You are on page 1of 21

BOILER NO.

- 1
2007-08
Sr. Shut Down Lined Up Prod. Elect. Mech. Instt. Other
No.
ON AT ON AT
1 06.05.07 8.30 17.05.07 21.00 - - - - 276.50

2 25.05.07 20.30 26.05.07 3.00 - 6.50 - - -

3 10.07.07 10.45 20.07.07 22.45 - - 252.00 - -

4 04.08.07 17.00 04.08.07 21.30 - 4.50 - - -

5 13.08.07 17.50 13.08.07 21.05 - 3.25 - - -

6 14.08.07 0.20 14.08.07 2.30 - 2.00 - - -

7 12.10.07 12.55 12.10.07 16.55 - 4.00 - - -

8 21.11.07 20.00 14.12.07 22.30 - - - - 554.50

9 05.03.08 15.00 29.03.08 3.00 - - - - 506.50

Total 20.25 252.00 1337.50

2008-09
Sr. Shut Down Lined Up Prod. Elect. Mech. Instt. Other
No.
ON AT ON AT
1 06.04.08 17.15 09.04.08 1.00 - - 31.75 - -

2 30.04.08 15.30 04.05.08 15.00 - - - - -

3 18.05.08 0.45 25.05.08 17.00 - - 184.25 - -

4 21.07.08 3.00 26.07.08 1.45 - - 118.75 - -

5 03.08.08 14.40 03.08.08 19.40 - - - 5.00 -

6 10.08.08 6.45 23.08.08 17.15 - - 322.5 - -

7 28.10.08 5.00 30.10.08 20.00 - - - - 87.00

8 06.11.08 5.25 18.11.08 1.00 - - 307.75 - -

9 17.01.09 12.10 18.01.09 16.10 - 17.50 - - -

10 06.02.09 9.00 06.02.09 14.15 - 5.25 - - -

11 13.03.09 22.45 17.03.09 22.30 - - 95.75 - -

12 21.03.09 4.30 23.03.09 21.45 - - 65.25 - -

Total 0.00 22.75 1126.00 5.00 87.00


2009-10
Sr. Shut Down Lined Up Prod. Elect. Mech. Instt. Other
No.
ON AT ON AT
1 ATA 14.04.09 13.15 - - - - 320.25

