You are on page 1of 186

PMT OPRNS

SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
S.S.K K.S.M

S.S.K K.S.M

S.S.K K.S.M
ENG’G CERT

PROJECT SPECIFICATION
DESCRIPTION

ISSUED FOR CONSTURCTION


ISSUED FOR CONSTRUCTION

ISSUED FOR CONSTRUCTION

PIPE SUPPORT STANDARD


JO/EWO

BI-10-00167

AUG/01/12 BI-10-00167

BI-10-00167
SEP/23/11

MAR/14/12
DATE
REV.
NO.
00

02

01

DISCIPLINE
ENGINEER

DATE MM/DD/YY

PROJECT
ENGINEER

DATE MM/DD/YY

CERTIFIED

DATE MM/DD/YY
INLET & GAS TREATMENT
CONSTRUCTION
AGENCY
SHAYBAH
DATE MM/DD/YY
SAUDI ARABIA
OPERATIONS

DATE MM/DD/YY

02 01/AUG/’12 Issued for Construction S.S.KIM J.Y.JANG K.S.MIN S.J.LEE


DATE _____________
CONTROL NUMBER
BY: ______________
_______________
VERIFICATION

01 14/MAR/’12 Issued for Construction S.S.KIM J.Y.JANG K.S.MIN S.J.LEE


EDSD

00 23/SEP/’11 Issued for Construction S.S.Kim J.Y.JANG K.S.MIN S.J.LEE

B 10/AUG/’11 Revised as per Client’s Comment S.S.KIM J.Y.JANG K.S.MIN S.J.LEE


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO. _________
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

A 30/JUN/’11 Issued for Review S.S.KIM J.Y.JANG K.S.MIN S.J.LEE

REV. DATE STATUS Written by Checked by App’d by PM

PROJECT SPECIFICATION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

INSULATION DOC
B55 M BE-748492 1
(DCC)NO.

INLET & GAS TREATMENT OF 02


SHAYBAH SAUDI ARABIA JO / EWO: 10-00167-0003 18
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Table of Contents
1. GENERAL
S.S.K K.S.M

S.S.K K.S.M

S.S.K K.S.M
ENG’G CERT

1.1 Intent ------------------------------------------------------------------------------------------------------ 4


1.2 References ---------------------------------------------------------------------------------------------- 4
1.3 Units ------------------------------------------------------------------------------------------------------- 5

2. SUPPORT MARKING
DESCRIPTION

2.1 Support Number and Symbol ----------------------------------------------------------------------- 5


ISSUED FOR CONSTURCTION
ISSUED FOR CONSTRUCTION

ISSUED FOR CONSTRUCTION

3. INSTALLATION REQUIREMENTS

3.1 General --------------------------------------------------------------------------------------------------- 6


3.2 Notes for Pipe Support Works ---------------------------------------------------------------------- 7
JO/EWO

BI-10-00167

AUG/01/12 BI-10-00167

BI-10-00167

4. GENERAL INSTRUCTIONS FOR PIPE SUPPORT DETAILS


SEP/23/11

MAR/14/12
DATE

4.1 General -------------------------------------------------------------------------------------------------- 9


4.2 Shoe ------------------------------------------------------------------------------------------------------- 9
REV.
NO.
00

02

01

4.3 Pipe Guide --------------------------------------------------------------------------------------------- 10


DISCIPLINE
ENGINEER
4.4 Pick-up Support --------------------------------------------------------------------------------------- 12
DATE MM/DD/YY 4.5 Support Trunnion -------------------------------------------------------------------------------------- 14
PROJECT
ENGINEER 4.6 Pipe Stub ----------------------------------------------------------------------------------------------- 14
DATE MM/DD/YY 4.7 Maximum Loading on Paved Area --------------------------------------------------------------- 14
CERTIFIED
4.8 Hold-Down --------------------------------------------------------------------------------------------- 15
DATE MM/DD/YY 4.9 Dummy Support -------------------------------------------------------------------------------------- 15
CONSTRUCTION
AGENCY
4.10 Pipe Support Span ----------------------------------------------------------------------------------- 15
DATE MM/DD/YY
5. RECOMMENDED METHODS FOR SUPPORT OF SMALL
OPERATIONS

5.1 Purpose ------------------------------------------------------------------------------------------------- 17


5.2 Pipe Support Span ----------------------------------------------------------------------------------- 17
DATE MM/DD/YY
5.3 Permissible Overhang Variations ----------------------------------------------------------------- 17
5.4 Miscellaneous Support ------------------------------------------------------------------------------ 18
DATE _____________

5.5 Gusset Plate -------------------------------------------------------------------------------------------- 18


CONTROL NUMBER
BY: ______________
_______________
VERIFICATION
EDSD

6. PAINTING
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO. _________
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

PROJECT SPECIFICATION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

INSULATION DOC
B55 M BE-748492 2
(DCC)NO.

INLET & GAS TREATMENT OF 02


SHAYBAH SAUDI ARABIA JO / EWO: 10-00167-0003 18
REVISION CERTIFICATE EDSD REV. DATE JO/EWO DESCRIPTION ENG’G CERT PMT OPRNS
THIS INDICATES THAT REV. NO. _________ VERIFICATION NO.
00 SEP/23/11 BI-10-00167 ISSUED FOR CONSTRUCTION S.S.K K.S.M
OF THIS DRAWING IS COVERED, FOR ALL _______________
APPROVAL/CERTIFICATION REQUIREMENTS, CONTROL NUMBER

AGENCY
BY: ______________ 02 AUG/01/12 BI-10-00167 ISSUED FOR CONSTURCTION S.S.K K.S.M

PROJECT
ENGINEER
ENGINEER

CERTIFIED
DISCIPLINE

DATE MM/DD/YY
DATE MM/DD/YY

OPERATIONS
BY DRAWING COMPLETION CERTIFICATE

DATE MM/DD/YY
DATE MM/DD/YY
DATE MM/DD/YY

CONSTRUCTION
DATE _____________ 01 MAR/14/12 BI-10-00167 ISSUED FOR CONSTRUCTION S.S.K K.S.M
(DCC)NO.

SHAYBAH
INSULATION

INLET & GAS TREATMENT


PROJECT SPECIFICATION
APPENDIX

APPENDIX VI – REINFORCEMENT DETAIL

DOC
DWG.TYPE

SAUDI ARABIA
B55
PLANT .NO
APPENDIX IV - PIPE SUPPORT STANDARD DRAWINGS

M
APPENDIX V - VESSEL SUPPORT STANDARD DRAWINGS

INDEX
SAUDI ARABIAN OIL COMPANY

APPENDIX I - SELECTION GUIDE FOR SUPPORT STANDARDS

JO / EWO: 10-00167-0003
APPENDIX II - STANDARD COLLECTION FOR SUPPORTS MATERIALS

DRAWING NO.

BE-748492
APPENDIX III - STANDARD COLLECTION FOR STRUCTURAL ELEMENTS

18
OF
SHT. NO.
02

02
REV. NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
S.S.K K.S.M

S.S.K K.S.M

S.S.K K.S.M
ENG’G CERT

1. GENERAL
1.1 Intent

This specification covers the minimum technical engineering requirements for the
design of pipe supports for the piping systems designed by Samsung Engineering Co.,
Ltd. (hereinafter referred to as Contractor), and shall be used as the general
DESCRIPTION

instructions for the “Pipe Support Details”. This specification shall generally exclude
ISSUED FOR CONSTURCTION
ISSUED FOR CONSTRUCTION

ISSUED FOR CONSTRUCTION

piping systems furnished as a regular part of the manufacturer's standardized


equipment or package facility.

1.2 References

The selection of material and equipment, and the design, fabrication, inspection and
JO/EWO

BI-10-00167

AUG/01/12 BI-10-00167

BI-10-00167

testing of support material shall be in accordance with the applicable standards,


SEP/23/11

MAR/14/12

specifications, codes, and industry practice.


DATE

1.2.1 Saudi Aramco Standards / Material System Specifications


REV.
NO.
00

02

01

SAES-A-112 Meteorological and Seismic Design Data


DISCIPLINE
ENGINEER SAES-L-120 Piping Flexibility Analysis
SAES-L-310 Design of Plant Piping
DATE MM/DD/YY

PROJECT
SABP-L-006 Piping Stress Analysis Review
ENGINEER

DATE MM/DD/YY

CERTIFIED
1.2.2 Saudi Aramco Specifications
B55-N-BE-748489-001 Insulation Specification
DATE MM/DD/YY

B55-H-BE-748491-001 Paint Specification


CONSTRUCTION
AGENCY

DATE MM/DD/YY
1.2.3 Codes
OPERATIONS
Comply with all applicable federal, state and local codes including:
AISC American Institute of Steel Construction
DATE MM/DD/YY ANSI American National Standards Institute
B.1.1 Unified Screwed Threads
B.18.2.1 Square and Hex Nuts
DATE _____________
CONTROL NUMBER
BY: ______________
_______________
VERIFICATION
EDSD

B.18.2.2 Square and Hex Bolts and Screws, including


Askew Head Bolts, Hex Cap Screws, and Lag Screws
ASME American Society of Mechanical Engineering
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO. _________
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

B31.3 Chemical Plant and Petroleum Refinery Piping


REVISION CERTIFICATE

PROJECT SPECIFICATION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

INSULATION DOC
B55 M BE-748492 4
(DCC)NO.

