Job No:

Tann Designs & Engineers

149B, Selegie Road, Selegie Court Sheet No: of


Singapore 188314
Designed by: KAM Checked by: KH TANN Date: 8/11/2018
Title:

Rectification of Beam Stirrub Rebar.


2T16

2T25 2T25 + 1T20 2T25

4600 mm
R13-100

Concrete Strength = 30 N/mm2


60 mm
Rebar Strength = 250 N/mm2
500

100 mm

300

Consider Max Yield Strength of Rebar of Reinforcement Bar,


Yield Stress = 250 N/mm2
Max Area of Rebar = R10 Rebar
= 78.54 mm2

Max. Expected Load on rebar = 1.5 kN

For the Rectification works, welding is proposed with the considerations of weld
experience welder shall be deployed to the work and Proper Supervisor and monitoring of
Welding ensured on site.

Assumed 6mm Fillet Weld.


s = 6 mm
a = 4.2 mm
Job No:
Tann Designs & Engineers

149B, Selegie Road, Selegie Court Sheet No: of


Singapore 188314
Designed by: KAM Checked by: KH TANN Date: 8/11/2018
Title:

Welding Strength = fv,wd X a

Fv,wd = fu /√3 β = 0.85


β x γm0 γm0 = 1.2

fu = 410 N/mm2

Fv,wd = 232.1 N/mm2 < 250 N/mm2


Hence Weld Strength Govern

Fw,rd = Fv,wd X a
= 984.6 N/mm2

Consider Weld length of 60mm

Design Weld Stress = 1.5 X 1000


30 - 2 X 4.2

= 68 N/mm2 < Fw,rd


(492.3 N/mm2)
hence 60mm Weld Adequate..

Method of Rectification works

(i) The Beam Shall be Supported with 48mm Scaffolding.

(ii) Concrete shall be Be hacked up Required Depth to accommodate the


Welding and lapping of Reinforcement.

(iii) Rebar Shall be bent to Required shape and minimum 60mm shall be
lapped with existing shear reinforcement.

(iv) Welding of Reinforcement for the length of 60mm shall be carried out with
Proper supervision and experience welded shall be deployed to ensure works
done as according to designs.
a. Length of Weld - 60 mm
b. 6mm Fillet Weld
(v) The hacked Concrete Surface shall be filled back with 731 Repair mortar.