Design of Administrative Building

(Unit No. 19)

20.000 m

w w w w
w
UP
10.000

w D w w w

3.500

3.500

Footing 1.6X1.6X0.2m Avg. thick


M25conc = 2500.000 kg/m3 Floor finish = 2300.000 kg/m3

Floor Slab
Load kg/M2
SlabThickness = 0.150 m 375.000
Floor finish = 0.040 m 92.000
Live Load = 300.000 kg/m2 300.000
Total = 767.000

5.000 m

5.000 m Ly/Lx = 1.000

Maxm - ve moment at continuous edge = 901.225 kgm/m


σsteel = 2300.000 kg/cm2
σ cb = 83.000 kg/cm2 Clear cover,
m= 11.245 Slab= 3.000
k = mc/(t+mc)= 0.289 Beam= 3.000
j= 0.904 Column= 4.000
R= 10.827
d= 9.124 cm
D= 12.924 < than 15 cm o.k.

At = 3.674 cm2/m

Provide 12 mm Ø 30.727 cm c/c


Provide 12 mm Ø 200mm c/c both way top and bottom

BEAM
15.000
25.00 45.000 cm

Load coming from the slab = 9587.500


Self load = 257.500
Considering partition wal of 0.075 m,
Wt of wall = 2437.500
Considering some fixity,
M = 6656.250 kgm/m Total load over beam =
n = 11.951 < than 15 cm hence NA lies within Flange
At = 10.603 cm2
Provided 16 mmØ = 6.000 nos
Shear force = 6656.250
τ = 6.462 kg/cm2
100*As/(b*d) = 1.171
Permissible shear stress 4.2 kg/cm2

Vertical stirrups = 10 mm, 4 legged At = 3.140 cm2


Reidual shear Vs = 2435.250
Spacing = 104.389 mm Provide, 100 mm c/c

Column

Load over central column from beam = 26625.000


Self wt. 250X250 = 546.875
Total load = 27171.875
Let the Section of Column be 250 X 250 mm
Providing 1% steel Asc = 6.250 cm2
16 mm 4 nos
P= 70363.320 O.K.

As no wind / seismic considered hence this much allowance is O.K. for preliminary Design.

Binders, Provide 8 mmØ 150 c/c

Foundation
Considering permissiblle Bearing Capacity of soil = = 12.000

Load on Footing = 27171.875


Self Weight: 1.6m X 1.6 m X 0.20 ( AV)
Wt = 1280.000 kg

Total wt below footing = 28451.875


Stress on soil = 11114.014
= 11.110
O.K.

Upward reaction = = 10314.014


Moment = 8251.211
d = 16.956
D = 22.756

At = 16.403
Provide 16 mm rod @ 120 c/c
m clear

m clear

0.600
1.500

kg/M2

cm
cm
cm

kg
kg/m

kg

13312.500 kg

kg
kg
kg
T/M2

kg

kg

t/M2

kg/m2
kgm/m
cm
< 30 cm

cm2/m
Estimation of Administrative Building

1) Earthwork in excavation =
( normal soil )

2) E/W in filling with compaction =

3) Mat Conc ( M15 ) ( 75mm thk) =

4) RCC Work ( M25)


( only conc. Volume )
Footing =
Column =
Tie Beam at Plinth level =
Lintel =
( gr. & 1st)

Slab (1st floor+ 2nd floor ) =


( inclu stair opening )
Beams 25X30 (below slab) =
( for both floors )
Total =
5) Shuttering

Footing =
Plinth Beam =
( neglecting junctions ) =
Lintels =
Column =
( neglecting junctions ) =
Slab( side ) =
slab( bottom ) =
Beam =
Total =

6) BFS ( 75 mm ) on Gr. Floor =

7) M15 conc ( 75mm ) =


8) Mosaic in Floor
Gr. Floor and 1st Floor =

9) 25 mm Mosaic Skirting =

10) 250mm CBW ( 1:6 cement &sand ) =

11) 75mm CBW partition wall LS =

12) 12mm thk (1:5 ) cement sand


(inside plaster) =
13) 18mm outside plaster (1;5) =
14) 6mm ceiling plaster (1:4) =
15) Inside painting =
( 20% extra for partitionwall columns etc)
16) )utside Painting =
17) Steel Windows (1.8X1.2M) =
18) Rolling shutter 2 X 2.1 m =
19) Supplying Tor Steel ( Fe 500 ) and bending & Binding
2% of RCC conc volume =
n of Administrative Building

57.600 cum

166.080 cum

45.938 sq m

8.980 cum
8.250
5.313
4.275

60.000 cum

16.500

103.318 cum

14.400
44.000 sqm

36.000 sqm
132.000 sqm

9.000 sqm
200.000 sqm
84.000 sqm
519.400 sqm

200.000 sqm

200.000 sqm

400.000 sqm

19.200 sqm

99.855 cum

105.000 sqm

448.000 sqm
456.000 sqm
400.000 sqm
504.000 sqm

456.000 sqm
22 nos
1 no

16.221 ton
Design of Chemical House
(Unit No. 21)
20.00
A
2.60

Toilet
Alum & PE Store
Rolling Sutter

10.00
MCC Room

D A
Ground Floor Plan
3X3X2 - 3 nos Alum Tanks

C1 C2 C3 A C4
C5
Platform
Toilet

C16 C13 C11 C9 C6


C15

C14 C12 C10 C8 C7


A
First Floor Plan 2X2 M PE Tanks 2nos

Monorail hoist Over head Tank

5.50 m

5.00 m

GL GL
Section A-A

Sp. Gr of Alum solution is 1.05


Poly ethylene as water.

