PRE-FEASIBILITY REPORT

for
PROPOSED 1X18 MW CAPACITY BIOMASS BASED
THERMAL POWER PLANT
at
Village-Sedha singh Wala, Tehsil-Jaito, District-Faridkot
by

M/s Sukhbir Agro Energy Limited


EIA Consultant

SMS Envocare ltd.


(A QCI - NABET Accredited Environmental Consultant)
301, Pentagon P3, Magarpatta City Hadapsar,
Pune-411028, Maharastra
PROPOSED 18 MW BIOMASS BASED THERMAL POWER
PLANT AT VILL. SEDHA SINGH WALA, TEHSIL- JAITU,
PRE-FEASIBILITY REPOORT
DISTRICT- FARIDKOT, PUNJAB BY M/S SUKHBIR AGRO
ENERGY LIMITED

INDEX
Point No Particular Page No
1. EXECUTIVE SUMMARY
1.1 Introduction 1
1.2 Project Proponent 2
2 BACKGROUND INFORMATION
2.1 Identification of Project 3
2.2 Statuary Requirement 4
2.3 Need for the project and its importance to the country and 4
or region & Demand-Supply Gap
2.4 Employment Generation (Direct and Indirect) due to the 5
project
3 PROJECT DESCRIPTION
3.1 Type of project including interlinked and interdependent 7
projects, if any.
3.2 Location (map showing general location, specific location, 7
and project boundary & Project site layout) with
coordinates.
3.3 Details of alternate sites considered and the basis of 12
selecting the proposed site, particularly the environmental
considerations gone into should be highlighted.
3.4 Size or magnitude of operation 12
3.5 Project description with process details (a schematic 12
diagram/ flow chart showing the project layout,
components of the project etc. Should be given).
3.6 Raw material required along with estimated quantity, likely 16
source, marketing area of final product/s, Mode of transport
of raw Material and Finished Product.
3.7 Resource optimization/recycling and reuse envisaged in the 17
project, if any, should be briefly outlined.
3.8 Availability of water its source, Energy/ power requirement 17
and source should be given.
3.9 Quantity of wastes to be generated (liquid and solid) and 17
scheme for their Management/ disposal.
3.10 Schematic representation of the feasibility drawing 16
4 SITE ANALYSIS
4.1 Connectivity 19
4.2 Land Form, Land use and Land ownership 19
4.3 Topography 19
4.4 Existing land use pattern (agriculture, non-agriculture, 19

SMS Envocare Limited Page 1


PROPOSED 18 MW BIOMASS BASED THERMAL POWER
PLANT AT VILL. SEDHA SINGH WALA, TEHSIL- JAITU,
PRE-FEASIBILITY REPOORT
DISTRICT- FARIDKOT, PUNJAB BY M/S SUKHBIR AGRO
ENERGY LIMITED

forest, water bodies (including area under CRZ)), shortest


distances from the periphery of the project to periphery of
the forests, national park, wild life sanctuary, eco sensitive
areas, water bodies (distance from the HFL of the river),
CRZ. In case of notified industrial area, a copy of the Gazette
notification should be given.
4.5 Existing Infrastructure 20
4.6 Soil classification 20
4.7 Climatic data from secondary sources 20
5 PLANNING BRIEF
5.1 Planning Concept (type of industries, facilities, 20
transportation etc) Town and Country Planning/
Development authority Classification.
5.2 Population Projection 21
5.3 Land use planning (breakup along with green belt etc.) 21
5.4 Assessment of Infrastructure Demand (Physical & Social) 21
5.5 Amenities/Facilities 21
6 PROPOSED INFRASTRUCTURE
6.1 Industrial Area(Processing Area) 21
6.2 Residential Area 22
6.3 Green Belt 22
6.4 Social infrastructure 22
6.5 Connectivity (Traffic and Transportation Road/ Rail/ 22
Metro/Water ways etc.)
6.6 Drinking Water Management (Sources & Supply of Water) 22
6.7 Sewerage System 22
6.8 Industrial Waste Management/Solid Waste Management 22
6.9 Power requirement & Supply/Source 22
7 REHABILITATION & RESETTLEMENT (R & R PLAN) 23
8 PROJECT SCHEDULE & COST ESTIMATES
8.1 Likely date of start of construction and likely date of 23
Completion (Time schedule for the project to be given)
8.2 Estimated project cost along with analysis in terms of 23
economic viability of
the project.
9 ANALYSIS OF PROPOSAL
9.1 Financial and Social benefits with special emphasis on the 24
benefits of the local people including trial population, if any ,
in the area

SMS Envocare Limited Page 2


PROPOSED 18 MW BIOMASS BASED THERMAL POWER
PLANT AT VILL. SEDHA SINGH WALA, TEHSIL- JAITU,
PRE-FEASIBILITY REPOORT
DISTRICT- FARIDKOT, PUNJAB BY M/S SUKHBIR AGRO
ENERGY LIMITED

List of Tables

Table No. Particulars Page No


1. Board of Directors 2
2. Employment for Plant Operation 5
3. Employment for Plant Maintenance 6
4. Design Parameter of Boiler 14
5. Specification of Turbo Generator 14
6. Specification of Steam Balance 15
7. Compatibility of Boilers & Steam Turbine 15
8. Material: Paddy Straw 16
9. Waste to be generated 16
10. Land Bifurcation 21
11. Project Cost 23

List of Figures

Figure No. Particulars Page No


1. Google image of Proposed Area 3
2. Location Map 8
3. Khasara Map 9
4. 10 Km Radius Google map 10
5. 10 Km Toposheet map 11
6. Heat Flow Diagram 13
7. Layout Plan 18

SMS Envocare Limited Page 3


PROPOSED 18 MW BIOMASS BASED THERMAL POWER
PLANT AT VILL. SEDHA SINGH WALA, TEHSIL- JAITU,
PRE-FEASIBILITY REPOORT
DISTRICT- FARIDKOT, PUNJAB BY M/S SUKHBIR AGRO
ENERGY LIMITED

1. EXECUTIVE SUMMARY
S.No. Details Information
1. Name of the Project 18 MW Biomass Based Thermal Power Plant of M/s.
Sukhbir Agro Energy Limited
2. Regulatory 1(d ) Thermal Power Plants as per EIA notification 2006
Framework
3. Category ‘B’ Category (> 15 MW plants based on biomass fuel)
4. Location Khasara No. 206, 207, 214, 170, 171, 204, 205,571/172,
159,160, 161/1, 173, 174,572/172 at Village Sedha Singh
Wala, Tehsil-Jaito, District-Faridkot, Punjab
5. Toposheet No. 44J/14, 44 J/15, 44 N/2 & 44 N/3
6. Capacity 1 X18 MW Biomass Based Thermal Power Plant
7. Name of Project M/s Sukhbir Agro Energy Limited
Proponent
8. Area Requirement Particulars Area in SQM
Built-up Land 16500
Road Development 12000
Green Belt 35200.73
Storage Biomass 37000
Open Areas 5853
Total Area 106553.73
9. Water Requirement Total Cooling Water Circulation will be 6000 CuM/Hr i.e.
Capacity of Cooling Towers. Evaporation Loss will depend
on season and will vary from 3-4%. Considering 3.5% loss,
make-up water requirement will be 210 CuM/Hr. After
adding requirement of Water for Green Belt Development
& Human consumption, total requirement of Water has
been estimated at 225 CuM/Hr.
10. Power 10 to 11 % of total power generation
Requirement
11. Man Power 123 (Skilled/Semi-Skilled/Unskilled)
12. Project Cost 141.25Crore

SMS Envocare Ltd Page 1


PROPOSED 18 MW BIOMASS BASED THERMAL POWER
PLANT AT VILL. SEDHA SINGH WALA, TEHSIL- JAITU,
PRE-FEASIBILITY REPOORT
DISTRICT- FARIDKOT, PUNJAB BY M/S SUKHBIR AGRO
ENERGY LIMITED

1.1 Introduction

M/s Sukhbir Agro Energy Limited has proposed Biomass based Thermal Power Plant with
capacity of 18 MW at Village Sedha Singh Wala, Tehsil-Jaitu, District- Faridkot Punjab.
Paddy Straw will be used as Raw material for this proposed project
1.2 Project Proponent
M/s. Sukhbir Agro Energy Limited has more than 30 Year experience in agriculture & agro-
based industries. The Company was incorporated in 1999 as a Private Limited Company
and in 2006 reconstituted as a Limited Company. The first Venture of the group was setting
up of Rice mill in 1977.The major expansion and diversification was carried out during
2006 by setting up an integrated Food processing unit and 15 MW biomass based power
plant at Fatehullapur, Ghazipur, UP & 14.5 MW at Lambi, near Bhatinda,Punjab.