INLET & GAS TREATMENT OF 02


SHAYBAH SAUDI ARABIA JO / EWO: 10-00167-0003 18
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
1.2.4 Standards
Comply with the following standards:
S.S.K K.S.M

S.S.K K.S.M

S.S.K K.S.M
ENG’G CERT

MSS Manufacturers Standardization Society


SP-58 Pipe Hangers and Supports -- Materials, Design
and Manufacture
SP-89 Pipe Hangers and Supports -- Fabrication and
Installation Practices
DESCRIPTION

1.2.5 This document shall be read in conjunction with the following related project
ISSUED FOR CONSTURCTION
ISSUED FOR CONSTRUCTION

ISSUED FOR CONSTRUCTION

Documents.
B55-A-DOC-EM-000022 Project Scope Clarifications & Requirements
B55-A-DOC-EM-000022 Project Scope Clarifications & Requirements
JO/EWO

BI-10-00167

AUG/01/12 BI-10-00167

BI-10-00167

1.3 Units
SEP/23/11

MAR/14/12
DATE

Unless otherwise specified, Meter(M), Kilogram(Kg) units shall be applied as the


measurement System for drawings and documents to be submitted. However, nominal
REV.
NO.
00

02

01

sizes of piping components shall be in accordance with inch system, which


DISCIPLINE
ENGINEER
Abbreviation is (B).
DATE MM/DD/YY

PROJECT
ENGINEER

DATE MM/DD/YY
2. SUPPORT MARKING
CERTIFIED
2.1 Support Number and Symbol
DATE MM/DD/YY
Support numbers and symbols are shown on the Piping plan drawings as follows;
CONSTRUCTION
AGENCY

Bare pipe supported on support beam.


DATE MM/DD/YY

OPERATIONS
No support number required

Support No. (example: S1A, A2 or DA1, etc)


DATE MM/DD/YY
Support or Hanger (including spring hanger)
DATE _____________
CONTROL NUMBER
BY: ______________

Support No. (example: G1, G2 or G3, etc)


_______________
VERIFICATION
EDSD

Guide

Support No. (example: DA1, DA1S or DA2, etc)


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO. _________
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

Directional Stop

PROJECT SPECIFICATION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

INSULATION DOC
B55 M BE-748492 5
(DCC)NO.

INLET & GAS TREATMENT OF 02


SHAYBAH SAUDI ARABIA JO / EWO: 10-00167-0003 18
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Support No. (example: DA1/G1, DA1S/G3, etc)
Directional Stop with Guide
S.S.K K.S.M

S.S.K K.S.M

S.S.K K.S.M
ENG’G CERT

Support No. (example: A1 or A2)


Fixed anchor (welded to structure)

3. INSTALLATION REQUIREMENTS
DESCRIPTION

3.1 General
ISSUED FOR CONSTURCTION
ISSUED FOR CONSTRUCTION

ISSUED FOR CONSTRUCTION

3.1.1

All pipe support shall be provided for piping of 2" and larger. Supports will be identified
and located by a specific mark number as shown on above. Unless otherwise
JO/EWO

mandated by project or client, supports for piping of 1.1/2" and smaller shall be field
BI-10-00167

AUG/01/12 BI-10-00167

BI-10-00167

installed based on the paragraph 5.0, with exceptions as follows.


SEP/23/11

MAR/14/12
DATE

(1) High temperature pipe lines, operating above 400°C


(2) Process pipelines in refrigeration service, operating -43°C and below
REV.
NO.
00

02

01

(3) Piping connected to rotating equipment nozzle


DISCIPLINE
ENGINEER
(4) Piping which requires supports from vessels
DATE MM/DD/YY (5) Stress relieved pipe lines
PROJECT
ENGINEER (6) Piping in services requiring Class 900 ANSI flange rating or higher
DATE MM/DD/YY

CERTIFIED
3.1.2 Materials for each support shall be selected by the service temperature of the
DATE MM/DD/YY line.
CONSTRUCTION
AGENCY

DATE MM/DD/YY 3.1.3 In case clamps to be fabricated, clamps shall be provided from continuous
OPERATIONS length plate. Alloy steel pipe clamp shall be used for the lines operating above
400°C with stress engineer’s approval.

DATE MM/DD/YY

3.1.4 Support shall be designed and installed to prevent electrolysis of galvanic


action at contact area.
DATE _____________
CONTROL NUMBER
BY: ______________
_______________
VERIFICATION
EDSD

3.1.5 Anchor security shall be provided at vibrating service as below;


(1) Two phase flow
APPROVAL/CERTIFICATION REQUIREMENTS,

(2) High speed pump discharge piping


THIS INDICATES THAT REV. NO. _________
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

(3) High pressure pump discharge piping


(4) High pressure drop piping
PROJECT SPECIFICATION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

INSULATION DOC
B55 M BE-748492 6
(DCC)NO.

INLET & GAS TREATMENT OF 02


SHAYBAH SAUDI ARABIA JO / EWO: 10-00167-0003 18
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
3.2 Notes for Pipe Support Works
S.S.K K.S.M

S.S.K K.S.M

S.S.K K.S.M
ENG’G CERT

3.2.1 The welding shall be carefully done as indicated on the pipe support details.
Weld points between main pipe and support attachment such as dummy or
trunnion shall be stress-relieved in stress relieved pipe line.

3.2.2 The material for integral attachments attached by welding shall be compatible
DESCRIPTION

for pipe and attachment. Consideration shall be given to the localized stresses
ISSUED FOR CONSTURCTION
ISSUED FOR CONSTRUCTION

ISSUED FOR CONSTRUCTION

induced in the piping component by welding the integral attachment.


Intermediate pads of suitable alloy and design may be used to distribute
stresses and to reduce contamination or undesirable that effects in alloy piping.

3.2.3 In final support location differs from that shown on the “Piping Layout Drawing”,
JO/EWO

BI-10-00167

AUG/01/12 BI-10-00167

BI-10-00167

those support shall be reviewed by SECL stress engineer.


SEP/23/11

MAR/14/12
DATE

3.2.4 Shoe shall be centered over supporting beams unless otherwise indicated.
REV.
NO.
00

02

01

DISCIPLINE 3.2.5 No clearance shall be allowed between the bottom of pipes or shoe and the top
ENGINEER

of support beams unless otherwise noted. Where clearance exists, it shall be


DATE MM/DD/YY
adjusted with insert plates. Insert plates shall be equal to the beams of the
PROJECT
ENGINEER
width and suitable length considering lateral movement of piping, and welded to
DATE MM/DD/YY
the beams at both ends.
CERTIFIED

DATE MM/DD/YY
3.2.6 With the exception of spring supports, supporting of pipe with hanger rods is to
CONSTRUCTION
AGENCY be avoided.
DATE MM/DD/YY

OPERATIONS
3.2.7 Supporting of pipes directly from other pipes shall be avoided wherever
possible. Where it is unavoidable, care must be taken to take account of the

DATE MM/DD/YY
differential expansion between relevant piping services.

3.2.8 Where resting supports are designed to slide along foundation or pavement,
DATE _____________
CONTROL NUMBER
BY: ______________
_______________
VERIFICATION

the mortar level shall not be higher or equal than the sliding surface. The
EDSD

mating plate shall be insertion to top of foundation. Sliding surface shall be


adjusted to be horizontal and smooth, without weld-spatter, painting and any
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO. _________

other obstructions.
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

PROJECT SPECIFICATION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

INSULATION DOC
B55 M BE-748492 7
(DCC)NO.

INLET & GAS TREATMENT OF 02


SHAYBAH SAUDI ARABIA JO / EWO: 10-00167-0003 18
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
3.2.9 Maintenance supports for use during shutdown will not be provided.
S.S.K K.S.M

S.S.K K.S.M

S.S.K K.S.M
ENG’G CERT

3.2.10 Contractor shall provide temporary supports for hydrostatic test if necessary but
all temporary supports shall be clearly marked and removed prior to
commissioning of system. The welds of temporary supports to piping shall be
prohibited.

3.2.11 Anchors, stops and guides shall not be voluntarily added, deleted, or relocated
DESCRIPTION

in field without stress engineer’s approval.


ISSUED FOR CONSTURCTION
ISSUED FOR CONSTRUCTION

ISSUED FOR CONSTRUCTION

3.2.12 All spring supports shall be installed with name plate facing to the walkway side
so that the name plate can be read.

