CONCRETO ARAMADO I 2013

ANALISIS Y DISEÑO DE VIGAS Y COLUMNAS


DE UNA VIVIENDA DE 3 PISOS

1. DATOS GENERALES

Diseño de una edificación (pórtico) de concreto armado de 3 niveles,


Se consideró lo siguiente:

 Concreto: f´c=210kg/cm2
 Acero: fy=4200kg/cm2

Longitudes en Ejes:

EJE “X” LONGITUD EJE “Y” LONGITUD


A-B 6.55m 1-2 6.55m
B-C 6.50m 2-3 6.55m
C-D 6.40m 3-4 6.55m
D-E 6.29m 4-5 6.55m

1
CONCRETO ARAMADO I 2013

2
CONCRETO ARAMADO I 2013

I. Pre-dimensionamiento de la viga:

A. Análisis mediante fórmulas y plano:

 Tramos apoyados:

l
h = 10 ; l: Luz libre mayor de los tramos

6.55 6.50 6.40 6.29

A B C D

655
h= 10

h = 65.5cm

 Tomando en cuenta que:

h = 2b
h = 2(32)
h = 64cm

0.85f ′ c ba = As fy

0.85 ∗ 210 ∗ 32 ∗ 160.65 = As ∗ 2400

0.85 ∗ 210 ∗ 34 ∗ 160.65


= As
4200
As = 21.84cm2

MOMENTO RESISTENTE EN VIGAS BAJO ARMADAS

F’c= 210 kg/cm2

Fy=4200 kg/cm2

As=21.84cm2

β1 = 0.85

3
CONCRETO ARAMADO I 2013

0.85f ′ c. β1 6000
ρb =
fy (6000 + fy )

0.85 ∗ 210 ∗ 0.85 ∗ 6000


ρb =
4200(6000 + 4200)

ρb = 0.023

As
ρ=
b∗d
21.84
ρ=
32 ∗ 80.3
ρ = 0.0085

ρ < ρb

fy
w=ρ
f′c
4200
w = 0.0085
210

w = 0.17

MR = 0.17 ∗ 32 ∗ 80.32 ∗ (210)(1 − 0.59(0.17))

MR = 76.27cm2

4
CONCRETO ARAMADO I 2013

DETERMINACION DE MOMENTO RESISTENTE (MR)

F’c= 210 kg/cm2

Fy=4200 kg/cm2

As=21.84cm2

0.85 ∗ 210 ∗ 0.85 ∗ 6000


ρb =
4200(6000 + 4200)

ρb = 0.023
A s
ρ = b∗d
21.84
ρ=
32 ∗ 80.3
ρ = 0.0085

MR = 0.17 ∗ 32 ∗ 80.32 ∗ (210)(1 − 0.59(0.17))

MR = 76.27cm2

0.85f′ c∗β1 ∗C
fs = …………(1)
ρ∗d

0.85 ∗ 210 ∗ 0.85 ∗ c


fs =
0.0085 ∗ 32
6000(d−c)
fs = ………….(2)
c

6000(32 − c)
fs =
21.84
0.85 ∗ 210 ∗ 0.85 ∗ c 6000(32 − c)
=
0.0085 ∗ 32 21.84
c = 25.54cm

a = β1 ∗ c

5
CONCRETO ARAMADO I 2013

a = 0.85 ∗ 25.54

a = 21.71cm
6000(d−c) 6000(32−25.54)
fs = =
c 21.71

fs = 1868 kg/cm2

fs < fy)

1868 < 4200

a
MR = 0.18f′cab(d − )
2

21.71
MR = 0.18 ∗ 210 ∗ 21.71 ∗ 32(80.3 − )
2
MR = 18.23Tn. m

Asb = ρb ∗ b ∗ d

Asb = 0.023 ∗ 32 ∗ 80.3

Asb = 59.10cm2

Asfy
a=
6.85(f ′ c ∗ b)

21.84 ∗ 4200
a=
6.85(210 ∗ 32)

a = 19.93cm

d − ab
MRB = Asb . fy ( )
2
80.3 − 32
MRB = 59.10 ∗ 4200 ( )
2

6
CONCRETO ARAMADO I 2013

MRB =59.94

CUANTILLA MAXIMA EN VIGAS DE CONCRETO ARMADO

ρmáx = o. 75ρb … … … (1)

ρmáx = o. 75(0.02125)

