1. DATOS GENERALES
Concreto: f´c=210kg/cm2
Acero: fy=4200kg/cm2
Longitudes en Ejes:
1
CONCRETO ARAMADO I 2013
2
CONCRETO ARAMADO I 2013
I. Pre-dimensionamiento de la viga:
Tramos apoyados:
l
h = 10 ; l: Luz libre mayor de los tramos
A B C D
655
h= 10
h = 65.5cm
h = 2b
h = 2(32)
h = 64cm
0.85f ′ c ba = As fy
Fy=4200 kg/cm2
As=21.84cm2
β1 = 0.85
3
CONCRETO ARAMADO I 2013
0.85f ′ c. β1 6000
ρb =
fy (6000 + fy )
ρb = 0.023
As
ρ=
b∗d
21.84
ρ=
32 ∗ 80.3
ρ = 0.0085
ρ < ρb
fy
w=ρ
f′c
4200
w = 0.0085
210
w = 0.17
MR = 76.27cm2
4
CONCRETO ARAMADO I 2013
Fy=4200 kg/cm2
As=21.84cm2
ρb = 0.023
A s
ρ = b∗d
21.84
ρ=
32 ∗ 80.3
ρ = 0.0085
MR = 76.27cm2
0.85f′ c∗β1 ∗C
fs = …………(1)
ρ∗d
6000(32 − c)
fs =
21.84
0.85 ∗ 210 ∗ 0.85 ∗ c 6000(32 − c)
=
0.0085 ∗ 32 21.84
c = 25.54cm
a = β1 ∗ c
5
CONCRETO ARAMADO I 2013
a = 0.85 ∗ 25.54
a = 21.71cm
6000(d−c) 6000(32−25.54)
fs = =
c 21.71
fs = 1868 kg/cm2
fs < fy)
a
MR = 0.18f′cab(d − )
2
21.71
MR = 0.18 ∗ 210 ∗ 21.71 ∗ 32(80.3 − )
2
MR = 18.23Tn. m
Asb = ρb ∗ b ∗ d
Asb = 59.10cm2
Asfy
a=
6.85(f ′ c ∗ b)
21.84 ∗ 4200
a=
6.85(210 ∗ 32)
a = 19.93cm
d − ab
MRB = Asb . fy ( )
2
80.3 − 32
MRB = 59.10 ∗ 4200 ( )
2
6
CONCRETO ARAMADO I 2013
MRB =59.94
ρmáx = o. 75(0.02125)
ρmáx = 0.016
fy
ωmáx = ρmáx … … … … . . (2)
f ′c
4200
ωmáx = 0.016
210
ωmáx = 0.32
MR máx = [ωmáx f ′ c(1 − 0.59ωmáx) ]bxd2
MR máx = 11.25kg. m
k = 63.11
MR máx = 13.06kg. m
0.85f ′ c ∗ β ∗ (6000)
ρb = … … … … … . . (3)
fy(6000 + fy)
7
CONCRETO ARAMADO I 2013
ρb = 0.021
Fy=4200 kg/cm2
As=21.84cm2
β1 = 0.85
∅ = 3/4"
r=2.5cm
MR=?
dc2 = 8.8cm
dc = 6.8cm
8
CONCRETO ARAMADO I 2013
h
C=
3
68
C= 3
C = 22.67cm
εs1 0.003 ∗ d1
= εs1 =
d1 c
0.003 ∗ 5.1
εs1 =
22.67
0.003∗5.1
εs1 = 22.67
εs1 = 0.00067
fy 4200kg/cm2
εy = =
εs 0.00067kg/cm2
εy = 0.063
εs > εy
T = As fy = 23.21cm2 ∗ 4200kg/cm2
T = As fy = 23.21cm2 ∗ 4200kg/cm2
T = 974.82Tn
T = 0.85f ′ c ∗ a ∗ b
T = 0.85 ∗ 210*21.71*34
T = 131.75Tn
9
CONCRETO ARAMADO I 2013
Toda sección que tenga valor menor que 11,82 Tn-m se tendrá que usar el
área de acero mínimo.