3.2.13 Materials
JO/EWO

(1) All structural members shall be ASTM A-36 or equal except for WT and W-
BI-10-00167

AUG/01/12 BI-10-00167

BI-10-00167

shape. ASTM A-572 or A-992 shall be used for WT and W-shapes. 02


SEP/23/11

MAR/14/12
DATE

(2) All bolting material shall be ASTM A-325 or equal.


(3) Stainless steel bolts and mate shall be used for stainless steel and
REV.
NO.
00

02

01

alloy pipe lines and corrosive environment areas.


DISCIPLINE
ENGINEER

3.2.14 The top point of concrete for pipe support foundation shall be min. 150mm
DATE MM/DD/YY

PROJECT
above finished grade
ENGINEER

DATE MM/DD/YY
3.2.15 Shoe to be used:
CERTIFIED
(1) Provide shoe for insulated piping 2” and above. On 1.1/2” and smaller
DATE MM/DD/YY
insulated lines, insulation shall be cut away locally to the support.
CONSTRUCTION
AGENCY (2) Clamp type shoe shall be used for thin wall pipe (less than 6mm wall for 14”
DATE MM/DD/YY O.D. pipe and larger).
OPERATIONS (3) Clamp type shoe shall be used for alloy and stress relieved piping.

3.2.16 Rigid pipe supports should be utilized to maximum extent thus avoiding the use
DATE MM/DD/YY
of spring supports and rod hangers wherever design permits.
DATE _____________
CONTROL NUMBER

3.2.17 All safety valves and rupture discs of vapor services shall be checked for thrust
BY: ______________
_______________
VERIFICATION
EDSD

load.

3.2.18 High pressure control valve should be anchored at one side of connecting pipe
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO. _________
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

and the piping reaction plus dynamic effect should be incorporated in the
REVISION CERTIFICATE

design of this anchor support.

PROJECT SPECIFICATION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

INSULATION DOC
B55 M BE-748492 8
(DCC)NO.

INLET & GAS TREATMENT OF 02


SHAYBAH SAUDI ARABIA JO / EWO: 10-00167-0003 18
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
3.2.19 Lines connected to tanks subject to settlement shall have the first support
located at sufficient distances from the tank to avoid excessive pipe or tank
S.S.K K.S.M

S.S.K K.S.M

S.S.K K.S.M
ENG’G CERT

stresses. In case of large settlements, the lines shall be supported from the
tank or by adjustable or spring supports from grade.

3.2.20 In the process unit the maximum movement at each side of the loop should not
be no more than 150mm(6 inch). In the offsite unit the maximum movement at
each side of the loop should not be no more than 300mm(12 inch).
DESCRIPTION

ISSUED FOR CONSTURCTION


ISSUED FOR CONSTRUCTION

ISSUED FOR CONSTRUCTION

3.2.21 All directly welded supports members shall be checked if wear pad is required
or not.

3.2.22 All Structural attachments, which transfer loads to the pipe through welds, shall
be weld to full encirclement sleeves or saddle pads if the piping is designed to
operate at a hoop stress in excess of 50% of the allowable stress.
JO/EWO

BI-10-00167

AUG/01/12 BI-10-00167

BI-10-00167
SEP/23/11

MAR/14/12

3.2.23 Piping shall be supported to permit removal of equipment such as pumps,


DATE

exchanger bundles for routine maintenance without having to install temporary


supports.
REV.
NO.
00

02

01

DISCIPLINE
ENGINEER

DATE MM/DD/YY
4. GENERAL INSTRUCTION FOR PIPE SUPPORTS DETAILS
PROJECT
ENGINEER

DATE MM/DD/YY 4.1 General


CERTIFIED

4.1.1 This drawing shall be used for selection and application only. Details of
DATE MM/DD/YY
supports are shown on fabrication detail drawings.
CONSTRUCTION
AGENCY

DATE MM/DD/YY
4.1.2 All dimensions are in millimeters.
OPERATIONS

4.1.3 Deviations from this drawing shall be reviewed by stress engineer and detailed
on the piping drawing.
DATE MM/DD/YY

4.2 Shoe
DATE _____________
CONTROL NUMBER
BY: ______________
_______________
VERIFICATION
EDSD

4.2.1 Shoe is required for all hot insulated lines;


(1) For expansion 75mm and less, use 300mm long shoe
APPROVAL/CERTIFICATION REQUIREMENTS,

(2) For expansion 76mm to 150mm, use 450mm long shoe


THIS INDICATES THAT REV. NO. _________
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

(3) For expansion 151mm to 225mm, use 600mm long shoe


(4) For expansion 226mm to 300mm, use 750mm long shoe

PROJECT SPECIFICATION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

INSULATION DOC
B55 M BE-748492 9
(DCC)NO.

INLET & GAS TREATMENT OF 02


SHAYBAH SAUDI ARABIA JO / EWO: 10-00167-0003 18
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
4.2.2 Shoe height is selected by insulation thickness as follows;
(1) Shoe height (H) = 100mm for insulation thickness 75mm and less
S.S.K K.S.M

S.S.K K.S.M

S.S.K K.S.M
ENG’G CERT

(2) Shoe height (H) = 150mm for insulation thickness 76mm and 125mm
(3) Shoe height (H) = 200mm for insulation thickness 126mm and 175mm
(4) Shoe height (H) = 250mm for insulation thickness 176mm and 225mm

4.3 Pipe Guide

4.3.1 Pipe guide spacing shall be as per the table below.


DESCRIPTION

(1) Guide at horizontal lines


ISSUED FOR CONSTURCTION
ISSUED FOR CONSTRUCTION

ISSUED FOR CONSTRUCTION

Pipe Size Max. Span (mm)


1.1/2” and smaller 6,000
2” to 6” 12,000
8” to 18” 18,000
JO/EWO

BI-10-00167

AUG/01/12 BI-10-00167

BI-10-00167

20” & larger 24,000


SEP/23/11

MAR/14/12

Note : Consider wind pressure and other condition,


DATE

stress engineering places the required guides.


REV.
NO.
00

02

01

DISCIPLINE
ENGINEER
(2) Guide at vessel

DATE MM/DD/YY

PROJECT
ENGINEER
Maximum spacing of guides (h) (m)
Nom. Insul. Wind Wind Wind Wind Wind Wind
DATE MM/DD/YY
Pipe Thick. Press. Press. Press. Press. Press. Press.
CERTIFIED Size mm 145kg/m² 170kg/m² 195kg/m 220kg/m 240kg/m² 300kg/m
² ² ²
DATE MM/DD/YY
1” 25 6.7 5.8 5.1 4.6 4.0 3.6
CONSTRUCTION
AGENCY 1.1/2” 25 7.0 6.1 5.1 4.6 4.3 4.0
DATE MM/DD/YY 2” 25 7.3 6.1 5.5 4.9 4.3 4.0
OPERATIONS 3” 25 8.2 7.0 6.1 5.5 4.9 4.3
4” 25 8.8 7.6 6.7 5.8 5.2 4.6
6” 50 10.0 8.5 7.6 6.7 6.1 5.5
DATE MM/DD/YY
8” 50 11.3 9.8 8.5 7.3 6.7 6.2
10” 50 12.5 10.7 9.4 8.2 7.6 7.3
12” 50 13.7 11.6 10.4 9.1 8.2 8.0
DATE _____________
CONTROL NUMBER
BY: ______________
_______________
VERIFICATION

14” 50 14.3 12.2 10.7 9.4 8.5 8.2


EDSD

16” 75 15.2 13.1 11.6 10.0 9.1 8.8


18” 75 16.2 13.7 12.2 10.7 9.8 9.5
APPROVAL/CERTIFICATION REQUIREMENTS,

20” 75 17.0 14.6 12.8 11.3 10.4 10.0


THIS INDICATES THAT REV. NO. _________
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

24”&
75 18.3 15.5 13.7 13.2 11.0 10.5
Larger

PROJECT SPECIFICATION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

INSULATION DOC
B55 M BE-748492 10
(DCC)NO.

INLET & GAS TREATMENT OF 02


SHAYBAH SAUDI ARABIA JO / EWO: 10-00167-0003 18
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
For lines with insulation thickness larger than those shown, the reduced guide spacing (H)
may be found by the following formula;
S.S.K K.S.M

S.S.K K.S.M

S.S.K K.S.M
ENG’G CERT

D2
H  h
D1
Where;
D1 = OD of pipe + twice the given insulation thickness from the above table.
DESCRIPTION

D2 = OD of pipe + twice the actual insulation thickness, as shown in the nomenclature.


