Professional Documents
Culture Documents
- 1
2007-08
Sr. Shut Down Lined Up Prod. Elect. Mech. Instt. Other
No.
ON AT ON AT
1 06.05.07 8.30 17.05.07 21.00 - - - - 276.50
2008-09
Sr. Shut Down Lined Up Prod. Elect. Mech. Instt. Other
No.
ON AT ON AT
1 06.04.08 17.15 09.04.08 1.00 - - 31.75 - -
2010-11
Sr. Shut Down Lined Up Prod. Elect. Mech. Instt. Other
No.
ON AT ON AT
2011-12
Sr. Shut Down Lined Up Prod. Elect. Mech. Instt. Other
No.
ON AT ON AT
10
11
12
ATA
Reasons
power dip
power dip
Reasons
Boiler leakage
Leakage Economizer
Due to ATA
Reasons
2008-09
Sr. Shut Down Lined Up Prod. Elect. Mech. Instt. Other
No.
ON AT ON AT
1 01.04.08 15.15 06.04.08 15.15 - - 120.00 - 63.50
2009-10
Sr. Shut Down Lined Up Prod. Elect. Mech. Instt. Other
No.
ON AT ON AT
1 ATA 08.04.09 22.00 - - - - 185.00
2010-11
Sr. Shut Down Lined Up Prod. Elect. Mech. Instt. Other
No.
ON AT ON AT
2011-12
Sr. Shut Down Lined Up Prod. Elect. Mech. Instt. Other
No.
ON AT ON AT
1 - - 24.04.11 23.15 - - - - 570.25
11
12
13
Reasons
Reasons
Boiler line up after ATA
Due to bank tubes leakages
(four nos. of tube plugged)
Due to down stream problem
Due to bank tube leakage
Normal S/D (cleaning of EPs)
power dip
power dip
Reasons
Due to ATA
Reasons
Boiler taken I/L after ATA
Due to downstream problem
Due to downstream problem
Due to bank tube leakage
Power failure from Bhakra
Power dip
Bank tube leakage
2008-09
Sr. Shut Down Lined Up Prod. Elect. Mech. Instt. Other Reasons
No.
ON AT ON AT
1 30.04.08 16.00 02.05.08 20.00 - - - - 52.00 Due to down stream problem
Boiler tripped with MFR
switch due to flame failure
2 03.08.08 14.40 04.08.08 20.10 - - - 29.50 -
(failure of 110 volt DC
supply)
Plant under S/D due to low
3 28.10.08 5.00 31.10.08 21.00 - - - - 112.00
stoke of coal.
4 17.01.09 12.10 17.01.09 20.25 - 8.25 - - - Power failure from Bhakra
5 20.10.09 0.15 04.02.09 23.00 - - 511.00 - - Water wall tube leakage
6 06.02.09 9.00 07.02.09 3.00 - 18.00 - - - Power failure from Bhakra
7 23.03.09 23.15 - - - - - Due to water wall tube leakage
Total 0.00 26.25 511.00 29.50 164.00
2009-10
Sr. Shut Down Lined Up Prod. Elect. Mech. Instt. Other Reasons
No.
Sr. Prod. Elect. Mech. Instt. Other Reasons
No.
ON AT ON AT
1 - - 06.04.09 1.45 - - - - 116.75 Boiler lined up ATA
Boiler boxed up due to down
2 07.04.09 1.00 08.04.09 19.30 - - - - 42.50
stream problem (air comp. )
3 06.07.09 5.00 07.07.09 19.00 - - - - 38.00 Due to down stream problem
4 03.08.09 0.15 03.09.09 0.45 - - 96.00 - - Economic tube leak
5 17.10.09 15.30 23.10.09 2.00 - - 130.50 - - Economic tube leakage
6 29.10.09 1.30 29.10.09 5.00 - 3.50 - - - Power failure
Due to down stream problem
7 06.11.09 5.30 07.11.09 15.15 - - 33.75 - -
(Amm-II air comp problem)
Down stream problem
8 11.11.09 23.45 12.11.09 15.00 - - - - 15.25 (Amm-II air comp.
Problem)
Boiler taken in line for oil rake
9 13.11.09 8.15 14.11.09 14.30 - - - - 30.25
unloading (air comp. problem)
10 15.11.09 1.30 15.11.09 10.45 - - - - 9.25 Air comp. problem
11 02.01.10 3.00 02.01.10 09.40/12.15 power dip
2010-11
Sr. Shut Down Lined Up Prod. Elect. Mech. Instt. Other Reasons
No.
ON AT ON AT
2011-12
Sr. Shut Down Lined Up Prod. Elect. Mech. Instt. Other Reasons
No.
ON AT ON AT
7 28.03.08 21.15 - - - - -
2008-09
Sr. Shut Down Lined Up Prod. Elect. Mech. Instt. Other
No.
ON AT ON AT
1 - - 21.07.08 2.00 - - - - -
2009-10
Sr. Shut Down Lined Up Prod. Elect. Mech. Instt. Other
No.
ON AT ON AT
1 ATA 20.04.09 4.15 - - 455.25 - -
2010-11
Sr. Shut Down Lined Up Prod. Elect. Mech. Instt. Other
No.
ON AT ON AT
2011-12
Sr. Shut Down Lined Up Prod. Elect. Mech. Instt. Other
No.
ON AT ON AT
9 03.09.11 8.45 - - - - -
10
11
12
13
Total 0.00 0.00 0.00 0.00 2962.50
Reasons
Reasons
Reasons
Due to ATA
Reasons
Reasons