You are on page 1of 17

Saudi Aramco 2616-ENG (03/99)

OPRNS SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
CERT

EC

EC
ENGG

CW

CW
ISSUED FOR COMMENT AND IFB ENQUIRY (AFW REV A1)

MARJAN DEVELOPMENT PROGRAM


ISSUED FOR IFB (REV B1)

BI-10-09003
TANAJIB GAS PLANT (TGP)
DESCRIPTION

04/05/2018 BI-10-09003

04/18/2018 BI-10-09003
JO/EWO

FACILITIES SPECIFICATION
DATE
REV. NO.

TANAJIB SOLID WASTE LANDFILL (SWL)


A

DISCIPLINE
ENGINEER
craig.warrender
________________

DATE ___________

PROJECT
ENGINEER SCOPE OF WORKS
SPECIFICATION
elliot.cairnes
________________

DATE ___________

CERTIFIED

________________

DATE ___________

CONSTRUCTION
AGENCY

________________

DATE ___________

OPERATIONS

________________

DATE ___________
CONTROL NUMBER

DATE _____________
BY: ______________
VERIFICATION
EDSD
THIS INDICATES THAT REV. NO. ____________

APPROVAL/CERTIFICATION REQUIREMENTS,

(DCC)NO. _______________________________
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

FACILITIES SPECIFICATION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

FACILITIES SCOPE OF WORKS SPECIFICATION DOC 1


T80 A PP-312856
TANAJIB SOLID WASTE LANDFILL (SWL) OF B
SAUDI ARABIA JO / EWO: BI-10-09003 17
TANAJIB
T80-A-PP-312856 Rev B DOC CLASS: 4b DSN: 22810
Saudi Aramco 2616-ENG (03/99)

OPRNS SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

REVISION AFW A1 AFW B1


Signature Signature Signature
CERT

DATE 04/05/2018 04/18/2018


EC

EC

EXT. APP. BY E. Cairnes EC E. Cairnes elliot.cairnes


ENGG

QA APP. BY S. Cahill SC S. Cahill


CW

CW

sean.cahill
ISSUED FOR COMMENT AND IFB ENQUIRY (AFW REV A1)

TABLE OF CONTENTS

1. PURPOSE 3
2. SCOPE 3
3. DEFINITIONS 3
ISSUED FOR IFB (REV B1)

4. REFERENCE DOCUMENTS 5
5. RESPONSIBILITIES 6
DESCRIPTION

6. TANAJIB SOLID WASTE LANDFILL (SWL) - SCOPE OF WORKS AND


SPECIFICATION 6
04/05/2018 BI-10-09003

04/18/2018 BI-10-09003

6
JO/EWO

6.1 Siting Study and Proposed Site Location


6.2 Functional Requirements 8
9
DATE

6.3 Site Access and Security


6.4 Waste Reception Area 10
REV. NO.

DISCIPLINE
6.5 Landfill Cells 11
ENGINEER

________________ 6.6 Waste Supervisor Office and Ancillaries 12


DATE ___________
7. APPENDIX 1: LITTER-FENCE EXAMPLES 15
PROJECT
ENGINEER
8. APPENDIX 2: TYPICAL LANDFILL OPERATING EQUIPMENT 16
________________

DATE ___________ 9. APPENDIX 3: TANAJIB SWL - PLOT PLAN SKETCH 17


CERTIFIED

________________

DATE ___________

CONSTRUCTION
AGENCY

________________

DATE ___________

OPERATIONS

________________

DATE ___________
CONTROL NUMBER

DATE _____________
BY: ______________
VERIFICATION
EDSD
THIS INDICATES THAT REV. NO. ____________

APPROVAL/CERTIFICATION REQUIREMENTS,

(DCC)NO. _______________________________
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

FACILITIES SPECIFICATION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

FACILITIES SCOPE OF WORKS SPECIFICATION DOC 2


T80 A PP-312856
TANAJIB SOLID WASTE LANDFILL (SWL) OF B
SAUDI ARABIA JO / EWO: BI-10-09003 17
TANAJIB
T80-A-PP-312856 Rev B DOC CLASS: 4b DSN: 22810
Saudi Aramco 2616-ENG (03/99)

OPRNS SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

1. PURPOSE
CERT

EC

EC

This Purpose of this document is to describe the Tanajib Class II and III Solid
ENGG

Waste Landfill (SWL) Scope of Works Specification.