Let us distribute the total wt. of 3X3X2 m deep solution and the wt of tank and pedestals over the
floor of 10mX5m (3 nos)
Wt of Alum Solution = 56700.00 Kg
Wt of tank of 0.15 thick = 31927.50 kg

2.15
Pedestal= 16200.00 kg
0.80 3.30
0.45

Superimposed load on slab = 104827.50 kg


Distributed load = 2096.55 kg/m2
Thickness of Slab = 0.22 m
Wt of slab 550.00
Total wt = 2646.55
Say , 2800.00 kg/m2 cosidering floor finish etc

5.00

5.00

Mmax = 3290.00 kgm /m


d= 17.43 cm
D= 21.23 < than 22 cm O.K.

At = 8.70 cm2/m
10 mm dia @ 9.02 cm
Provide 8 cm c/c

Other Slab
Same as before 0.15 thk Roof slab same

Beam
Maxm loaded
From Slab = 35000.00 kg

0.22
0.40
0.25

Self load 1250.00 kg


considering 0.075 partition wal
Wall load = = 3750.00 kg

Total Load on Beam = = 40000.00 kg


Moment = = 20000.00 kg m
Shear = = 20000.00 kg
n = 16.511 < 22 cm hence the neutral axis lies within the Flange.
At = 16.821 cm2/m
provide 25 mmØ 4 nos

Shear stress = 14.10


100.As/(bd) = 1.38
Permissible shear stress = 4.2 kg /cm2
Vs = 14041.25 kg

Provide 4 legged 10 mmØ stirrups,


Spacing = 29.19 cm

Provide, Spacing 200 cm c/c to 300 cm c/c

Other beams as previous structure Admin Bldg.

STAIRs

Total rise = 5m 2.5 in each flight


Steps 1.2 M X 0.15 m

No. of Steps in each flight = 16.67 ≈ 16 nos

length of slab without 1m landing slab 4.00

Assume thickness of waist slab = 0.18 m

DL / m = 450.00 kg
wt of steps = 46.88 kg/m width
= 187.50 kg/m length
live load = = 300.00 kg.m2
total load per m / per m width = 937.50 kg/m/m
Moment = 1875.00 kgm/m
d= 13.16 cm
d= 16.96
Provide thickness = 0.18m O.K.

At = 3.18 cm2/m
Provide 12mm rod @ 35.59 cm
Provide 25 cm c/c

COLUMN

Load on Central column = 40000.00 kg


Hence 250X250 column is O.K. as before

Footing ( For C2 to C11) 2X2X0.35 M

Load coming on footing = 41921.88 kg


Self wt = 2X2X0.35 = 3000.00 kg

Total load on ground = 11230.47 o.k.

Provide 20 mm rod 120 c/c


Estimation of Chemical House
1) Earthwork in excavation
( normal soil )
2) E/W in filling with compaction
3) Mat Conc ( M15 ) ( 75mm thk)
4) RCC Work ( M25)
( only conc. Volume )
Footing
Column
Tie Beam at Plinth level
Lintel
( gr. & 1st)

Slab (1st floor+ 2nd floor )


( inclu stair opening )
Beams 25X30 (below slab)
( for both floors )
Total

Alum Tank wall =


floor =
Support =
PE Tank
wall =
Floor =
Support =

5) Shuttering

Footing
Plinth Beam
( neglecting junctions )
Lintels =
Column =
( neglecting junctions )
Slab( side ) =
slab( bottom ) =
Beam =
Total =

6) BFS ( 75 mm ) on Gr. Floor =

7) M15 conc ( 75mm ) =


8) Mosaic in Floor
Gr. Floor and 1st Floor =
9) 25 mm Mosaic Skirting =
10) 250mm CBW ( 1:6 cement &sand ) =
11) 75mm CBW partition wall LS =

12) 12mm thk (1:5 ) cement sand


inside plaster =
13) 18mm outside plaster (1;5) =
14) 6mm ceiling plaster (1:4) =
15) Inside painting =
( 20% extra for partitionwall columns etc)
16) outside Painting =
17) Steel Windows (1.8X1.2M) =
18) Rolling shutter 2 X 2.1 m =
19) Supplying Tor Steel ( Fe 500 ) and bending & Binding
2% of RCC conc volume
77.040 cum

181.632 cum
59.978 sq m

43.464 cum
11.531 cum
5.313 cum
4.275 cum

67.000 cum

18.000 cum

149.583 cum

10.800 cum
5.400 cum
6.075 cum

4.800 cum
1.200 cum
2.700 cum

16.560 sqm
44.000 sqm

36.000 sqm
184.500 sqm

22.300 sqm
200.000 sqm
118.000 sqm
621.360 sqm

200.000 sqm

200.000 sqm

400.000 sqm
19.200 sqm
149.535 cum
150.000 sqm

672.000 sqm
666.000 sqm
400.000 sqm
756.000 sqm

666.000 sqm
20 Nos.
1 No.

23.485 ton