D8.1
400KV SC AND DC – VOLUME 2
SCHEDULE D (continued)
(to be completed by the Tenderer)
Shear on bolts
Bearing on bolts
D8.2
400KV SC AND DC – VOLUME 2
SCHEDULE D (continued)
(to be completed by the Tenderer)
or
At two attachments:
and
D9.1
400KV SC AND DC – VOLUME 2
SCHEDULE D (continued)
(to be completed by the Tenderer)
phase 80000
or
earth 22000
At two attachments:
and
phase Newton 0
or
earth Newton 0
D9.2
400KV SC AND DC – VOLUME 2
SCHEDULE D (continued)
(to be completed by the Tenderer)
Maintenance condition
Maintenance condition:
D10.1
400KV SC AND DC – VOLUME 2
SCHEDULE D (continued)
(To be completed by the tenderer)
Type of tower XA XB XC XD XE XT
Type of insulator sets Vee Vee Tension Tension Tension Tension Tension Suspension
Trans-
suspension suspension Dead end position
Basic span length m 450 650 450 450 450 450 450 450
Minimum ground clearance of line m 8.5 8.5 8.5 8.5 8.5 8.5 8.5 8.5
conductor at 90°C, normal ground
Sag of line conductor in span length assumed m 18.22 33.50 18.22 18.22 18.225 18.22 18.22 18.22
at 90°C
offered m
crossarm offered m - - - - - -
Height of earthwires above line minimum m 8.9 8.9 7.0 7.0 7.0 7.0 7.0 8.9
conductor at tower
offered
Horizontal spacing between adjacent minimum m 9.0 10.0 9.0 9.0 9.0 9.0 9.0 9.0
400KV SC AND DC – VOLUME 2
Type of tower XA XB XC XD XE XT
Type of tower XA XB XC XD XE XT
6 m extended tower kg -
12 m extended tower kg - - - - - - -
24 m extended tower kg - - - - - - -
D11.3
30 m extended tower kg - - - - - - -
36 m extended tower kg - - - - - - -