Subsequently, SAEL diversified into Grid connected Solar Power Generation 20 MW (AC) in
district Mahoba (UP), 20 MW + 10 MW in District Lalitpur (UP). Also a 20 MW Grid
Connected Solar Power Plant was installed and commissioned in December, 2017 at
Solapur, Maharashtra. List of Board of Directors is given below:

Table No.1: List of Board of Directors


S.No. Name Designation
1 Mr. Jasbir Singh Awla Managing Director
2 Mr. Sukhbir Singh Awla Whole time Director
3 Mr. Ramesh Singh Dhir Director
4 Mr. Munish Kumar Dhir Director
5 Mr. Randeep Singh Grewal Independent Director
6 Mr. Bhagat Singh Independent Directors
7 Mr. Harbhajan Singh Professional Director
8 Dr. Sanjeevan Bajaj Independent Woman Director
Source: DPR

SMS Envocare Ltd Page 2


PROPOSED 18 MW BIOMASS BASED THERMAL POWER
PLANT AT VILL. SEDHA SINGH WALA, TEHSIL- JAITU,
PRE-FEASIBILITY REPOORT
DISTRICT- FARIDKOT, PUNJAB BY M/S SUKHBIR AGRO
ENERGY LIMITED

2. BACKGROUND INFORMATION
2.1 Identification of Project

Proposed Power plant project is located on Khasara No. 206, 207, 214, 170, 171, 204,
205,571/172, 159,160, 161/1, 173, 174,572/172 at Vill: Sedha Singh Wala, Tehsil -Jaito,
District Faridkot. This project covers the Toposheet no. 44J/14, 44 J/15, 44 N/2 & 44 N/3&
the geographical location of the project is 30°27’22.8"N & 74°56'16.2"E.

Figure No. 1 Google image of Proposed Area

SMS Envocare Ltd Page 3


PROPOSED 18 MW BIOMASS BASED THERMAL POWER
PLANT AT VILL. SEDHA SINGH WALA, TEHSIL- JAITU,
PRE-FEASIBILITY REPOORT
DISTRICT- FARIDKOT, PUNJAB BY M/S SUKHBIR AGRO
ENERGY LIMITED

2.2 Statuary Requirement

As per the Schedule attached to the EIA Notification 2006 the proposed project is covered
under Project or Activity of 1(d), namely “Thermal Power Plants” requiring prior
Environmental Clearance (EC). This proposed project categorized as Category B (>15 MW
based on biomass fuel) requiring Environmental Clearance.

The proposed Project will therefore require prior Environmental Clearance (EC) from the
State Government in the SEIAA on the recommendations of State Expert Appraisal
Committee (SEAC) constituted by the Central Government for the purposes of this
notification.

2.3 Need for the project and its importance to the country and or region & Demand-
Supply Gap

Electricity known to be vital utility & stimulating the economic development of the nation.
India has witnessed significant growth in power generation sector. However, the demand
has escalated so high in spite of high generation. The thermal power always has major
component among the different type of power generation in India.

Renewable energy sector in India has emerged as a significant player in the grid connected
power generation capacity. It supports the government agenda of sustainable growth,
while, emerging as an integral part of the solution to meet the nation’s energy needs and an
essential player for energy access. It has been realized that renewable energy has to play a
much deeper role in achieving energy security in the years ahead and be an integral part of
the energy planning process

Punjab being agriculture state has immense potential for energy generation from agro
residue. Total aggregated capacity of the grid connected Rice Straw based with Water
Cooled Condenser projects to be developed shall be 200 MW. Project developer can set up
the plant anywhere in any Tehsil of Punjab in which Rice Straw is available for setting up
biomass power project of capacity 6 MW to 20 MW at each site.

SMS Envocare Ltd Page 4


PROPOSED 18 MW BIOMASS BASED THERMAL POWER
PLANT AT VILL. SEDHA SINGH WALA, TEHSIL- JAITU,
PRE-FEASIBILITY REPOORT
DISTRICT- FARIDKOT, PUNJAB BY M/S SUKHBIR AGRO
ENERGY LIMITED

In State, 6.6 Million acres of land under paddy cultivation in Punjab. An acre of land yields
about 2 MT of crop residue. Thus, the aggregate crop residue comes to approximately 13.2
Million Tonnes of which more than 90 per cent paddy straw is burnt. With the above
Paddy Straw, it may be possible to generate over 10 Million Mw-Hr of Power.

In order to manage this increasing demand supply gap, Punjab Energy Development
Agency promoting the development of Renewable energy projects in Punjab.

To harvest the current opportunity M/s Sukhbir Agro Energy Limited initiated Submitted
the proposal & proceedings for setting up of Biomass based thermal power plants in
Punjab. In response to that proposal PEDA allotted 2 thermal power plants project based
bio-mass. The letter of Award is 6226 dated 19.02.2016 from PEDA.

2.4 Employment Generation (Direct and Indirect) due to the project

The Biomass Based Thermal Power Project will generate employment in the surroundings
for the local people during the construction as well as during operation period.
Unskilled/semi-skilled manpower related to industrial activities will be drawn locally or
from nearby places. Preference during recruitment will be given to the people of
surrounding areas according to their qualification and experience. Apart from direct
employment, indirect employment opportunity in term of transport operation, repair
garages, various ancillaries, shops & market etc. will be generated. Total 123 people will be
directly hired in the facility.

Table No. 2 Employment for Plant Operation


Sl. No. Item Total Heads Deployed

1. Plant Head 1

2. Shift Engineer 4
3. DM Plant Operator 4
4. Fuel Handling plant Operator 7

SMS Envocare Ltd Page 5


PROPOSED 18 MW BIOMASS BASED THERMAL POWER
PLANT AT VILL. SEDHA SINGH WALA, TEHSIL- JAITU,
PRE-FEASIBILITY REPOORT
DISTRICT- FARIDKOT, PUNJAB BY M/S SUKHBIR AGRO
ENERGY LIMITED

5. Boiler DCS Operator 4


6. Boiler Field Operator 7
7. Turbine Field operator 4
8. Turbine DCS Operator 4
9. Loader / Dumper Operator 7
10. Tractor & Trailer Operator 7
11. Tractor & Trailer Helper 7
12 Operator at Sub-station / Meter Room 4
13. Chemist 1
14. Lab Assistant 3
Total 64

Table No. 3 Employment for Plant Maintenance


Sl. No. Item Total Heads Deployed
1. Mechanical Engineer 1

2. Technician – Mechanical 7

3. Welder / Fitter 4

4. Electrical Engineer 1

5. Technician – Electrical 7
6. Instrument Engineer 1

7. Instrument Technician 4

8. Helpers 7
9. Store Clerk 5
10. Purchase Assistant 1

Total 38
Source: DPR

SMS Envocare Ltd Page 6


PROPOSED 18 MW BIOMASS BASED THERMAL POWER
PLANT AT VILL. SEDHA SINGH WALA, TEHSIL- JAITU,
PRE-FEASIBILITY REPOORT
DISTRICT- FARIDKOT, PUNJAB BY M/S SUKHBIR AGRO
ENERGY LIMITED

3. PROJECT DESCRIPTION
3.1 Type of project including interlinked and interdependent projects, if any.

SAEL proposed to set up a 18 MW Biomass based Thermal power Plant to meet the power
demand. This proposed project is purely independent not interlinked with any project.