ρmáx = 0.016

MR máx = ωmáx b. d2 f′c(1 − 0.59ωmáx)

MR máx = 0.32 ∗ 32 ∗ 80.32 ∗ 210(1 − 0.59(0.318))

MR máx = 11.26 kg. m

fy
ωmáx = ρmáx … … … … . . (2)
f ′c
4200
ωmáx = 0.016
210
ωmáx = 0.32
MR máx = [ωmáx f ′ c(1 − 0.59ωmáx) ]bxd2

MR máx = [0.32 ∗ 210(1 − 0.59(0.32)]32 ∗ 80.32

MR máx = 11.25kg. m

MR máx = [k]bxd2 k = ωmáx f′c(1 − 0.19ωmáx )

MR máx = [k]bxd2 k = 0.32 ∗ 210 ∗ (1 − 0.19 ∗ 0.32)

k = 63.11

MR máx = [6.33] ∗ 34 ∗ 80.32

MR máx = 13.06kg. m

0.85f ′ c ∗ β ∗ (6000)
ρb = … … … … … . . (3)
fy(6000 + fy)

0.85 ∗ 210 ∗ 0.85 ∗ (6000)


ρb =
4200(6000 + 4200)

7
CONCRETO ARAMADO I 2013

ρb = 0.021

SECCIONES DE VIGAS SIMETRICAS/ METODO DE TANTEOS

F’c= 210 kg/cm2

Fy=4200 kg/cm2

As=21.84cm2

β1 = 0.85

∅ = 3/4"

r=2.5cm

MR=?

2∅1" = 2(5.10) − − − − − −10.20cm2

4∅3/4" = 4(2.84) − − − −11.36cm2

AST ∗ dc = As1 ∗ dc2 + As2 ∗ dc1

dc1 = r + ∅3/4" + 1⁄2 "∅ ∗ 3⁄4 "

dc1 = 2.5 + 0.876 + 1⁄2 (3.42)

dc1 = 5.08 ≅ 5.1cm

dc2 = 2.5cm + 0.876cm + 3.42 + 2cm2

dc2 = 8.8cm

As2 dc1 + As2 dc2


dc =
AsT
11.36∗5.1+10.2∗8.8
dc = 21.56

dc = 6.8cm

8
CONCRETO ARAMADO I 2013

h
C=
3
68
C= 3

C = 22.67cm

εs1 0.003 ∗ d1
= εs1 =
d1 c

0.003 ∗ 5.1
εs1 =
22.67
0.003∗5.1
εs1 = 22.67

εs1 = 0.00067

fy 4200kg/cm2
εy = =
εs 0.00067kg/cm2

εy = 0.063

εs > εy

T = As fy = 23.21cm2 ∗ 4200kg/cm2

T = As fy = 23.21cm2 ∗ 4200kg/cm2

T = 974.82Tn

T = 0.85f ′ c ∗ a ∗ b

T = 0.85 ∗ 210*21.71*34

T = 131.75Tn

I. CHEQUEO DEL MOMENTO MÁXIMO POR CUANTÍA MÁXIMA:

Mrρmax = Kbd2 ; K = 54,35 (Por tabla)

9
CONCRETO ARAMADO I 2013

Mrρmax = 54,35 × 30 × (60 − 6)2

Mrρmax = 47,54 Tn-m

Como M’u > Mrρmax en todas las secciones entonces se consideran V. D.


A.

II. CHEQUEO DEL MOMENTO POR CUANTÍA MÍNIMA:

Mrρmin = K min bd2 ; K min = 13,51 (Por tabla)

Mrρmin = 13,51 × 30 × 542

Mrρmin = 11,82 Tn-m

 Toda sección que tenga valor menor que 11,82 Tn-m se tendrá que usar el
área de acero mínimo.

III. Diseño de área de acero en la viga:

Vigas doblemente armadas en el cuadro: (V. D. A.)