2 20.04.09 6.45 26.04.09 13.15 - - 150.50 - -

3 30.06.09 2.15 03.06.09 6.30 - - 76.25 - -

4 06.07.09 5.15 07.07.09 11.00 - - - - 29.75

5 12.08.09 5.00 15.08.09 16.30 - - 83.50 - -

6 22.10.09 3.45 06.11.09 1.30 - - 333.75 - -

7 06.11.09 8.45 07.11.09 3.30 - - - - 18.75

8 11.11.09 16.45 15.11.09 21.30 - - - - 100.75

9 28.11.09 3.00 03.12.09 2.00 - - 119.00 - -

10 02.01.10 3.00 02.01.10 06.15/08.45

11 02.01.10 21.55 03.01.10 02.40/04.30

12 18.01.10 9.15 21.01.10 04.45 /11.15 74.00

13 14.03.10 16 19.03.10 17.30 - - 121.5

14 20.03.10 12.00 21.03.10 1.30 13.50

15 24.03.10 20.15 176.75 - -

Total 0.00 0.00 1135.25 0.00 483.00

2010-11
Sr. Shut Down Lined Up Prod. Elect. Mech. Instt. Other
No.
ON AT ON AT

1 - - 05.05.10 22.00 - - - - 833.00

2 05.07.10 04.00 13.07.10 20.30 - - - - 208.50

3 27.07.10 07.45 28.07.10 06.30 - - 94.75 - -

4 21.08.10 14.30 24.08.10 21.00 - - 78.50 - -

5 01.09.10 15.45 04.09.10 01.45 - - 58.00 - -

6 13.10.10 14.45 16.10.10 04.00 - - 61.25 - -

7 26.10.10 21.30 27.10.10 02.15 - 4.75 - - -

8 27.10.10 08.00 30.10.10 05.00 - - - - 69.00


9 16.11.10 21.15 21.11.10 18.00 - - 116.75 - -

10 03.12.10 17.45 04.12.10 03.00 - 9.25 - - -


11 06.12.10 17.30 09.12.10 21.15 - - 75.75 - -

12 06.02.11 18.30 09.02.11 07.45 - - 61.25 - -

13 30.03.11 12.45 - - - - - - 40.25

Total 0.00 14.00 546.25 0.00 1150.75

2011-12
Sr. Shut Down Lined Up Prod. Elect. Mech. Instt. Other
No.
ON AT ON AT

1 - - 19.04.11 9.45 - - - - 436.75

2 21.04.11 6.45 23.04.11 21.45 - - - - 63.00

3 15.05.11 17.00 16.05.11 19.30 - - - - 26.50

4 17.05.11 19.00 19.05.11 13.45 - - 42.50 - -

5 31.05.11 15.30 01.06.11 17.00 - - - - 25.50

6 25.06.11 3.45 26.06.11 1.30 21.75 - -

7 27.06.11 5.45 27.06.11 1.45 - - - - 20.00

8 31.08.11 8.15 03.06.11 7.45 - - 50.75 - -

10

11

12

Total 0.00 21.75 93.25 0.00 571.75


Reasons

Tow BLR operation

Power failure from Bhakra

Bank tube leakage

Power failure from Bhakra

Power failure from Bhakra

Power failure from Bhakra

Power failure from Bhakra

Normal Shut Down (BLR-1 take


in due to BLR-3 economical tube
leakage

ATA

Reasons

Bank tube leakage

Due to down steam

Bank tube leakage

Bank tube leakage

Boiler tripped due to MFR switch


due to flame (failure of 110 volt
D.S. Supply)

Water wall tube leakage


Plant under shut down due to low
stock of coal
Bank tube leakage

Power failure from Bhakra

Power failure from Bhakra

Bank tube leakage


Input Steam superheat tube
leakage
Reasons

Boiler lined up after ATA

I.S.S.H. tube leakage (I.S.S.H/


leaky tube (south to north) 5th
tube plugged & 6th tube
repaired)

Due to I.S.S.H. tube leakage

Due to down stream problem

Due to I.S.S.H. tube leakage

Normal shut down for meant


Due to down stream problem
(Air comp. problem)
Down stream problem
(Air comp. problem)
Water wall tube leakage

power dip

power dip

I.S.S.H. tube leakage

Bank tube leakage


Due to down stream energy
(Explosion Co-shift section)
Due to ATA

Reasons

Boiler No. 1 item I/L after ATA

Due to down stream problem

Due Economizer tube leakage

Boiler leakage

Boiler tube leakage

Leakage Economizer

Power failure from Bhakra

Due to down stream problem


Due to economiser tube leakage

Power failure from Bhakra


Due to economiser tube leakage
Due to leakage in bank tube (N-E
side of boiler dran)

Due to ATA

Reasons

Boiler taken I/L after ATA

Due to down stream problem

Due to down stream problem

Bank tube leakage

Due to down stream problem

Power failure from Bhakra

Due to down stream problem

Water well tube leakage


BOILER NO. - 2
2007-08
Sr. Shut Down Lined Up Prod. Elect. Mech. Instt. Other
No.
ON AT ON AT

1 13.04.07 15.00 01.05.07 23.00 - - 440.00 - -

2 16.05.07 19.45 16.06.07 23.00 - 3.25 - - -

3 25.05.07 20.30 26.05.07 16.00 - 19.50 - - -

4 04.08.07 17.00 04.08.07 21.30 - 4.50 - - -

5 13.08.07 17.50 13.08.07 21.30 - 3.40 - - -

6 14.08.07 0.20 14.08.07 4.00 - 3.40 - - -

7 12.10.07 12.55 13.01.07 17.55 - 29.00 - - -

8 05.03.08 12.45 26.03.08 15.15 - - - - -

Total 63.05 440.00 0.00

2008-09
Sr. Shut Down Lined Up Prod. Elect. Mech. Instt. Other
No.
ON AT ON AT
1 01.04.08 15.15 06.04.08 15.15 - - 120.00 - 63.50

2 30.04.08 11.00 03.05.08 2.30 - - - - -

3 03.06.08 17.15 08.06.08 16.00 - - 118.75 - -

4 03.08.08 14.40 03.08.08 20.55 - - - 6.25 -

5 11.08.08 3.00 13.08.08 5.45 - 2.75 - - -

6 28.10.08 5.00 30.10.08 20.00 - - - - 87.00

7 17.01.09 12.10 17.01.09 20.10 - 8.00 - - -

8 06.02.09 9.00 06.02.09 13.45 - 4.75 - - -

Total 0.00 15.50 238.75 6.25 150.50

2009-10
Sr. Shut Down Lined Up Prod. Elect. Mech. Instt. Other
No.
ON AT ON AT
1 ATA 08.04.09 22.00 - - - - 185.00