ISSUED FOR CONSTURCTION
ISSUED FOR CONSTRUCTION

ISSUED FOR CONSTRUCTION


JO/EWO

BI-10-00167

AUG/01/12 BI-10-00167

BI-10-00167
SEP/23/11

MAR/14/12
DATE
REV.
NO.
00

02

01

DISCIPLINE
ENGINEER

DATE MM/DD/YY

PROJECT
ENGINEER

DATE MM/DD/YY

CERTIFIED

DATE MM/DD/YY

CONSTRUCTION
AGENCY

DATE MM/DD/YY

OPERATIONS
(3) Pipe guides shall not be placed closer than 1000 pipe diameter from a
directional change of pipe except where required by stress engineer.
DATE MM/DD/YY i.e. 6” pipe : 1000 × 6 = 6000mm
4” pipe : 1000 x 4 = 4000mm
DATE _____________
CONTROL NUMBER
BY: ______________
_______________
VERIFICATION
EDSD

4.4 Pick-up Support


APPROVAL/CERTIFICATION REQUIREMENTS,

4.4.1 Pick-up support shall not be used unless specifically approved in each case
THIS INDICATES THAT REV. NO. _________
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

and checked by stress engineer.

PROJECT SPECIFICATION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

INSULATION DOC
B55 M BE-748492 11
(DCC)NO.

INLET & GAS TREATMENT OF 02


SHAYBAH SAUDI ARABIA JO / EWO: 10-00167-0003 18
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
4.4.2 The maximum size limit of supported pipe is 2 inch and less, shall be supported
by 4 times and above diameter pipe.
S.S.K K.S.M

S.S.K K.S.M

S.S.K K.S.M
ENG’G CERT

4.4.3 Supporting pipe is limited to operating temperature of 90°C or below.

4.4.4 Pick-ups shall have supporting pipe limited to uninsulated, non heat traced and
carbon steel. Use of pick-ups on insulated, heat traced and non-carbon steel
pipe shall require approval by stress engineer.
DESCRIPTION

ISSUED FOR CONSTURCTION


ISSUED FOR CONSTRUCTION

ISSUED FOR CONSTRUCTION

4.4.5 Load shall be calculated by using following method.


JO/EWO

BI-10-00167

AUG/01/12 BI-10-00167

BI-10-00167
SEP/23/11

MAR/14/12
DATE
REV.
NO.
00

02

01

DISCIPLINE
ENGINEER

DATE MM/DD/YY
 L  L 3   P
PROJECT W   1   L2  
ENGINEER
 2   1000
DATE MM/DD/YY Where, W = Support load in kg
CERTIFIED
L1, L2, L3 = Pipe length in mm.
P = Unit weight of pipe including full of water and insulation
DATE MM/DD/YY in kg/m.
Example, L1 = 3500, L2 = 900, L3 = 4500
CONSTRUCTION
AGENCY Pipe = 2” SCH.80 with full of water and P = 9.4 kg/m
DATE MM/DD/YY
Therefore,  3500  4500   9.4
W     900 
OPERATIONS  2   1000
 46kg  130kg...Ac ceptable
Torsional moment = 46×250/1000 = 11.5kg×m
DATE MM/DD/YY

< 60kg×m…Acceptable
DATE _____________
CONTROL NUMBER
BY: ______________
_______________
VERIFICATION
EDSD

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO. _________
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

PROJECT SPECIFICATION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

INSULATION DOC
B55 M BE-748492 12
(DCC)NO.

INLET & GAS TREATMENT OF 02


SHAYBAH SAUDI ARABIA JO / EWO: 10-00167-0003 18
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
4.5 Support Trunnion
S.S.K K.S.M

S.S.K K.S.M

S.S.K K.S.M
ENG’G CERT

4.5.1 Maximum vertical drop provides for weight of pipe full of water plus insulation.
Vertical drop also provides for load allowance of horizontal run

4.5.2 Approval of stress engineer is required if support load exceeds maximum total
load in the table.
DESCRIPTION

4.5.3 Actual load must be calculated and transmitted to support design.


ISSUED FOR CONSTURCTION
ISSUED FOR CONSTRUCTION

ISSUED FOR CONSTRUCTION

4.5.4 Trunnion shall be shop fabricated and shown on shop fabrication drawing.

4.6 Pipe Stub


JO/EWO

4.6.1 All stubs on stainless steel, alloy, or stress relieved piping shall be installed by
BI-10-00167

AUG/01/12 BI-10-00167

BI-10-00167

the shop.
SEP/23/11

MAR/14/12
DATE

4.6.2 Stub material and schedule shall be per the line class of supported pipe.
REV.
NO.
00

02

01

DISCIPLINE
ENGINEER

4.7 Maximum Loading on Paved Area


DATE MM/DD/YY

PROJECT Maximum loadings on paved area using concrete slab based on 150 mm and over
ENGINEER

DATE MM/DD/YY
thick are as follows;

CERTIFIED
Concrete Slab Pedestal Maximum Vertical
DATE MM/DD/YY Thickness (mm) Size (mm) Loading (ton)
CONSTRUCTION
200 x 200 1.3
AGENCY
150 300 x 300 1.7
DATE MM/DD/YY 400 x 400 2.0
OPERATIONS
Note : Greater loads than above vertical loadings require approval from civil engineer.

DATE MM/DD/YY
DATE _____________
CONTROL NUMBER
BY: ______________
_______________
VERIFICATION
EDSD

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO. _________
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

PROJECT SPECIFICATION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

INSULATION DOC
B55 M BE-748492 13
(DCC)NO.

INLET & GAS TREATMENT OF 02


SHAYBAH SAUDI ARABIA JO / EWO: 10-00167-0003 18
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
4.8 Hold-Down

Reciprocating compressor or pump piping subject to vibration shall be held down by


S.S.K K.S.M

S.S.K K.S.M

S.S.K K.S.M
ENG’G CERT

HD5, HD7.

4.9 Dummy Support

4.9.1 Dummy support shall be used by piping design, if pipe wall thickness is
minimum standard wall thickness.
DESCRIPTION

ISSUED FOR CONSTURCTION


ISSUED FOR CONSTRUCTION

ISSUED FOR CONSTRUCTION

4.9.2 If pipe wall thickness is thinner than standard wall thickness, stress engineer
should check to see whether reinforcement is required or not.

4.9.3 Dummy support size for pipe size 2” and smaller shall be same size as the
supported pipe.
JO/EWO

BI-10-00167

AUG/01/12 BI-10-00167

BI-10-00167

4.9.4 Dummy supports shall be shown on piping arrangement drawing together with
SEP/23/11

MAR/14/12
DATE

piping and shall be purchased and fabricated together with piping.


REV.
NO.
00

02

01

DISCIPLINE
ENGINEER 4.10 Pipe Support Span
DATE MM/DD/YY The following pipe span is based on 16mm (5/8”) maximum deflection and 4Hz in
PROJECT
ENGINEER minimum natural frequency of the piping concerned
DATE MM/DD/YY 4.10.1 Maximum pipe support span (carbon steel / alloy steel)
CERTIFIED

Pipe Empty With Full of Water


DATE MM/DD/YY
Pipe Wall
Size Bare Insulate Insul. Bare Insulate Insul.
CONSTRUCTION Thickness
AGENCY (B) (m) d thk. (m) d thk.
DATE MM/DD/YY 1/2” SCH.80 4.0 (m)3.0 (mm)50 4.0 (m)3.0 (mm)50
OPERATIONS 3/4” SCH.80 5.0 3.5 50 4.5 3.5 50
1” SCH.40 5.5 4.0 50 5.0 4.0 50
1.1/4” SCH.80 6.0 5.0 50 5.5 5.0 50
DATE MM/DD/YY
1.1/2” SCH.80 6.5 6.0 50 6.0 5.0 50
2” SCH.40 7.0 6.0 50 6.5 6.0 50
3” SCH.40 9.0 8.0 50 8.0 7.0 50
DATE _____________
CONTROL NUMBER
BY: ______________
_______________
VERIFICATION

4” SCH.40 10.0 9.0 50 9.0 8.0 75


EDSD

6” SCH.40 12.0 11.0 75 10.5 10.0 75


8” SCH.40 14.0 12.5 75 12.0 11.0 75
APPROVAL/CERTIFICATION REQUIREMENTS,

10” SCH.40 15.5 14.0 75 13.0 12.5 75


THIS INDICATES THAT REV. NO. _________
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

12” STD. 17.0 15.5 75 14.0 13.5 75


14” STD. 18.0 16.0 75 15.0 14.0 75
PROJECT SPECIFICATION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

INSULATION DOC
B55 M BE-748492 14
(DCC)NO.

INLET & GAS TREATMENT OF 02


SHAYBAH SAUDI ARABIA JO / EWO: 10-00167-0003 18
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
16” STD. 19.0 17.5 75 15.5 15.0 75
18” STD. 20.0 18.5 90 16.0 15.0 90
S.S.K K.S.M

S.S.K K.S.M

S.S.K K.S.M
ENG’G CERT

20” STD. 21.0 19.5 90 17.0 16.0 90


22” STD. 22.0 20.5 90 17.0 16.5 90
24” STD. 23.0 21.5 90 18.0 17.0 90
Note : Above table is base on temperature 350°C.