CW

CW

2. SCOPE
ISSUED FOR COMMENT AND IFB ENQUIRY (AFW REV A1)

The SWL Scope comprises the works required to construct a Class II and III
SWL is to be described as the Tanajib SWL including its access routes
illustrated as a polygon in the permanent Land Use Permit application drawing
number T80-A-PP-033003-001.

3. DEFINITIONS
ISSUED FOR IFB (REV B1)

(Extracts from SAES-S-007 and SA EHC)


Bulky waste: large-items of solid waste such as household appliances,
DESCRIPTION

furniture, large auto parts, trees, branches, stumps, and other oversize wastes
whose large-size precludes or complicates their handling by normal solid
wastes collection, processing, or disposal methods.
04/05/2018 BI-10-09003

04/18/2018 BI-10-09003
JO/EWO

Class I Landfill: Isolates solid wastes from surface water or groundwater. The
site must have a stable foundation and two impermeable liners with leachate
collection and removal systems. Precipitation runoff from surrounding areas
must be diverted away from the site. A Class I Landfill Disposal Site must be
DATE

used for the disposal of Class I hazardous wastes and may be used for the
disposal of Class II biodegradable and chemically decomposable wastes and
REV. NO.

Class III inert wastes.


DISCIPLINE
ENGINEER
Class II Landfill: Must be above the highest groundwater elevation to prevent
________________
direct contact of the wastes with surface water or groundwater. The landfill site
DATE ___________
should have a stable foundation and provisions should be made for diversion
PROJECT
ENGINEER of runoff. A Class II Landfill Disposal Site must be used for Class II wastes and
________________ may be used for Class III wastes.
DATE ___________
Class III Landfill: Provides little or no protection for underlying groundwater.
CERTIFIED
Surface water adjacent to the disposal site may contact the waste material. A
________________

DATE ___________
Class III Landfill Disposal Site is for the disposal of Class III inert wastes only.
Class I Waste (Hazardous Waste): Wastes, which constitute a high degree
CONSTRUCTION
AGENCY of hazard to the public health and the environment. These include materials,
________________ which are flammable, corrosive, reactive, toxic, radioactive, infectious,
DATE ___________ carcinogenic, mutagenic or teratogenic. Refer to CU-22.03, Processing &
OPERATIONS Handling Hazardous Material.
________________

DATE ___________
Class II Waste: Non-hazardous solid wastes and dewatered sludge, which
are biologically or chemically decomposable in the natural environment.
Examples include paper, dewatered digested sewage sludge, animal wastes,
CONTROL NUMBER

DATE _____________
BY: ______________

garbage and other putrescible wastes.


VERIFICATION
EDSD

Class III Wastes: Wastes that are not water-soluble, that are not biologically
or chemically active in the natural environment. Examples include glass, wood,
inert plastics, rubber products, brick, concrete and clay.
THIS INDICATES THAT REV. NO. ____________

APPROVAL/CERTIFICATION REQUIREMENTS,

(DCC)NO. _______________________________

Collection: means the act of removing solid waste (or materials which have
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

been separated for recycling) from a central storage point.

FACILITIES SPECIFICATION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

FACILITIES SCOPE OF WORKS SPECIFICATION DOC 3


T80 A PP-312856
TANAJIB SOLID WASTE LANDFILL (SWL) OF B
SAUDI ARABIA JO / EWO: BI-10-09003 17
TANAJIB
T80-A-PP-312856 Rev B DOC CLASS: 4b DSN: 22810
Saudi Aramco 2616-ENG (03/99)