 Apoyo “5”: (118,82 Tn-m)

(As − A′ s) = ρmax × b × d ; ρmax = 0,0159 (Por tabla)

(As − A′ s) = 0,0159 × 30 × 54

(As − A′ s) = 25,76 cm2………………………………………*

M2′ = M ′ u − Mrρmax

M2′ = 118,82 − 47,54

M2′ = 71,28 Tn-m…………………………………..*

M′
A′ s = fy(d−d
2
′)
; d’ = 5 cm

7128000
A′ s = 4200(54−5)

10
CONCRETO ARAMADO I 2013

A′ s = 34,64 cm2……………………………..*

∴ As = 25,76 + 34,64

∴ 𝐀𝐬 = 𝟔𝟎, 𝟒0 cm2

Chequeo por cuantía mínima: (A’s)


14
A′ s = ×b×d
fy

14
A′ s = 4200 × 30 × 54

A′ s = 5,4 cm2

 Tramo “5-4”: (135,80 Tn-m)

(As − A′ s) = 25,76 cm2………………………………………*

M2′ = M ′ u − Mrρmax

M2′ = 135,80 − 47,54

M2′ = 88,26 Tn-m…………………………………..*

M′
A′ s = fy(d−d
2
′)
; d’ = 5 cm

8826000
A′ s = 4200(54−5)

A′ s = 42,89 cm2……………………………..*

∴ As = 25,76 + 42,89

∴ 𝐀𝐬 = 𝟔𝟖, 𝟔𝟓 cm2

 Apoyo “(4-5)’”: (190,12 Tn-m)

(As − A′ s) = 25,76 cm2………………………………………*

11
CONCRETO ARAMADO I 2013

M2′ = M ′ u − Mrρmax

M2′ = 190,12 − 47,54

M2′ = 142,58 Tn-m…………………………………..*

M′
A′ s = fy(d−d
2
′)
; d’ = 5 cm

14258000
A′ s = 4200(54−5)

A′ s = 69,28 cm2……………………………..*

∴ As = 25,76 + 69,28

∴ 𝐀𝐬 = 𝟗𝟓, 𝟎𝟒 cm2

 Apoyo “(4-3)’”: (150,57 Tn-m)

(As − A′ s) = 25,76 cm2………………………………………*

M2′ = M ′ u − Mrρmax

M2′ = 150,57 − 47,54

M2′ = 103,03 Tn-m…………………………………..*

M′
A′ s = fy(d−d
2
′) ; d’ = 5 cm

10303000
A′ s = 4200(54−5)

A′ s = 50,06 cm2……………………………..*

∴ As = 25,76 + 50,06

∴ 𝐀𝐬 = 𝟕𝟓, 𝟖𝟐 cm2

12
CONCRETO ARAMADO I 2013

 Tramo “4-3”: (103,51 Tn-m)

(As − A′ s) = 25,76 cm2………………………………………*

M2′ = M ′ u − Mrρmax

M2′ = 103,51 − 47,54

M2′ = 55,97 Tn-m…………………………………..*

M′
A′ s = fy(d−d
2
′) ; d’ = 5 cm

5597000
A′ s = 4200(54−5)

A′ s = 27,19 cm2……………………………..*

∴ As = 25,76 + 27,19

∴ 𝐀𝐬 = 𝟓𝟐, 𝟗𝟓 cm2

 Apoyo “3”: (150,57 Tn-m)

(As − A′ s) = 25,76 cm2………………………………………*


M2′ = M ′ u − Mrρmax

M2′ = 150,57 − 47,54

M2′ = 103,03 Tn-m…………………………………..*

M′
A′ s = fy(d−d
2
′)
; d’ = 5 cm

10303000
A′ s = 4200(54−5)

A′ s = 50,06 cm2……………………………..*

∴ As = 25,76 + 50,06

13
CONCRETO ARAMADO I 2013

∴ 𝐀𝐬 = 𝟕𝟓, 𝟖𝟐 cm2

 Tramo “3-2”: (112,58 Tn-m)

(As − A′ s) = 25,76 cm2………………………………………*

M2′ = M ′ u − Mrρmax

M2′ = 112,58 − 47,54

M2′ = 65,04 Tn-m…………………………………..*

M′
A′ s = fy(d−d
2
′)
; d’ = 5 cm

6504000
A′ s = 4200(54−5)

A′ s = 31,60 cm2……………………………..*

∴ As = 25,76 + 31,60

∴ 𝐀𝐬 = 𝟓𝟕, 𝟑𝟔 cm2

 Apoyo “(2-3)’”: (163,74 Tn-m)