3.2 Location (map showing general location, specific location, and project boundary
& Project site layout) with coordinates.

Proposed Power plant project is located on Khasara No. 206, 207, 214, 170, 171, 204, 205,
571/172, 159,160, 161/1, 173, 174,572/172 at Vill- Sedha Singh Wala, Tehsil -Jaitu, District
Faridkot, Punjab. This project covers the Toposheet no. 44J/14, 44 J/15, 44 N/2 & 44 N/3.
The Geographical location of the project is 30°27’22.8"N & 74°56'16.2"E.

SMS Envocare Ltd Page 7


PROPOSED 18 MW BIOMASS BASED THERMAL POWER
PLANT AT VILL. SEDHA SINGH WALA, TEHSIL- JAITU,
PRE-FEASIBILITY REPOORT
DISTRICT- FARIDKOT, PUNJAB BY M/S SUKHBIR AGRO
ENERGY LIMITED

Figure No. 2 Location Map of Proposed Agro-based Power Plant

SMS Envocare Ltd Page 8


PROPOSED 18 MW BIOMASS BASED THERMAL POWER
PLANT AT VILL. SEDHA SINGH WALA, TEHSIL- JAITU,
PRE-FEASIBILITY REPOORT
DISTRICT- FARIDKOT, PUNJAB BY M/S SUKHBIR AGRO
ENERGY LIMITED

Figure No. 3: View of Khasara Map

SMS Envocare Ltd Page 9


PROPOSED 18 MW BIOMASS BASED THERMAL POWER
PLANT AT VILL. SEDHA SINGH WALA, TEHSIL- JAITU,
PRE-FEASIBILITY REPOORT
DISTRICT- FARIDKOT, PUNJAB BY M/S SUKHBIR AGRO
ENERGY LIMITED

Figure No.4: 10 Km Radius Google map

SMS Envocare Ltd Page 10


PROPOSED 18 MW BIOMASS BASED THERMAL POWER
PLANT AT VILL. SEDHA SINGH WALA, TEHSIL- JAITU,
PRE-FEASIBILITY REPOORT
DISTRICT- FARIDKOT, PUNJAB BY M/S SUKHBIR AGRO
ENERGY LIMITED

Figure No.5: 10 Km Toposheet Map

SMS Envocare Ltd Page 11


PROPOSED 18 MW BIOMASS BASED THERMAL POWER
PLANT AT VILL. SEDHA SINGH WALA, TEHSIL- JAITU,
PRE-FEASIBILITY REPOORT
DISTRICT- FARIDKOT, PUNJAB BY M/S SUKHBIR AGRO
ENERGY LIMITED

3.3 Details of alternate sites considered and the basis of selecting the proposed site,
particularly the environmental considerations gone into should be highlighted.
No other alternative site identified/considered as selected site found techno-economically
and environmentally feasible for development of proposed project.
3.4 Size or magnitude of operation
The proposed biomass based thermal power plant has capacity of 18 MW based on 100%
paddy straw. The proposed project cover 106553.73 Sq.M (26.33Acres) of land & the
project cost is 141.25 Crore.
3.5Project description with process details (a schematic diagram/ flow chart
showing the project layout, components of the project etc. Should be given).
Power generation process is based on combustion technology with Rankine Steam cycle.
For Power generation in thermal power plant is achieved by steam generation at high
temperature and pressure which is then used to run a turbine to generate electricity. Paddy
straw will used as fuel for steam generation. Steam generation requires heating
demineralized water in the boiler at high temperature and pressure. Steam at high
temperature 540 ̊C and high pressure (95 Kg/cm2) is fed to rotate the turbine to generate
power. Spent steam is converted into condensate by cooling in heat exchanger. Cooling
water used in heat exchanger is cooled in the cooling tower.
Paddy Straw for generation of 1 Kw-Hr Power, the same has been estimated at 1.20 kg. This
has been based on Boiler efficiency of 75%, Station Heat Rate of 2313.25 Kcal/Kw-Hr
requirement of Steam for generation of 1 Mw-Hr of Power has been estimated at 3.805
TPH. Thus for generating 18 MW Power, total hourly requirement of Steam comes to 3.805
x 18 =68.49 TPH. As against this, MCR of Boiler is 80 TPH. The detail description of
process is attached in Annexure 1.

SMS Envocare Ltd Page 12


PROPOSED 18 MW BIOMASS BASED THERMAL POWER
PLANT AT VILL. SEDHA SINGH WALA, TEHSIL- JAITU,
PRE-FEASIBILITY REPOORT
DISTRICT- FARIDKOT, PUNJAB BY M/S SUKHBIR AGRO
ENERGY LIMITED

Figure No 6: Heat Flow Diagram of Proposed Project

SMS Envocare Ltd Page 13


PROPOSED 18 MW BIOMASS BASED THERMAL POWER
PLANT AT VILL. SEDHA SINGH WALA, TEHSIL- JAITU,
PRE-FEASIBILITY REPOORT
DISTRICT- FARIDKOT, PUNJAB BY M/S SUKHBIR AGRO
ENERGY LIMITED

Boiler
Technical Parameters of Travelling Grate Boiler will be given below:
Table No. 4: Details of Design Parameter of Boiler
Design Parameters Unit Design
Boiler Parameters ( 100% BMCR) Steam flow at main Steam TPH 80
Stop Valve Outlet
Steam pressure at main Steam Stop Valve Outlet Kg/cm2 (g) 95
Steam temperature at main Steam Stop Valve outlet at 100% Deg.C 540
MCR
Feed Water Temperature at Boiler Inlet Deg.C 225
Design Code for Pressure Parts IBR
Source: DPR

Boiler will be operating with Paddy Straw having GCV of 2800 Kcal/Kg.

Steam Turbine Generator


Table No. 5: Details of Specification of Turbo Generator
Particulars Specification
Type of Steam Turbine Will be a slow speed Turbine ( 3000 RPM) & will
be directly coupled to Generator Gear Box
Output 18 MW
Operating Condition Speed 6300 rpm
Inlet Steam Pressure 90 Kg/cm2
Inlet Steam temperature 5350C
Exhaust Steam Pressure 0.0094 Mpa ( 0.096 Kg/cm2)
Feed Water Temperature after 225 deg C
deaerator
Inlet Steam Flow 68.5 T / Hour
Calculated Steam Rate 3.805 Kg / Kw-Hr
Calculated Heat Rate 2313.25 Kcal/ Kw-Hr
Source: DPR

SMS Envocare Ltd Page 14


PROPOSED 18 MW BIOMASS BASED THERMAL POWER
PLANT AT VILL. SEDHA SINGH WALA, TEHSIL- JAITU,
PRE-FEASIBILITY REPOORT
DISTRICT- FARIDKOT, PUNJAB BY M/S SUKHBIR AGRO
ENERGY LIMITED

Steam Balance:
The utilization of Steam would be as given below:

Table No. 6: Details of Specification of Steam Balance


Sl. No. Particulars Specification
1. Steam Turbine Rating 18 MW
2. Requirement of Steam at 100% PLF as per 68.5 TPH
BHEL’s Specification
3. Boiler Capacity 80 TPH
4. Balance Steam Available 11.5
5. Utilization of Boiler at Full Load of STG 85.63 %
Source: DPR
Compatibility of Boilers & Steam Turbine
Table No. 7: Details of Compatibility of Boilers & Steam Turbine
S. No. Specification Grate Boiler STG
80 TPH ( 18 MW)
1. Steam Pressure
1.1 Steam Pressure at Outlet of Steam 95
Stop Valve [Kg/Cm2(g)]
1.2 Specified Inlet Steam Pressure 90
[Kg/Cm2(g)] at STG
2. Steam Temperature
2.1 Steam Temperature at the outlet of 540
main stream stop valve ( 0C)
2.2 Inlet Steam Temperature to STG (0C) 535
3. Steam Generation / Consumption
3.1 Steam Generation ( T / Hr) 80
3.2 Steam Consumption (T / Hr) 68.5
Source: DPR
3.6 Raw material required along with estimated quantity, likely source, marketing
area of final product/s, Mode of transport of raw Material and Finished Product.