4.10.2 Maximum pipe support span (stainless steel)


DESCRIPTION

Pipe Pipe Wall Empty With Full of Water


Bare Insulated Insul. Bare Insulated Insul.
ISSUED FOR CONSTURCTION
ISSUED FOR CONSTRUCTION

ISSUED FOR CONSTRUCTION

Size Thickness
(m) (m) thk. (m) (m) thk.
1/2” SCH.10S 2.9 2.1 50 2.8 2.0 50
3/4” SCH.10S 3.3 2.5 50 3.1 2.4 50
1” SCH.10S 3.7 2.9 50 3.5 2.8 50
1.1/4” SCH.10S 5.0 4.1 50 3.8 3.9 50
1.1/2” SCH.10S 5.4 4.3 50 4.8 4.1 50
JO/EWO

BI-10-00167

AUG/01/12 BI-10-00167

BI-10-00167

2” SCH.10S 7.0 5.9 50 6.4 5.5 50


SEP/23/11

MAR/14/12

3” SCH.10S 8.7 7.5 50 7.5 6.7 50


DATE

4” SCH.10S 9.9 8.5 50 8.2 7.5 50


REV.

6” SCH.10S 12.0 10.6 75 9.6 9.0 75


NO.
00

02

01

DISCIPLINE 8” SCH.10S 13.8 11.8 75 10.7 9.9 75


ENGINEER

10” SCH.10S 15.5 13.4 75 11.7 11.5 75


DATE MM/DD/YY
12” SCH.10S 16.8 14.8 75 12.6 11.9 75
PROJECT
ENGINEER 14” SCH.10S 17.6 15.5 75 13.1 12.4 75
DATE MM/DD/YY 16” SCH.10S 18.8 16.7 75 13.7 13.0 75
CERTIFIED 18” SCH.10S 20.0 17.6 90 14.2 13.4 90

DATE MM/DD/YY
20” SCH.10S 21.0 18.7 90 15.1 14.3 90

CONSTRUCTION
22” SCH.10S 22.0 19.7 90 15.5 14.8 90
AGENCY
24” SCH.10S 23.0 20.8 90 16.5 15.7 90
DATE MM/DD/YY
Note: Above table is base on temperature 350°C
OPERATIONS

DATE MM/DD/YY
DATE _____________
CONTROL NUMBER
BY: ______________
_______________
VERIFICATION
EDSD

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO. _________
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

PROJECT SPECIFICATION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

INSULATION DOC
B55 M BE-748492 15
(DCC)NO.

INLET & GAS TREATMENT OF 02


SHAYBAH SAUDI ARABIA JO / EWO: 10-00167-0003 18
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
5. RECOMMANDED METHODS FOR SUPPORT OF SMALL PIPE
S.S.K K.S.M

S.S.K K.S.M

S.S.K K.S.M
ENG’G CERT

5.1 Purpose

It is provided for field piping fabricator of contractor to prepare and install proper
support on the lines 1.1/2" and smaller.

5.2 Pipe Support Span


DESCRIPTION

All supports are based on insulated pipe with full of water.


ISSUED FOR CONSTURCTION
ISSUED FOR CONSTRUCTION

ISSUED FOR CONSTRUCTION

5.2.1 Guide Spacing

Vertical Guide
Line Size Horizontal Guide Spacing Pipe Weights Full of Water
Spacing
MAX.(mm) (Kg/m)
MAX.(mm)
3/4" 4000 6000 2.5
1" 4500 6000 3.7
JO/EWO

BI-10-00167

AUG/01/12 BI-10-00167

BI-10-00167

1.1/2" 6000 6000 6.5


Note: Add 2.5 kg/m for insulated lines.
SEP/23/11

MAR/14/12
DATE

5.3 Permissible Overhang Variations


REV.
NO.
00

02

01

DISCIPLINE
ENGINEER

DATE MM/DD/YY

PROJECT
ENGINEER

DATE MM/DD/YY

CERTIFIED

DATE MM/DD/YY

CONSTRUCTION
AGENCY

DATE MM/DD/YY

OPERATIONS
Plan view of piping

Line
DATE MM/DD/YY
Size Dimension 'A' Dimension 'B'
(mm) (mm)
3/4" 1200 1500 1800 2100 2400 2400 2100 1800 1500 1200
DATE _____________
CONTROL NUMBER
BY: ______________
_______________

1" 1200 1500 1800 2100 2400 2400 2100 1800 1500 1200
VERIFICATION

1.1/2" 1500 1800 2100 2400 2700 2700 2400 2100 1800 1500
EDSD

COL No. 1 2 3 4 5 1 2 3 4 5
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO. _________
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

PROJECT SPECIFICATION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

INSULATION DOC
B55 M BE-748492 16
(DCC)NO.

INLET & GAS TREATMENT OF 02


SHAYBAH SAUDI ARABIA JO / EWO: 10-00167-0003 18
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
To find Permissible overhangs, match column number for dimension 'A' with same column
number for dimension 'B'
S.S.K K.S.M

S.S.K K.S.M

S.S.K K.S.M
ENG’G CERT
DESCRIPTION

ISSUED FOR CONSTURCTION


ISSUED FOR CONSTRUCTION

ISSUED FOR CONSTRUCTION

Plan view of piping

Line Size Dimension 'A' Dimension 'B'


(mm) (mm)
JO/EWO

BI-10-00167

AUG/01/12 BI-10-00167

BI-10-00167

3/4" 700 900 1000 1200 1300 3300 2500 1900 1300 900
1" 900 1000 1200 1300 1500 3000 2400 1800 1300 900
SEP/23/11

MAR/14/12
DATE

1.1/2" 900 1000 1200 1300 1500 4500 3900 3300 2500 2100
COL No. 1 2 3 4 5 1 2 3 4 5
REV.
NO.
00

02

01

DISCIPLINE
To find Permissible overhangs, match column number for dimension 'A' with same column
ENGINEER
number for dimension 'B’
DATE MM/DD/YY

PROJECT
ENGINEER

DATE MM/DD/YY

CERTIFIED

DATE MM/DD/YY

CONSTRUCTION
AGENCY

DATE MM/DD/YY

OPERATIONS

DATE MM/DD/YY
Isometric

Line Dimension 'A' Dimension 'B' Dimension 'C'


DATE _____________
CONTROL NUMBER
BY: ______________
_______________

Size (mm) (mm) (mm)


VERIFICATION

3/4" 300 700 1000 1300 1800 3600 2900 1400 300 300 1500 700 1000 1700 1200
EDSD

1" 400 800 1200 1700 2100 4200 2500 1500 1200 1700 1700 1200 1100 1000 800
1.1/2" 500 1000 1600 2100 2700 5400 3200 2100 1000 2100 2100 1500 1400 1600 1000
COL
APPROVAL/CERTIFICATION REQUIREMENTS,

No. 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5
THIS INDICATES THAT REV. NO. _________
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

PROJECT SPECIFICATION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

INSULATION DOC
B55 M BE-748492 17
(DCC)NO.

INLET & GAS TREATMENT OF 02


SHAYBAH SAUDI ARABIA JO / EWO: 10-00167-0003 18
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
To find permissible overhangs, match column number for dimension 'A' with same column
number for dimension ‘B’ and ‘C’
S.S.K K.S.M

S.S.K K.S.M

S.S.K K.S.M
ENG’G CERT

5.4 Miscellaneous Support

On pipe support details, type MC1 ~ MC8 shall be used


DESCRIPTION

5.5 Gusset Plate


ISSUED FOR CONSTURCTION
ISSUED FOR CONSTRUCTION

ISSUED FOR CONSTRUCTION

Branch connections (1.1/2” and smaller) in piping connected to rotating equipments or

in location where vibration can occur (such as near control valve) shall be braced in
accordance with type GUS1 ~ 5.
JO/EWO

BI-10-00167

AUG/01/12 BI-10-00167

BI-10-00167

6. PAINTING
SEP/23/11

MAR/14/12
DATE

Unless otherwise specified, all pipe supports shall be painted as per B55-H-BE-748491-001
REV.
NO.
00

02

01

DISCIPLINE
ENGINEER

DATE MM/DD/YY

PROJECT
ENGINEER

DATE MM/DD/YY

CERTIFIED

DATE MM/DD/YY

CONSTRUCTION
AGENCY

DATE MM/DD/YY

OPERATIONS

DATE MM/DD/YY
DATE _____________
CONTROL NUMBER
BY: ______________
_______________
VERIFICATION
EDSD

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO. _________
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

PROJECT SPECIFICATION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

INSULATION DOC
B55 M BE-748492 18
(DCC)NO.