OPRNS SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

Collection frequency: The number of times collection is provided in each


CERT

period.
EC

EC

COMPANY – shall mean SAUDI ARAMCO, and vice-versa, for the purposes
ENGG

CW

CW

of this document.
Compactor collection vehicle: A vehicle with an enclosed body containing
ISSUED FOR COMMENT AND IFB ENQUIRY (AFW REV A1)

mechanical devices that convey solid waste into the main compartment of the
body and compress it into a smaller volume of greater density.
Composting: Controlled microbial degradation of organic waste yielding a
nuisance-free product of potential value as a soil conditioner.
Construction and demolition waste: Waste resulting from demolition,
erection, construction, refurbishment of buildings or other structures such as
ISSUED FOR IFB (REV B1)

roads which is not mixed with any other type of waste and does not contain
any asbestos waste. Examples include bricks, concrete, paper, plastics, glass,
metal and timber.
DESCRIPTION

CONTRACTOR – shall mean the SWL Construction Contractor for the


purposes of this document.
Cover Material: (e.g., marl, clay) Granular material, generally soil that is used
04/05/2018 BI-10-09003

04/18/2018 BI-10-09003
JO/EWO

to cover compacted solid waste in a Class II landfill. It should be free of large


objects that would hinder compaction and free of organic content that would
be conducive to vector harborage, feeding and/or breeding.
DATE

Daily Cover: At the end of each operating day, or at more frequent intervals if
necessary, disposed solid waste must be covered with 15 cm of earthen
REV. NO.

material (or approved alternative material) to control disease vectors, fires,


A

DISCIPLINE
ENGINEER
odors, blowing litter and scavenging.
________________
Food waste: The organic residues generated by the handling, storage, sale,
DATE ___________
preparation, cooking, and serving of foods, commonly called garbage.
PROJECT
ENGINEER Hazardous waste: A waste that is hazardous to public health and detrimental
________________
to the environment taking into account the toxicity of such waste, its
DATE ___________
persistence and degradability in nature, its potential for accumulation or
CERTIFIED
concentration in tissue, and other factors that may otherwise cause or
________________
contribute to adverse acute or chronic health effects and environmental
DATE ___________
degradation. Examples include materials that are flammable, corrosive,
CONSTRUCTION
reactive, toxic, radioactive, infectious, or carcinogenic.
AGENCY

________________ Landfill Gas (LFG): A by-product of the digestion by microorganisms of


DATE ___________ putrescible matter present in the waste deposited in landfill sites. The gas is
OPERATIONS predominantly methane (64%) together with carbon dioxide (34%) and trace
________________ concentrations of vapors and other gases.
DATE ___________
Leachate: The result of liquid seeping through a landfill and, by doing so
extracting substances from the deposited waste.
CONTROL NUMBER

DATE _____________
BY: ______________
VERIFICATION

Lower Explosive Limit (LEL): The lower percentage by volume of a mixture


EDSD

of explosive gases in air that will propagate a flame at 25°C at atmospheric


pressure.
Modified landfill: The disposal of solid waste by compaction in or upon the
THIS INDICATES THAT REV. NO. ____________

APPROVAL/CERTIFICATION REQUIREMENTS,

(DCC)NO. _______________________________

land and the covering of all wastes deposited with earth or other approved
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

cover material at specific designated intervals, but not each operating day.
Municipal Solid Waste (MSW): includes garbage, refuse, food waste, office
waste, waste vegetation and other decomposable material resulting from
FACILITIES SPECIFICATION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

FACILITIES SCOPE OF WORKS SPECIFICATION DOC 4


T80 A PP-312856
TANAJIB SOLID WASTE LANDFILL (SWL) OF B
SAUDI ARABIA JO / EWO: BI-10-09003 17
TANAJIB
T80-A-PP-312856 Rev B DOC CLASS: 4b DSN: 22810
Saudi Aramco 2616-ENG (03/99)

OPRNS SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

operation of residential, commercial, municipal or industrial establishments


CERT

and from community activities. Unless specifically noted otherwise, the term
EC

EC

“solid waste” as used in these guidelines shall not include mining, hazardous
ENGG

CW

CW

wastes and infectious wastes.


Open burning: Uncontrolled burning of wastes in the open or in an open
ISSUED FOR COMMENT AND IFB ENQUIRY (AFW REV A1)

dump.
Sanitary Landfill: An engineered facility that is located, designed, operated,
and monitored to ensure full protection of the environment and public health. It
is a method of disposing of non-hazardous solid wastes on land without
creating nuisances or hazards to the environment or public health by utilizing
the principles of engineering to confine the refuse to the smallest practical
area, to reduce it to the smallest practical volume, and to cover it with a layer
ISSUED FOR IFB (REV B1)

of earth at the conclusion of each day’s operation or at such more frequent


intervals as may be necessary.
DESCRIPTION

Scavenging: The uncontrolled picking of materials by animals or humans.


