Project Brief

DASKA – PASRUR ROAD (27.08 KM)

FLOOD EMERGENCY RECONDTRUCTION & RESILIENCE PROJECT


Asian Development Bank (ADB) ASSISTED (LOAN NO 3264-PAK)
PROJECT COORDINATION UNIT (PCU),
PLANNING & DEVELOPMENT DEPARTMENT, GOVT. OF THE PUNJAB

Submitted to:
Mr. Tauseef Younis

Submitted by:
Muhammad Waqar Ashraf Dar
(MSPM_03_298181_032)
Amir Rashid
(MSPM_03_298181_004)

2nd Semester

Bahria University, Lahore Campus (BULC)


47-C Civic Center Johar Town, Lahore.
Project Silent Feature:

Content Description
Name Of Project Flood Emergency Recondtruction & Resilience Project- Adb Assisted (Loan
No 3264-Pak)
Location Daska – Pasrur City
Project Sponsor Asian Development Bank
Project Client C&W Department, Government Of Punjab
Project Contractors Rustum Associates – Dynamic Constructors
Project Duration 10 Months
Cost Of Project Rs.1071.857 Million
Formation Width 40 Feet
Sand Cushion 12 Inch
Metaled Width 20 Feet
Treated Shoulder 04 Feet (Either Side)
Subbase 08 Inch Main Carriageway & 06 Inch Treated Shoulder
Base Course
Carpet 4 ½ Inch Thick (2 ½ Inch ABC & 2 Inch AWC)
Road Structures 01 Bridge Repair
Slab & Pipe Culvert … 26 Nos
Redacting Of Existing Culvert … 13 Nos
Drain … 11 KM

Project Location:
Summary of Works:
Work Detail Specs
Proposed Pavement design for new construction
Asphalt Concrete wearing course 2.0 Inch
Asphalt Concrete Base Course 2 ¾ Inch
Water Bound Macadam 9 ½ Inch
Granular Subbase 8.0 Inch
Capillary Cutt of layer 8.0 Inch
Sub-grade CBR 7.0 %
Proposed Pavement design for overlay
Asphaltic concrete wearing course 2.0 Inch
Asphalt Concrete Base Course 2 ¾ Inch
Water Bound Macadam 9 ½ Inch