INLET & GAS TREATMENT OF 02


SHAYBAH SAUDI ARABIA JO / EWO: 10-00167-0003 18
APPENDIX I - SELECTION GUIDE FOR SUPPORT STANDARDS

SIZE SUPPORT
CATEGORY TYPE LOCATION INSULATION REMARK
RANGE NO
GROUND/PLAT
ADJUSTABLE GUIDE NO/HOT 2"~54" BAG1~8
FORM
GROUND/PLAT
ADJUSTABLE RESTING NO/HOT 2"~54" BAR1~8
FORM
GROUND/PLAT IF DISTANCE FROM FOUNDATION TOP
GUIDE NO/HOT 2"~64" BG1~9
FORM TO BOP IS OVER 600
BASE SUPPORT GROUND/PLAT IF DISTANCE FROM FOUNDATION TOP
GUIDE NO/HOT 2"~64" BSG1~9
FORM TO BOP IS 600 & BELOW
GROUND/PLAT IF DISTANCE FROM FOUNDATION TOP
RESTING NO/HOT 2"~64" BR1~9
FORM TO BOP IS OVER 600
GROUND/PLAT IF DISTANCE FROM FOUNDATION TOP
RESTING NO/HOT 2"~64" BS1~9
FORM TO BOP IS OVER 600
RESTING ELBOW NO/HOT 2"~64" DS3
RESTING HOR./VERT. ALL ~12" CN1~2 SELECT BY LENGTH AND MAX. LOAD
CANTILEVER GUIDE VERT. ALL ~12" CN5~6
SUPPORT
RESTING HOR. ALL ~16" CN3~4 SELECT BY LENGTH AND MAX. LOAD

DIRECTIONAL ANCHOR HOR. NO 2"~72" DA1~3


DIRECTIONAL
DIRECTIONAL ANCHOR HOR. HOT 2"~72" DA1S~3S WITH SHOE
SUPPORT
DIRECTIONAL ANCHOR HOR. NO 2"~72" DA1P~3P WITH WEAR PAD
ELBOW DUMMY
RESTING ELBOW ALL 2"~54" DS1~2
SUPPORT
GUIDE HOR. NO 1"~28" G1~2
GUIDE HOR. HOT 1"~76" G3
GUIDE VERT. NO 1"~8" G6
GUIDE SUPPORT GUIDE VERT. HOT 1"~8" G7
GUIDE VERT. NO/HOT 10"~24" G8
NON-LIFTING TYPE, CONFIRM BY
GUIDE HOR. NO/HOT ~18" G4/G5
STRESS ENGINEER
GUSSET ANCHOR BRANCH ALL ~1.1/2 GUS1~4
SUPPORT ANCHOR FLANGE ALL ~1.1/2 GUS5 ORIFFICE FLANGE TAP VALVE
HANGER
HANGER TRAPEZE HOR. ALL ~24" H3~4 SELECT BY MAX. LOAD
SUPPORT
HOLD DOWN HOR./VERT. NO ~36" HD1 ONLY TO BE APPLIED AT FIELD
HOLD DOWN HOR./VERT. NO ~36" HD5
ANTI VIBRATION HOLD DOWN HOR./VERT. HOT ~36" HD7
SUPPORT GUIDE HOR. NO/HOT ~8" GV4 ON STEEL STRUCTURE
GUIDE HOR. NO/HOT 10"~18" GV5 ON STEEL STRUCTURE
GUIDE HOR. NO/HOT 10"~24" GV6 ON EMBEDDED PLATE
ANCHOR HOSE STATION NO/HOT ~1.1/2" HOS2 TYPE SELECT BY SITE CONDITION
SELECT BY SITE CONDITION AND MAX.
RESTING HOR. ALL ~4" MC1~2/MC6
LOAD
MISCELLANEOUS SELECT BY SITE CONDITION AND MAX.
RESTING HOR. ALL ~6" MC3~5
SUPPORT LOAD
RESTING HOR. ALL ALL MC7~8 SELECT BY MAX. LOAD
RESTING HOR. ALL ALL T1~3 SELECT BY MAX. LOAD
RESTING HOR. ALL ALL T4 SELECT BY MAX. LOAD
ANCHOR / GUIDE PSV INLET NO/HOT ~24" PSV1
PSV SUPPORT
ANCHOR / GUIDE PSV INLET NO/HOT ~24" PSV2 PAD TYPE
PICK-UP RESTING HOR. NO/HOT ALL PU1~3 CONFIRM BY STRESS ENGINEER
RESTING HOR./VERT. NO/HOT ~60" S1~3
SHOE
RESTING HOR./VERT. NO ~26" S8~10 CLAMP TYPE SHOE
RISER CLAMP RESTING VERT. NO 3/4"~4" RC1
RESTING HOR. ALL 2"~ TSP1 -10C TO 120C
RESTING BASE SUPPORT ALL 2"~ TSP2 -10C TO 120C
SLIDING PLATE
RESTING HOR. ALL 10"~ SSP1 -195C AND ABOVE
RESTING BASE SUPPORT ALL 2"~ SSP2 -195C AND ABOVE
TRUNNION
RESTING VERT. ALL 2"~72" ST1~4,STP1~4 SELECT BY STRESS ENGINEER
SUPPORT
U-BOLT ALL ALL NO/HOT ~24" UB1
LIFTING LUG LUG ELBOW ALL 3"~42" WL1
PLATE
BEAM EXTENSION PLATFORM ALL ALL XP1
EXTENSTION
RESTING HOR. NO ALL WP1 CORROSION PROTECTION FOR S.S.
PAD
RESTING HOR. NO ALL WP2
APPENDIX II - STANDARD COLLECTION FOR SUPPORTS MATERIALS

PIPING SUPPORTING ELEMENTS AS PER ASTM SPECIFICATION

SUPPORT MATCL
ELEMENT NOT WELDED TO PIPE BUT IN ELEMENT OUT OF THERMAL FLOW
ELEMENT WELDED TO PIPE CONTACT WITH PIPING THERMAL FLOW COMPLETELY OUTSIDE OF INSULATION
INSIDE INSULATION
MATERIAL TEMP.(℉)
SHAPES SHAPES BOLTING SHAPES PLATES BOLTING
SHAPES PLATES & SHAPES PLATES & SHAPES
PIPES (OTHERS PIPES (OTHERS (BOLT& PIPES (OTHERS & (BOLT& FORGED
(W, WT) BARS (W, WT) BARS (W, WT)
) ) NUT) ) BARS NUT)

A53-B A572 or A53-B A572or


-20 TO 700 CS A36 A36 A193/B7
C.S. API5L-B A992 API5L-B A992
A194/2H
700 TO 800 CH A106-B / / A285GR.C A106-B / / A285GR.C

C.S. A285GR.C A320/L7


-50 TO -20 CL A333-6 / / A333-6 / / A285GR.C
(AL-Killed C.S.) (2) A194/2H

C.S. A193/B7
-50 TO 212 CG NOTUSED A53-B A36
(GALVANIZED) A194/2H

A193/B7
-50 TO 700 AS / / A53-B / A36
A194/2H
C - 1/2 Mo A335-P11 A387-11
A335- A193/B8
700 TO 874 AH / / / / A387-11
P11 A194/8

A193/B7
-20 TO 700 AS / / A53-B / A36
A194/2H
1 1/4 Cr - 1/2 Mo A335-P11 A387-11
A335- A193/B8
02
700 TO 1202 AH / / / / A387-11
P11 A194/8
A572or A193/B7
A193/B7 A53-B A36 A36 A668-D
-20 TO 700 AS / / A53-B / A36 A992 A194/2H
A194/2H
2 1/4 Cr - 1 Mo A335-P11 A387-11
A335- A193/B8
700 TO 1202 AH / / / / A387-11
P11 A194/8

5Cr - 1/2 Mo A193/B7


-20 TO 700 AS / / A53-B / A36
7Cr - 1/2 Mo A194/2H
A335-P11 A387-11
9Cr - 1 Mo A335- A193/B8
9Cr - 1 Mo-V 700 TO 1202 AH / / / / A387-11
P11 A194/8

AISI 304 (H&L) A193/B7


-20 TO 700 SS / / A53-B(1) / A36
AISI 316 (H&L) A194/2H
A312-
AISI 321 (H&L) A240-304
-324 TO -20 TP304 / / A312 / A320/B8
AISI 347 (H&L) SH / A240-304
AISI 254SMO Tp304 A194/8
700 TO 1202 / / /

A193/B8
3 1/2 NI -150 TO -51 NI A333-3 / / A203-D A333-3 / / A203-D
A194/8

A193/B8
9 NI -321 TO -101 NL A333-8 / / A353 A333-8 / / A353
A194/8
(1) Commonly accepted shapes include shapes specified to Japanese Standards(JS), Britich Standards(BS) Eropean Standards(EuroNorm) and German Standards(DIN).
(2) Charpy V notch impact test shall be performed at -51 deg. F according to ASME B31.3 & ASTM A370.
(2) Equivalent or higher grade materal commonly accepted.
APPENDIX III - STANDARD COLLECTION FOR STEEL BEAM AND ANCHOR BOLT

