You are on page 1of 3

MTBF and MTTR Calculator

Month February, 2009


Name of Machine GTE GE LM 2500
Operation availability (min/mo) 40,320

Frequence 13

MTBF (min) 3,073 5:04:37 AM


MTTR (min) 29

No. Date Time Start Time Finish Down (min)


1 1-Feb 10:00 AM 11:00 AM 60
2 3-Feb 10:00 AM 12:00 PM 120
3 4-Feb 10:00 AM 11:30 AM 90
4 5-Feb 10:00 AM 11:00 AM 60
5 6-Feb 11:30 AM 11:35 AM 5
6 7-Feb 12:30 PM 12:35 PM 5
7 15-Feb 1:30 PM 1:35 PM 5
8 22-Feb 2:30 PM 2:35 PM 5
9 25-Feb 3:30 PM 3:35 PM 5
10 25-Feb 4:30 PM 4:35 PM 5
11 26-Feb 5:30 PM 5:35 PM 5
12 27-Feb 6:30 PM 6:35 PM 5
13 28-Feb 7:30 PM 7:35 PM 5
14
15
16
17
18
19
20
21
22
23
24
25
Total down time (min) 375

Harry Consulting Services Philippines, Inc.


Fail Rate 0.03%

Repair Rate 3.47%

Replacement
Parts 56 MTBF Vs MTTR
Parts 98
Parts 33 3,500

Parts 11 3,000

Parts 12 2,500

Parts 98 2,000

Parts 09 1,500

Parts 12 1,000

Parts 98 500
Parts 09 0
Parts 12 1
2
Parts 13
Parts 14
Fail rate Vs Repair Rate
3.50%
3.00%
2.50%
2.00%
1.50%
1.00%
0.50%
0.00%
Fai l Rate
Repai r Rate

Harry Consulting Services Philippines, Inc.


TTR

air Rate

epai r Rate

Harry Consulting Services Philippines, Inc.

You might also like