using 25mm dis. heavy duty
stainless steel pipe bracings and
40mm dia. heavy duty stainless steel
pipe railing including all necessary
base plates, stailnless steel anchor
bolts, etc as per detailed drawing.

3K2.8 In Ground Floor m 15.00 1,750.00 26,250.00

3K2.9 In First Floor m 16.00 1,765.00 28,240.00

3K2.10 In Second Floor m 16.00 1,780.00 28,480.00

3K2.11 In Third Floor m 16.00 1,795.00 28,720.00

3K2.12 In Forth Floor m 16.00 1,810.00 28,960.00


105
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY. Rs. Cts. Rs. Cts.

3K2.13 In Fifth Floor m 16.00 1,825.00 29,200.00

3K2.14 Above Fifth Floor m 16.00 1,840.00 29,440.00

Supplying of all materials, fabricating


and fixing of 225mm high stailnless
steel hand rail type 03 (Grab Rail)
fixed to the top of the short walls in
following locations, using 25mm dis.
heavy duty stainless steel pipe
uprights and 40mm dia. heavy duty
stainless steel pipe railing including all
necessary base plates, stailnless steel
anchor bolts, etc as per detailed
drawing.

3K2.15 In Ground Floor m 10.00 1,550.00 15,500.00

3K2.16 In First Floor m 10.00 1,560.00 15,600.00

3K2.17 In Second Floor m 10.00 1,570.00 15,700.00

3K2.18 In Third Floor m 10.00 1,580.00 15,800.00

3K2.19 In Forth Floor m 10.00 1,590.00 15,900.00

3K2.20 In Fifth Floor m 10.00 1,600.00 16,000.00

3K2.21 Above Fifth Floor m 10.00 1,610.00 16,100.00

3K3 - WATER PROOFING WORKS

Rate shall include for chipping, Note


removing and clearing of all loose
materials on the surfaces to be
waterproofed

106
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY. Rs. Cts. Rs. Cts.
Rate shall include for repairing of Note
minor cracks which may be appeared
shall be repaired with light weight
construction grout of approved quality.

Supplying all materials, and applying


of "XYPEX" or equivalent (Approved
by the Engineer) crystalline cement
based water proofing treatment as per
the manufactures specifications for
the following areas. Rate to include for
water proofing of all edges and
corners, for laying necessary leveling
screeds, grouting etc, and for all other
connecting works as directed by the
Engineer. Rate to include for covering
of water proofing layers with 12mm
thick 1:3 cement sand mortar finishing
smooth with cement floating.

3K3.1 In internal surfaces of water sump m2 120.00 2,100.00 252,000.00

3K3.2 In internal surfaces of lift wells m2 80.00 2,100.00 168,000.00

3K3.3 In top surface of machine room roof m2 40.00 2,250.00 90,000.00


slab

3K3.4 In internal surfaces of roof water drain m2 40.00 2,250.00 90,000.00

107
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY. Rs. Cts. Rs. Cts.

Supplying all materials, and applying


of "BARALASTIC" or equivalent
(Approved by the Engineer)
cementations membrane type water
proofing treatment as per the
manufactures specifications for the
following areas. Rate to include for
water proofing of all edges and
corners, for laying necessary leveling
screeds, grouting etc, and for all other
connecting works as directed by the
Engineer. Rate to include for covering
of water proofing layers with 12mm
thick 1:3 cement sand mortar finishing
smooth with cement floating.

3K3.5 In toilet area of 1st floor m2 65.00 1,600.00 104,000.00

3K3.6 In toilet area of 2nd floor m2 90.00 1,625.00 146,250.00

3K3.7 In toilet area of 3rd floor m2 40.00 1,650.00 66,000.00

3K3.8 In toilet area of 4th floor m2 80.00 1,675.00 134,000.00

3K3.9 In toilet area of 5th floor m2 70.00 1,700.00 119,000.00

3K4 - COUNTERS

3K4.1 Allow provisional sum for installation P. Sum 1,000,000.00


of counters, tables, nurses duty
stations, reception tables, etc as per
the drawings and as directed,
including followings.

(i). Ground Floor Main Inquiry Table


(ii). Secondary Inquiry Tables from 1st
to 5th Floors
(iii). Nurses Station for Cath Lab
(iv). Counter top for Pharmacy
(v). Nurses Duty Station for wards
from 1st floor to 4th floor

108
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY. Rs. Cts. Rs. Cts.
(vi). Nurses duty Station or ICU

3K5 - CUPBOARDS

3K5.1 Allow provisional sum for installation P. Sum 750,000.00


of wall cupboards, cupboards under
work tips, lockers, etc as per drawings
and as directed.

3K6 - NAME BOARDS/ NOTICE BOARDS

3K6.1 Allow provisional sum for installation P. Sum 400,000.00


of name boards, sign boards, notice
boards, etc as per drawings and as
directed.

3K7 - WALL GUARDS

Rate shall include for the application Note


of two coats of approved quality wood
preservatives before placing the
timber, but after getting the approval of
Engineer for the same.

Rate to include for cutting, notching, Note


drilling, sunking, trimming, joining
edges and including fixing in position
completing with all nails, spikes and
screws and priming to joints and ends

3K7.1 Supplying, fabricating & fixing 32mm m 250.0 880.00 220,000.00


thick 225mm wide timber wall
protective boards using Jack, Balaw
or Batadomba timber with 100mm to
75mm tapered timber plugs in
500mm intervals at two layers using
brass screws. Rate to include for
painting boards with one coat of wood
primer and two coats of enamel paint
including edges of the boarding as per
detail given by the Engineer.

109
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY. Rs. Cts. Rs. Cts.

3K8 - STEEL GRILL WORKS

Rates to include for all necessary Note


cutting, bending, grinding, welding,
hoisting, joining, riveting, nailing,
placing, leveling, etc.

The bidder should forward all Note


necessary shop drawings, sketches,
proposals for prior approval of the
Engineer.

All steel works should be applied two Note


coats of anticorrosive paints and two
coats of enamel paints as directed.

Supplying all materials, fabricating


and fixing of steel grill works using
50X50X5mm size angle irons and
25X6mm flat iron as per details
drawings for the following Types/
locations as directed.

3K8.1 Type "SD1" in ground Floor No. 1 40,000.00 40,000.00

3K8.2 Type "SD2" in ground Floor No. 1 20,000.00 20,000.00

3K8.3 Type "SD3" in second Floor No. 1 45,000.00 45,000.00

Total of Painter & Decorator carried to Summary (Page 108) 12,319,390.00

110
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY. Rs. Cts. Rs. Cts.

111
CONSTRUCTION OF CARDIOLOGY UNIT (BALANCE WORKS)
TEACHING HOSPITAL - KURUNEGALA

STAGE 01 - CIVIL AND ELECTRICAL WORKS

SUMMARY OF BILL No. 03 - CIVIL WORKS

AMOUNT
Sub Bill No. DESCRIPTION
Rs. Cts.

3A PREPARATIONOF EXISTING BUILDING 201,650.00


3B CONCRETOR 2,432,908.50

3C RANDOM RUBBLE MASONRY 16,869.00

3D BRICK WORK 8,292,746.50

3E PLASTERER 4,980,130.50

3F PAVIOR 18,085,765.00
3G ROOFER AND ROOF PLUMBER 4,058,000.00
3H ALUMINIUM WORKS 11,017,065.00
3J PAINTER AND DECORATOR 3,522,561.00
3K MISCELLANEOUS 12,319,390.00

TOTAL OF BILL No.03 CARRIED TO MAIN SUMMARY


(PAGE 165)
64,927,085.50

108
CONSTRUCTION OF CARDIOLOGY UNIT (BALANCE WORKS)
TEACHING HOSPITAL - KURUNEGALA

STAGE 01 - CIVIL AND ELECTRICAL WORKS

ENGINEER'S ESTIMATE

BILL NO. 04 - STRUCTURAL REPAIR WORKS.

RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
Rs. Cts. Rs. Cts.

4.01 Allow provisional sum for all P.Sum 8,500,000.00


necessary structural repair works
as specified by the structural
Engineer time to time in order to
enhance the structural strength of
the building. All repair materials
should be specified approved types
and all repair methods should be as
specified by the Engineer and as
directed in the manufactures
specifications.

Total carried to Main summary (Page 165) 8,500,000.00

109
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
Rs. Cts. Rs. Cts.

110
CONSTRUCTION OF CARDIOLOGY UNIT (BALANCE WORKS)
TEACHING HOSPITAL - KURUNEGALA

STAGE 01 - CIVIL AND ELECTRICAL WORKS

ENGINEER'S ESTIMATE

BILL NO. 05 - WATER SUPPLYING, SEWERAGE AND DRAINAGE WORK

RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
Rs. Cts. Rs. Cts.

All unplasicized polyvinyl chloride (uPVC)


pipes used in the plumbing installation
must conform in every respect to the
requirements of the SLS 147 of 1989 &
1972 or BS 4514.

All fittings and specials used in the


plumbing installation shall be suitable in
all respects to the pipe line to which
fittings and specials are fixed.

Rates for plumbing work shall include


for :-

(a) Compling with the relevant Sri Lanka,


British or any other standard as given
under the specifications and with the
regulations of relevant authorities.

(b) Cutting and waste of pipes etc. and


joining pipes.

(c) All specials such as elbows, bends,


tees, junctions, plugs, reducers and
similar pipe fittings except for valves
which wll be measured separately.

(d) Connecting pipes to sanitary fixtures


and appliances.

110
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
Rs. Cts. Rs. Cts.
(e) Chasing to brick, cement block or
concrete walls, columns, beams etc. and
necessary hangers and clips for fixing to
soffits etc. and making good all works
disturbed.

(f) Necessary screws, nails, sockets,


connection backnuts standard pipe fixing
or supporting clips, saddles, brackets,
holder bats, straps etc.

(g) Connecting different types of pipes

(h) Testing and disinfection after


completion.

(i) Submitting shop drawings

(j) Excavation, backfilling, disposal for


surplus soil.

(k) Submitting as built drawings.

(l) Obtaining necessary approvals from


Local Authorities, CEA etc.All the
authorised payments will be paid by the
client.

All Chromium plated valves, taps, etc Note


shall be "Plumber " or equvelent
approved quality

All Brass valves, taps, etc shall be Note


"Pegler " or equvelent approved quality

SANITARY FITTINGS

Supplying and installation of sanitary


appliances with pipe specials, fittings and
connectiong to water Supplying lines and
waste & soil pipes & commissioning.

111
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
Rs. Cts. Rs. Cts.
Unless otherwise stated, colour of
sanitary fittings should be white.

Unless otherwise stated, make of sanitary


fittings should be Armitage Shank,
American standard, Ideal standard,
Toto or equvalent apporved quality

Rates for sanitary fittings shall include


for :-

(a) Fittings such as taps, waste water


outlet, internal overflows etc. and
supporting brackets, incidental materials
for fixing.

(b) Assembling, jointing together fixing


components parts and jointing to pipes
including necessary coupling and for
leaving perfectly clean and in perfect
working order as on completion.

(c) Jointing and connection pipes to


sanitary fittings.

(d) Testing and commissioning of the


installation.

(e) Making good the work disturbed.

(f) Submitting samples and shop


drawings for the approval of the
Architect/Engineer

(g) Protecting the Works

SEWAGE & DRAINAGE WORK

Rates for Drainage Work shall include


for :-

(a) Laying of pipes to falls.

112
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
Rs. Cts. Rs. Cts.

(b) Excavation, backfilling, disposal of


surplus soil.

(c) All pipe specials such as bends,


junctions, elbows, tees etc. unless
separately shown in the BOQ.

(d) Connection to sides of manholes etc.

(e) Providing sleeves etc., when pipes


pass through walls, foundations etc.