SMS Envocare Ltd Page 15


PROPOSED 18 MW BIOMASS BASED THERMAL POWER
PLANT AT VILL. SEDHA SINGH WALA, TEHSIL- JAITU,
PRE-FEASIBILITY REPOORT
DISTRICT- FARIDKOT, PUNJAB BY M/S SUKHBIR AGRO
ENERGY LIMITED

Fuel proposed for thermal power plant will be Paddy Straw. The maximum consumption of
paddy straw is given below:
Table no. 8 Details of Raw Material: Paddy Straw
Sl. Particulars 2019-20 2020-21 2021-22
no. (4 th Qtr) Onwards
1 st Qtr 2 nd Qtr & 4 th Qtr Total
3 rd Qtr
1. No. of months 3 3 6 3 12 12
operation
2. Plant Capacity in 394.20 394.20 788.40 394.20 1576.80 1576.80
Lac Kw-Hr. ( pro-
rated for No. of
months
operation)
3. PLF 60% 60% 70% 75% 68.75% 75%
4. Total Power 236.52 236.52 551.88 295.65 1084.05 1182.60
Generation in Lac
Kw-Hr.
5. Consumption of 283.82 283.82 662.26 354.78 1300.86 1419.12
Paddy Straw @
1.2 Kg / Kw-Hr in
Lac Kg
6. Consumption of 28382 28382 66226 35478 130086 141912
Paddy Straw in
MT
7. Auxiliary 11% 11% 10% 10% 10%
Consumption
8. Auxiliary 26.02 26.02 55.19 29.57 110.78 118.26
Consumption in
Lac Kw-Hr
9. Exportable Power 210.50 210.50 496.69 266.08 973.27 1064.34
Generation (Sl.
No. 4-8)
Source: DPR
3.7 Resource optimization/recycling and reuse envisaged in the project, if any,
should be briefly outlined.
The waste water generated from power plant will be reused in green belt development &
Dust suppression after proper treatment.

SMS Envocare Ltd Page 16


PROPOSED 18 MW BIOMASS BASED THERMAL POWER
PLANT AT VILL. SEDHA SINGH WALA, TEHSIL- JAITU,
PRE-FEASIBILITY REPOORT
DISTRICT- FARIDKOT, PUNJAB BY M/S SUKHBIR AGRO
ENERGY LIMITED

3.8 Availability of water its source, Energy/ power requirement and source should
be given.
Water: Cooling Water Circulation will be 6000 CuM/Hr (Capacity of Cooling Towers).
Evaporation Loss will depend on season and will vary from 3-4%. Considering 3.5% loss,
make-up water requirement will be 210 CuM/Hr. After adding requirement of Water for
Green Belt Development & Human consumption, total requirement of Water has been
estimated at 225 CuM/Hr. The proposed water will be obtain water from Raunta (Jaitu)
Rajwaha Canal through through pipeline of 2.50 Km length.
Energy: 10 to 11 % of total power generation is required for Power plant. For cold start,
power will be import from Grid through 66 KV Power transmission line of Punjab State
Power Corporation Limited.
3.9 Quantity of wastes to be generated (liquid and solid) and scheme for their
Management/ disposal.
Table No. 9: Details of Waste to be generated (Liquid and Solid)
S. No. Waste Generation Unit Quantity Disposal
1. Ash MT/Annum 42,000 Send to farmers as a
(Fly Ash-20%) manure for crops and
(Bottom Ash-80%) Cement grinding Industry
for their use
2. Waste Water Liter/Day 3659 Used for Dust
Suppression & Green belt
development
Source: DPR

SMS Envocare Ltd Page 17


PROPOSED 18 MW BIOMASS BASED THERMAL POWER
PLANT AT VILL. SEDHA SINGH WALA, TEHSIL- JAITU,
PRE-FEASIBILITY REPOORT
DISTRICT- FARIDKOT, PUNJAB BY M/S SUKHBIR AGRO
ENERGY LIMITED

3.10 Schematic representation of the feasibility drawing

Figure No 7: Layout of Proposed Project

SMS Envocare Ltd Page 18


PROPOSED 18 MW BIOMASS BASED THERMAL POWER
PLANT AT VILL. SEDHA SINGH WALA, TEHSIL- JAITU,
PRE-FEASIBILITY REPOORT
DISTRICT- FARIDKOT, PUNJAB BY M/S SUKHBIR AGRO
ENERGY LIMITED

4.0 SITE ANALYSIS

4.1 Connectivity
Jaitu- Bajakhana Road is passes at a distance of 0.5 km from the main plant area towards
South direction. The nearest railway station is Gangasar Jaito Railway Station which is 8.0
KM away from project site in SW direction. There is no Eco-sensitive Zone i.e. National Park
/ Wildlife Sanctuary /Reserve Forests/ Biosphere reserve or Archaeological/Religious site
are present within the 10 Km radius study area.
4.2 Land Form, Land use and Land ownership
The proposed site is located in Village Vill: Sedha Singh Wala, Tehsil -Jaito, District Faridkot
owned by M/s Sukhbir Agro Energy Ltd. Raunta (Jaitu) Rajwaha Canal is approximately 2
km away from the proposed site.
4.3 Topography
Village Sedha singh Wala is located in the District Faridkot of Punjab state, The topography
of the district is plain with only 1.4% of its area under forest cover, there is no river but
proper network of canal flowing through the district. District is confined within northern
latitudes of 290 54’00” to 340 54’00” and the eastern longitudes of 740 15 ’00” to 750 25’00”
located in the southwestern parts of Punjab state. Proposed Project site is elevated at 685 ft
msl.
District is sub-divided into the following three micro regions on the basis of soil,
topography, climate and natural vegetation.
 Faridkot Hathar-Sadiq-Sandy Plain
 Faridkot: Uttar- Dhudhi-sandy-Loam
 Jaitu Area : Sandy Loam to Loam
4.4Existing land use pattern (agriculture, non-agriculture, forest, water bodies
(including area under CRZ)), shortest distances from the periphery of the project to
periphery of the forests, national park, wild life sanctuary, eco sensitive areas, water
bodies (distance from the HFL of the river), CRZ. In case of notified industrial area, a
copy of the Gazette notification should be given.

SMS Envocare Ltd Page 19


PROPOSED 18 MW BIOMASS BASED THERMAL POWER
PLANT AT VILL. SEDHA SINGH WALA, TEHSIL- JAITU,
PRE-FEASIBILITY REPOORT
DISTRICT- FARIDKOT, PUNJAB BY M/S SUKHBIR AGRO
ENERGY LIMITED

There is no wildlife sanctuary, eco-sensitive zone, national park & coastal line lies within
the 10 km radius from the project site.
4.5 Existing Infrastructure
The available infrastructure and facilities are hospital, schools, post office, and banks
available in the study area. National Highways (NH-15) is only 4.0 km away in East
direction and the Jaito-Bajakhana Road is 0.5 Km away from the main plant area.
4.6 Soil classification
Mainly two types of soils found in Jaitu area of Faridkot district. The details are as follows:
1. Coarse Loamy
2. Coarse Loamy & Fine Loamy associations
3. Fine loamy
4.7 Climatic data from secondary sources
Climate of the district is classified as sub-tropical steppee, semi-arid and hot which is
mainly dry except in rainy months. The cold season is from November to March. This is
followed by the summer season which lasts up to about the end of June. The Temperatures
increase rapidly beginning with the end of March till June, which is generally the hottest
month, with the mean daily minimum temperature about 41OC and the mean daily
minimum about 26.5OC. The mean daily maximum temperature in January is about 20 ̊C
and the mean daily minimum about 5 ̊C. In the cold season the district is affected by cold
waves in the wake of passing western disturbances and the minimum temperature
occasionally drops down to about a degree or two below the freezing point of water. The
average annual rainfall in the district is 433 mm. about 71 percent of the annual rainfall in
the district is received during the monsoon months July to September.
5. PLANNING BRIEF
5.1 Planning Concept (type of industries, facilities, transportation etc) Town and
Country Planning/ Development authority Classification.
The proposed 18 MW biomass based thermal power plant will be located at owned
premises of M/s Sukhbir Agro Energy Ltd. The site is well connected to the Rail & road