(As − A′ s) = 25,76 cm2………………………………………*

M2′ = M ′ u − Mrρmax

M2′ = 163,74 − 47,54

M2′ = 116,20 Tn-m…………………………………..*

M′
A′ s = fy(d−d
2
′)
; d’ = 5 cm

11620000
A′ s = 4200(54−5)

A′ s = 56,46 cm2……………………………..*

14
CONCRETO ARAMADO I 2013

∴ As = 25,76 + 56,46

∴ 𝐀𝐬 = 𝟖𝟐, 𝟐𝟐 cm2

 Apoyo “(2-1)’”: (165,62 Tn-m)

(As − A′ s) = 25,76 cm2………………………………………*

M2′ = M ′ u − Mrρmax

M2′ = 165,62 − 47,54

M2′ = 118,08 Tn-m…………………………………..*

M′
A′ s = fy(d−d
2
′)
; d’ = 5 cm

11808000
A′ s = 4200(54−5)

A′ s = 57,38 cm2……………………………..*

∴ As = 25,76 + 57,38

∴ 𝐀𝐬 = 𝟖𝟑, 𝟏𝟒 cm2

 Tramo “2-1”: (118,30 Tn-m)

(As − A′ s) = 25,76 cm2………………………………………*


M2′ = M ′ u − Mrρmax

M2′ = 118,30 − 47,54

M2′ = 70,76 Tn-m…………………………………..*

M′
A′ s = fy(d−d
2
′)
; d’ = 5 cm

7076000
A′ s = 4200(54−5)

15
CONCRETO ARAMADO I 2013

A′ s = 34,38 cm2……………………………..*

∴ As = 25,76 + 34,38

∴ 𝐀𝐬 = 𝟔𝟎, 𝟏𝟒 cm2

 Apoyo “1”: (103,51 Tn-m)

(As − A′ s) = 25,76 cm2………………………………………*

M2′ = M ′ u − Mrρmax

M2′ = 103,51 − 47,54

M2′ = 55,97 Tn-m…………………………………..*

M′
A′ s = fy(d−d
2
′)
; d’ = 5 cm
5597000
A′ s = 4200(54−5)

A′ s = 27,19 cm2……………………………..*

∴ As = 25,76 + 27,19

∴ 𝐀𝐬 = 𝟓𝟐, 𝟗𝟓 cm2

Considerando los valores obtenidos se tendrá la siguiente tabla:


5 5-4 (4-5)’ (4-3)’ 4-3 3 3-2 (2-3)’ (2-1)’ 2-1 1
A’s 34,64 42,89 69,28 50,06 27,19 50,06 31,60 56,46 57,38 34,3 27,19
8
As 60,40 68,65 95,04 75,82 52,95 75,82 57,36 82,22 83,14 60,1 52,95
4
Фs’ 4Ф1’’ 4Ф1’’ 4Ф1’’ 5Ф18’
3 3Ф1’’ 3
5Ф18’ 4Ф1’’ 5Ф1’’ 5Ф1’’ 4Ф1’’ 3Ф1’’
+5Ф4’’ +2Ф1 +5Ф1 +3Ф1 +3Ф1
3 3 3 3 3
’ +4Ф4’ ’ +4Ф4’ +5Ф4 +4Ф4’
3 3 3 3
’’ ’’ ’ ’ ’’ ’’ ’’ ’
8 8 8 8
Фs 2Ф1’’ 4Ф1’’ 5Ф1’’ 5Ф1’’ 4Ф1’’ 5Ф1’’ 5Ф1’’ 6Ф1’’ 6Ф1’’ 4Ф1’’ 4Ф1’’
+5Ф1 +5Ф1 +7Ф1 +5Ф1 +3Ф1 +5Ф1 +3Ф1 +5Ф1 +5Ф1 +4Ф1 +3Ф1
3 3 3 3 3 3 3 3 3 3 3
8
’’ 8
’’ 8
’’ 8
’’ 8
’’ 8
’’ 8
’’ 8
’’ 8
’’ 8
’’ 8
’’

16
CONCRETO ARAMADO I 2013

DISEÑO DE ESTRIBOS EN LA VIGA MÁS CRÍTICA

3,50 m

ln = 7,00 m

(V)

V’u
V’ud
V’udc

Vcr Vcr/2
(d)

d
a
x
y

3,50 m

 f’c = 210 kg/cm2


 fy = 4200 kg/cm2
 bxh = 30x60 cm2
 d = 54 cm
 𝒱cr = 0,5√f′c

17
CONCRETO ARAMADO I 2013

I. Valor del cortante último incrementado “V’u”:

ln
Vu = U × 2
7,00
Vu = 30,42 × 2
Vu = 106,47 Tn
Vu
V′u = ; Ф = 0,85
Ф
106,47
V′u = 0,85
V′u = 125,26 Tn