(f) Giving notices, obtaining permits,


paying fees etc

(g) Testing installation as specified.

(h) Protecting the works.

5A - Water Supply Lines

Supplying and laying of uPVC pipes of


type 1000. The rate should include for all
pipe specials, fixing, testing and
commissioning, incerting, burying, etc.

5A.1 63mm dia. uPVC supply pipe from m 103.00 557.00 57,371.00
overhead tank on ring main.

5A.2 Supplying and laying of uPVC water


distribution pipes vertically downwards
and along the walls from water tanks level
to each floor levels of the following sizes.

5A2.1 50mm Dia. Pipes m 15.00 341.00 5,115.00

5A2.2 40mm Dia. Pipes m 50.00 234.00 11,700.00

5A2.3 32mm Dia. Pipes m 100.00 165.00 16,500.00

113
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
Rs. Cts. Rs. Cts.

5A.3 Supplying and laying of 40mm dia. uPVC m 25.00 234.00 5,850.00
pipes horizontally through the walls or
secondary stage concrete in toilets and
other necessary areas in fifth floor level.

5A.4 Supplying and laying of 32mm dia. uPVC


pipes horizontally through the walls or
secondary stage concrete in toilets and
other necessary areas in following floor
levels.

5A.4.1 In First Floor m 48.00 165.00 7,920.00

5A.4.2 In Second Floor m 55.00 165.00 9,075.00

5A.4.3 In Third Floor m 40.00 165.00 6,600.00

5A.4.4 In Forth Floor m 55.00 165.00 9,075.00

5A.5 Supplying and laying of 25mm dia. uPVC


pipes horizontally through the walls or
secondary stage concrete in toilets and
other necessary areas in following floor
levels.

5A5.1 In Ground Floor m 45.00 113.00 5,085.00

5A5.2 In First Floor m 10.00 113.00 1,130.00

5A5.3 In Second Floor m 13.00 113.00 1,469.00

5A5.4 In Third Floor m 8.00 113.00 904.00

5A5.5 In Forth Floor m 15.00 113.00 1,695.00

5A5.6 In Fifth Floor m 10.00 113.00 1,130.00

5B - Valves in Distribution system

114
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
Rs. Cts. Rs. Cts.
5B.1 Supply and installation of 63mm (2") dia. No. 1 4,500.00 4,500.00
Brass stop valve in main system. Rate to
include for fixtures.

5B.2 Supply and installation of following Brass


stop valves in vertical water distribution
system. Rate to include for fixtures.

5B.2.1 50mm (1 ½") dia. Valves Nos. 03 3,500.00 10,500.00

5B.2.2 40mm (1 ¼") dia. Valves Nos. 14 2,500.00 35,000.00

5B.2.3 32mm (1") dia. Valves Nos. 16 1,600.00 25,600.00

5B.3 Supply and installation of 40mm (1 ¼") Nos. 4 2,500.00 10,000.00


dia. brass stop valves in horizontal water
distribution system in fifth floor level. Rate
to include fixtures.

5B.4 Supply and installation of 32mm (1") dia.


brass stop valves in horizontal water
distribution system. Rate to include
fixtures.

5B.4.1 In First Floor Nos. 8 1,600.00 12,800.00

5B.4.2 In Second Floor Nos. 6 1,600.00 9,600.00

5B.4.3 In Third Floor Nos. 5 1,600.00 8,000.00

5B.4.4 In Forth Floor Nos. 9 1,600.00 14,400.00

5B.5 Supply and installation of 25mm (¾") dia. Nos. 7 1,150.00 8,050.00
brass stop valves in horizontal water
distribution system in ground floor level.
Rate to include fixtures.

5C - SANITARY FITTINGS & FIXTURES

115
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
Rs. Cts. Rs. Cts.

5C1 Supply and installation of closed couple


type water closet with cistern and
necessary trap (S or P), plastic hinged
seat and cover, 12mm chromium plated
angle valve with 450mm long chromium
plated flexible hose, syphonic system and
all other necessary accessories including
giving connection to the water supply &
sewer lines fixed to working order.

5C1.1 In Ground Floor Nos. 5 13,000.00 65,000.00

5C1.2 In First Floor Nos. 9 13,000.00 117,000.00

5C1.3 In Second Floor Nos. 4 13,000.00 52,000.00

5C1.4 In Third Floor Nos. 3 13,000.00 39,000.00

5C1.5 In Forth Floor Nos. 7 13,000.00 91,000.00

5C1.6 In Fifth Floor Nos. 5 13,000.00 65,000.00

5C2 Supply and fixing of approved quality &


colour low level water closet (Indian or
equivalent) with necessary trap and
plastic hinged seat and cover with 9 liter
capacity low level flushing cistern with all
necessary accessories including overflow
pipe, flush pipe, 12mm chromium plated
angle valve (Plumber or equivalent) with
chromium plated flexible hose with all
other accessories complete to working
order

5C2.1 In First Floor No. 1 7,500.00 7,500.00

5C2.2 In Second Floor No. 1 7,500.00 7,500.00

5C2.3 In Third Floor No. 1 7,500.00 7,500.00

5C2.4 In Forth Floor No. 1 7,500.00 7,500.00

116
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
Rs. Cts. Rs. Cts.

5C3 Supply and installation of squatting type


closet (Indian make and approved quality)
with inbuilt foot rest of approved quality
with necessary taps etc., and complete to
working order. Rate to include for all
necessary fixtures.

5C3.1 In Ground Floor Nos. 2 3,000.00 6,000.00

5C3.2 In First Floor Nos. 4 3,000.00 12,000.00

5C3.3 In Second Floor Nos. 7 3,000.00 21,000.00

5C3.4 In Third Floor Nos. 5 3,000.00 15,000.00

5C3.5 In Forth Floor Nos. 5 3,000.00 15,000.00

5C4 Supplying and installation of approved


quality plastic high level flushing cistern of
9 liters capacity and approved quality
including flush pipe, 12mm dia. chromium
plated brass stop valve, overflow pipe
with all other necessary accessories etc.,
and complete to working order in all
toilets. Rate to include for all necessary
fixtures.

5C4.1 In Ground Floor Nos. 2 2,500.00 5,000.00

5C4.2 In First Floor Nos. 4 2,500.00 10,000.00

5C4.3 In Second Floor Nos. 7 2,500.00 17,500.00

5C4.4 In Third Floor Nos. 5 2,500.00 12,500.00

5C4.5 In Forth Floor Nos. 5 2,500.00 12,500.00

117
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
Rs. Cts. Rs. Cts.
5C5 Supplying and installation of 510 X
420mm size pedestal type wash basin
including 32mm dia. Chromium plated
bottle trap and 12mm dia. chromium
plated pillar tap of approved quality, fixing
socket & flexible hose (max. length
450mm) 32mm dia. waste plug and chain,
semi concealed brackets with all other
accessories etc., and complete to working
order in all toilets. Rate to include for all
necessary fixtures.

5C5.1 In Ground Floor Nos. 7 7,000.00 49,000.00

5C5.2 In First Floor Nos. 9 7,000.00 63,000.00

5C5.3 In Second Floor Nos. 8 7,000.00 56,000.00

5C5.4 In Third Floor Nos. 6 7,000.00 42,000.00

5C5.5 In Forth Floor Nos. 10 7,000.00 70,000.00

5C5.6 In Fifth Floor Nos. 5 7,000.00 35,000.00

5C6 Supplying and installation of approved


quality bowl type urinals (2 - bowl unit)
with chromium plated bottle traps
(exposed), approved quality chromium
plated flush valve, 12mm chromium
plated conseal valve and separators with
necessary specials and fixtures.

5C6.1 In First Floor Unit. 1 9,000.00 9,000.00

5C6.2 In Second Floor Units. 2 9,000.00 18,000.00

5C6.3 In Third Floor Units. 1 9,000.00 9,000.00

5C6.4 In Forth Floor Unit. 1 9,000.00 9,000.00

118
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
Rs. Cts. Rs. Cts.
5C7 Supply and installation of Chromium
Plated hand bidet of approved quality
imported (Indunecian or Taiwan Make)
with wall mounted brackets and
Chromium Plated 12mm Dia. angle valve.
Rate to include for all accessories
required for pipe connections and
fixtures.

5C7.1 In Ground Floor Nos. 5 1,500.00 7,500.00

5C7.2 In First Floor Nos. 10 1,500.00 15,000.00

5C7.3 In Second Floor Nos. 5 1,500.00 7,500.00

5C7.4 In Third Floor Nos. 4 1,500.00 6,000.00

5C7.5 In Forth Floor Nos. 8 1,500.00 12,000.00

5C7.6 In Fifth Floor Nos. 5 1,500.00 7,500.00

5C8 Supplying and installation of 450mm long


stainless steel towel rail with end brackets
mounted on wall in all toilets. Rate to
include for fixtures.

5C8.1 In Ground Floor Nos. 10 1,250.00 12,500.00

5C8.2 In First Floor Nos. 14 1,250.00 17,500.00

5C8.3 In Second Floor Nos. 10 1,250.00 12,500.00

5C8.4 In Third Floor Nos. 9 1,250.00 11,250.00

5C8.5 In Forth Floor Nos. 13 1,250.00 16,250.00

5C8.6 In Fifth Floor Nos. 12 1,250.00 15,000.00

119
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
Rs. Cts. Rs. Cts.
5C9 Supply and installation of shower unit
including approved quality Chromium
plated bib tap and conceal valve and
chromium plated ajustable shower rose.
Rate to include for all necessary fixtures.

5C9.1 In Ground Floor No. 1 2,500.00 2,500.00

5C9.2 In First Floor No. 1 2,500.00 2,500.00

5C9.3 In Second Floor Nos. 2 2,500.00 5,000.00

5C9.4 In Third Floor No. 1 2,500.00 2,500.00

5C9.5 In Forth Floor No. 1 2,500.00 2,500.00

5C9.6 In Fifth Floor No. 1 2,500.00 2,500.00

5C10 Supplying and fixing of approved quality


Chromium plated soap holder with all
specials

5C10.1 In Ground Floor Nos. 10 350.00 3,500.00

5C10.2 In First Floor Nos. 14 350.00 4,900.00

5C10.3 In Second Floor Nos. 10 350.00 3,500.00

5C10.4 In Third Floor Nos. 9 350.00 3,150.00

5C10.5 In Forth Floor Nos. 13 350.00 4,550.00

5C10.6 In Fifth Floor Nos. 12 350.00 4,200.00

5C11 Supply and installation of stainless steel


kitchen sink of approved quality imported
(Indunecian or Taiwan Make) with single
bowl & single drain board. Rate to include
for fixtures.

5C11.1 In Ground Floor No. 1 4,250.00 4,250.00

5C11.2 In First Floor No. 1 4,250.00 4,250.00

120
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
Rs. Cts. Rs. Cts.

5C11.3 In Second Floor No. 1 4,250.00 4,250.00

5C11.4 In Third Floor No. 1 4,250.00 4,250.00

5C11.5 In Forth Floor No. 1 4,250.00 4,250.00

5C11.6 In Fifth Floor Nos. 2 4,250.00 8,500.00

5C12 Supplying and fixing of 600 X 400mm


size plastic framed plain glass mirror of
approved quality with chromium plated
clips and plugs to be fixed to wall in all
toilets. Rate to include for fixtures.

5C12.1 In Ground Floor Nos. 6 1,600.00 9,600.00

5C12.2 In First Floor Nos. 10 1,600.00 16,000.00

5C12.3 In Second Floor Nos. 4 1,600.00 6,400.00

5C12.4 In Third Floor Nos. 5 1,600.00 8,000.00

5C12.5 In Forth Floor Nos. 9 1,600.00 14,400.00

5C12.6 In Fifth Floor Nos. 5 1,600.00 8,000.00

5.C13 Supplying and installation of 12mm (½")


dia. Chromium plated chromium plated
bib taps with faucet socket.