SMS Envocare Ltd Page 20


PROPOSED 18 MW BIOMASS BASED THERMAL POWER
PLANT AT VILL. SEDHA SINGH WALA, TEHSIL- JAITU,
PRE-FEASIBILITY REPOORT
DISTRICT- FARIDKOT, PUNJAB BY M/S SUKHBIR AGRO
ENERGY LIMITED

network. All basic infrastructure facilities shall be provided to workers and office staff.
Company shall also ensure the social development work under its Corporate Social
Responsibility (CSR). All statutory requirements shall be fulfill before commissioning and
while operation of the plant.
5.2 Population Projection
Total 123 working person will be employed for proposed power plant. Locals will be
preferred for semiskilled & unskilled work based on their qualification & capability.
5.3 Land use planning (breakup along with green belt etc.)
Table No. 10: Details of Land Bifurcation
S. No. Particulars Area in SQM
1. Built-up Land 16500
2. Road Development 12000
3. Green Belt 35200.73
4. Storage Biomass 37000
5. Open Areas 5853
Total Area 106553.73
Source: DPR
5.4Assessment of Infrastructure Demand (Physical & Social)
The proposed project will provide employment to the population of nearby area, proper
connectivity is available within the study area.
5.5 Amenities/Facilities
All basic infrastructure facility such as education, health facilities & other social amenities
are adequate at nearby areas.
6. PROPOSED INFRASTRUCTURE
6.1 Industrial Area(Processing Area)
The proposed infrastructure of the power plant is detailed below:
 Main Power Building(Turbine & Boiler house)
 Shaded Fuel Yard

SMS Envocare Ltd Page 21


PROPOSED 18 MW BIOMASS BASED THERMAL POWER
PLANT AT VILL. SEDHA SINGH WALA, TEHSIL- JAITU,
PRE-FEASIBILITY REPOORT
DISTRICT- FARIDKOT, PUNJAB BY M/S SUKHBIR AGRO
ENERGY LIMITED

 DM Plant
 Mechanical Workshop
 Switch Yard
 Water Reservoir
 Bag Filter & ESP
 Open Fuel Yard etc.
Administrative building, Canteen & parking area is proposed inside the plant boundary.
6.2 Residential Area
A small colony is proposed in plant area & other facility like hospital, school, bank, post
office market is available in nearby areas.
6.3 Green Belt
According to the CPCB green belt Development guidelines 33% area of total plot area is
proposed for plantation. Suitable local Plant species will be planted with adequate spacing
to maintain or to develop the green cover in and around the plant area
6.4 Social infrastructure
The social infrastructure is available in & around area is of moderate level. & will be
improved in CSR activity.
6.5 Connectivity (Traffic and Transportation Road/ Rail/ Metro/Water ways etc.)
Proposed site is well connected through Road, Rail. The site can be approached by using
these connectivity. No additional connectivity is required.
6.5 Drinking Water Management (Sources & Supply of Water)
225 Cum/day will be required for Greenbelt & Human consumption. This will be met from
Raunta (Jaitu) Rajwaha Canal.
6.7 Sewerage System
STP of adequate capacity will be installed for treatment of wastewater.
6.8 Industrial Waste Management/Solid Waste Management
Ash generated from industrial process will send to the farmers as their manure & Cement
grinding & brick making industries for their use.

SMS Envocare Ltd Page 22


PROPOSED 18 MW BIOMASS BASED THERMAL POWER
PLANT AT VILL. SEDHA SINGH WALA, TEHSIL- JAITU,
PRE-FEASIBILITY REPOORT
DISTRICT- FARIDKOT, PUNJAB BY M/S SUKHBIR AGRO
ENERGY LIMITED

6.9 Power requirement & Supply/Source


Consumption of Power will be 10 to 11% of total power generation. For Cold start of the
Power Plant, plant auxiliary will be made operational one by one in a sequence and Power
for Cold Start will be obtained through Import of Power for the Grid through 66 KV Power
transmission line of Punjab State Power Corporation Limited.
7. REHABILITATION & RESETTLEMENT (R & R PLAN)
Not Applicable
8. PROJECT SCHEDULE & COST ESTIMATES
8.1 Likely date of start of construction and likely date of Completion (Time schedule
for the project to be given)
Construction will be start after the grant of Environmental Clearance & Consents from
statutory authorities.
8.2 Estimated project cost along with analysis in terms of economic viability of the
project.
Bifurcation of Costing is given below:
Table No. 11: Details of Project Cost

Sl. No. Item Total

A. HARD COST
1 Land & Land Development 9.08
2 Factory Building & Other Civil Cost 16.89
3 Plant & Machinery 92.11
4 Miscellaneous Fixed Assets 5.35
5 Contingency Provision for Cost Escalation 0.80
6 Sub - total : Hard Cost 124.24

B. SOFT COST

1 IDC 7.60
2 Other Pre-operative Expenses 2.19

SMS Envocare Ltd Page 23


PROPOSED 18 MW BIOMASS BASED THERMAL POWER
PLANT AT VILL. SEDHA SINGH WALA, TEHSIL- JAITU,
PRE-FEASIBILITY REPOORT
DISTRICT- FARIDKOT, PUNJAB BY M/S SUKHBIR AGRO
ENERGY LIMITED

Sl. No. Item Total

3 Sub - total : Soft Cost 9.79

C. Margin for BG - 1 (25% on Rs 45 Lakhs) 0.11

D. Margin for BG - 2 (25% on Rs 105 Lakhs) 0.26

E. Margin for Working Capital 6.84

F. Total 141.25
Source: DPR
9. ANALYSIS OF PROPOSAL
9.1 Financial and Social benefits with special emphasis on the benefits of the local
people including trial population, if any , in the area
Under CSR activity many development programme will be organized.
 Educational Programme
 Women & youth development activities
 Health care camps
 Polio Camps
 Rehabilitation camps
With setting up of the proposed 18 Mw Biomass Thermal Power Plant with 100% Paddy
Straw, there will be generation of employment both direct to the Plant and in Biomass
Collection Centres & indirect to the Contractors for collection & delivery of Paddy straw to
Collection Centres / Plant.

SMS Envocare Ltd Page 24


Sukhbir Agro Energy Limited
TEV Study for 18 MW Biomass Project
(Rice Straw Based) at Faridkot
87

5. TECHNOLOGY SELECTION

Bio-mass

5.1 Bio-mass is the agricultural residue coming out after the main crop is cultivated
or processed. Bio-mass comprising of several agricultural residues and woods
has emerged as an non-conventional source of energy in the country.

5.2 Bio-mass has always been an important energy source for the country
considering the benefits it offers. Bio-mass is renewable, widely available,
Carbon neutral and has the potential to provide significant employment in the
rural area. Bio-mass is also capable of providing firm energy. Further, Biomass is
a clean fuel & environmentally benign as compared to conventional fuel.

5.3 Basically there are 2 technologies available for producing electrical energy from
Bio-mass. These are :

(i) Combustion Technology using Rankine Cycle


(ii) Gasification Process using Auto Cycle

Combustion Technology

5.4 In Combustion Technology, Bio-mass is burnt in a Boiler to produce steam. This


is the most commonly used technology for producing power from Bio-mass. The
advantage is that the technology use is similarly to that of a thermal plant base
on fossil fuel like Coal, except for the Boiler. The Cycle used is conventional
Rankine Cycle with Bio-mass being burnt in high pressure Boiler to generate
steam and operate a Turbine with generated steam to produce electricity.