II. Valor del cortante de la viga incrementada “V’ud”:

Vud = Vu − U × d
Vud = 106,47 − 30,42 × 0,54
Vud = 90,04 Tn

Vud
V′ud = Ф
90,04
V′ud = 0,85
V′ud = 105,93 Tn

III. Valor del cortante crítico máximo de la sección de viga “Vcr”:

Vcr = 𝒱cr × b × d ; 𝒱cr = 0,5√f′c


Vcr = 0,5√f′c × b × d
Vcr = 0,5√210 × 30 × 54
Vcr = 11,74 Tn

∴ Vcr < V′ud ⟹ Necesita estribos


(11,74 Tn) (105,93Tn)

V′ ud
𝒱ud = 2,6√f′c
b×d
2,6√210
105930
𝒱ud = 37,68 Kg/cm2
30×54

𝒱ud = 65,39 Kg/cm2

18
CONCRETO ARAMADO I 2013

𝒱ud > 2,6√f′c ⟹ No necesita estribos


(65,39 Kg/cm2) (37,68 Kg/cm2)

∴ Si necesita estribos por el primer caso.

IV. Hallando el valor de “X” y el valor de “Y”:

Valor de “x”: Valor de “y”:


Vcr
x V′ u−Vcr y V′ u−
2
= =
3,5 V′ u 3,5 V′ u

11,74
x 125,26−11,74 y 125,26−
2
= =
3,5 125,26 3,5 125,26

x = 3,17 m y = 3,34 m

V. Determinación del tipo de armadura que cubre el área de acero para los
estribos:

Como diámetro de estribo mínimo asumir Ф3/8’’

Av = 2AsФ3/8’’ Av: Área de la viga


Av = 2(0,71) As: Área del acero
Av = 1,42 cm2

VI. Espaciamientos de armadura transversal para los estribos máximos y


mínimos:

A. Espaciamiento Máximo:

ln ln
 Primer criterio: >5 ó ≤5
d d

ln 700
= = 13 > 5 ; Viga esbelta
d 54

Av×fy
Smax = 3,5×b

1,42×4200
Smax = 3,5×30

Smax = 56,80 cm

 Segundo criterio: 𝒱ud ≤ 1,6√f′c

19
CONCRETO ARAMADO I 2013

𝒱ud = 65,39 Kg/cm2


1,6√f′c = 1,6√210
23,19 Kg/cm2

(65,39) > (23,19) ⟹ No se cumple

d 54
Smax = 2 = 2
Smax = 27 cm (no se considera)

∴ Smax = 56,80 cm

B. Espaciamiento Mínimo:

 Primer criterio:

Smin = 10 cm (Según A. C. I.)

 Segundo criterio:

Av×fy×d
Smin = (V′ ud−Vcr) (cosα + senα) ; α = 90o

1,42×4200×54
Smin = (105930−11740) (cos90 + sen90)

Smin = 3,42 cm

Tomando el mayor de ambos criterios

∴ Smin = 10 cm

C. Determinación de la ordenada central para un espaciamiento máximo


entre estribos:

Av×fy×d
V’udc = (cosα + senα) + Vcr
Smax

1,42×4200×54
V’udc = (cos90 + sen90) + 11740
56,80

V’udc = 17,41 Tn

Por semejanza de ∆:

20
CONCRETO ARAMADO I 2013

a V′ u−V’udc
=
3,5 V′ u

a 125,26−17,41
=
3,5 125,26
a = 3,01 m

D. Determinación del espaciamiento de los estribos que deberán


ubicarse por confinamiento:

 Sconf = b = 30 cm

 Sconf = 48 cm

 Sconf = 16ФL ; ФL = 1’’ = 2,54 cm


Sconf = 16 × 2,54 cm
Sconf = 40,64 cm

Tomando el menor de los tres criterios

∴ Sconf = 30 cm

E. Distribución de estribos en viga:

Smin = 10,00 cm
Smax = 57,00 cm
Sconf = 30,00 cm

26 c/10cm + 1 c/57cm + R c/30cm

260 57

317

Stotal = 350 cm