5C13.1 In Ground Floor Nos. 5 1,050.00 5,250.00

5C13.2 In First Floor Nos. 6 1,050.00 6,300.00

5C13.3 In Second Floor Nos. 4 1,050.00 4,200.00

5C13.4 In Third Floor Nos. 4 1,050.00 4,200.00

5C13.5 In Forth Floor Nos. 5 1,050.00 5,250.00

5C13.6 In Fifth Floor Nos. 5 1,050.00 5,250.00

121
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
Rs. Cts. Rs. Cts.

5D - Sewage Disposal System

Supplying, laying and jointing of uPVC Note


pipes of type 600 embedded in secondary
stage concrete fill, fixed to wall at
adequate intervals and laid underground
as specified, connecting manholes for the
efficient discharge of sewage. Rate to
include for all necessary pipe brackets,
clips, supports, anchors etc.

5D1 - Vertical Soil Stack fixed along


ducts & walls up to manhole and vent
pipes

5D1.1 Supplying and laying of 75mm dia. uPVC m 110.00 705.50 77,605.00
pipes in ventilation stacks

5D1.2 Supplying and laying of 110mm dia. m 170.00 1,341.50 228,055.00


uPVC pipes in soil stacks

Horizontal Feeder Pipes in upper floor


leading to soil stacks and in Ground
floor

5D2 Supplying and fixing of 110mm dia. uPVC


pipe connecting water closets/ squartting
pans , etc.
5D2.1 In Ground Floor m 12.00 1,200.00 14,400.00

5D2.2 In First Floor m 20.00 1,200.00 24,000.00

5D2.3 In Second Floor m 23.00 1,200.00 27,600.00

5D2.4 In Third Floor m 16.00 1,200.00 19,200.00

5D2.5 In Forth Floor m 25.00 1,200.00 30,000.00

122
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
Rs. Cts. Rs. Cts.

5D2.6 In Fifth Floor m 10.00 1,200.00 12,000.00

5D3 Supplying and fixing of 110mm uPVC


drainage tee with cleaning eye.

5D3.1 In Ground Floor Nos. 8 650.00 5,200.00

5D3.2 In First Floor Nos. 15 650.00 9,750.00

5D3.3 In Second Floor Nos. 15 650.00 9,750.00

5D3.4 In Third Floor Nos. 10 650.00 6,500.00

5D3.5 In Forth Floor Nos. 15 650.00 9,750.00

5D3.6 In Fifth Floor Nos. 7 650.00 4,550.00

5D4 Supplying and fixing of 110mm uPVC 90


degree bend

5D4.1 In Ground Floor Nos. 2 550.00 1,100.00

5D4.2 In First Floor Nos. 8 550.00 4,400.00

5D4.3 In Second Floor Nos. 6 550.00 3,300.00

5D4.4 In Third Floor Nos. 6 550.00 3,300.00

5D4.5 In Forth Floor Nos. 9 550.00 4,950.00

5D4.6 In Fifth Floor Nos. 5 550.00 2,750.00

123
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
Rs. Cts. Rs. Cts.
5D5 Underground sewers from soil stack to
manholes, from manholes to manholes
and from manholes to final disposal
system. Rate to include for excavation for
pipe trenches and backfilling with sand
bedding.

5D5.1 Supplying and fixing of 160mm dia. uPVC m 50.00 2,425.00 121,250.00
pipe

5D5.2 - do - 110mm dia. - do - m 35.00 1,400.00 49,000.00

5D5.3 do- 110mm dia. uPVC long radius bend Nos. 11 975.00 10,725.00
at the base of soil stack.

5D5.4 Supplying and fixing of 75mm dia. Nos. 11 750.00 8,250.00


ventilation cowl including all accessories.

5E - Waste Water Disposal System

Supplying, laying and jointing of uPVC


pipes of type 600 embedded in concrete
floor slabs, fixed to wall at adequate
intervals and laid underground as
specified, connecting gullys, catch pits,
manholes for the efficient discharge of
waste water. Rate to include for all
necessary pipe brackets, clips, supports,
anchors etc.

Vertical Waste Water Stacks fixed


along the ducts & walls

5E.1 Supplying and laying of 63mm dia. uPVC m 106.00 424.00 44,944.00
pipes in the ventilation stacks.

5E.2 Supplying and laying of 90mm dia. uPVC m 160.00 975.00 156,000.00
pipes in the vertical stack.

124
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
Rs. Cts. Rs. Cts.

Horizontal waste water pipes laid through Note


walls or secondory stage concrete fill, up
to vertcal stack

5E.3 Supplying and laying of 63mm dia. uPVC


waste water discharge pipes for
followings.

5E3.1 In Ground Floor m 17.00 424.00 7,208.00

5E3.2 In First Floor m 38.00 424.00 16,112.00

5E3.3 In Second Floor m 50.00 424.00 21,200.00

5E3.4 In Third Floor m 30.00 424.00 12,720.00

5E3.5 In Forth Floor m 50.00 424.00 21,200.00

5E3.6 In Fifth Floor m 20.00 424.00 8,480.00

5E.4 Supplying and laying of 40mm dia. uPVC


waste water discharge pipe for the
followings

5E4.1 In Ground Floor m 10.00 215.00 2,150.00

5E4.2 In First Floor m 10.00 215.00 2,150.00

5E4.3 In Second Floor m 10.00 215.00 2,150.00

5E4.4 In Third Floor m 10.00 215.00 2,150.00

5E4.5 In Forth Floor m 10.00 215.00 2,150.00

5E4.6 In Fifth Floor m 10.00 215.00 2,150.00

5E.5 Supply and installation of 150 X 150mm


moulded uPVC floor traps in toilets and
other necessary areas asfollows. Rate to
include for all necessary fixtures.

5E6.1 In Ground Floor Nos. 10 1,150.00 11,500.00

125
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
Rs. Cts. Rs. Cts.

5E6.2 In First Floor Nos. 18 1,150.00 20,700.00

5E6.3 In Second Floor Nos. 18 1,150.00 20,700.00

5E6.4 In Third Floor Nos. 18 1,150.00 20,700.00

5E6.5 In Forth Floor Nos. 18 1,150.00 20,700.00

5E6.6 In Fifth Floor Nos. 10 1,150.00 11,500.00

5F - Manholes, Water sealed catchpits

5F1 Allow Provisional Sum for cleaning, P.Sum 250,000.00


reparing, improving, and other required
works to the existing Manholes, water
sealed catch pits, pipes, etc as directed.

5G - Miscellaneous

5G.1 Allow provisional sum for miscellaneous P.Sum 200,000.00


plumbing work like demolishing of holes
and parts of structural concrete works,
miscellaneous pipe and valve works as
directed.

5G.2 Allow provisional sum for 06 Nos. of 5000 P.Sum 200,000.00


litres capacity plastic over head water
tanks of approved quality. Rate to include
for interconnecting tanks with 63mm dia.
Pipes.

5G.3 Allow provisional sum for preparation of P.Sum 250,000.00


bed pan cleaning area as per details,
from ground floor to fifth floor

5G.4 Allow provisional sum for stainless steel P.Sum 750,000.00


scrub basins as per details. (02 Nos
should be Imported basins)

126
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
Rs. Cts. Rs. Cts.
5G.5 Allow provisional sum for wash room P.Sum 250,000.00
arrangement in operation theatre as per
details

5G.6 Allow provisional sum moveble, P.Sum 200,000.00


collapsible, plastic curtain arrangements
as per dertails

5G.7 Allow provisional sum for preparation of P.Sum 150,000.00


perfusionist washing area as per details.

5H - Pumps and lines

5H1 Allow provisional sum for sump inlet and P.Sum 250,000.00
outlet lines, main water supply lines,
valve chambers, valves, floaters, etc.

5H2 Allow Provisional Sum for supplying and P.Sum 350,000.00


installation of specified quality pumps
(two nos) with starter panels installed with
necessary connecting accessories.

5H3 Allow Provisional Sum for Distribution P.Sum 150,000.00


Board, pump control panel (Auto and
manual operation), cables, connectors
and other accessories as per details

Total of Water Sup., Sewerage & Drainage carried to Main Summary 5,622,918.00
(Page165)

127
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY.
Rs. Cts. Rs. Cts.

128
CONSTRUCTION OF CARDIOLOGY UNIT (BALANCE WORKS)
TEACHING HOSPITAL - KURUNEGALA

STAGE 01 - CIVIL AND ELECTRICAL WORKS

ENGINEER'S ESTIMATE

BILL No. 06 - ELECTRICAL INSTALLATION WORKS

RATE
ITEM DESCRIPTION UNIT QTY.
Rs. Cts.

6A - Standby Generator & Generator Pannal


6A.1 Supply & installation of standby diesel No 1 8,000,000.00
geneating set complete with the followings

i). Diesel Generator set


One No. of 400 kVA (continuous rating at
standard reference conditions of 250C & sea
level) 400/230V 3 phase, 4 wire, 50 Hz
diesel generating set complete with, starting
battery with mains energized battery
charger, control and alarm panels with
Generatoe circuit breaker, protection
equipment, earthing, day tank etc. and
sound attenuated canopy for 65dBA at 10m
as specified.

ii). 01 No. of 630A, 4 pole Automatic


Transfer Switch

iii). CEB Incoming Breaker panel with


a. 02 Nos. of 630A MCCB ,4 pole, 50kA of
withdrawal type
b. And complete with ammeters,voltmeter,
kWh meter, indicator lights etc.

iv). 630A,Manual Change Over Switch


panel
Above items ii, iii, iv should be in separate Note.
enclosures

6B - Main Distribution Board (MDB)


Supply and installation of free standing Main Note.
Distribution Board to IP54 complete with
following items

127
RATE
ITEM DESCRIPTION UNIT QTY.
Rs. Cts.
Breakers shall be ABB, Terasaki , Siemens
or equivalent make approved by the
engineer.

6B.1 MDB consisting the followings No. 1 555,000.00

Main Incoming Breaker

01 No. MCCB, 630 A , 4 Pole, 50 kA.


Variable Magnetic, variable thermal with
adjustable tripping time

(Main breaker ON/OFF handle could be


accessible from the outside)

Main Outgoing Breakers

02 Nos. of 250A , 35 kA , 3 Pole MCCB with


neutral link.(Variable Magnetic, variable
thermal with adjustable tripping time). For
FDB 4 & 6

02 Nos. of 160A , 25 kA , 3 Pole MCCB with


neutral link.(Variable Magnetic, variable
thermal with adjustable tripping time).- For
FDB1 & Spare

02 Nos. of 125A ,25 kA , 3 Pole MCCB with


neutral link.(Variable Magnetic, variable
thermal with adjustable tripping time).For
FDB 3 & DB-A/C

03 Nos. of 100A ,25 kA , 3 Pole MCCB with


neutral link.(Variable Magnetic, variable
thermal with adjustable tripping time).For
FDB 2, 5 & 7(Lift room)

01 Nos. of 63 A , 25 kA, 3 Pole & N of fixed-


magnetic, variable-thermal MCCB - Spare

128
RATE
ITEM DESCRIPTION UNIT QTY.
Rs. Cts.
04 Nos. of 30 A , 15 kA, 3 Pole & N of fixed-
magnetic, variable-thermal MCCB - for
Water pump room, Medical Gas Romm, Fire
pump room & Spare

Other Accessories

i). Relays, CTs & Shunt Tripping Coils

01 No of Earth Leage Relay (0.03A-10A)


01 Set of CTs (for ELR & Ameters)
01 No of Shunt Tripping Coil to Trip Main
Incomming Breaker.

ii). Surge Protection

04 Nos. of 40A,1P and Type C, MCBs for


surge diverters
3 phase All mode Surge Diverters of M.O.V.
type
*Maximum Surge Current 85kA
*Rated Surge Current (minimum) 30kA
*Protection Level (1-2)kV
*Minimum of 5 year warranty.
Surge arresters shall be MOV type
(European/Japanese make).

iii). Panel Meters & Indicator lamps with


all required accessories.