2 20.06.09 13.30 26.06.09 13.45 - - 144.25 - -

3 05.07.09 23.15 08.07.09 19.45 - - - - 29.75

4 03.08.09 20.00 08.08.09 3.00 - - 103.00 - -

5 06.11.09 3.15 22.11.09 20.00 - - - - 400.75

6 02.01.10 3.00 02.01.10 21.15/-

7 02.01.10 21.55 03.01.10 11.00/16.30

8 13.01.10 17.00 16.01.10 00.45/0700

9 20.03.10 12.00 21.03.10 12.45 24.75

10 27.03.10 17.45 107.25

Total 0.00 0.00 354.50 0.00 640.25

2010-11
Sr. Shut Down Lined Up Prod. Elect. Mech. Instt. Other
No.
ON AT ON AT

1 - - 23.04.10 08.30 - - - - 531.50

2 07.05.10 13.00 08.05.10 05.45 - - - - 16.75

3 06.07.10 11.30 09.07.10 19.30 - - - - 80.00

4 01.09.10 23.45 03.09.10 01.00 - - 27.25 - -

5 26.10.10 21.30 27.10.10 04.00 - 6.50 - - -

6 27.10.10 08.00 30.10.10 07.00 - - - - 71.00

7 03.12.10 17.45 04.12.10 20.00 - 26.25 - - -

8 13.01.11 21.00 19.01.11 09.00 - - 132.00 - -


9 18.02.11 12.00 18.02.11 18.15 - - - 6.25 -

10 23.02.11 0.30 23.02.11 16.00 - - - - 15.50

11 02.03.11 1.00 02.03.11 7.00 - - - 6.00 -

12 15.03.11 0.30 17.03.11 11.00 - - 57.75 - -

13 27.03.11 20.00 - - - - - - 105.00

Total 0.00 32.75 217.00 12.25 819.75

2011-12
Sr. Shut Down Lined Up Prod. Elect. Mech. Instt. Other
No.
ON AT ON AT
1 - - 24.04.11 23.15 - - - - 570.25

2 15.05.11 8.45 17.05.11 18.15 - - - - 57.50

3 31.05.11 18.30 01.06.11 1.30 - - - - 7.00

4 20.06.11 8.15 24.06.11 13.30 - - 102.25 - -

5 25.06.11 3.45 25.06.11 7.45 - 4.00 - - -

6 29.06.11 12.00 29.06.11 13.45 - 1.75 - - -


7 15.07.11 19.00 18.07.11 16.00 - - 69.00 - -

8 26.07.11 1.30 27.07.11 12.15 - - - - 34.75

9 07.08.11 5.30 09.08.11 5.30 - - 48.00 - -

10 14.09.11 5.45 16.09.11 13.15 - - - - 55.50

11

12

13

Total 0.00 5.75 219.25 0.00 725.00


Reasons

Super heater leakage (bank


tube pin hole from (s) and east
to west 3rd row 2nd side tube
plugged) (Boiler 2 lined up
due to ID fan 6-M vibration
high)
Power dip from Bhakra
Power failure from Bhakra
Power failure from Bhakra
Power failure from Bhakra
Again power failure from
Bhakra
Power failure from Bhakra
ATA

Reasons

Bank tube leakage


Due to down stream problem
Bank tube leakage
Boiler tripped with MFR
switch due to flame failure
(failure of 110 volt DC
supply)
Power dip observed (Elect.
Expansion feeder No 1
tripped)
Plant under S/D due to low
stock of coal
Power failure from Bhakra
Power failure from Bhakra

Reasons
Boiler line up after ATA
Due to bank tubes leakages
(four nos. of tube plugged)
Due to down stream problem
Due to bank tube leakage
Normal S/D (cleaning of EPs)
power dip

power dip

bank tube EW-1 NS6 plugged


Due to down stream energy
(Explosion Co-shift section)
Due to ATA

Reasons

Boiler lined up after ATA


Boiler boxed up due to
downstream problem
Boiler boxed up due to down
stream problem
Due to boiler No. 1 & 3 boxed
due to leakage
Power failure from Bhakra
Due to down stream problem