(As − A′ s) = 0,0159 × 30 × 54
M2′ = M ′ u − Mrρmax
M′
A′ s = fy(d−d
2
′)
; d’ = 5 cm
7128000
A′ s = 4200(54−5)
10
CONCRETO ARAMADO I 2013
A′ s = 34,64 cm2……………………………..*
∴ As = 25,76 + 34,64
∴ 𝐀𝐬 = 𝟔𝟎, 𝟒0 cm2
14
A′ s = 4200 × 30 × 54
A′ s = 5,4 cm2
M2′ = M ′ u − Mrρmax
M′
A′ s = fy(d−d
2
′)
; d’ = 5 cm
8826000
A′ s = 4200(54−5)
A′ s = 42,89 cm2……………………………..*
∴ As = 25,76 + 42,89
∴ 𝐀𝐬 = 𝟔𝟖, 𝟔𝟓 cm2
11
CONCRETO ARAMADO I 2013
M2′ = M ′ u − Mrρmax
M′
A′ s = fy(d−d
2
′)
; d’ = 5 cm
14258000
A′ s = 4200(54−5)
A′ s = 69,28 cm2……………………………..*
∴ As = 25,76 + 69,28
∴ 𝐀𝐬 = 𝟗𝟓, 𝟎𝟒 cm2
M2′ = M ′ u − Mrρmax
M′
A′ s = fy(d−d
2
′) ; d’ = 5 cm
10303000
A′ s = 4200(54−5)
A′ s = 50,06 cm2……………………………..*
∴ As = 25,76 + 50,06
∴ 𝐀𝐬 = 𝟕𝟓, 𝟖𝟐 cm2
12
CONCRETO ARAMADO I 2013
M2′ = M ′ u − Mrρmax
M′
A′ s = fy(d−d
2
′) ; d’ = 5 cm
5597000
A′ s = 4200(54−5)
A′ s = 27,19 cm2……………………………..*
∴ As = 25,76 + 27,19
∴ 𝐀𝐬 = 𝟓𝟐, 𝟗𝟓 cm2
M′
A′ s = fy(d−d
2
′)
; d’ = 5 cm
10303000
A′ s = 4200(54−5)
A′ s = 50,06 cm2……………………………..*
∴ As = 25,76 + 50,06
13
CONCRETO ARAMADO I 2013
∴ 𝐀𝐬 = 𝟕𝟓, 𝟖𝟐 cm2
M2′ = M ′ u − Mrρmax
M′
A′ s = fy(d−d
2
′)
; d’ = 5 cm
6504000
A′ s = 4200(54−5)
A′ s = 31,60 cm2……………………………..*
∴ As = 25,76 + 31,60
∴ 𝐀𝐬 = 𝟓𝟕, 𝟑𝟔 cm2
M2′ = M ′ u − Mrρmax
M′
A′ s = fy(d−d
2
′)
; d’ = 5 cm
11620000
A′ s = 4200(54−5)
A′ s = 56,46 cm2……………………………..*
14
CONCRETO ARAMADO I 2013
∴ As = 25,76 + 56,46
∴ 𝐀𝐬 = 𝟖𝟐, 𝟐𝟐 cm2
M2′ = M ′ u − Mrρmax
M′
A′ s = fy(d−d
2
′)
; d’ = 5 cm
11808000
A′ s = 4200(54−5)
A′ s = 57,38 cm2……………………………..*
∴ As = 25,76 + 57,38
∴ 𝐀𝐬 = 𝟖𝟑, 𝟏𝟒 cm2
M′
A′ s = fy(d−d
2
′)
; d’ = 5 cm
7076000
A′ s = 4200(54−5)
15
CONCRETO ARAMADO I 2013
A′ s = 34,38 cm2……………………………..*
∴ As = 25,76 + 34,38
∴ 𝐀𝐬 = 𝟔𝟎, 𝟏𝟒 cm2
M2′ = M ′ u − Mrρmax
M′
A′ s = fy(d−d
2
′)
; d’ = 5 cm
5597000
A′ s = 4200(54−5)
A′ s = 27,19 cm2……………………………..*
∴ As = 25,76 + 27,19
∴ 𝐀𝐬 = 𝟓𝟐, 𝟗𝟓 cm2
16
CONCRETO ARAMADO I 2013
3,50 m
ln = 7,00 m
(V)
V’u
V’ud
V’udc
Vcr Vcr/2
(d)
d
a
x
y
3,50 m
17
CONCRETO ARAMADO I 2013
ln
Vu = U × 2
7,00
Vu = 30,42 × 2
Vu = 106,47 Tn
Vu
V′u = ; Ф = 0,85
Ф
106,47
V′u = 0,85
V′u = 125,26 Tn
Vud = Vu − U × d
Vud = 106,47 − 30,42 × 0,54
Vud = 90,04 Tn
Vud
V′ud = Ф
90,04
V′ud = 0,85
V′ud = 105,93 Tn
V′ ud
𝒱ud = 2,6√f′c
b×d
2,6√210
105930
𝒱ud = 37,68 Kg/cm2
30×54
18
CONCRETO ARAMADO I 2013
11,74
x 125,26−11,74 y 125,26−
2
= =
3,5 125,26 3,5 125,26
x = 3,17 m y = 3,34 m
V. Determinación del tipo de armadura que cubre el área de acero para los
estribos:
A. Espaciamiento Máximo:
ln ln
Primer criterio: >5 ó ≤5
d d
ln 700
= = 13 > 5 ; Viga esbelta
d 54
Av×fy
Smax = 3,5×b
1,42×4200
Smax = 3,5×30
Smax = 56,80 cm
19
CONCRETO ARAMADO I 2013
d 54
Smax = 2 = 2
Smax = 27 cm (no se considera)
∴ Smax = 56,80 cm
B. Espaciamiento Mínimo:
Primer criterio:
Segundo criterio:
Av×fy×d
Smin = (V′ ud−Vcr) (cosα + senα) ; α = 90o
1,42×4200×54
Smin = (105930−11740) (cos90 + sen90)
Smin = 3,42 cm
∴ Smin = 10 cm
Av×fy×d
V’udc = (cosα + senα) + Vcr
Smax
1,42×4200×54
V’udc = (cos90 + sen90) + 11740
56,80
V’udc = 17,41 Tn
Por semejanza de ∆:
20
CONCRETO ARAMADO I 2013
a V′ u−V’udc
=
3,5 V′ u
a 125,26−17,41
=
3,5 125,26
a = 3,01 m
Sconf = b = 30 cm
Sconf = 48 cm
∴ Sconf = 30 cm
Smin = 10,00 cm
Smax = 57,00 cm
Sconf = 30,00 cm
260 57
317
Stotal = 350 cm
21