01 Nos. of Ameters with Selecter Switch for


3 Phases (0 - 800A)
01 No. of Voltmeter with Selecter Switch
(7-Position, 0 - 500V)
01 set of Neon Indicator Lamps (3 Nos.)
01 No. of 3 Phase kWh Meter, CT Type

iv). Busbars

Main Busbars of 800A current capacity for


Phases , Neutral & Earth

129
RATE
ITEM DESCRIPTION UNIT QTY.
Rs. Cts.

v). Enclosure

Powder coated 2mm Sheet steel with


lockable doors.

Additional space should be provided for Note.


mounting 4 nos. of 63A, 3 pole MCCBs

Rate Includes the Cost for necessary CTs, Note.


Protection Relays, Internal Connections and
all other accessories.

6C - Floor Distribution Boards

Supply and installation of following recessed Note.


mounted Floor Distribution Boards.

Enclosure- Powder coated 1.5mm sheet


steel with lockable doors and Neon Indicator
Lamps for three phases.

Surge Arrester - shall be M.O.V type


(European/Japanese make). with max. surge
current of 65 kA, rated current of 30kA and
Protection level of 1-2 kV

All Breakers and other assosaries shall be


ABB , Terasaki , Siemens or Equivalent
approved by the Engineer.

Floor Distribution Board shall include the


following

6C.01 FDB-1 (Ground Floor) No 1 250,000.00

01 Nos. of 160A , 25 kA , 4 Pole MCCB with .


neutral link.(Variable Magnetic, variable
thermal with adjustable tripping time). For
incoming

(Main breaker ON/OFF handle could be


accessible from the outside)

130
RATE
ITEM DESCRIPTION UNIT QTY.
Rs. Cts.
04 Nos. of 63 A , 15 kA, 3 Pole & N MCCB
of fixed-magnetic, variable-thermal

01 No. of 40 A , 15 kA, 3 Pole & N MCCB of


fixed-magnetic, variable-thermal for DB 1
02 Nos. of MCB, 60A, 2 Pole of 16kA
(for CU-G3, & Spare)

03 Nos. of MCB, 40A, 2 Pole of 16kA


(for CU-G2, G4 & Spare)

Other Accessories

i). Relays, CTs & Shunt Tripping Coils

01 No of Earth Leage Relay (0.03A-10A)


01 Set of CTs (for ELR & Ameters)
01 No of Shunt Tripping Coil to Trip Main
Incomming Breaker.

ii). Surge Protection


04 Nos. of 32A,1P and Type C, MCBs for
surge diverters
01 No. of 3 phase all mode Surge Diverters
of M.O.V. type
*Maximum Surge Current 65kA
*Rated Surge Current (minimum) 30kA
*Protection Level (1-2)kV
*Minimum of 5 year warranty.
Surge arresters shall be MOV type
(European/Japanese make).

iii). Panel Meters & Indicator lamps with


all required accessories.

01 No. of Ameter with Selecter Switch for 3


Phases (0 - 400A)

131
RATE
ITEM DESCRIPTION UNIT QTY.
Rs. Cts.
01 No. of Voltmeter with Selecter Switch
(7-Position, 0 - 500V)
01 set of Neon Indicator Lamps (3 Nos.)

iv). Busbars
Main Busbars of 500A current capacity for
Phases , Neutral & Earth

v). Enclosure
Powder coated 2mm Sheet steel with
lockable doors.

6C.02 FDB-2 (First Floor) No 1 200,000.00

01 Nos. of 100A , 25 kA , 4 Pole MCCB with


neutral link.(Variable Magnetic, variable
thermal with adjustable tripping time).

(Main breaker ON/OFF handle could be


accessible from the outside)
01 No. of MCCB, 40A, 3 Pole of 10kA
(spare)
05 Nos. of MCB, 40A, 2 Pole of 4.5kA
(for CU-1, 2, 3, 4 & Spare)

Other Accessories

i). Relays, CTs & Shunt Tripping Coils


Same as item 3.1 (other accessories - i )

ii). Surge Protection


Same as item 3.1 (other accessories - ii )

132
RATE
ITEM DESCRIPTION UNIT QTY.
Rs. Cts.
iii). Panel Meters & Indicator lamps with
all required accessories.

01 No. of Ameters with Selecter Switch for 3


Phases (0 - 300A)
01 No. of Voltmeter with Selecter Switch
(7-Position, 0 - 500V)

01 set of Neon Indicator Lamps (3 Nos.)

iv). Busbars
Main Busbars of 150A current capacity for
Phases , Neutral & Earth

v). Enclosure
Powder coated 2mm Sheet steel with
lockable doors.

6C.03 FDB-3 (Second Floor) No 1 220,000.00

01 No. of 125A ,25 kA , 4 Pole MCCB with


neutral link. (Variable Magnetic, variable
thermal with adjustable tripping time).

(Main breaker ON/OFF handle could be


accessible from the outside)

02 Nos.of MCCB, 60A, 3 Pole of 10kA (ICCU


& spare)

01 No. of MCB, 40A, 3 Pole of 4.5kA


(for CU-4)

04 Nos. of MCB, 40A, 2 Pole of 4.5kA


(for CU-1, 2, 3 & Spare)

Other Accessories

133
RATE
ITEM DESCRIPTION UNIT QTY.
Rs. Cts.
i) . Relays, CTs & Shunt Tripping Coils
Same as item 3.1 (other accessories - i )

ii). Surge Protection


Same as item 3.1 (other accessories - ii )

iii). Panel Meters & Indicator lamps with


all required accessories.
01 No. of Ameter with Selecter Switch for 3
Phases (0 - 150A)

01 No. of Voltmeter with Selecter Switch


(7-Position, 0 - 500V)

01 set of Neon Indicator Lamps (3 Nos.)

iv). Busbars
Main Busbars of 200A current capacity for
Phases , Neutral & Earth

v). Enclosure
Powder coated 2mm Sheet steel with
lockable doors.

6C.04 FDB-4 (Third Floor) No 1 240,000.00


01 Nos. of 250A , 35 kA , 4 Pole MCCB with
neutral link.(Variable Magnetic, variable
thermal with adjustable tripping time).

(Main breaker ON/OFF handle could be


accessible from the outside)

01 No. of MCCB, 160A, 3 Pole of 25kA (For


X-Ray room)

02 Nos. of MCCB, 60A, 3 Pole of 10kA


(for ECG room & Spare)
04 Nos. of MCB, 40A, 2 Pole of 4.5kA
(for CU-1, 2, 3 & Spare)

134
RATE
ITEM DESCRIPTION UNIT QTY.
Rs. Cts.

Other Accessories

i). Relays, CTs & Shunt Tripping Coils


Same as item 3.1 (other accessories - i )

ii). Surge Protection


Same as item 3.1 (other accessories - ii )

iii). Panel Meters & Indicator lamps with


all required accessories.
01 Nos. of Ameters with Selecter Switch for
3 Phases (0 - 200A)

01 No. of Voltmeter with Selecter Switch


(7-Position, 0 - 500V)

01 set of Neon Indicator Lamps (3 Nos.)

iv). Busbars
Main Busbars of 300A current capacity for
Phases , Neutral & Earth

v). Enclosure
Powder coated 2mm Sheet steel with
lockable doors.

6C.05 FDB-5 (Fourth Floor) No 1 210,000.00

01 Nos. of 100A , 35 kA , 4 Pole MCCB with


neutral link.(Variable Magnetic, variable
thermal with adjustable tripping time).

(Main breaker ON/OFF handle could be


accessible from the outside)

01 No. of MCCB, 40A, 3 Pole of 10kA


(Spare)

135
RATE
ITEM DESCRIPTION UNIT QTY.
Rs. Cts.
01 No. of MCB, 60A, 2 Pole of 10kA
(for CU4)
05 Nos. of MCB, 40A, 2 Pole of 4.5kA
(for CU-1, 2, 3, 5 & Spare)

Other Accessories

i). Relays, CTs & Shunt Tripping Coils


Same as item 3.1 (other accessories - i )

ii). Surge Protection


Same as item 3.1 (other accessories - ii )

iii). Panel Meters & Indicator lamps with


all required accessories.
01 No. of Ameters with Selecter Switch for 3
Phases (0 - 100A)

01 No. of Voltmeter with Selecter Switch


(7-Position, 0 - 500V)

01 set of Neon Indicator Lamps (3 Nos.)

iv). Busbars
Main Busbars of 150A current capacity for
Phases , Neutral & Earth

v). Enclosure
Powder coated 2mm Sheet steel with
lockable doors.

6C.06 FDB-6 (Fifth Floor) No 1 245,000.00

01 Nos. of 250A , 35 kA , 4 Pole MCCB with


neutral link.(Variable Magnetic, variable
thermal with adjustable tripping time).

136
RATE
ITEM DESCRIPTION UNIT QTY.
Rs. Cts.
(Main breaker ON/OFF handle could be
accessible from the outside)

05 Nos. of MCCB, 60A, 3 Pole of 10kA

03 Nos. of MCB, 32A, 2 Pole of 4.5kA


(for CU-1, 2 & Spare)

Other Accessories

i) . Relays, CTs & Shunt Tripping Coils


Same as item 3.1 (other accessories - i )

ii). Surge Protection


Same as item 3.1 (other accessories - ii )

iii). Panel Meters & Indicator lamps with


all required accessories.
01 No. of Ameters ith Selecter Switch for 3
Phases (0 - 200A)

01 No. of Voltmeter with Selecter Switch


(7-Position, 0 - 500V)
01 set of Neon Indicator Lamps (3 Nos.)

iv). Busbars
Main Busbars of 300A current capacity for
Phases , Neutral & Earth

v). Enclosure
Powder coated 2mm Sheet steel with
lockable doors.

6C.07 FDB-7 (Machine Room) No 1 215,000.00

137
RATE
ITEM DESCRIPTION UNIT QTY.
Rs. Cts.
01 Nos. of 100A , 35 kA , 4 Pole MCCB with
neutral link. (Variable Magnetic, variable
thermal with adjustable tripping time).

(Main breaker ON/OFF handle could be


accessible from the outside)

03 Nos. of MCCB, 30A, 3 Pole of 10kA(For


Lift 1, Lift 2 & Spare)

02 Nos. of MCB, 40A, 2 Pole of 10kA

01 No. of RCCB, 40A, 2 Pole of 30mA

06 Nos. of ways (6A-32A) MCBs

Other Accessories

i). Relays, CTs & Shunt Tripping Coils


Same as item 3.1 (other accessories - i )

ii). Surge Protection


Same as item 3.1 (other accessories - ii )

iii). Panel Meters & Indicator lamps with


all required accessories.
01 No. of Ameter with Selecter Switch for 3
Phases (0 - 125A)

01 No. of Voltmeter with Selecter Switch


(7-Position, 0 - 500V)

01 set of Neon Indicator Lamps (3 Nos.)

iv). Busbars
Main Busbars of 150A current capacity for
Phases , Neutral & Earth

v). Enclosure
Powder coated 2mm Sheet steel with
lockable doors.

Additional space should be provided for Note.


mounting 3 nos. of 40A, 3 pole MCBs
Floor Distribution Boards Shall Complete Note.
with all necessary accessories required

138
RATE
ITEM DESCRIPTION UNIT QTY.
Rs. Cts.

6D - Distribution Board

Supply and installation of following recessed Note.


mounted Distribution Board.

Enclosure- Powder coated 2mm sheet steel


with lockable doors and Neon Indicator
Lamps for three phases.