Sludge: Means any solid, semi-solid or liquid waste generated from a
municipal commercial or industrial wastewater treatment plant or air pollution
control facility exclusive of the treated effluent from a wastewater treatment
04/05/2018 BI-10-09003

04/18/2018 BI-10-09003
JO/EWO

plant.
Vector (of disease): A living insect or animal (non-human), which transmits
infectious diseases from one animal or human to another.
DATE

Weighbridges: are large scales that are usually mounted permanently on a


REV. NO.

concrete foundation weighing scale that is used to weigh entire vehicles and
A

DISCIPLINE
their contents. By weighing the vehicle both empty and when loaded the load
ENGINEER
carried by the vehicle can be calculated.
________________

4. REFERENCE DOCUMENTS
DATE ___________

PROJECT
ENGINEER

________________
Saudi Aramco Engineering Standards
DATE ___________
SAES-S-007 Solid Waste Landfill Requirements
CERTIFIED

________________
SAES-A-104 Wastewater Treatment, Reuse, and Disposal
DATE ___________
SAES-A-115 Groundwater Monitoring Well Design, Installation and
CONSTRUCTION
Decommissioning
AGENCY

________________ SAES-M-006 Saudi Aramco Security and General-Purpose Fencing


DATE ___________
SAES-M-100 Saudi Aramco Building Code
OPERATIONS

________________
Saudi Aramco General Instructions:
DATE ___________
GI-0150.001 Asbestos Hazard Management
GI-0430.001 Implementing the Saudi Aramco Hazardous Waste Code
CONTROL NUMBER

DATE _____________
BY: ______________
VERIFICATION

Saudi Aramco Material Instruction


EDSD

CU-22.03 Processing & Handling Hazardous Material


Saudi Aramco Environmental Health Code
THIS INDICATES THAT REV. NO. ____________

APPROVAL/CERTIFICATION REQUIREMENTS,

(DCC)NO. _______________________________

SAEHC-S-01 Water
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

SAEHC-S-03 Solid Waste Management


SAEHC-S-17 Insects, Rodents and Other Vermin of Public Health Significance
FACILITIES SPECIFICATION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

FACILITIES SCOPE OF WORKS SPECIFICATION DOC 5


T80 A PP-312856
TANAJIB SOLID WASTE LANDFILL (SWL) OF B
SAUDI ARABIA JO / EWO: BI-10-09003 17
TANAJIB
T80-A-PP-312856 Rev B DOC CLASS: 4b DSN: 22810
Saudi Aramco 2616-ENG (03/99)

OPRNS SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

5. RESPONSIBILITIES
CERT

EC

EC

5.1.1 CONTRACTOR shall both construct and operate the Tanajib SWL until a
ENGG

Facilities Operating and Maintenance (O&M) Contract is put in place and the
CW

CW

SWL Operating Service Contract can be novated over to O&M Contractor.


ISSUED FOR COMMENT AND IFB ENQUIRY (AFW REV A1)

5.1.2 Operating performance of the SWL and the associated SWL Operation and
maintenance (sanitation) services shall, as a minimum, meet the following legal
and other requirements, specifications and standards:

5.1.3 CONTRACTOR shall supply and construct the SWL facility, comprising:

Access routes – 2 No.


ISSUED FOR IFB (REV B1)

Security provisions
Waste Reception (Inspection and Acceptance) Area
DESCRIPTION

Office and Ancillaries


4 no. Class II landfill cells
2 no. Class III landfill cells
04/05/2018 BI-10-09003

04/18/2018 BI-10-09003
JO/EWO

All ancillary supporting requirements to commence legal operation of the SWL.