Power failure from Bhakra

PSH outlet header tube leakage


Due to Instt./Maint. fault

Due to down stream problem

Due to DCS failure

Economizer tube leakage

Due to ATA

Reasons
Boiler taken I/L after ATA
Due to downstream problem
Due to downstream problem
Due to bank tube leakage
Power failure from Bhakra
Power dip
Bank tube leakage

Due to downstream problem

Due to I.S.S.H. Leakage

Due to downstream problem


BOILER NO. - 3
2007-08
Sr. Shut Down Lined Up Prod. Elect. Mech. Instt. Other Reasons
No.
ON AT ON AT
Boiler 3 lined up due to boiler
1 - - 13.04.07 10.45 - - - - 293.75
2 super heater leakage
2 16.05.07 19.45 17.05.07 3.00 - 7.25 - - - Power dip from Bhakra
3 25.05.07 20.30 26.05.07 3.15 - 6.75 - - - Power failure from Bhakra
4 16.06.07 9.00 10.07.07 7.45 - - 574.75 - - Economic tube leakage
5 04.08.07 17.00 08.08.07 23.30 - 19.50 - - - Power failure from Bhakra
6 13.08.07 17.50 14.08.07 19.45 - - - - - Power failure from Bhakra
7 12.10.07 12.55 12.10.07 17.25 - 19.50 - - - Power failure from Bhakra
Due to down stream problem
8 24.10.07 12.45 21.11.07 3.30 - - - - 16.25
(Amm-II)
9 15.12.07 0.30 28.01.08 22.45 - - - - - Due to actuation
Due to economicoftube leakage
special
valves D/S ball valves at LDO
10 14.02.08 11.20 14.02.08 14.20 - - - - -
& FO lines causes these valves
11 28.02.08 11.30 23.03.08 20.00 - - - - -
to
ATAclose

Due to power failure from


12 25.03.08 15.00 25.03.08 19.45 - - - - -
Bhakra
I.S.S.N. tube leakage (5nos at
13 26.03.08 23.15 28.03.08 18.15 - - - - -
leaky tube plugged)
Total 53.00 574.75 0.00 310.00

2008-09
Sr. Shut Down Lined Up Prod. Elect. Mech. Instt. Other Reasons
No.
ON AT ON AT
1 30.04.08 16.00 02.05.08 20.00 - - - - 52.00 Due to down stream problem
Boiler tripped with MFR
switch due to flame failure
2 03.08.08 14.40 04.08.08 20.10 - - - 29.50 -
(failure of 110 volt DC
supply)
Plant under S/D due to low
3 28.10.08 5.00 31.10.08 21.00 - - - - 112.00
stoke of coal.
4 17.01.09 12.10 17.01.09 20.25 - 8.25 - - - Power failure from Bhakra
5 20.10.09 0.15 04.02.09 23.00 - - 511.00 - - Water wall tube leakage
6 06.02.09 9.00 07.02.09 3.00 - 18.00 - - - Power failure from Bhakra
7 23.03.09 23.15 - - - - - Due to water wall tube leakage
Total 0.00 26.25 511.00 29.50 164.00

2009-10
Sr. Shut Down Lined Up Prod. Elect. Mech. Instt. Other Reasons
No.
Sr. Prod. Elect. Mech. Instt. Other Reasons
No.
ON AT ON AT
1 - - 06.04.09 1.45 - - - - 116.75 Boiler lined up ATA
Boiler boxed up due to down
2 07.04.09 1.00 08.04.09 19.30 - - - - 42.50
stream problem (air comp. )
3 06.07.09 5.00 07.07.09 19.00 - - - - 38.00 Due to down stream problem
4 03.08.09 0.15 03.09.09 0.45 - - 96.00 - - Economic tube leak
5 17.10.09 15.30 23.10.09 2.00 - - 130.50 - - Economic tube leakage
6 29.10.09 1.30 29.10.09 5.00 - 3.50 - - - Power failure
Due to down stream problem
7 06.11.09 5.30 07.11.09 15.15 - - 33.75 - -
(Amm-II air comp problem)
Down stream problem
8 11.11.09 23.45 12.11.09 15.00 - - - - 15.25 (Amm-II air comp.
Problem)
Boiler taken in line for oil rake
9 13.11.09 8.15 14.11.09 14.30 - - - - 30.25
unloading (air comp. problem)
10 15.11.09 1.30 15.11.09 10.45 - - - - 9.25 Air comp. problem
11 02.01.10 3.00 02.01.10 09.40/12.15 power dip