All Breakers, RCCBs and other assosaries


shall be ABB , Terasaki , Siemens or
Equivalent approved by the Engineer.

Minimum Breaking capacity of unspecified


MCBs shall be 4.5kA

Distribution Board shall include the following

6D.01 DB1 - (Cath Lab)-Ground Floor No 1 55,000.00

01 No. of MCCB, 40A, 4 Pole of 15kA & fixed


magnetic & thermal. (Incomming Breaker)

(Main breaker ON/OFF handle could be


accessible from the outside)

01 Nos. MCB, 20A, 3 Pole of 10kA for A/C


02 No. MCB, 40A, 2 Pole of Type C
02 No. RCCB, 40A, 2 Pole & 30mA
Sensitivity
18 No. of ways (6A-32A)
01 Set of 60A Bus Bars (Phases + N +
Earth)
01 set of neon indicator lights for three
phases
Enclosure : Powder coated 2mm Sheet steel
with lockable doors.

139
RATE
ITEM DESCRIPTION UNIT QTY.
Rs. Cts.

6D.02 DB2 - (CCU)-Ground Floor No 1 85,000.00

01 No. of MCCB, 60A, 4 Pole of 25kA & fixed


magnetic & thermal. (Incomming Breaker)

(Main breaker ON/OFF handle could be


accessible from the outside)

01 Nos. MCB, 30A, 3 Pole of 10kA, Type C


(for AC)
06 No. MCB, 40A, 2 Pole of Type C (for
SPO, UPS & spare)
09 Nos. of MCB, 20A, 2 Pole,4.5kA(for SPO)

05 No. RCCB, 40A, 2 Pole & 100mA


08 No. of ways MCB, 1P (6A-32A)
01 Set of 100A Bus Bars (Phases + N +
Earth)
01 set of neon indicator lights for three
phases
Enclosure : Powder coated 2mm Sheet steel
with lockable doors.

6D.03 DB3 - (ICCU)-Second Floor No 1 80,000.00

01 No. of MCCB, 60A, 4 Pole of 25kA & fixed


magnetic & thermal. (Incomming Breaker)

(Main breaker ON/OFF handle could be


accessible from the outside)
01 Nos. MCB, 20A, 3 Pole of 10kA, Type C
(for AC)
02 Nos. Isolator,16A, 4 Pole (for AC)
02 No. RCCB, 40A, 4 Pole & 30mA
Sensitivity
06 No. MCB, 40A, 2 Pole of Type C (for
SPO, UPS & spare)
09 Nos. of MCB, 20A, 2 Pole,4.5kA(for SPO)

140
RATE
ITEM DESCRIPTION UNIT QTY.
Rs. Cts.
04 No. RCCB, 40A, 2 Pole &100mA
Sensitivity
08 No. of ways (6A-32A)
01 Set of 100A Bus Bars (RYBN+Earth)
01 set of neon indicator lights for three
phases
Enclosure : Powder coated 2mm Sheet steel
with lockable doors.

6D.04 DB4 - (ECG Room)-Third Floor No 1 60,000.00

01 No. MCCB, 60A, 4 Pole of 25kA & fixed


magnetic & thermal. (Incomming Breaker)
(Main breaker ON/OFF handle could be
accessibl from the outside)

03 No. MCB, 40A, 2 Pole of Type C


02 No. RCCB, 40A, 2 Pole &30mA
Sensitivity
16 No. of ways (6A-32A)
01 Set of 100A Bus Bars (Phases + N +
Earth)
01 set of neon indicator lights for three
phases
Enclosure : Powder coated 2mm Sheet steel
with lockable doors.

6D.05 DB5 - (X-Ray Plant)-Third Floor No 1 130,000.00

01 No. MCCB, 160A, 4 Pole of 25kA & fixed


magnetic & thermal. (Incomming Breaker)

(Main breaker ON/OFF handle could be


accessibl from the outside)

01 No. MCCB, 60A, 3 Pole of 25kA (for X-


Ray M/C)
01 No. MCCB, 100A, 3 Pole of 25kA (spare)

01 No. MCB, 40A, 4 Pole of 10kA for SA


02 No. MCB, 40A, 2 Pole of 4.5kA
01 No. RCCB, 40A, 2 Pole &30mA
Sensitivity
141
RATE
ITEM DESCRIPTION UNIT QTY.
Rs. Cts.
06 No. of ways (6A-32A)
01 Set of 200A Bus Bars (RYBN+Earth)
01 set of neon indicator lights for three
phases
01 No. of 3 Ph all mode Surge Diverter of
M. O.V type, 16kA of Max Current & 10kA of
reted current and fault level of less than 1kV

Enclosure : Powder coated 2mm Sheet steel


with lockable doors.

6D.06 DB6 - Surgical Intensive Care- Fifth Floor No 1 90,000.00

01 No. MCCB, 60A, 4 Pole of 25kA & fixed


magnetic & thermal. (Incomming Breaker)

(Main breaker ON/OFF handle could be


accessible from the outside)
06 No. MCB, 40A, 2 Pole of 4.5kA
05 No. RCCB, 40A, 2 Pole &100mA
Sensitivity
09 Nos. of MCB, 20A, 2 Pole,4.5kA(for SPO)

12 No. of ways (6A-32A)


01 Set of 100A Bus Bars (Phases + N +
Earth)
01 set of neon indicator lights for three
phases
Enclosure : Powder coated 2mm Sheet steel
with lockable doors.

6D.07 DB7 - (Theatre A) & DB8 (Theatre B) - Nos 2 80,000.00


Fifth Floor

01 No. of MCCB, 60A, 4 Pole of 25kA & fixed


magnetic & thermal. (Incomming Breaker)

(Main breaker ON/OFF handle could be


accessible from the outside)
04 Nos. MCB, 40A, 2 Pole of 4.5kA

142
RATE
ITEM DESCRIPTION UNIT QTY.
Rs. Cts.
03 Nos. RCCB, 40A, 2 Pole &100mA
Sensitivity
09 Nos. of MCB, 20A, 2 Pole,4.5kA(for SPO)

18 Nos. of ways (6A-32A)


01 Set of 100A Bus Bars (RYBN+Earth)
01 set of neon indicator lights for three
phases
Enclosure : Powder coated 2mm Sheet steel
with lockable doors.

6D.08 DB - 8 for A/C Plant No 1 185,000.00

01 No. of MCCB, 125A, 4 Pole of 25kA &


fixed magnetic & thermal. (Incomming
Breaker)

(Main breaker ON/OFF handle could be


accessible from the outside)

01 No. MCCB, 100A, 3 Pole of 15kA for


plant 1

02 No. MCCB, 60A, 3 Pole of 15kA for plant


2 & spare

01 Set of 150A Bus Bars (RYBN+Earth)


01 No. of EFR (0.003-10A) with CT & Shunt
trip coil
01 set of neon indicator lights for three
phases

01 No. of 3 Ph all mode Surge Diverter of


M. O.V type, 40kA of Max Current & 30kA of
reted current and fault level of less than 2kV

Enclosure : Powder coated 2mm Sheet steel


with lockable doors.

143
RATE
ITEM DESCRIPTION UNIT QTY.
Rs. Cts.
6D.09 DB-9 - for Cath Lab Machine (Direct No 1 45,000.00
Supply From Transformer)

01 No. of MCCB, 160A, 4 Pole of 25kA &


fixed magnetic & thermal. (Incomming
Breaker)

(Main breaker ON/OFF handle could be


accessible from the outside)

01 set of neon indicator lights for three


phases
01 Set of 200A Bus Bars (RYBN+Earth)
Enclosure : Powder coated 2mm Sheet steel
with lockable doors.

6D.10 DB-10 - for A/C Plant 1 No 1 45,000.00

01 No. of MCCB, 100A, 4 Pole of 25kA &


fixed magnetic & thermal. (Incomming
Breaker)
(Main breaker ON/OFF handle could be
accessible from the outside)

02 Nos. of MCB, 60A, 3 Pole of 10kA

01 set of neon indicator lights for three


phases

01 Set of 150A Bus Bars (RYBN+Earth)


Enclosure : Powder coated 2mm Sheet steel
with lockable doors.
Additional space should be provided for Note.
mounting 2 nos. of 32A, 3 pole MCBs

Distribution Boards Shall Complete with all Note.


necessary accessories required.

144
RATE
ITEM DESCRIPTION UNIT QTY.
Rs. Cts.
6E - Consumer Units & Special Power
Outlets

Supply and installation of surface mounted Note.


type Consumer Unit (CU) with Enclosure of
powder coated 2mm sheet steel with
lockable doors.

Make of MCB, RCCB and Switch Isolator


shall be ABB, F&G, Hager, Merlin Gerin or
equivalent make approved by the Electrical
Engineer.

CU shall include isolators, residual current


devices (RCCB), outgoing miniature circuit
breakers (MCB), neutral & earth busbars,
terminals and all required accessories.
Minmum Breaking Capacity of MCB shall be
4.5kA unless specified otherwise.

6E.01 CU1 - Ground Floor

01 No. MCCB, 60A, 4 Pole of 25kA & fixed


magnetic & thermal. (Incomming Breaker)
01 No.MCB,30A, 3 Pole of 10kA (spare) No. 1 35,000.00
02 No.MCB,40A, 2 Pole of 10kA,Type C
02 Nos. RCCB, 40A, 2 Pole & 30mA
12 Nos. of ways of 1 pole (6A-32A)
01 set of neon indicator lights for three
phases
Space should be provided for 4 nos.of 1 pole
MCBs.

6E.02 CU2 & CU4 -Ground Floor Nos 2 15,000.00

01 No.MCB,40A, 2 Pole of 10kA,Type C

145
RATE
ITEM DESCRIPTION UNIT QTY.
Rs. Cts.
01 Nos. RCCB, 40A, 2 Pole & 30mA
10 Nos. of ways of 1 pole (6A-32A)
Space should be provided for 4 nos.of 1 pole
MCBs.

6E.03 CU3 - Ground Floor No. 1 30,000.00

01 No. MCB,60A, 2 Pole of 10kA,Type C


02 Nos. RCCB, 63A, 2 Pole & 30mA
20 Nos. of ways of 1 pole (6A-32A)
Space should be provided for 4 nos.of 1 pole
MCBs.
Note: Breaking capacity of MCBs should be
not less than 10kA (This is due to closeness
of MDB)

6E.04 CU1 - First Floor, Second Floor, Third Nos. 4 21,500.00


Floor & Fourth Floor

01 No.MCB,40A, 2 Pole of 4.5kA,Type C


02 Nos. RCCB, 40A, 2 Pole & 30mA
18 Nos. of ways of 1 pole (6A-32A)
Space should be provided for 2 nos.of 1 pole
MCBs.

6E.05 CU2 - First Floor, Second Floor, Third Nos. 4 15,000.00


Floor & Fourth Floor

01 No.MCB,40A, 2 Pole of 4.5kA,Type C


01 Nos. RCCB, 40A, 2 Pole & 30mA
10 Nos. of ways of 1 pole (6A-32A)
Space should be provided for 2 nos.of 1 pole
MCBs.

6E.06 CU3 - First Floor , Second Floor, Third Nos. 4 21,500.00


Floor & Fourth Floor

01 No.MCB,40A, 2 Pole of 4.5kA,Type C


02 Nos. RCCB, 40A, 2 Pole & 30mA

146
RATE
ITEM DESCRIPTION UNIT QTY.
Rs. Cts.
20 Nos. of ways of 1 pole (6A-32A)
Space should be provided for 4 nos.of 1 pole
MCBs.