5.5 In Combustion technology with Biomass, primarily 2 types of Boilers are used
viz Grate Boiler & Atmospheric Fludised Bed Combustion (AFBC) Boiler. The
selection of Boiler depends on type of Bio-mass used for firing the Boiler.

Gasification Process

5.6 Under gasification process, Bio-gas consisting about 52% Methane is generated
through Fermentation of Bio & Agro Residue/waste in a Digester and burning
the gas generated in a Gas engine coupled with an A.C. Generator to produce
Electricity. The process is called Auto Cycle.

U.B. CONSULTANTS PRIVATE LIMITED


PROJECT & MANAGEMENT CONSULTANTS
Sukhbir Agro Energy Limited
TEV Study for 18 MW Biomass Project
(Rice Straw Based) at Faridkot
88
5.7 Process for generation of Electricity from Bio-Gas in an Auto Cycle Plant is
summarised below :

5.7.1 To generate Electricity from Bio-gas , the steps that must be gone through are twofold,
chemical energy to mechanical energy and then from mechanical energy to electrical
energy.

5.7.2 For these conversion processes to be achieved, a suitable Engine which shall be used for
the generation of electricity from bio-gas digester is required.

5.7.3 The Bio-gas produced from the digester is slightly above the atmospheric pressure and
needs to be compressed to approximately 150 m bar in a radial gas compressor to feed
to the engine.

5.7.4 A gas engine is similar to an automobile car engine. It is an internal combustion engine
which will burn the methane to convert the chemical bond energy of the gas to heat
energy expanding the gases within the piston, driving the drive shaft and producing
mechanical energy.

5.7.5 The mechanical energy in the rotating drive shaft is then coupled into an electrical
generator.

5.7.6 The mechanical energy is utilized to drive the AC (alternating current) generator giving
electricity. Of course, the generator also has to be connected into an electrical power
distribution grid, and to save on power loss during transmission through the cables the
voltage is raised in a step-up transformer.

5.7.7 A Combined Heat and Power (CHP) system is always worth considering. The idea of
CHP is that, it uses the hot water otherwise wasted when the excess heat is cooled before
it can go back into the circuit.

5.8 Auto Cycle Plants did not gain popularity in the country. Also Cost / MW of
Auto Cycle Plant is higher as compared to Rankine Cycle Plant. Further as Auto
Cycle Plant did not gain popularity in India, for setting up of Auto Cycle Plant
foreign collaboration / assistance is required.

Technology Selected

5.9 As Combustion Technology is a standard technology in the country for


producing Power from Bio-mass, SAEL proposes to adept Combustion
Technology within Rankine Cycle process. Further, the Company is having
considerable experience in operation of 2 Nos. Bio-mass Power Plant of capacity
same as that which SAEL proposes to install, selection of Combustion
Technology is considered to be appropriate.
U.B. CONSULTANTS PRIVATE LIMITED
PROJECT & MANAGEMENT CONSULTANTS
Sukhbir Agro Energy Limited
TEV Study for 18 MW Biomass Project
(Rice Straw Based) at Faridkot
89

5.10 However, while utilizing Combustion Technology, selection of Boiler assumes


importance. Selection of Boiler depends on the major Bio-mass to be used in the
Plant for firing. For the subject Plant, Boiler is propose to be fired with 100%
Paddy Straw.

5.11 SAEL, in consultation with major Boiler manufacturing company i.e. DP Clean
Tech, Shanghai Power Equipment Research Institute Co. Ltd, BWSC has decided
to install one number Single Drum, natural Circulation, Balanced Draft , Water
Tube Biomass fired. Travelling Grate, Spreader Stoker Boiler suitable for steam
output capacity of 80 tons per hour at 95 Kg/ cm2 (g) pressure and steam
temperature of 5400C, all measured at Superheater outlet at boiler MCR
(Maximum Continuous Rating).

5.12 SAEL will decide on vendor for supply of Travelling Grate Boiler capable of
accepting 100% Paddy Straw firing in due course. For that purpose SAEL is
negotiating with reputed vendors like, DP Clean Tech, Shanghai Power
Equipment Research Institute Co. Ltd, BWSC etc.

Advantages of Travelling Grate Stoker

5.13 Advantages of Travelling Grate Stoker are given below:

Insensitive to fuel size.

Fuel containing maximum moisture can be successfully burnt.

Rapid load swings can be accommodated due to large inventory of the fuel on the
grate.

Simple control.

Robust construction with minimum maintenance, hence high operating reliability.

Simple and rapid installation.

Low power consumption.

Efficient fuel feeding system using hydraulically actuated feed piston and divergent
hoppers

U.B. CONSULTANTS PRIVATE LIMITED


PROJECT & MANAGEMENT CONSULTANTS
Sukhbir Agro Energy Limited
TEV Study for 18 MW Biomass Project
(Rice Straw Based) at Faridkot
90
Boiler Plant Design

5.14 The steam boiler is designed for firing various types of straws mainly paddy
straw. The boiler plant design is based on Boiler Manufacturer’s experience with
biomass fuels.

5.15 The fuel is introduced in the furnace through water cooled stoker ducts. The size
of the combustion grate and the size and geometry of the combustion chamber,
with respective combustion air nozzles, is designed with the aim of ensuring the
complete combustion of the biomass fuel.

5.16 The boiler and the combustion grate are based on the bottom support design,
simplifying the design of the sealing between the vibration grate and the boiler
walls. The flue gas outlet of the boiler is connected to a separate tower with
economizer and air preheater.

5.17 The combustion air is preheated in order to provide a more stable combustion
process and to improve the overall boiler efficiency.

5.18 The spacing (pitch) between the heat surface tubes in the hanging super heater
in the first pass is adapted to allow for the formation of deposits (scaling)
known to form on the tubes due to the relatively low melting temperature of
straw ash. The design and materials are specifically selected to counteract the
high temperature corrosion related to straw firing.

5.19 All connections in the steam boiler will be fully welded. No tubes will be
pressure expanded.

5.20 The boiler convection pass, economizer are cleaned with steam soot blowers.

Combustion process

5.21 The combustion process involves a number of physical / chemical aspects of


high complexity. The nature of the combustion process depends both on the fuel
properties and the combustion applications. However, it can be separated into
four different phases (drying, pyrolysis, gasification and combustion). In large
scale applications, with continuous fuel feeding, these processes will occur in
different sections of the grate.

U.B. CONSULTANTS PRIVATE LIMITED


PROJECT & MANAGEMENT CONSULTANTS
Sukhbir Agro Energy Limited
TEV Study for 18 MW Biomass Project
(Rice Straw Based) at Faridkot
91
Straw Feeding System

5.22 The straw feeding system has the following functions:

5.22.1 It shall loosen the straw from the compressed layers of the straw bales and allow the
formation of a uniform straw feed, filling out the stoker ducts and proceeding into the
boiler combustion zone.

5.22.2 It shall ensure a constant feeding of the straw corresponding to the desired boiler load
irrespective of the compression of the straw bales.

5.22.3 It shall ensure that any risk of fire from the furnace back into the straw lines is
contained.

5.22.4 From the scarifier screws, the separated straw falls down into the stoker screws, which
push the straw into the stoker ducts and into the furnace. The stoker ducts are water-
cooled not only to withstand the heat of the furnace but also to limit the heat
transported back to the straw feed system when the straw line is stopped.

5.22.5 To minimize any fire hazard, the straw feeding system includes a number of separate
fire protection barriers:

5.22.6 Any operating straw line will operate at a minimum speed to avoid risk of backfires
during normal operation.

5.22.7 A water-cooled damper is installed at the inlet of each stoker duct which, when the
straw feed is stopped, will compress the straw in the duct. This measure will reduce the
speed with which any potential backfire that may spread.

5.22.8 Also, when a straw feed line is stopped, water nozzles in the duct and at the inlet of the
stoker screws will soak the straw. These systems are normally fully sufficient to avoid
any spreading of fire.