5.1.4 All landfill cells shall be constructed to SAUDI ARAMCO Solid Waste Landfill
DATE

Engineering Standard, SAES-S-007, and in accordance with TCF


Environmental Impact Assessment mitigation commitments, that shall be
REV. NO.

considered legally and contractually binding to the extent practical and agreed
A

DISCIPLINE
with SAUDI ARAMCO. Works shall include the provision of suitably designed
ENGINEER and constructed access road(s) to the SWL as shown in the CONTRACT
________________
drawings;
DATE ___________

PROJECT 5.1.5 CONTRACTOR shall supply and construct all described below for SWL to
ENGINEER

________________
Operate to SAUDI ARAMCO Code SAEHC-S-03/07 and Solid Waste Landfill
DATE ___________
Engineering Standard, SAES-S-007, to manage relevant waste arisings from an
estimated 20,000-30,000 man construction phase (at peak), approximately 30
CERTIFIED

________________
years of Safaniyah Production Unit operations. It shall also manage wastes
DATE ___________
arising from early-construction (Site Preparation and Temporary Construction
Facilities) phase demolition works, and following TGP and TOP operations the
CONSTRUCTION
AGENCY
Class II and III decommissioning wastes arisings from related dismantling and
________________
site abandonment works.
DATE ___________
5.1.6 Potential sources of environmental impacts and disposal of waste materials
OPERATIONS
shall be handled by the CONTRACTOR onsite in accordance with SAUDI
________________

DATE ___________
ARAMCO G.I. 403.001 “Waste Management” and SAES-S-007.

6. TANAJIB SOLID WASTE LANDFILL (SWL) - SCOPE OF WORKS AND


CONTROL NUMBER

DATE _____________
BY: ______________

SPECIFICATION
VERIFICATION
EDSD

6.1 Siting Study and Proposed Site Location

6.1.1 Siting Study work is evaluating Site Options in priority-order, and seeking to
THIS INDICATES THAT REV. NO. ____________

APPROVAL/CERTIFICATION REQUIREMENTS,

(DCC)NO. _______________________________

evaluate the closest likely available and suitable location to the largest likely
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

source of Class II and III waste arisings, based upon the environmental
Proximity Principle. At the time of issuing this Invitation for Bid package

FACILITIES SPECIFICATION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

FACILITIES SCOPE OF WORKS SPECIFICATION DOC 6


T80 A PP-312856
TANAJIB SOLID WASTE LANDFILL (SWL) OF B
SAUDI ARABIA JO / EWO: BI-10-09003 17
TANAJIB
T80-A-PP-312856 Rev B DOC CLASS: 4b DSN: 22810
Saudi Aramco 2616-ENG (03/99)

OPRNS SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

application for approval of the proposed Land Use Permit (LUP) is to be


CERT

confirmed by SAUDI ARAMCO and will be in due course.


EC

EC
ENGG

6.1.2 For the purposes of bidding the CONTRACTOR shall assume the location
CW

CW

shown on the contract drawings, located south-west of the TGP LUP and
approximately 10km from the proposed SAPMT Camp.
ISSUED FOR COMMENT AND IFB ENQUIRY (AFW REV A1)

6.1.3 For additional details, CONTRACTOR shall refer to Sketch attached as


Appendix 3 below in Section 9.

6.1.4 The prevailing wind direction is northerly.

6.1.5 Topographic survey of the SWL area is:


ISSUED FOR IFB (REV B1)

1. Described in KBR TOPOGRAPHIC SURVEY REPORT ADNL 2 5 6 TGP


COGEN (DSN: 21513), and
DESCRIPTION

2. Illustrated in T80-A-TA-123456-001-00 Topgraphic Survey Layout Marjan Site


Preparation Tanajib Gas Plant and Cogen as Area 4, final data is produced in
3D DWG files.
04/05/2018 BI-10-09003

04/18/2018 BI-10-09003

6.1.6 Suitability of the hydrological characteristics for the area are to be confirmed by
JO/EWO

Saudi Aramco in due course, there is no obvious evidence of surface water


bodies current, or previously existing within the site. Diversion of surface waters
is not expected to be necessary for such a flat location, with the exception of the
DATE

need to manage and direct incident rainfall events.


REV. NO.