6E.07 CU4 - First Floor No. 1 24,000.00

01 No.MCB,40A, 2 Pole of 4.5kA,Type C


02 Nos. RCCB, 40A, 2 Pole & 30mA
24 Nos. of ways of 1 pole (6A-32A)
Space should be provided for 4 nos.of 1 pole
MCBs.

6E.08 CU4 - Second Floor No. 1 30,000.00

01 No.MCB,40A, 4 Pole of 4.5kA,Type C


02 Nos. RCCB, 40A, 2 Pole & 30mA
24Nos. of ways of 1 pole (6A-32A)
Space should be provided for 4 nos.of 1 pole
MCBs.

6E.09 CU4 - Third Floor No. 1 20,500.00

01 No.MCB,40A, 2 Pole of 4.5kA,Type C


02 Nos. RCCB, 40A, 2 Pole & 30mA
16 Nos. of ways of 1 pole (6A-32A)
Space should be provided for 4 nos.of 1 pole
MCBs.

6E.10 CU4 - Fourth Floor No. 1 28,000.00

01 No.MCB,60A, 2 Pole of 4.5kA,Type C


02 Nos. RCCB, 60A, 2 Pole & 30mA
16 Nos. of ways of 1 pole (6A-32A)
Space should be provided for 4 nos.of 1 pole
MCBs.

6E.11 CU5- Third Floor No. 1 20,500.00

01 No.MCB,40A, 2 Pole of 4.5kA,Type C

147
RATE
ITEM DESCRIPTION UNIT QTY.
Rs. Cts.
02 Nos. RCCB, 40A, 2 Pole & 30mA
16 Nos. of ways of 1 pole (6A-32A)
Space should be provided for 4 nos.of 1 pole
MCBs.

6E.12 CU1 & CU2 - Fifth Floor Nos. 2 11,000.00

01 No.MCB,32A, 2 Pole of 4.5kA,Type C


01 Nos. RCCB, 40A, 2 Pole & 30mA
06 Nos. of ways of 1 pole (6A-32A)
Space should be provided for 4 nos.of 1 pole
MCBs.

6E.13 Special Power Outlet Unit (SPO) - In CCU, Nos. 32 8,000.00


ICCU, SIC & THEATRES

01 No.Isolator, 20A, 2 Pole of 4.5kA,Type C


01 Nos. RCCB, 40A, 2 Pole & 30mA
04 Nos. of ways of 1 pole (6A-32A)
Space shuld be provided for 2 nos.of 1 pole
MCBs.

6E.14 UPS Consumer Units Nos. 5 9,500.00

01 Nos MCB, 40A,2 pole of 4.5kA


01 Nos. RCCB, 40A, 2 Pole & 30mA
05 Nos. of ways of 1 pole (6A-32A)
Space shuld be provided for 2 nos.of 1 pole
MCBs.

6E.15 CUs for Water Pump Room, Fire Pump Nos. 3 11,500.00
Room and Medical Gas Room

01 No.Isolator, 40A, 4 Pole

01 set of neon indicator lights for three


phases
01 set of Busbar for three phases, N & E

148
RATE
ITEM DESCRIPTION UNIT QTY.
Rs. Cts.
Space should be provided for 2 nos.of 3 pole
MCBs and 2 nos. of 2P MCB

6E.16 CUs for A/C Plant 2, Lift 1 & Lift 2 Nos. 3 11,500.00

01 No.Isolator, 40A, 4 Pole


01 set of neon indicator lights for three
phases

01 set of Busbar for three phases, N & E

Space should be provided for 2 nos.of 3 pole


MCBs and 2 nos. of 2P MCB

6F Un-Interrupted Power Supply System

6F.01 Supply and installation of On-Line, Single Nos. 5 300,000.00


Phase, 6kVA UPS Systems with back up
time of 15 minutes for ICU, ICCU, Operating
Theatres, Surgical Intensive Care, HDU and
all other existing displays as per the
drawings comprising all other accessories &
protections approved by the engineer and
complying with relevant BS/IEC standards.

6G Cables

Supply and installation of following Note


600/1000V & 500/300V Copper conductor,
multi-core cable with all accessories such as
copper cable lugs, glands, etc. Kelani, ACL
cables or equivalent make approved by the
Electrical engineer.

6G.1 Cu/XLPE/SWA/PVC/ 4 Core Cables

149
RATE
ITEM DESCRIPTION UNIT QTY.
Rs. Cts.
Supply & installation of following PVC Note
insulated, Steel Wire Armed & PVC
sheathed cables drawn vertically on the
cable ladder (cables are touching each other
in one plane) and clamping each cable to the
ladder firmly at the intervel of 500mm.

6G.1.1 2x150 mm2 Cu/XLPE/PVC/4 Core Cable m 60 36,000.00


(Connection from CEB Bus to MDB)

6G.2 Cu/XLPE/PVC/ 4 Core Cables

Supply & installation of following PVC Note


insulated, XLPE sheathed cables drawn
vertically on the cable ladder (cables are
touching each other in one plane) and
clamping each cable to the ladder firmly at
the intervel of 500mm.

6G.2.1 95 mm2 Cu/XLPE/PVC/4 Core Cable m 80 13,200.00


(Connection from MDB to FDB4 & FDB6)

6G.2.2 50 mm2 Cu/XLPE/PVC/4 Core Cable m 110 7,000.00


(Connection from FDB4 to DB5(X Ray
Plant) & CEB to DB 9)

6G.2.3 35 mm2 Cu/XPLE/PVC/4 Core Cable m 100 5,000.00


(Connection from MDB to FDB2 & FDB7)

6G.2.4 25 mm2 Cu/XLPE/PVC/4 Core Cable m 175 4,100.00


(Connection from MDB to FDB5 & FDB3)

6G.2.5 16 mm2 Cu/XLPE/PVC/4 Core Cable m 300 3,200.00


(Connection from FDB1 to DB2(CCU) & CU1
(X Ray room G/F), from FDB3 to
DB3(ICCU), from FDB4 to DB4(ECG) and
from FDB6 to DB6(SIC/HDU),DB7 & DB8
(Theatres) & A/C Plant DB to A/C plant 2)

6G.2.6 10 mm2 Cu/XLPE/PVC/4 Core Cable m 50 2,500.00

6G.2.7 6 mm2 Cu/XLPE/PVC/4 Core Cable m 50 1,600.00

150
RATE
ITEM DESCRIPTION UNIT QTY.
Rs. Cts.

6G.3 Cu/PVC/PVC Cables

Supply & installation of following PVC Note.


insulated, PVC sheathed cables drawn
through securely fixed concealed PVC
conduits from relevent MDB/FDB/SDB to
relevent CUs.

6G.3.1 16 mm2 Cu/PVC/PVC/Flat Twin Cable m 40 820.00

6G.3.2 10 mm2 Cu/PVC/PVC/Flat Twin Cable m 600 600.00

6G.3.3 6 mm2 Cu/PVC/PVC/Flat Twin Cable m 75 380.00

6G.4 Cu/PVC Earth Cables

6G.4.1 Supply & installation of 50mm2 Cu/PVC m 80 1,200.00


earth cable drawn through securely fixed
concealed PVC conduit/casing

6G.4.2 Supply & installation of 25mm2 Cu/PVC m 110 750.00


earth cable drawn through securely fixed
concealed PVC conduit/surface casing

6G.4.3 Supply & installation of 16mm2 Cu/PVC m 615 480.00


earth cable drawn through securely fixed
concealed PVC conduit/surface casing

6G.4.4 Supply & installation of 10mm2 Cu/PVC m 650 300.00


earth cable drawn through securely fixed
concealed PVC conduit/surface casing

6G.4.5 Supply & installation of 6mm2 Cu/PVC earth m 50 170.00


cable drawn through securely fixed
concealed PVC conduit/surface casing

151
RATE
ITEM DESCRIPTION UNIT QTY.
Rs. Cts.

6H PVC Truncking (for Theatres, ICU, ICCU & P. Sum


Wards)

Supply & Installation of single compartment


PVC truncking (around 100 mm x 50 mm)
suitable to install 5A, 13A and 15A socket
outlets including all necessary
accessories(end caps, bends, etc.).
Truncking shall be properely installed using
wall plugs and stainless steel screws in
adquate distances without any sag. (Make-
Legrand,Metta,Marshel Tiflex or equivalent)

6J Cable Ladder

Supply and installation (firmly fixing to the Note.


relavent wall to the approval of Engineer) of
following Galvanised Steel Cable ladder
from Ground floor upto the top floor roof
with all necessary accessories.

6J.1 600mm x 50 (Width x Height), cable ladder P. Sum


made of 2mm thick sheet steel for
supporting power supply cables.

6J.2 225mm x 50 (Width x Height), cable ladder P. Sum


made of 1.6mm thick sheet steel for
supporting fire cables and telephone cables.

6K Socket Outlets & DP Switches

152
RATE
ITEM DESCRIPTION UNIT QTY.
Rs. Cts.
Supply and installation of following switched Note.
shuttered socket outlets & DP Switches of
highest quality and shall be of Clipsal or
equivalent make including all other
accessories required. Each type of socket
outlet/DP switch shall be subjected to the
approval of the Electrical engineer. DP
switches and socket outlets should be
recessed to the wall.

A sticker should be pasted indicating "AC"


on socket outlets & DP switches for AC
power supply points.

6K.1 13 A single socket outlet. Nos 175 325.00

6K.2 13 A single socket outlet with neon indicator Nos 20 350.00

6K.3 13 A twin socket outlet. Nos 271 650.00

6K.4 13 A twin socket outlet with neon indicator Nos 145 700.00

6K.5 15 A single socket outlet. Nos 117 350.00

6K.6 20 A DP switch with neon indicator(for A/C) Nos 6 890.00

6L Wiring of socket outlets & DP switches

Wiring, shall be in concealed, rigid PVC Note.


conduits/Surface casung, buried in slab
plaster or installed in the void between
slab/ceiling and roof (on horizontal plane),
and buried in wall plaster (on vertical plane).

Wiring of a power socket outlet shall include


supply of cables, required rigid PVC
conduits/Surface casing, junction boxes, pull
boxes, sunk boxes, and all other required
materials.

153
RATE
ITEM DESCRIPTION UNIT QTY.
Rs. Cts.
6L.1 Wiring of a 13A switched shuttered socket Nos 611 2,300.00
outlet fixed on wall from the respective
Consumer Unit using 2.5sq.mm
Cu/PVC/PVC cable with 2.5 sqmm earth
wire drawn through securely fixed concealed
PVC conduit/surface casing. (Wiring should
be in ring circuits)

6L.2 Wiring of a 15A switched shuttered single Nos 117 2,500.00


socket outlet fixed on wall from the
respective Consumer Unit using 2.5sq.mm
Cu/PVC/PVC cable with 2.5 sqmm earth
wire drawn through securely fixed concealed
PVC conduit.

6L.3 Wiring of a 20A switched shuttered DP Nos 6 3,200.00


switch fixed on wall from the respective
Consumer Unit using 4sq.mm
Cu/PVC/PVC/2 core cable with 4sqmm
earth wire drawn through securely fixed
concealed PVC conduit.

6M Wiring for Three Phase AC Unit

Supply & installation of 4 pole, 16A Isolator Nos 6 6,000.00


with suitable recessed/surface mounted type
encloure in the wall near the AC unit using
2.5sq.mm Cu/PVC/PVC/ 4C cable with 2.5
sqmm earth wire drawn through securely
fixed concealed PVC conduit/surface casing
from respective consumer unit

6N Light Fittings

Supply and installation of following light Note.


fittings. Light fittings shall be of the highest
quality and each type of light fitting shall be
subjected to the approval of the Electrical
Engineer.

154
RATE
ITEM DESCRIPTION UNIT QTY.
Rs. Cts.
Tubes/Bulbs & accessories shall be of
Philips make or equivalent make approved
by the Engineer.

All the accessories shall comply with the


relevant British / IEC Standards.