STEEL BEAM
I-SHAPE H-SHAPE CHANNEL ANGLE
CODE JIS CODE JIS CODE JIS CODE JIS
L25 25*25*5
L50 50*50*6
L65 65*65*6
L75 75*75*6
L90 90*90*7
H100x100 100*100*6*8 C100 100*50*5*7.5 L100 100*100*10
H125x125 125*125*6.5*9 C125 125*65*6*8
I150 150*75*5.5*9.5 H150x150 150*150*7*10 C150 150*75*6.5*10 L150 150*150*15
I200 200*100*7*10 H200x200 200*200*8*12 C200 200*90*8*13.5
I250 250*125*7.5*12 H250x250 250*250*9*14 C250 250*90*9*13
H300x150 300*150*6.5*9 C300 300*90*10*15.5
H350x350 350*350*12*19

ANCHOR BOLT
CODE DETAIL
M10 M10 X 120
M12 M12 X 120
M16 M16 X 140
M20 M20 X 170
APPENDIX IV - THE LIST OF SUPPORT TYPES FOR PIPES
PIPE SIZE
RANGE SH'T
NO TYPE MARK NO. TITLE REV REMARK
Q'TY
FROM TO

1 BAG1 BAG1-NX SX EX WX BASE SUPPORT FOR ADUSTABLE GUIDE 2 4 1 2


2 BAG2 BAG2-NX SX EX WX BASE SUPPORT FOR ADUSTABLE GUIDE 6 8 1 2
3 BAG3 BAG3-NX SX EX WX BASE SUPPORT FOR ADUSTABLE GUIDE 10 12 1 2
4 BAG4 BAG4-NX SX EX WX BASE SUPPORT FOR ADUSTABLE GUIDE 14 16 1 2
5 BAG5 BAG5-NX SX EX WX BASE SUPPORT FOR ADUSTABLE GUIDE 18 24 1 2
6 BAG6 BAG6-NX SX EX WX BASE SUPPORT FOR ADUSTABLE GUIDE 26 32 1 2
7 BAG7 BAG7-NX SX EX WX BASE SUPPORT FOR ADUSTABLE GUIDE 34 42 1 2
8 BAG8 BAG8-NX SX EX WX BASE SUPPORT FOR ADUSTABLE GUIDE 44 54 1 2
9 BAR1 BAR1 BASE SUPPORT FOR ADUSTABLE RESTING 2 4 1 A
10 BAR2 BAR2 BASE SUPPORT FOR ADUSTABLE RESTING 6 8 1 A
11 BAR3 BAR3 BASE SUPPORT FOR ADUSTABLE RESTING 10 12 1 A
12 BAR4 BAR4 BASE SUPPORT FOR ADUSTABLE RESTING 14 16 1 A
13 BAR5 BAR5 BASE SUPPORT FOR ADUSTABLE RESTING 18 24 1 A
14 BAR6 BAR6 BASE SUPPORT FOR ADUSTABLE RESTING 28 32 1 A
15 BAR7 BAR7 BASE SUPPORT FOR ADUSTABLE RESTING 34 42 1 A
16 BAR8 BAR8 BASE SUPPORT FOR ADUSTABLE RESTING 44 54 1 A
17 BG1 BG1-NX SX EX WX BASE SUPPORT FOR GUIDE 2 4 1 2
18 BG2 BG2-NX SX EX WX BASE SUPPORT FOR GUIDE 6 8 1 2
19 BG3 BG3-NX SX EX WX BASE SUPPORT FOR GUIDE 10 12 1 2
20 BG4 BG4-NX SX EX WX BASE SUPPORT FOR GUIDE 14 16 1 2
21 BG5 BG5-NX SX EX WX BASE SUPPORT FOR GUIDE 18 24 1 2
22 BG6 BG6-NX SX EX WX BASE SUPPORT FOR GUIDE 26 32 1 2
23 BG7 BG7-NX SX EX WX BASE SUPPORT FOR GUIDE 34 42 1 2
24 BG8 BG8-NX SX EX WX BASE SUPPORT FOR GUIDE 44 54 1 2
25 BG9 BG9-NX SX EX WX BASE SUPPORT FOR GUIDE 56 64 1 2 ADDED
26 BR1 BR1 BASE SUPPORT FOR RESTING 2 4 1 A
27 BR2 BR2 BASE SUPPORT FOR RESTING 6 8 1 A
28 BR3 BR3 BASE SUPPORT FOR RESTING 10 12 1 A
29 BR4 BR4 BASE SUPPORT FOR RESTING 14 16 1 A
30 BR5 BR5 BASE SUPPORT FOR RESTING 18 24 1 A
31 BR6 BR6 BASE SUPPORT FOR RESTING 26 32 1 A
32 BR7 BR7 BASE SUPPORT FOR RESTING 34 42 1 A
33 BR8 BR8 BASE SUPPORT FOR RESTING 44 54 1 A 02
34 BR9 BR9 BASE SUPPORT FOR RESTING 56 64 1 2 ADDED
35 BS1 BS1 BASE SUPPORT 2 4 1 A
36 BS2 BS2 BASE SUPPORT 6 8 1 A
37 BS3 BS3 BASE SUPPORT 10 12 1 2
38 BS4 BS4 BASE SUPPORT 14 16 1 2
39 BS5 BS5 BASE SUPPORT 18 24 1 A
40 BS6 BS6 BASE SUPPORT 26 32 1 A
41 BS7 BS7 BASE SUPPORT 34 42 1 A
42 BS8 BS8 BASE SUPPORT 44 54 1 1
43 BS9 BS9 BASE SUPPORT 56 64 1 2 ADDED
44 BSG1 BSG1-NX SX EX WX BASE SUPPORT GUIDE(2 OR 4 WAY) 2 4 1 2
45 BSG2 BSG2-NX SX EX WX BASE SUPPORT GUIDE(2 OR 4 WAY) 6 8 1 2
46 BSG3 BSG3-NX SX EX WX BASE SUPPORT GUIDE(2 OR 4 WAY) 10 12 1 2
47 BSG4 BSG4-NX SX EX WX BASE SUPPORT GUIDE(2 OR 4 WAY) 14 16 1 2
48 BSG5 BSG5-NX SX EX WX BASE SUPPORT GUIDE(2 OR 4 WAY) 18 24 1 2
49 BSG6 BSG6-NX SX EX WX BASE SUPPORT GUIDE(2 OR 4 WAY) 26 32 1 2
50 BSG7 BSG7-NX SX EX WX BASE SUPPORT GUIDE(2 OR 4 WAY) 34 42 1 2
51 BSG8 BSG8-NX SX EX WX BASE SUPPORT GUIDE(2 OR 4 WAY) 44 54 1 2
52 BSG9 BSG9-NX SX EX WX BASE SUPPORT GUIDE(2 OR 4 WAY) 56 64 1 2 ADDED
53 CN1 CN1-A-01 CANTILEVER ~4 1 2
54 CN2 CN2-A-01 CANTILEVER 6 12 1 2
55 CN3 CN3-A-01 CANTILEVER BASKET 2 24 1 2
56 CN4 CN4-A-01 CANTILEVER BASKET 2 16 1 2
57 CN5 CN5-A-3-1000 CANTILEVER GUIDE FOR VERTICAL PIPE ~4 1 2
58 CN6 CN6-A-6-01 CANTILEVER GUIDE FOR VERTICAL PIPE 6 12 1 2
59 DA1 DA1 DIRECTIONAL ANCHOR FOR UNINSULATED PIPE 2 10 1 2
60 DA1P DA1P DIRECTIONAL ANCHOR WITH WEAR PAD FOR UNINSULATED PIPE 2 10 1 2 ADDED
61 DA1S DA1S DIRECTIONAL ANCHOR FOR PIPE WITH SHOE 2 10 1 2
62 DA2 DA2 DIRECTIONAL ANCHOR FOR UNINSULATED PIPE 12 24 1 2
63 DA2P DA2P DIRECTIONAL ANCHOR WITH WEAR PAD FOR UNINSULATED PIPE 12 24 1 2 ADDED
64 DA2S DA2S DIRECTIONAL ANCHOR FOR PIPE WITH SHOE 12 24 1 2
65 DA3 DA3 DIRECTIONAL ANCHOR FOR UNINSULATED PIPE 26 72 1 2
66 DA3P DA3P DIRECTIONAL ANCHOR WITH WEAR PAD FOR UNINSULATED PIPE 26 72 1 2 ADDED
67 DA3S DA3S DIRECTIONAL ANCHOR FOR PIPE WITH SHOE 26 72 1 2
68 DS1 DS1-A-4 DUMMY SUPPORT AT ELBOW 2 24 1 A
69 DS2 DS2-A-26-SCH40-800 DUMMY SUPPORT AT ELBOW 26 ~ 1 A
70 DS3 DS3-4 DUMMY SUPPORT FOR BASE TYPE 2 64 1 A
71 G1 G1-02 GUIDE FOR UNINSULATED PIPE 1 8 1 2
72 G2 G2-02 GUIDE FOR UNINSULATED PIPE 10 28 1 B
73 G3 G3-02 GUIDE FOR PIPE WITH SHOE 1/2 76 1 2
APPENDIX IV - THE LIST OF SUPPORT TYPES FOR PIPES
PIPE SIZE
RANGE SH'T
NO TYPE MARK NO. TITLE REV REMARK
Q'TY
FROM TO