6.1.7 Geological and hydrogeological investigations have yet to be performed for the
A

DISCIPLINE site specific SWL LUP. COMPANY will share data for the site in due course,
ENGINEER
however a Geotechnical Report is available that provides in COMPANY’S view
________________
likely ground and groundwater conditions for the SWL site. No particularly
DATE ___________
challenging ground or groundwater conditions are expected, however the
PROJECT
ENGINEER groundwater level is expected to be relatively shallow at circa 3.5m below grade.
________________

DATE ___________ Refer to TGP Geotech Report reference details are: Fugro Suhaimi Ltd.,
CERTIFIED
Preliminary Geotechnical Investigation, Marjan Field Development Site
________________ Preparation, Tanajib Gas Plant including Cogeneration Facilities at TGP (BI-10-
DATE ___________ 09003) & (BI-10-12264) Tanajib, Fugro Project No.: 17-11-2047 (Saudi Aramco
Geotechnical File No: 2017/109).
CONSTRUCTION
AGENCY

________________
Landfill cells and profiles shall be constructed in accordance with drawings
DATE ___________ COMPANY will provide in due course that will aim for Class III cells working
OPERATIONS
with existing topography, and Class II cells to be minimum cut and fill to
________________
ensure suitably impermeable lined bases can be constructed and leachate
DATE ___________ collection system installed.

6.1.8 Direction of groundwater has yet to be determined for the site, but is expected
CONTROL NUMBER

DATE _____________
BY: ______________

to flow in an easterly to north easterly direction. Some perched groundwater


VERIFICATION
EDSD

deposits may be present beneath the site, and geotechnical work will determine
any presence.

6.1.9 Terrestrial biodiversity for the site is sparse, with few flora and no faunal species
THIS INDICATES THAT REV. NO. ____________

APPROVAL/CERTIFICATION REQUIREMENTS,

(DCC)NO. _______________________________

observed during the February EIA Site reconnaissance visit. EIA surveys
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

completed 04 April 2018 are expected to report formally in line with these

FACILITIES SPECIFICATION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

FACILITIES SCOPE OF WORKS SPECIFICATION DOC 7


T80 A PP-312856
TANAJIB SOLID WASTE LANDFILL (SWL) OF B
SAUDI ARABIA JO / EWO: BI-10-09003 17
TANAJIB
T80-A-PP-312856 Rev B DOC CLASS: 4b DSN: 22810
Saudi Aramco 2616-ENG (03/99)

OPRNS SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

reconnaissance observations in due course, within the Temporary Construction


CERT

Facilities EIA (Document number and DSN to be confirmed).


EC

EC
ENGG

6.1.10 Life Expectancy for the site is expected to be circa 30-50 years, with landfill cells
CW

CW

being capped in a phased manner when full.


ISSUED FOR COMMENT AND IFB ENQUIRY (AFW REV A1)

6.1.11 Design depth is, on average, to be a 3m above the surrounding ground level,
and minimum storage volume requirements of SAES-S-007 Section 5.3 are met
by the proposed design depth stated above and area shown illustrated in T80-
A-PP-033003-001.

6.1.12 If in the future higher-final capping level is deemed reasonable by the Operator,
separate application for permission to raise capping levels shall be applied for
by Saudi Aramco with Competent Authorities.
ISSUED FOR IFB (REV B1)

6.1.13 Landfills are not located within avoidance criteria distances stated in SAES-S-
007, Section 5.6., and as illustrate in permanent Land Use Permit application
DESCRIPTION

drawing number T80-A-PP-033003-001.

6.2 Functional Requirements


04/05/2018 BI-10-09003

04/18/2018 BI-10-09003
JO/EWO

6.2.1 The SWL shall be prepared to receive Class II and III wastes from all Marjan
onshore BIs / assets during their construction, operational and decommissioning
phases. It shall correspondingly also receive Class II and III wastes from
DATE

Contractor Camps as soon as possible.


REV. NO.