6N.1 Supply and installation of surface/ceiling Nos 110 4,000.00


mounted type fluorescent lamp fitting
comprising plane opal diffuser of 1200mm x
225mm of high quality with 26 gauge sheet
steel and insect proof fitting, 2x36W
fluorescent lamps, magnetic ballast, power
factor correction capacitors and all other
accessories required (Type A). for Theatres,
ICU, ICCU, etc..

6N.2 Supply and installation of recessed mounted Nos 340 2,200.00


type fluorescent lamp fitting comprising
plane opal diffuser of 1200mm of high quality
with 26 gauge sheet steel and insect proof
fitting, 1x36W fluorescent lamp, magnetic
ballast, power factor correction capacitors
and all other accessories required (Type B).
for Wards and other areas

6N.3 Supply and installation of surface Nos 25 3,000.00


mounted/ceiling hanging , high quality with
26 gauge sheet and reflector type
fluorescent lamp ftting and comprising
2x36W fluorescent lamp, magnetic ballast,
power factor correction capacitors and all
other accessories required (Type C)

155
RATE
ITEM DESCRIPTION UNIT QTY.
Rs. Cts.
6N.4 Supply and installation of surface Nos 60 2,000.00
mounted/ceiling hanging , high quality with
26 gauge sheet and reflector type
fluorescent lamp ftting comprising 1x36W
fluorescent lamp, magnetic ballast, power
factor correction capacitors and all other
accessories required

6N.5 Supply and installation of surface Nos 95 1,500.00


mounted/ceiling hanging , high quality with
26 gauge sheet and reflector type
fluorescent lamp ftting comprising 1x18W
fluorescent lamp, magnetic ballast, power
factor correction capacitors and all other
accessories required (Type D). for toilets

6N.6 Supply and installation of recessed Nos 24 4,000.00


mounted/surface mounted louver type
fluorescent lamp fitting comprising plane
white reflector of 1200mm of high quality
with insect proof fitting, 2x36W fluorescent
lamp, magnetic ballast, power factor
correction capacitors and all other
accessories required (Type E). for
Conferance room

6N.7 Supply and installation of wall mounted Nos 20 1,750.00


decorative type luminary comprising 1x18W
CFL and all other accessories required
(Guarantee card for CFL should be provided
and life time should be not less than
8000hrs) -for stair case

6N.8 Supply and installation of wall mounted bulk Nos 10 2,000.00


head, out door type luminary comprising
1x22W CFL and all other accessories
required.(Guarantee card for CFL should be
provided and life time should be not less
than 8000hrs)

6P Emergency Lamps No 40 5,200.00

156
RATE
ITEM DESCRIPTION UNIT QTY.
Rs. Cts.
Supply and installation of a wall mounting
type Emergency lamp fitting with two Nos of
9W fluorescent lamps, polycarbonate (fibre)
cover and battery pack of minimum 3-hrs.
duration with both fluorescent lamps.(13A
s/o are provided in items under 6K)

6Q Ceiling Fans. Nos 130 5,600.00

Supply and installation of 1400mm sweep


ceiling fan complete with regulator, fan hook
and all other accessories required.
Guarantee cards shall be provided from
accredited agent before installation. KDK,
NATIONAL or equivalent make approved by
the Electrical engineer.

6R Exhaust Fans Nos 25 7,400.00

Supply and installation of wall mounted


exhaust fan having capacity of 450 cfm with
automatic louver shutters and all other
accessories required. Material should be
Chemical resistant polycarbonate material.
Guarantee cards shall be provided from
accredited agent before the installation.
KDK, NATIONAL or equivalent make
approved by the Electrical engineer. (For
main toilets ).(13A s/o are provided in itemo
under 6K)

6S Wiring for Light Points & Ceiling Fans

Wiring shall be in concealed PVC conduits Note


within the slab and walls with required
accessories of approved type & quality.

157
RATE
ITEM DESCRIPTION UNIT QTY.
Rs. Cts.
Wiring of a light point, ceiling fan and
exhaust fan shall include supply of cables,
required PVC conduits/Surface casing,
bends & joints, end caps, flush switches,
sunk boxes and all other material required.
(Conduiting should be done at the time of
laying the concrete slab and the brick work.)

Make of the Flush Gang Switches and DP


switches shall be CLIPSAL, CRABTREE,
TENBY, or equivalent make, and make of
cables shall be ACL or equivalent make
approved by the Electrical engineer.

6S.1 Wiring of a light point, from the respective Nos 684 1,500.00
Consumer Unit using 1sq.mm Cu/PVC/PVC
cables drawn through concealed PVC
conduits/surface casing, controlled by a 5A
flush switch.

6S.2 Wiring of a ceiling fan, from the respective Nos 130 1,800.00
Consumer Unit using 1sq.mm Cu/PVC/PVC
cable with earth wire drawn through
concealed PVC conduits/surface casing,,
switched by a 5A flush switch.

6T Main Earthing System P. Sum

Supply and installation of all required


materials and cables (2 nos. of 50mm2
Cu/PVC eart cables from MDB earth bar to
main earth electrode) and connection to
respective equipment to provide complete
system.

20 mm diameter solid copper main electrode


should be driven in to earth, with clamp
connection to earth conductors.

158
RATE
ITEM DESCRIPTION UNIT QTY.
Rs. Cts.
To achieve an earth resistance of not more
than 5 ohms, required number of standard
electrode lengths shall be installed &
interconnected them using bare Cu
conductors (25mm X 3mm Cu tape).
Clamping end of the each earth rod should
be covered by 300mm x 300mm x200mm
(length x width x depth) earth pit with brick
walls and with a 50mm thick removable
concrete lid.

6U Removing of existing wiring

Remove & Hand over the existing wiring and P. Sum


related items to client.

Total of Electrical Installaions to Sub Summary (Page 163)

6V TELEPHONE SYSTEM

The telephone system includes only the Note.


wiring of telephone points in the building.
These telephone lines shall be connected to
the existing PABX system by others, through
Main Distribution Frame.

6V.1 Distribution Frame P. Sum

Supply and installation of approved type and


quality wall mounted 120 pair Distribution
Frame with enclosure of powder coated
1.5mm sheet steel with lockable glass door,
krones, mounting plates and surge
protectors comprising all other accessories
required complying with relevant BS/IEC
standards and earthing. Distribution Frame
should have wire numbering and a laminated
line diagram should be pasted on the inside
surface of the door.

159
RATE
ITEM DESCRIPTION UNIT QTY.
Rs. Cts.

6V.2 Junction Box Nos 6 4,000.00

Supply and installation of recessed mounted


type 20 pair junction box with enclosure of
powder coated 1.5mm sheet steel with
lockable doors, krones, mounting plates
comprising all other accessories required,
complying with relevant BS/IEC standards.

6V.3 Telephone Cables (Multicore) m 275 420.00

Supply and installation of 20 pair telephone


cable (40 x 0.50 mm2 Cu/PVC/PVC)drawn
through vertically in PVC conduit and the
conduits are clamped to the cable ladder at
500mm intervels and horizontally drawn
through concealed PVC conduit. (connection
from Distribution Frame to the Junction
Boxes in floors.)

6V.4 Telephone Sockets Nos 60 450.00

Supply and Installation of RJ-11 Single


telephone sockets
Clipsal or equivalent, make approved by the
engineer.

6V.5 Telephone Wiring

Wiring of telephone socket outlet using Nos 60 2,300.00


approved type 2 pair UTP cables drawn
through 25 mm diameter PVC
conduits/surface casing including all
accessories required. (Cable ACL or
equivalent approved by the Engineer)

Total of Telephone System to Sub Summary (Page 163)

160
RATE
ITEM DESCRIPTION UNIT QTY.
Rs. Cts.
6W LIGHTENING PROTECTION

Air termination network consist of 10m x


20m meshes using 25mm x 3mm (width x
thickness) Cu strips.

Earth resistance shall be less than 5 ohms


and if it is not so additional copper ground
rods shall be connected through Mild steel
connecting clamp installed closer to the
column bases.

All the installation of the lightening protection


system shall confirm to the BS6651.

6W.1 Supply and installation of annealed copper m 500 1,500.00


strips (25mmx3mm) as Air Termination
Network using Insulated Copper tape clips at
each 500 mm span, for interconnecting earth
rods, main earth at ground level and for mild
steel rods & air termination network.

6W.2 Supply and installation copper to steel Nos 25 1,750.00


bimetlic joints

6W.3 Tape to Tape Cad weld joints for Air Nos 25 2,000.00
termination network.

6W.4 Supply and installation of 20 mm diameter Nos 8 5,000.00


standared length hard drawn copper rods
(including inspection pit of 300mm x 300mm
x 200mm and 50mm thick concrete lid) to
achieve specified resistance. .

6W.5 Supply and installation of Rod to Tape clamp Nos 8 450.00


for 20 mm diameter rod & (25mmx3mm)
Tape

Note
Rates shall include the cost for all fixing
accessories required for completion of work.

161
RATE
ITEM DESCRIPTION UNIT QTY.
Rs. Cts.

Total of Lightening Protection to Sub Summary (Page 163)

6X PUBLIC ADDRESS SYSTEM

The installation shall conform to the relavent


BS/IEC standard. All relevant accessories
should be Original products & guarantee
cards issued by the authorised agent, should
be provided when requested.

6X.01 Audio Power Amplifier P. Sum

Supply and installation of Audio Power


Amplifier with following specifications.
Pre-amplifier stage should be built in to the
same power amplifier
RMS power output: Stereo 300W
6% THD at rated power output
220V/240V, 50Hz power Input
Signal to Noise Ratio (SNR) - 60dB
Treble/ Bass/ Balance control
Input lines: 2 mic inputs 2 CD/aux inputs.
Speaker matching: 4/8/16/ Ohms at 100V
line

Following accessories shall be provided with


the amplifier
600 Ohm, 50-15000 Hz frequency response
microphone with table mic-stand.

Out put connection from Power Amplifier to


the Main Control Board
Input connection codes for CD/Aux input/Mic
and AC power code.

162
RATE
ITEM DESCRIPTION UNIT QTY.
Rs. Cts.
Power amplifier shall be Ahuja or Equivalent
approved by the Engineer.

6X.02 Supply and Installation of Multimedia. P. Sum

Supply and installation of Audio Cassette


Tape Deck with CD/DVD player and with
AM/FM Tuner

6X.03 Main Control Board P. Sum

Supply and installation of Main Control


Board of high quality, wall mounted type
(made of 1.5mm thick powder coated sheet
steel with lockable doors) with capability of
switching ON and OFF each floor area
separately with all necessary accessories
required.

Control Board should be properly wired


indicating floor numbering for individual
control of the switches and easy
identification.

(Output from the power amplifier as input to


the main control board and floor control
board input as output from the main control
board)

6X.04 Floor Control Board.(Switch Board) P. Sum

Supply and installation of 06 nos.(01 for


each floor) of high quality wall mounted type
control board (made of 1.5mm thick powder
coated sheet steel with lockable doors) with
capability of switching ON and OFF each
patient area and lecture hall area separately
with all necessary accessories required.

163
RATE
ITEM DESCRIPTION UNIT QTY.
Rs. Cts.
Control Board should be properly wired
indicating speaker numbering for individual
control of the switches and easy
identification.

(Output from the power amplifier as input to


the control board and speaker input as
output from the floor control board)

6X.05 Cables

Supply and installation of 1.5 mm2 m 150 320.00


Cu/PVC/PVC/2 core multi-strained flexible
cable from Main Control Board to Floor
Control Boards drawn vertically through PVC
conduit and firmly fixed to the control cable
ladder and horizontally securely fixed
concealed PVC conduit/Surface casing

6X.06 Wall Speakers

Supply and installation of wall mounted Nos 24 6,500.00


speakers of 9W (max) rating, frequency
responce 100Hz – 10,000Hz and
6W/3W/1.5W power tapings with line match
transformers and all necessary accessories
(mounting plates, couplings etc.). Speaker
shall be of 150mm dia. (approx.) and
matched with the ceiling/surface colour.