12 02.01.10 21.55 03.01.10 00.05/01.55 power dip


CW return header leak due to
13 12.01.10 0.15 12.01.10 20.00/01.45
1705 leak
14 16.01.10 9.00 18.01.10 01.30/07.30 PSH 3 tubes
Due to down sream problem (Air
15 16.03.10 19.30 18.03.10 11.30 40.00
comp. rotor shaft broken)
Due to down sream problem
16 20.03.10 12.00 281.00
(Explosion in Co-shift section)
Total 0.00 3.50 541.25 0.00 292.00

2010-11
Sr. Shut Down Lined Up Prod. Elect. Mech. Instt. Other Reasons
No.
ON AT ON AT

1 - - 29.04.10 20.00 - - - - 687.00 Boiler lined up after ATA


Boiler boxed up due to down
2 06.07.10 11.15 10.07.10 08.00 - - - - 92.75
stream problem
Steam drain & main drain
northern side E-W 12th row
3 01.09.10 13.45 03.09.10 13.00 - - 47.25 - -
1,2 & 13 th row 1st tube
plugged
4 26.10.10 21.30 31.10.10 10.30 - 109.00 - - - Power failuer from Bhakra
5 03.12.10 17.45 04.12.10 09.45 - 16.00 - - - Power failuer from Bhakra

6 31.12.10 17.15 02.01.11 03.45 - - 34.50 - - I.S.S.H. tube leakage


7 21.01.11 08.15 22.01.11 14.15 - - - - 30.00 Due to down stream problem
8 27.01.11 22.45 30.01.11 22.15 - - 70.50 - - Leakage in superheater
9 30.03.11 20.00 - - - - - - 33.00 Due to ATA
Total 0.00 125.00 152.25 0.00 842.75

2011-12
Sr. Shut Down Lined Up Prod. Elect. Mech. Instt. Other Reasons
No.
ON AT ON AT

1 - - 14.04.11 23.30 - - - - 330.50 Boiler taken I/L after ATA


2 09.05.11 22.15 12.05.11 17.45 - - 67.50 - - Economizer tube leakage
3 15.05.11 16.45 16.05.11 13.15 - - - - 20.50 Due to down stream problem
4 18.05.11 9.40 21.05.11 21.25 - - 83.75 - - Due to PSH tube leakage
5 27.05.11 8.15 29.05.11 22.45 - - 62.50 - - Due to PSH tube leakage
6 31.05.11 18.15 01.06.11 8.15 - - - - 14.00 Due to down stream problem
7 25.06.11 3.45 25.06.11 10.00 - 6.25 - - - Power failuer from Bhakra

8 29.06.11 12.00 29.06.11 21.45 - 9.75 - - - Power dip


9 08.07.11 00.15 10.07.11 07.45 - - 55.50 - - Due to water wall tube failure
10 14.09.11 8.45 15.09.11 14.30 - - - - 29.75 Due to down stream problem
11 17.09.11 12.15 17.09.11 21.30 - - - - 9.25 Due to down stream problem

Total 0.00 16.00 269.25 0.00 404.00


BOILER NO. - 4
2007-08
Sr. Shut Down Lined Up Prod. Elect. Mech. Instt. Other
No.
ON AT ON AT
1 - - 03.04.07 17.50 - - - - -

2 06.04.07 8.00 06.05.07 7.30 - - - - -

3 09.04.07 11.00 16.06.07 14.75 - - - - -

4 19.06.07 7.00 04.07.07 23.00 - - - - -

5 07.07.07 23.00 05.08.07 19.75 - - - - -

6 09.08.07 0.30 26.03.08 18.30 - - - - -

7 28.03.08 21.15 - - - - -

Total 0.00 0.00 0.00

2008-09
Sr. Shut Down Lined Up Prod. Elect. Mech. Instt. Other
No.
ON AT ON AT
1 - - 21.07.08 2.00 - - - - -

2 26.07.08 3.00 10.08.08 0.30 - - - - -

3 23.08.08 18.30 12.08.08 3.45 - - - - -

Total 0.00 0.00 0.00 0.00 0.00

2009-10
Sr. Shut Down Lined Up Prod. Elect. Mech. Instt. Other
No.
ON AT ON AT
1 ATA 20.04.09 4.15 - - 455.25 - -

