Model number
Serial number
Additional requirements for the use of this equipment Details of additional requirements
☐ Specialised Training ☐ Restricted area / users
☐ Documented Safe Work ☐ Usage log book
Instruction (SWI) ☐ Other (provide details)
☐ Maintenance / service contract
Consequence: C
a. Catastrophe; numerous fatalities; major disruption of activities 100 Extreme Risk
This equipment must not be
CONSEQUENCE b. Disaster; multiple fatalities 50 >500 used. An alternative must be
Most probable c. Very serious; fatality 25 found.
result of the d. Serious; permanent disability 15
potential accident. e. Moderate; serious but non-permanent disability 5
High Risk
f. Minor; minor cuts, bruises, burns (first aid treatment required) 1 Further controls must be
300 – 499 implemented in order to reduce
Exposure: E the risk score.
Requires management approval.
a. Continuously (or many times daily) 10
EXPOSURE b. Frequently (approximately once daily) 6
Substantial Risk
The frequency of c. Occasionally (from once per week to once per month) 3 Further controls must be
exposure to the 100 – 299 considered in order to reduce the
d. Infrequent (from once per month to once per year) 2
hazard. risk score. Requires management
e. Rarely (once every 2 - 4 years) 1 approval.
f. Very rarely (once every 5 years or more) 0.5 Medium Risk
Probability: P Requires management .
50 - 99 oversight and approval.
PROBABILITY a. Almost certain or expected result 10
Likelihood that the b. Quite possible / not unusual 6
consequence will
occur once the c. Would be an unusual sequence or coincidence 3
individual is d. Would be a remotely possible coincidence 1 Low Risk
exposed to the 10 - 49 Manage by routine
e. Has never happened after many years of exposure, but is conceivable 0.5 procedures. Caution must be
hazard. observed.
f. Practically impossible sequence (has never happened) 0.1
RISK SCORE
CALCULATIONS: CONSEQUENCE (C) X EXPOSURE (E) X PROBABILITY = RISK SCORE
(P)
15 WORKING AT HEIGHTS: Are you required to work above floor level to access the equipment, either for operation or servicing? ☐ ☐
16 WORKING IN ISOLATION: Will the equipment be operated in isolated areas or after hours? ☐ ☐
17 OFF SITE LOCATIONS: Is the equipment portable and intended for use off-site (i.e. at non-RMIT premises)? ☐ ☐
OTHER: Does the equipment involve any other hazards not listed above?
If yes, individually list each hazard below and assess risks in Sections 4 and 5
18 ☐ ☐
19
20
Notes: 1. Consult the Risk Assessment Instructions and guidelines document (SEH-RA-001) for more information on identifying hazards.
2. If radiation sources or lasers are present, you must contact the RSO or LSO and complete the relevant Radiation or Laser Risk Assessment form.
Author: Technical Team OHS SEH College
Form No.: SEH-RA-002
Version: 002 Date: 15/01/2018 Page 4 of 7
RISK ASSESSMENT: EQUIPMENT: SEH-RA-002
SECTION 4: RISK ASSESSMENT
Initial Risk Score and Rating (without any controls)
Hazards (Refer to risk score matrix in Section 2)
(from Section 3)
Associated Risks
Hazard Brief description (resulting in damage, injury or illness) Rating
number Score (low, medium etc)
C E P (C x E x P)
Hazard Risk control measures required to reduce the risk Residual Risk Score (after controls) Residual Risk Person
(from Section 4) (Refer to risk score matrix in Section 2) Rating responsible for
(low, implementing
Select risk Details of risk controls Score
control(s) C E P medium etc) controls
(provide a brief description) (CxExP)
☐Elimination
☐Substitution
☐Isolation
☐Engineering
☐Administration
☐PPE
☐Elimination
☐Substitution
☐Isolation
☐Engineering
☐Administration
☐PPE
☐Elimination
☐Substitution
☐Isolation
☐Engineering
☐Administration
☐PPE
Note: Add more rows as required.
SECTION 6: APPROVAL
Position Name Signature Date
Click here to enter a date.
Technical / Research Officer
Click here to enter a date.
Supervisor
Area / Facility Manager (required if residual risk Click here to enter a date.
scores for any hazard in Section 5 is 50 or
above)
SECTION 7: REVIEW
Risk assessment should be reviewed if any changes to the activity are made or otherwise every 3 years from date of approval (new version number required).