5.22.9 The chute from the scarifier screw to the stoker screws is provided with a fire damper,
which closes when a straw line is stopped. Furthermore, the area is provided with
water nozzles connected to the plant firewater system, which will open if high
temperatures are detected.

5.22.10 The straw lines to the scarifier screws are internally protected by a sprinkling system
connected to the plant firewater system.
5.22.11 The feeding lines and scarifiers shall be indoor.
5.22.12 From the straw bale scarifiers, the straw enters the stoker screws, where a set of double
screws pushes the straw into the water cooled stoker duct and into the furnace. The
stoker ducts are provided with compression plates (“dynamic dollies”) which ensure that
the stoker ducts are filled with straw in a uniform compression.

U.B. CONSULTANTS PRIVATE LIMITED


PROJECT & MANAGEMENT CONSULTANTS
Sukhbir Agro Energy Limited
TEV Study for 18 MW Biomass Project
(Rice Straw Based) at Faridkot
92
Slag and Ash System

Slag Hopper after Grate

5.23 At the lower end of the grate the slag and bottom ash from the combustion will
be collected in a hopper and dropped to the Wet submerged slag conveyor. The
hopper will be provided with refractory, protecting it from the radiation of the
furnace. An inspection and cleaning door will be built into the hopper.

Submerged Slag Conveyor

5.24 At the lower end of the grate the slag and bottom ash from the combustion will
be collected in a hopper and dropped to the Wet submerged slag conveyor. The
hopper will be provided with refractory, protecting it from the radiation of the
furnace. An inspection and cleaning door will be built into the hopper.

5.25 The conveyor extracts the slag from the water bath and delivers it to the pit.

5.26 The conveyor belt is tightened at the drive shaft. This adjustment is made by
loosening the locking device and manually adjusting the tightening screws.

5.27 The scrapers of the slag conveyor are provided with zinc anodes to limit
corrosion.

5.28 Due to water evaporation caused by the hot slag, there will be a constant need
for refilling the conveyor system with water. The water control is carried out by a
fully automatic control system mounted on the slag conveyor.

Transport of Slag after Submerged Conveyor

5.29 The slag is transported by a conveyor belt to a pit at end of slag conveyor.

5.30 A pit for collecting water from the slag conveyor, as well as for draining the
intermediate storage area for the slag is recommended. The water collected in
this pit may be used for refilling the slag conveyor, reducing the required
amount of separately added water.

Heating surface cleaning systems

5.31 The steam boiler is equipped with a heating surface cleaning system. This system
consists of steam soot blowers for superheaters the economizer and the air
preheater.
U.B. CONSULTANTS PRIVATE LIMITED
PROJECT & MANAGEMENT CONSULTANTS
Sukhbir Agro Energy Limited
TEV Study for 18 MW Biomass Project
(Rice Straw Based) at Faridkot
93
5.32 The soot blowers located in the areas with high flue gas temperature will be of
the fully retractable type. The soot blowers in the economizer and air preheater
area will be semi- retractable. During operation, the soot blowers will rotate and
move in the longitudinal direction, making the steam from the nozzles on the soot
blower intercept the heat surfaces cleaning them.

5.33 Soot blowing sequences are anticipated to occur three times per day, or one
sequence for each operator shift. The soot blowing steam is taken from the
turbine’s first extraction, with a pressure of approximately 25 bar(a).

5.34 A local PLC for control of the different steam soot blowers according to the
selected cleaning program is included. The start of the desired soot blowing
program will be initiated from the central control system.

Boiler Specification

5.35 Suggested Boiler specification is given below:

A. BOILER PARAMETERS (100% BMCR)


Steam flow at main steam stop valve outlet TPH 80.00
Peak Generation (2 hours per 2 4 hours) 110%
Steam pressure at Main Steam Stop Valve outlet 2 95
Kg/cm (g)
Superheated steam temperature at Main O 540
C
Steam Stop Valve outlet
Feed Water temperature at Economiser inlet O 225
C
B. FUELS FOR BOILER
100% Paddy Straw 100 % MCR
Fuel Sizing
i) Bale height mm 275 + 25/-25
ii) Bale Width mm 550 + 50/-25
iii) Bale Length mm 1000 + 100/-100
iv) Density of Bale Kg/CUM 110 + 50/-15
v) Design weight Kg 20 - 25
vi) String Orientation - Along Top & Ends
Note: SAEL will be utilising Paddy Straw with GCV of 2800 Kcal / Kg.
C. EMISSION FROM BOILER
i) NOX mg/Nm3 400
ii) SOX NA
iii) Hg NA
iv) Dust mg/Nm3 30

U.B. CONSULTANTS PRIVATE LIMITED


PROJECT & MANAGEMENT CONSULTANTS
Sukhbir Agro Energy Limited
TEV Study for 18 MW Biomass Project
(Rice Straw Based) at Faridkot
94

D. RECOMMENDED FEED AND BOILER WATER REQUIREMENT

Description Unit Feed water Boiler Water

Total Hardness (max.) ppm Nil Nil


pH Value at 25 deg.C 8.5-9.2 9.5-10.5
Oxygen (Max.) ppm 0.007 Nil
Iron (max.) ppm Nil Nil
Copper (max.) ppm Nil Nil
Silica (Max.) ppm 0.02 2.5

Total CO2 (Max.) ppm Nil Nil


Permanganate (Max.) ppm Nil Nil

Total Dissolved Solids (Max.) ppm 0.1 100

Total suspended Solids ppm Nil Nil


(Max.)
Oil (Max.) ppm Nil Nil

Specific electric conductivity micro S/cum 0.2 200


O
Residual Hydrazine (Max.) ppm 0.01 – 0.02 -

Residual Phosphate (Max.) ppm - 15

NT- Not Traceable.

The boiler will be manufactured in accordance with the requirements of latest IBR rules and
regulations.

Note: SAEL is negotiating with the following 3 suppliers of Boiler having experience in designing & installing Boiler which
can accept 100% Paddy Straw as fuel.

i) DP Clean Tech
ii) BSWC
iii) Shangai Power Equipment Research Institute Co. Ltd.

In the TEV Study Report offer from DP Clean Tech has been taken into consideration although SAEL may install
Boiler supplied by any one of the 3 vendors mentioned above. It may further be noted that total cost of all 3 venders are
close , ranging between 61-62 Crore (with duties & taxes).
T G Set
5.36 As regards Turbine, SAEL will be installing a Condensing Steam Turbine of the
following specifications :

(i) Power Generation Capacity - 18 MW at 11 KV, 3 Phase, 50 HZ,


(ii) Inlet Steam Temperature - 5350C
(iii) Inlet Steam Pressure - 90 Kg/cm2

U.B. CONSULTANTS PRIVATE LIMITED


PROJECT & MANAGEMENT CONSULTANTS
Sukhbir Agro Energy Limited
TEV Study for 18 MW Biomass Project
(Rice Straw Based) at Faridkot
95

5.37 With the specification of Boiler & TG Set discussed above, it may be seen that
both the Units are compatible and allows for marginal drop in Steam
temperature & Pressure from Boiler outlet to Turbine Inlet.

5.38 SAEL will decide on the Vendor for supply of STG. Currently SAEL is
negotiating with Company like BHEL, Siemens & QINGDAO JIENENG who are
reputed manufacturer of STGs.

Note: As regards STG, SAEL is negotiating with reputed supplier of STG like BHEL, Siemens & QINGDAO JIENENG. In the TEV Study
Report supply from BHEL has been considered. However SAEL may source STG from any of the above 3 suppliers of STG and cost of
18 MW STG of specification given above is similar (about Rs. 16 Crore).

