Professional Documents
Culture Documents
1
Figure 1 Oil and Gas Resources Reserves, (Source: ESDM)
ProduksiGas
8,000.00
7,000.00
6,000.00
5,000.00
4,000.00 LNG
3,000.00 Pipeline
2,000.00
1,000.00
-
2010 2011 2012 2013 2014
2
Figure 2 Indonesian Gas Production Chart 2010 - 2014 (source: SKK Migas)
Figure 3 Graph Gas Indonesia were exported in 2010-2014 (source: SKK Migas)
KonsumsiGas Domestik
Domestic Pipeline Domestic LNG
3,500.00
3,000.00
2,500.00
2,000.00
1,500.00
1,000.00
500.00
-
2010 2011 2012 2013 2014
Figure 4 Graph of Domestic Gas Consumption 2010 - 2014 (source: SKK Migas)
3
E. Natural Gas Processing Industry in Indonesia
In 2015 Indonesia had 4 (four) LNG the function as the LNG sending terminal was
processing plants, with an installed capacity of replaced by the LNG receiving terminal. For
39 MTPA. The LNG Plant is located in Arun the Tangguh LNG plant, one more LNG plant
(6.8 MTPA), Bontang East Kalimantan (22.6 will be built with a capacity of 3.8 MTPA.
MTPA), Tangguh in West Papua (7.6 MTPA) Meanwhile the government is building a
and Donggi Senoro Central Sulawesi (2 Floating LNG Plant with a capacity of 4.5
MTPA). For the Arun LNG Refinery due to the million tons per year to utilize natural gas from
supply of natural gas, from Exxon Mobil has the Abadi Masela Block field.
experienced a significant decrease, then in
2014,
4
Lembak, SOUTH
3 PT. SURYA ESA PERKASA SUMATRA 125 Ton LPG/DAY
4 PT. BINA BANGUN WIBAWA MUKTI Bekasi, WEST JAVA 150 Ton LPG/DAY
5 PT. SUMBER DAYA KELOLA Tugu Barat, WEST JAVA 18 Ton LPG/DAY
6 PT. MEDIA KARYA SENTOSA Gresik, EAST JAVA 160 Ton LPG/DAY
7 PT. YUDHISTIRA HAKA PERKASA Cilamaya, WEST JAVA 120 Ton LPG/DAY
9 PT. TUBAN LPG INDONESIA Tuban, EAST JAVA 480 Ton LPG/DAY
Centre Pondok, WEST
10 PT. PT. YUDHISTIRA ENERGY JAVA 160 Ton LPG/DAY
12 PT. MEDIA KARYA SENTOSA (PHASE II) Gresik, EAST JAVA 230 Ton LPG/ DAY
Sungai Gerong, SOUTH
13 PT. PERTASAMTAN GAS SUMATRA 710 Ton LPG/ DAY
5
LNG Pola Hilir
6
Figure 6 Infrastructure of National Natural Gas Transmission Pipes
7
Up to now the natural gas as an archipelago has designed to develop
transmission network that has been the Floating Storage Regasification Unit to
installed in Indonesia is 3,202 km on the overcome gas scarcity in several regions in
Indonesia.
island of Sumatra, 1,804 km on the island
of Java, and 295 km on the island of One FSRU that has been operating is
PT FSRU. Nusantara Regasification, this
Kalimantan, while the installed natural gas
FSRU has a capacity of 3 million tons per year
distribution network is 751 km on the island and has obtained LNG supply from the
of Sumatra and 2,520 km on Java Island. Bontang Refinery of 1.5 million tons per year
In addition to reducing dependence starting in 2012, for a period of 10 years.
on fuel oil, using the state budget has There is also a FSRU with a capacity of 3
million tons per year offshore Lampung,
carried out the construction of a city gas
offshore Central Java and offshore East Java
network for households in several cities Examples of PGN's FSRU in the Sunda
close to natural gas sources and has a Straits of Lampung.
natural gas transmission network..
8
H. Transportation of Natural Gas in the
form of Compressed Natural Gas
(CNG)
9
REFERENCES
1. ESDM, POTENSI DAN PELUANG DAN INVESTASI SEKTOR ENERGI DAN SUMBER
DAYA MINERAL, Kementerian ESDM, 2014
2. Dharmasaputra, Metta dkk, WAJAH BARU INSDUSTRI MIGAS INDONESIA, Kata Data
Indonesia, 2014
3. Tim Kementerian ESDM, PETA JALAN KEBIJAKAN GAS BUMI NASIONAL 2014-2030,
Kementerian ESDM, Jakarta, 2014
4. Widjajono Partowidagdo, MIGAS DAN ENERGI DI INDONESIA, Permasalahan dan
Analisis Kebijakan, Development Studies Foundation, Bandung, 2009