2 23.04.09 7.00 04.08.09 4.15 - - 190.00 - -

3 08.08.09 4.00 12.08.09 3.45 - - 95.75 - -

4 15.08.09 17.30 30.08.09 12.45 - - 365.25 - -

5 02.09.09 13.45 17.10.09 13.00 - - 1079.25 - -

6 29.10.09 1.50 29.11.09 19.20 - - - 17.50 -

7 06.11.09 4.00 08.11.09 5.45 - - - 49.75 -


8 11.11.09 16.30 17.11.09 11.00 - - - - 138.50

22.11.09 21.30 28.11.09 1.45 - - - - -

9 02.12.09 5 13.01.10 16.15 1019.25

10 21.01.10 12.15 13.01.10 10.15 /1615

11 16.03.10 19.30 24.03.10 19.15 191.75

12 27.03.10 17.30 - - 107.50

Total 0.00 0.00 2293.00 67.25 1349.50

2010-11
Sr. Shut Down Lined Up Prod. Elect. Mech. Instt. Other
No.
ON AT ON AT

1 - - 25.04.10 13.00 - - - - 584.00

2 29.04.10 21.30 24.07.10 06.30 - - - - 2065.00

3 28.07.10 07.30 01.08.10 23.00 - - - - 111.50

4 09.08.10 07.15 21.08.10 07.30 - - - - 228.25

5 24.08.10 22.30 13.10.10 13.15 - - - - 1190.75

6 16.10.10 05.15 16.11.10 20.15 - - - - 759.00

7 21.11.10 19.00 06.12.10 16.15 - - - - 357.25

8 09.12.10 22.45 31.12.10 16.45 - - - - 530.50

31.12.10 20.30 14.01.11 00.30 - - - - 327.75

9 19.01.11 09.45 28.01.11 07.30 - - - - 213.75

10 30.01.11 22.15 06.02.11 17.45 - - - - 163.50

11 09.02.11 08.15 14.03.11 23.3 - - - - 807.25

12 17.03.11 11.00 - - - - - - 330.00

Total 0.00 0.00 0.00 0.00 7668.50

2011-12
Sr. Shut Down Lined Up Prod. Elect. Mech. Instt. Other
No.
ON AT ON AT

1 - - 09.05.11 20.45 - - - - 957.75


2 12.05.11 18.15 17.05.11 22.45 - - - - 20.50
3 21.05.11 22.45 27.05.11 7.30 - - - - 128.75

4 29.05.11 23.15 20.06.11 6.45 - - - - 511.50

5 24.06.11 14.30 08.07.11 08.15 - - - - 329.75

6 10.07.11 08.30 15.07.11 18.00 - - - - 129.50

7 18.07.11 16.45 07.08.11 09.00 - - - - 468.25

8 09.08.11 6.45 31.08.11 7.15 - - - - 416.50

9 03.09.11 8.45 - - - - -

10

11

12

13
Total 0.00 0.00 0.00 0.00 2962.50
Reasons

Reasons

Due to water will tube leakage


Due to boiler - 1 I.S.S.N. tube
leakage

Reasons

Boiler line up after ATA.

Normal S/D (Boiler no. 4


lined up due to boiler – 2 Bank
tube leakage)
Normal S/D
Normal S/D (Boiler 4 taken in
line due to boiler 3 economic
tube leakage)

4th boiler taken in line due to


boiler no. 3 economic tube
leakage)
Instt. Air pressure low (due to
power failure)
Instt. Air pressure low
Due to down stream problem
(Air comp. Problem)
Normal S/D (Boiler 1 taken in
line due to boiler 1 water wall
tube leakage)
Due to down stream problem
(Urea Plant)
Boiler I started
Due to down stream ( Air
comp. rotor shaft broken)

Due to ATA

Reasons

Boiler lined up after ATA


Normal S/D
Normal S/D
Normal S/D
Normal S/D
Normal S/D
Normal S/D
Normal S/D
Water tube leakage
Normal S/D
Normal S/D
Normal S/D
Normal S/D

Reasons

Boiler taken I/L after ATA


Normal S/D
Normal S/D
Normal S/D
Normal S/D
Normal S/D
Normal S/D
Normal S/D
Normal S/D