74 G4 G4 GUIDE FOR PIPE WITH SHOE ~8 1 A


75 G5 G5 GUIDE FOR PIPE WITH SHOE 10 18 1 A
76 G6 G6-8-A GUIDE FOR VERTICAL PIPING FOR UNINSULATED PIPE 1 8 1 2
77 G7 G7-8-A GUIDE FOR VERTICAL PIPING FOR INSULATED PIPE 1 8 1 2
78 G8 G8-16 GUIDE FOR VERTICAL PIPING 10 24 1 2
79 GUS1 GUS1 GUSSET FOR PIPE SIZE 1.1/2" AND SMALLER ~ 1.1/2 1 A
80 GUS2 GUS2 GUSSET FOR PIPE SIZE 1.1/2" AND SMALLER ~ 1.1/2 1 A
81 GUS3 GUS3 GUSSET FOR PIPE SIZE 1.1/2" AND SMALLER ~ 1.1/2 1 A
82 GUS4 GUS4 GUSSET FOR PIPE SIZE 1.1/2" AND SMALLER ~ 1.1/2 1 A
83 GUS5 GUS5 GUSSET FOR ORIFICE FLANGE TAP VALVE ~ 1.1/2 1 A
84 GV4 GV4-6 GUIDE SUPPORT FOR VIBRATION PIPING ~8 1 2
85 GV5 GV5-12 GUIDE SUPPORT FOR VIBRATION PIPING 10 18 1 2
86 GV6 GV6-12 GUIDE SUPPORT FOR VIBRATION PIPING (ON EMBEDDED PLATE) 10 24 1 2
87 H3 H3-A-900-1500 HANGER-TRAPEZE 1 2
88 H4 H4-A-900-1500 HANGER-TRAPEZE 1 2
89 HD1 HD1-6-3 HOLD-DOWN FOR UNINSULATED PIPE (FABRICATED AT FIELD) ~ 36 1 2
90 HD5 HD5-6-3 HOLD-DOWN FOR UNINSULATED PIPE ~ 36 1 2
91 HD7 HD7-6-100-150-3 HOLD-DOWN FOR INSULATED PIPE ~ 36 1 2
92 HOS1 HOS1-A-01 HOSE STATION SUPPORT 2 2
93 MC1 MC1-A-65 MISCELLANEOUS SUPPORT 1 2
94 MC2 MC2-A-65 MISCELLANEOUS SUPPORT 1 2
95 MC3 MC3-A-65 MISCELLANEOUS SUPPORT 1 2
96 MC4 MC4-A-65 MISCELLANEOUS SUPPORT 1 2
97 MC5 MC5-A-65 MISCELLANEOUS SUPPORT 1 2
98 MC6 MC6-A-65-1.5 MISCELLANEOUS SUPPORT 1 2
99 MC7 MC7-900-1500 MISCELLANEOUS SUPPORT 1 2
100 MC8 MC8-900-1500 MISCELLANEOUS SUPPORT 1 2
101 PSV1 PSV1-6 SUPPORT FOR PSV 2 24 1 1
102 PSV2 PSV2-6 SUPPORT FOR PSV (PAD TYPE) 2 24 1 1
103 PU1 PU1-A-4 PICK-UP 1 A
104 PU2 PU2-A-6 PICK-UP 1 A
105
106
PU3
RC1
PU3-A-4:6-1500
RC1
PICK-UP
RISER CLAMP FOR PIPE 3/4 4
1
1
A
2
02
107 S1 S1-300 SHOE ~8 1 2
108 S2 S2-300-12 SHOE 10 18 1 2
109 S3 S3-300-20 SHOE 20 60 1 2
110 S8 S8-800-8A CLAMP-ON SHOE ~8 1 2
111 S9 S9-300-12A CLAMP-ON SHOE 10 18 1 2
112 S10 S10-300-20A CLAMP-ON SHOE 20 26 1 2
113 SSP1 SSP-36-300 S.S. SLIDE PLATE FOR PIPE SIZES 10" AND LARGER 10~ 1 2 ADDED
114 SSP2 SSP-36-300 S.S. SLIDE PLATE FOR BASE SUPPORTS 1 2 ADDED
115 ST1 ST1-6-EW DUMMY SUPPORT AT PIPE(DOUBLE) 2 72 1 2
116 ST2 ST2-6-E45N DUMMY SUPPORT (SINGLE) AT PIPE 2 24 1 2
117 ST3 ST3-26-SCH40-800-E45N DUMMY SUPPORT (SINGLE) AT PIPE 26 ~ 1 2
118 ST4 ST4-16-SCH40-800-E45N DUMMY SUPPORT AT PIPE(DOUBLE) 2~ 1 2
119 STP1 STP1-6-EW DUMMY SUPPORT (DOUBLE) WITH PAD AT PIPE 2 72 1 2
120 STP2 STP2-6-E45N DUMMY SUPPORT (SINGLE) WITH PAD AT PIPE 2 24 1 2
121 STP3 STP3-26-SCH40-800-E45N DUMMY SUPPORT (SINGLE) WITH PAD AT PIPE 2~ 1 2
122 STP4 STP4-16-SCH40-800-E45N DUMMY SUPPORT (DOUBLE) WITH PAD AT PIPE 2~ 1 2
123 T1 T1-A-02-1 T-POST 1 2
124 T2 T2-A-01-1 T-POST 1 B
125 T3 T3-B-03-1 T-POST 1 A
126 T4 T4-A-02 STANCHION 1 A
127 TSP1 TSP1-36-300 TEFLON SLIDE PLATE 2~ 1 1
128 TSP2 TSP2-12 TEFLON SLIDE PLATE FOR BASE PLATE 1 1
129 UB1 UB1-2A(-S) U-BOLT 1/2 24 1 A
130 WL1 XP1 STIFFNER PLATE FOR BASE SUPPORT 1 1
131 WP1 WP1 CORROSION PROTECTION PLATE FOR STAINLESS STEEL PIPE 1 2
132 WP2 WP2-1-24(-450) BEARING PLATE FOR UNINSULATED METALLIC PIPE 1 2
133 XP1 XP1 STIFFNER PLATE FOR BASE SUPPORT 1 1
APPENDIX V - THE LIST OF SUPPORT TYPES FOR VESSEL
PIPE SIZE
RANGE SH'T
NO TYPE MARK NO. TITLE REV REMARK
Q'TY
FROM TO

1 VCN1 VCN1-1-TOS EL. VESSEL SUPPORT FOR CANTILEVER ~ 1.1/2 1 A


2 VCN2 VCN2-2 VESSEL SUPPORT FOR CANTILEVER FOR SPRAY RING PIPES 1 A
3 VCN3 VCN3-A-X VESSEL SUPPORT FOR CANTILEVER FOR HOR. PIPING 2 A
4 VG1 VG1-8-C-TOS EL. VESSEL SUPPORT FOR GUIDE FOR UNINSULATED 2 8 1 A
5 VG2 VG2-8-TOS EL. VESSEL SUPPORT FOR GUIDE FOR INSULATED 2 8 1 A
6 VG3 VG3-16-TOS EL. VESSEL SUPPORT FOR GUIDE 10 ~ 2 A
7 VH1 VH1-A-12-1500-TOS EL. VESSEL SUPPORT FOR HANGER 12 ~ 2 A
8 VH2 VH2-12-1500-TOS EL. VESSEL SUPPORT FOR HANGER 12 ~ 2 2
9 VH3 VH3-28-TOS EL. VESSEL SUPPORT FOR HANGER (MAX. LOAD 20 TON THRU 40 TON) 12 ~ 2 2 02
10 VR1 VR1-6-TOS EL. VESSEL SUPPORT FOR RESTING 2 6 1 A
11 VR2 VR2-8-TOS EL. VESSEL SUPPORT FOR RESTING 8 10 1 A
12 VR3 VR3-A-12-TOS EL. VESSEL SUPPORT FOR RESTING 12 ~ 2 A
13 VR4 VR4-12-TOS EL. VESSEL SUPPORT FOR RESTING 12 ~ 2 2
14 VR5 VR5-28-TOS EL. VESSEL SUPPORT FOR RESTING 12 ~ 2 2
15 VR11 VR11-A-800 VESSEL SUPPORT FOR RESTING AT HOR. PIPING MAX. LOAD : 1500 KG AND SMALLER 2 A
16 VR12 VR12-A-1500 SUPPORT AT VESSEL CLIP DETAIL 2 A

You might also like