6-02 F

ANCHOR LINE #1 PARTED DURING HEAVY WEATHER


ACTION AFTER SUSPENDED DISCONNECTION:

1. SLACK LINE #8 TO PREVENT TENDER MOVING TOWARDS PLATFORM


2. SLACK DOWN ANCHOR LINE #3, # 4, AND #2.
3. HEAVE ON LINE #5, #6 AND #7, AND MOVE THE TENDER 100 TO 200 FT. AWAY FROM
THE PLATFORM.
4. ALIGN THE TENDER INTO THE WEATHER RIDING ON LINE #7, #8 AND #2.
5. THE TOWING VESSEL SHOULD BE CONNECTED AS SOON AS POSSIBLE.

PLATFORM

BOW
35D

PORT STBD

WEATHER FROM BOW TO PORT BEAM

______________________________________________________________
PPC Manual Sept'95 Rev/1 Page 7