Credentials of Supply of Boiler & Turbine

5.39 Credentials of supplier of Boiler i,e. DP Clean Tech & Turbine i,e. BHEL are
discussed below: (In the TEV Report offer from DP Clean Tech for Boiler & BHEL
for Turbine were considered, hence credentials of these two companies are given
below,. It may further be noted that other suppliers of Boiler i,e. BSWC &
Shangai & suppliers of Turbine i,e. Siemens & QINGDAO are also suppliers of
repute & are having no. of Boiler/Turbine installations in various Power Plants):

DP Clean Tech (Boiler)

5.39.1 Founded in 2004, DP Clean Tech designs, engineers, manufactures, commissions


and services biomass and power plants, providing complete solutions for turning
waste materials into clean energy. As per the CEO of DPCT

Quote” At DP Clean Tech we are singularly f ocused on providing organic and inorganic waste
materials into clean energy and we have built a company to develop and deliver
outstanding and world class solutions to our customers worldwide.
We have grown steadily towards achieving our global ambitions, and today we have offices
in 7 countries, and a diverse and multicultural workforce recruited to the highest
professional standards. We leverage these resources intelligently to both anticipate market
opportunities and enable efficient project execution. We have the advantage of a truly global
engineering and development platform to share knowledge and develop innovative
solutions, and our employees have the motivation and remit to deliver world class
technology and solutions that are the most efficient, reliable and competitive in the world.
Our customer focused attitude towards analysis and problem solving is complemented with
our technology and depth of knowledge. Since 2012, we have successfully extended our
scope to encompass new opportunities in related, complementary industries and in new
geographic regions.

U.B. CONSULTANTS PRIVATE LIMITED


PROJECT & MANAGEMENT CONSULTANTS
Sukhbir Agro Energy Limited
TEV Study for 18 MW Biomass Project
(Rice Straw Based) at Faridkot
96
At DP Clean Tech we are committed to rising to the ongoing challenges posed by our
customers in this fast growing and dynamic industry, and we are confident of achieving our
vision of ‘A world leading renewable energy company” by providing them with the right
advice, the right solutions, and the right results. “ Unquote

5.39.2 DP Clean Tech is the foremost expert in biomass technology, and is a


recognized biomass clean energy pioneer and market leader, with 30% of
the market in China. Building on DPCT’s breadth and depth of experience
in both Europe and Asia, DPCT continue to develop and implement
innovative and highly competitive solutions and to expand into new
industries and markets worldwide

5.39.3 DP Clean Tech has over 80 biomass power plant references around the world
using High Pressure, High Temperature (HPHT) technology which was
pioneered and developed in Denmark.

5.39.4 DP Clean Tech technology was behind the first straw biomass power plant in
Denmark and was also built the first straw biomass plant in China. DP is
currently pioneering the first, largest and most advanced waste-to-energy project
of its kind in sub-Saharan Africa.

5.39.5 A List of Boiler installations made by DP Clean Tech Global Engineering


Services is furnished in Enclosure – XIII/B.

Source : Website of DP Clean Tech Global Engineering Services. Relevant portion of Company Profile of
DP Clean Tech compiled from the Website are furnished in Enclosure – XIII/A.

BHEL (Turbine)

5.39.6 Forging ahead on a sturdy foundation of over five decades of engineering


excellence and embracing the glorious next phase of its growth, BHEL is an
integrated power plant equipment manufacturer and one of the largest
engineering and manufacturing companies of its kind in India engaged in the
design, engineering, manufacture, construction, testing, commissioning and
servicing of a wide range of products and services for core sectors of the
economy, viz. Power, Transmission, Industry, Transportation (Railways),
Renewable Energy, Oil & Gas, Water and Defence with over 180 products
offerings to meet the needs of these sectors. BHEL has been the bedrock of India's
Heavy Electrical Equipment industry since its incorporation in 1964.

U.B. CONSULTANTS PRIVATE LIMITED


PROJECT & MANAGEMENT CONSULTANTS
Sukhbir Agro Energy Limited
TEV Study for 18 MW Biomass Project
(Rice Straw Based) at Faridkot
97
5.39.7 BHEL's growth has been synchronous with achieving self-sufficiency in the
indigenous manufacturing of heavy electrical equipment. Out of the available
35,000 MW per annum capacity for power plant equipment manufacturing in the
country, BHEL alone constitutes a mammoth 20,000 MW per annum capacity. A
widespread network of 17 Manufacturing Divisions, 2 Repair Units, 4 Regional
Offices, 8 Service Centres, 4 Overseas Offices, 6 Joint Ventures, 15 Regional
Marketing Centres and current project execution at more than 150 project sites
across India and abroad corroborates the humungous scale and size of its
operations.

5.39.8 In FY 2016-17, the company commissioned/synchronized 8,539 MW of power


generating equipment. With this, the company’s global installed power
generating capacity has gone up to 178 GW. Notably, enhanced focus on project
execution has resulted in BHEL achieving a capacity addition of 45,274 MW
during the 12th Five Year Plan period (2012-17), surpassing the target of 41,661
MW set by the government for BHEL, by 9%. With this, BHEL continues to
remain the single largest contributor to the country’s power generation capacity
addition.

5.39.9 During the year, BHEL-built thermal power generating sets generated an all-time
high 549 Billion Units of electricity which was 58.2% of the total thermal power
generated in the country.

5.39.10 BHEL also has a widespread overseas footprint in 82 countries across all the six
continents with cumulative overseas installed capacity of BHEL manufactured
power plants nearing 10,000 MW including Belarus, Bhutan, Egypt, Indonesia,
Iraq, Kazakhstan, Malaysia, New Zealand, Oman, Rwanda, Sudan, Tajikistan
and UAE. A major highlight of the year was the largest ever export order, valued
at US$1.5 billion (Rs.10,000 Crore), for setting up 1,320 MW (2x660 MW) Maitree
Super Thermal Power Project in Bangladesh. Significantly, won against stiff
international competitive bidding, this is BHEL’s largest power project order in
the international market.

5.39.11 Leveraging its experience of over three decades in Solar PV (SPV), the company
is capitalising on emerging opportunities in the segment. During the year, BHEL
set a new record in its Solar PV business, by supplying 176 MW of SPV modules
in a single year, marking a significant contribution to the nation’s green
initiatives.
U.B. CONSULTANTS PRIVATE LIMITED
PROJECT & MANAGEMENT CONSULTANTS
Sukhbir Agro Energy Limited
TEV Study for 18 MW Biomass Project
(Rice Straw Based) at Faridkot
98
5.39.12 The high level of quality & reliability of BHEL products is due to adherence to
international standards by acquiring and adapting some of the best technologies
from leading companies in the world, together with technologies developed in its
own R&D centres. BHEL divisions like Manufacturing units, Engineering centres
and Business Sectors like Power Sector, Industry sector, International Operations
are accredited to Quality Management Systems (ISO 9001). Major Manufacturing
units and Power Sector Regions are also accredited to Environmental
Management Systems (ISO 14001) and Occupational Health & Safety
Management Systems (OHSAS 18001).

5.39.13 BHEL's greatest strength is its highly skilled and committed workforce of
around 39,821 employees that have been the cornerstone of BHEL's journey
ensuring success. Excellence of the company and its people has been recognised
at various national and international platforms. ‘Top 25 Best Companies to Work
for in India’, ‘Prime Minister’s Shram Awards’, ‘Vishwakarma Rashtriya
Puraskars’, ‘National Safety Award’ and, recognition by Hon’ble Prime Minister
for contribution in skill development are a few notable ones.

5.39.14 Further, the concept of sustainable development is inculcated in the DNA of


BHEL which is evident from its mission statement-"providing sustainable
business solutions in the fields of energy, industry and infrastructure". As part of
this, focus is on creating new verticals within the company to capitalize on the
massive infrastructure spending by the Govt. of India, with a special focus on
sustainable energy development by offering EPC solutions in solar and
environment-friendly supercritical technology in the thermal sector, besides
transportation, defence and other industrial products to drive the next wave of
growth.

Source: http://www.bhel.com/about.php

A List of Turbine installations made by BHEL is furnished in Enclosure – XIV/B

Company Profile of BHEL compiled from the Website are furnished in Enclosure – XIV/A.

U.B. CONSULTANTS PRIVATE LIMITED


PROJECT & MANAGEMENT CONSULTANTS