6X.07 Wiring of wall Speakers

164
RATE
ITEM DESCRIPTION UNIT QTY.
Rs. Cts.
Wiring of ceiling speakers starting from an Nos 24 4,350.00
individual switch in the Control Board of the
Public Address System, in concealed PVC
conduit/casing with 0.5mm2, flexible twisted
pair PVC cables with all necessaries
required.

Each parrellel connected and series


connected speakers (this connection could
be achieved in the control box) should be
matched the impedance to the imput
impidence of the power amplifier for
separate switching for the floors.

Total of Public Address System to Sub Summary (Page 163)

6Y INSPECTION, TESTING AND DRAWINGS

6Y.01 Inspection and Testing

Testing of Entire installation (Electrical, No 1 50,000.00


Lightning protection, PA System & telephone
System) and submit a test certificate issued
by a chartered engineer including detail test
report acceptable to the supply authority and
commissioning of the system.

6Y.02 Drawings

Provide a set of 'As Built' drawings No 1 25,000.00


consisting of one copy of transparency and 3
copies of blue prints of each drawing for the
above instalation seperately

Total of Inspection, Testing & Draeing to Sub Summary (Page 163)

165
RATE
ITEM DESCRIPTION UNIT QTY.
Rs. Cts.

166
AMOUNT
Rs. Cts.

8,000,000.00

167
AMOUNT
Rs. Cts.

555,000.00

168
AMOUNT
Rs. Cts.

169
AMOUNT
Rs. Cts.

250,000.00

170
AMOUNT
Rs. Cts.

171
AMOUNT
Rs. Cts.

200,000.00

172
AMOUNT
Rs. Cts.

220,000.00

173
AMOUNT
Rs. Cts.

240,000.00

174
AMOUNT
Rs. Cts.

210,000.00

175
AMOUNT
Rs. Cts.

245,000.00

176
AMOUNT
Rs. Cts.

215,000.00

177
AMOUNT
Rs. Cts.

178
AMOUNT
Rs. Cts.

55,000.00

179
AMOUNT
Rs. Cts.

85,000.00

80,000.00

180
AMOUNT
Rs. Cts.

60,000.00

130,000.00

181
AMOUNT
Rs. Cts.

90,000.00

160,000.00

182
AMOUNT
Rs. Cts.

185,000.00

183
AMOUNT
Rs. Cts.
45,000.00

45,000.00

184
AMOUNT
Rs. Cts.

35,000.00

30,000.00

185
AMOUNT
Rs. Cts.

30,000.00

86,000.00

60,000.00

86,000.00

186
AMOUNT
Rs. Cts.

24,000.00

30,000.00

20,500.00

28,000.00

20,500.00

187
AMOUNT
Rs. Cts.

22,000.00

256,000.00

47,500.00

34,500.00

188
AMOUNT
Rs. Cts.

34,500.00

1,500,000.00

189
AMOUNT
Rs. Cts.

2,160,000.00

1,056,000.00

770,000.00

500,000.00

717,500.00

960,000.00

125,000.00

80,000.00

190
AMOUNT
Rs. Cts.

32,800.00

360,000.00

28,500.00

96,000.00

82,500.00

295,200.00

195,000.00

8,500.00

191
AMOUNT
Rs. Cts.

500,000.00

200,000.00

100,000.00

192
AMOUNT
Rs. Cts.

56,875.00

7,000.00

176,150.00

101,500.00

40,950.00

5,340.00

193
AMOUNT
Rs. Cts.
1,405,300.00

292,500.00

19,200.00

36,000.00

194
AMOUNT
Rs. Cts.

440,000.00

748,000.00

75,000.00

195
AMOUNT
Rs. Cts.
120,000.00

142,500.00

96,000.00

35,000.00

20,000.00

208,000.00

196
AMOUNT
Rs. Cts.

728,000.00

185,000.00

197
AMOUNT
Rs. Cts.

1,026,000.00

234,000.00

50,000.00

198
AMOUNT
Rs. Cts.

25,000.00

27,954,815.00

40,000.00

199
AMOUNT
Rs. Cts.

24,000.00

115,500.00

27,000.00

138,000.00

344,500.00

200
AMOUNT
Rs. Cts.

750,000.00

43,750.00

50,000.00

40,000.00

3,600.00

201
AMOUNT
Rs. Cts.

887,350.00

70,000.00

202
AMOUNT
Rs. Cts.

40,000.00
.

10,000.00

40,000.00

203
AMOUNT
Rs. Cts.

48,000.00

156,000.00

204
AMOUNT
Rs. Cts.
104,400.00

468,400.00

50,000.00

25,000.00

75,000.00

205
AMOUNT
Rs. Cts.

206
CONSTRUCTION OF CARDIOLOGY UNIT (BALANCE WORKS)
TEACHING HOSPITAL - KURUNEGALA

STAGE 01 - CIVIL AND ELECTRICAL WORKS

SUMMARY OF BILL No. 06 - ELECTRICAL INSTALLATION WORKS

AMOUNT
Sub Bill No. DESCRIPTION
Rs. Cts.

6A - 6U ELECTRICAL WORKS 27,954,815.00

6V TELEPHONE SYSTEM 344,500.00

6W LIGHTENING PROTECTION 887,350.00


6X PUBLIC ADDRESS SYSTEM 468,400.00
6Y INSPECTION, TESTING AND DRAWINGS 75,000.00

TOTAL OF BILL No.06 CARRIED TO MAIN SUMMARY


(PAGE 165) 29,730,065.00

163
CONSTRUCTION OF CARDIOLOGY UNIT (BALANCE WORKS)
TEACHING HOSPITAL - KURUNEGALA

STAGE 01 - CIVIL AND ELECTRICAL WORKS

ENGINEER'S ESTIMATE

BILL No. 07 - MISCELLANEOUS WORK

RATE
ITEM DESCRIPTION UNIT QTY.
Rs. Cts.

7A Increasing of width of brick walls of X-


Ray room using in-situ casting 100mm
thick 1:1 1/2:3 (10mm) cement concrete
wall attached to the brick wall including
12mm plywood formwork and 50X50mm
GI weld mesh as reinforcements. Rate to
include for chipping, removing loose
materials and cleaning of brick wall
surface as directed and clearing od
debris away from the site.

7A.01 In Ground Floor m2 70.00 2,100.00

7A.02 In Third Floor m2 68.00 2,250.00

7B Allow provisional sum for supplying P.Sum


materials, fabricating and installation of
steel door, Aluminium louvered windows,
chequired plates, hand rails, ladders,
Steel Guider Beam for lifting of Lift
components, Concrete cubes for placing
of lift machine, etc as specified and as
directed.

7C Allow provisional sum for lanscaping P.Sum


works of the building as directed

7D Allow provisional sum for racks for shoes, P.Sum


cloths, etc, lockers, cupboards, etc as
detailed.

Total of Miscellaneous Works carried to Main summary (Page 165)

164
RATE
ITEM DESCRIPTION UNIT QTY.
Rs. Cts.

165
RKS)

AMOUNT
Rs. Cts.

147,000.00

153,000.00

350,000.00

400,000.00

500,000.00

1,550,000.00

166
AMOUNT
Rs. Cts.

167
CONSTRUCTION OF CARDIOLOGY UNIT (BALANCE WORKS)
TEACHING HOSPITAL - KURUNEGALA

STAGE 01 - CIVIL AND ELECTRICAL WORKS

MAIN SUMMARY OF ENGINEER'S ESTIMATE

AMOUNT
Bill No. DESCRIPTION
Rs. Cts.

1 PRELIMINARIES 5,245,000.00
2 SITE PREPARATION WORKS 10,924,387.50
3 CIVIL WORKS 64,927,085.50
4 STRUCTURAL REPAIR WORKS 8,500,000.00
5 WATER SUPPLY WORKS 5,622,918.00
6 ELECTRICAL INSTALLATION WORKS 29,730,065.00
7 MISCELLANEOUS 1,550,000.00

Basic Cost Estimate 126,499,456.00


Less: Provisional Sum 19,877,500.00
Sub Total I 106,621,956.00
Add: Contingencies (10 %) 10,662,195.60
Add: Escalation (10 %) 10,662,195.60
Sub Total ll 127,946,347.20
Add: Provisional Sum 19,877,500.00
Engineer's Estimate 147,823,847.20
Add: Consultancy Fee (10 % of Eng. Est.) 14,782,384.72
Sub Total III 162,606,231.92
Add VAT 15 % for Relavent Works for 15% Works 24,390,934.79
TOTAL COST ESTIMATE 186,997,166.71

Recommended By: …………………………….. Date: ………………………


Eng. B.A.P.U. Bulathsinghe
Acting Deputy General Manager
(Hospital Works, Out Station)

165
CONSTRUCTION OF CARDIOLOGY UNIT (BALANCE WORKS)
TEACHING HOSPITAL - KURUNEGALA

STAGE 01 - CIVIL AND ELECTRICAL WORKS

MAIN SUMMARY OF ENGINEER'S ESTIMATE

AMOUNT
Bill No. DESCRIPTION
Rs. Cts.

1 PRELIMINARIES 5,245,000.00
2 SITE PREPARATION WORKS 10,924,387.50
3 CIVIL WORKS 64,927,085.50
4 STRUCTURAL REPAIR WORKS 8,500,000.00
5 WATER SUPPLY WORKS 5,622,918.00
6 ELECTRICAL INSTALLATION WORKS 29,730,065.00
7 MISCELLANEOUS 1,550,000.00

Basic Cost Estimate 126,499,456.00


Less: Provisional Sum 19,910,000.00
Sub Total I 106,589,456.00
Add: Contingencies (10 %) 10,658,945.60
Add: Escalation (10 %) 10,641,598.40
Sub Total ll 127,890,000.00
Add: Provisional Sum 19,910,000.00
Engineer's Estimate 147,800,000.00
Add: Consultancy Fee (10 % of Eng. Est.) 14,780,000.00
Sub Total III 162,580,000.00
Add VAT 15 % for Relavent Works for 15% Works 24,387,000.00
TOTAL COST ESTIMATE 186,967,000.00

Prepared By: Project Engineer, CECB Ofice.

OFFICE COPY
Checked By: …………………………………
Eng. I. R. P. Gunathilake
Assistant Project Manager
(Hospital Works, Out Station)

Recommended By: …………………………….. Date: ………………………


Eng. B.A.P.U. Bulathsinghe

165
Acting Deputy General Manager
(Hospital Works, Out Station)

166
Page Amount Page Amount Page Amount Page Amount
1 - 51 101 151
2 - 52 102 152
3 10,000.00 53 103 153
4 820,000.00 54 100,000.00 104 154
5 2,430,000.00 55 50,000.00 105 1,000,000.00 155 50,000.00
6 56 106 1,150,000.00 156 65,000.00
7 57 107 157
8 58 108 158
9 59 109 8,500,000.00 159 110,000.00
10 60 110 160 50,000.00
11 61 111 161
12 62 112 162
13 63 113 163
14 64 114 164 1,250,000.00
15 65 115
16 66 116 20,127,500.00
17 67 117
18 68 118
19 69 119
20 70 120
21 71 121
22 72 122
23 73 123
24 15,000.00 74 124
25 75 125 2,150,000.00
26 76 126 1,100,000.00
27 77 127
28 78 100,000.00 128
29 15,000.00 79 129
30 80 130
31 81 131
32 35,000.00 82 132
33 83 133
34 84 134
35 85 135
36 86 136
37 87 137
38 88 300,000.00 138
39 89 139
40 90 140
41 91 141
42 92 142
43 93 143
44 94 144
45 7,500.00 95 145
46 96 146
47 97 147
48 20,000.00 98 148
49 99 149
50 100 150 800,000.00

You might also like