This document covers structural analysis and design of ERH (Emergency Reclaim Hopper) of 1X 800 MW
WANAKBORI TPS.
The ERH is underground structure of base size 9.8 x 26.4 mt and approximately 14 mt in
depth. It is supported a roof covered steel shed which is modeled seperatly and reactions
of that transfered on the support location. It consist four floor level at 64.256 mt, 69.3mt,
75.2 mt and 78.7 mt respectively. To access the each floor, stairs are provided and to handle
the equipments openings and monorails are provided as per latest mechanical load data available.
B. UNIT OF MEASUREMENT
Unit of measurement used in analysis of structure is SI units.
GEOTECHNICAL INVESTIGATION
2 REPORT IS-4-DC-687-100-C003
Temperature –
(a) Mean daily minimum ambient temperature during coldest month of the year –10.8 0c
(b) Mean daily max ambient temperature during hotest month of the year –40.8 0c
E. Material Used:
Grade of Concrete shall be M25 as pe IS-456 2000
Grade of Steel reinforcement shall be Fe 500D confirming to IS-1786.
2.0 ANALYSIS AND DESIGN PHILOSOPHY
a) The foundation mat and ERH Structure are analysed using STAAD Pro software .
b) The foundation mat and Walls are modeled using 4 noded quadrilateral elements. Slab is not
modeled in staad and designed seperatly. All beams and column modeled in staad an designed.
c) The water table is considered at RL 70 .0 m above MSL.
d) The lateral soil pressure is considering soil at rest.
e) The mat is supported on soil
f) For calculating the spring stiffness for the soil, the permissible deflection is 75mm.
Net allowable bearing capacity of soil = qnet 21 ton/m2 for 75mm settlement.
Gross allowable bearing capacity of soil = qnet+ γs.D = 47.46 ton/m2
F = 47.46 ton/m2
∆ = 0.075 m
STRENGTH OF MATERIALS
1) CONCRETE
REINFORCED CONCRETE : fck = M25 N/mm2
2) REINFORCEMENT (GRADE) : fy = 500 N/mm2
UNIT WEIGHTS
Earth Pressure
Ko = 1-Sin() Ko = 0.5
coff.at rest
Other Loads
surcharge Load considered for bull dozer , Wsur 1 = 10.73 T/m2
Minimum surcharge Load considered , Wsur 2 = 2.0 T/m2
Depth of ground water table below the HPP, GWT = 6.94 m
LC No. Combination
201 LOAD COMB 201 DL+HL+LL+SP+SL+MR+LDO+SHED
202 LOAD COMB 202 DL+HL+LL+SP+SL+MR+LDO+SHED + EQX
203 LOAD COMB 203 DL+HL+LL+SP+SL+MR+LDO+SHED - EQX
204 LOAD COMB 204 DL+HL+LL+SP+SL+MR+LDO+SHED + EOZ
205 LOAD COMB 205 DL+HL+LL+SP+SL+MR+LDO+SHED - EQZ
206 LOAD COMB 206 DL+HL+LL+SP+SL+MR+LDS+SHED
207 LOAD COMB 207 DL+HL+LL+SP+SL+MR+LDS+SHED + EQX
208 LOAD COMB 208 DL+HL+LL+SP+SL+MR+LDS+SHED - EQX
209 LOAD COMB 209 DL+HL+LL+SP+SL+MR+LDS+SHED + EQZ
210 LOAD COMB 210 DL+HL+LL+SP+SL+MR+LDS+SHED - EQZ
211 LOAD COMB 211 DL+SP+SL+MR+LDO+SHED+WP+SPSAT
212 LOAD COMB 212 DL+SP+SL+MR+LDO+SHED+WP+SPSAT + EQX
213 LOAD COMB 213 DL+SP+SL+MR+LDO+SHED+WP+SPSAT - EQX
214 LOAD COMB 214 DL+SP+SL+MR+LDO+SHED+WP+SPSAT + EQZ
215 LOAD COMB 215 DL+SP+SL+MR+LDO+SHED+WP+SPSAT - EQZ
216 LOAD COMB 216 DL+SP+SL+MR+LDS+SHED+WP+SPSAT
217 LOAD COMB 217 DL+SP+SL+MR+LDS+SHED+WP+SPSAT + EQX
218 LOAD COMB 218 DL+SP+SL+MR+LDS+SHED+WP+SPSAT - EQX
219 LOAD COMB 219 DL+SP+SL+MR+LDS+SHED+WP+SPSAT + EQZ
220 LOAD COMB 220 DL+SP+SL+MR+LDS+SHED+WP+SPSAT - EQX
4.4 LOAD CALCULATION FOR STAAD
Seismic load shall be in accordance with IS 1893 and Seismic parameters define as follow:
(a) SEISMIC ZONE =III as per Clause 5.00 K9213R-EPC-SPC-001- VOL -2G1
(b) ZONE FACTOR= 0.16
(c ) IMPORTANCE FACTOR= 1.75
(d) RESPONSE REDUCTION FACTOR= 3
(e) DAMPING 0.05
PRESSURE CALCULATION OF HOPPER
Live Load of 5 KN/m2 is considered on +65.456 ,+75.2 ,and + 64.256 with bull dozer load
& 2 m coal heap load on the top floor at + 78.7
live load on stair case is taken as 5 KN/m^2
Operational load of the bulldozer = 44 T (as per bulldozer spec BEML BS6D170-1
track width of the bulldozer = 0.61 m
Contact length of bulldozer = 3.36 m
Pressure = 22/(0.61 x 3.36) = 10.73T/m^2 = 105.23 KN/m^2
Soil pressure due to surcharge upto + 75.2 due to surcharge of bulldozer = 0.5 x 105.23 = 52.165 KN/m
Soil pressure due to surcharge below + 75.2 = Ko x wsr2 = 0.5 x 23.54 = 11.77 KN/m
Load Case 8: Monorail wt.
The maximum Reaction of monorail with 25% of impact load is applied on the support location of floor beam.
At level 69.3 mt
At level 64.25 mt
At level 69.3 mt
At level 64.25 mt
Load Case 11: Load from ERH shed
Load Case 12: Water pressure
a) 3-Dimensional View
b) General Arrangement
6.0 BASE PRESSURE CHECK:
Base pressure check is performed for the load comb. of 201 and 220
Hence ok.