6.2.2 Class I Hazardous Waste consignments or shipments shall not be accepted


A

at the SWL for either temporary storage or landfill disposal. Rules for storage,
DISCIPLINE
ENGINEER transport, treatment and disposal of hazardous waste are set out in the Kingdom
________________ of Saudi Arabia General Environmental Regulations, Rule for Implementation,
DATE ___________
Appendix 4.
PROJECT
ENGINEER
6.2.3 Where Class I wastes are discovered mixed within received Class II or III Waste
________________

DATE ___________
Shipments, these wastes shall be segregated and stored-temporarily for return
to the Contractor or organisation traceably linked to the hazardous wastes
CERTIFIED
received, or where ownership is not able to be determined stored securely and
________________

DATE ___________
temporarily until it can be transferred onwards to a suitably licenced Class I
Waste Receiver.
CONSTRUCTION
AGENCY
6.2.4 Prior to the operation of the new Tanajib SWL, Marjan Class II and III waste
________________
flows may be accepted at the Safaniyah Landfill. The Safaniyah Landfill, as
DATE ___________
currently configured however, has rapidly diminishing receiving capacity, and is
OPERATIONS
expected to be full within approximately 5 years (circa. 2022) with existing
________________
Safaniyah Producing Unit waste inflows, from Safaniyah GOSP, Tanajib
DATE ___________
Onshore Oil Facilities, and local government and military facilities. Due to the
limited capacity of the Safaniyah Landfill, the new Tanajib SWL shall be
CONTROL NUMBER

DATE _____________
BY: ______________

delivered as early as feasible in the Marjan execution program.


VERIFICATION
EDSD

6.2.5 At the time of drafting there remains significant uncertainty in Marjan waste
forecasts, so the SWL is sized based upon best available data and
benchmarking against other recent SA Oil and Gas facility developments - to
THIS INDICATES THAT REV. NO. ____________

receive waste inflows for Marjan onshore Budget Item assets, primarily the
APPROVAL/CERTIFICATION REQUIREMENTS,

(DCC)NO. _______________________________
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

Tanajib Gas Plant and the Tanajib Onshore Oil expansion developments. Due
to the the wider agreement to utilise Safaniyah Producing Department’s waste
landfill assets for early Marjan works, some future provision within the Tanajib
FACILITIES SPECIFICATION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

FACILITIES SCOPE OF WORKS SPECIFICATION DOC 8


T80 A PP-312856
TANAJIB SOLID WASTE LANDFILL (SWL) OF B
SAUDI ARABIA JO / EWO: BI-10-09003 17
TANAJIB
T80-A-PP-312856 Rev B DOC CLASS: 4b DSN: 22810
Saudi Aramco 2616-ENG (03/99)

OPRNS SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

SWL LUP has therefore been allocated to redirect flows from the SA
CERT

Community, and to facilitate early development actitivities of the Zuluf Central


EC

EC

Processing Facility should it be necessary, and to provide additional wider


ENGG

CW

CW

capacity provision for Class II and III wastes for the Tanajib / Safaniyah
Producing Region.
ISSUED FOR COMMENT AND IFB ENQUIRY (AFW REV A1)

6.2.6 Design elevation is nominally 3m average depth including final cover, to suit
typical landfill equipment available and provided by service operators in the
KSA. Final depth and profile to be adjusted in detailed design to suit
topography, and leachate drainage and liner design needs.

6.2.7 Class II cells shall, if necessary in accordance with SAES-S-007 and SA


Environmental Engineering Division (EED) requirements, be equipped with
ISSUED FOR IFB (REV B1)

leachate management facilities, likely to include a suitably simple leachate


drainage and evaporation area.

6.2.8 CONTRACTOR shall install site security, landfill cells, site security and operator
DESCRIPTION

offices and supporting amenities described further below.

6.2.9 CONTRACTOR shall install and maintain area drain trenches cut to low points
04/05/2018 BI-10-09003

04/18/2018 BI-10-09003

to prevent ponding or water accumulation in the disposal area.


JO/EWO

6.3 Site Access and Security


DATE

6.3.1 Site access routes – two site access routes shall be constructed to suit regular
heavy equipment and vehicle access, inline with SAES-S-007, SAES-M-100
REV. NO.

and SAES-Q-006, via:


A

DISCIPLINE
ENGINEER A temporary access to the main TGP construction site for the duration of
________________ construction of the TGP, and
DATE ___________
A second permanent route shall be accessed via the SAPMT access road located
PROJECT
ENGINEER to the south of the TGP LUP, to facilitate receiving imported waste flows from the
________________ other Marjan onshore assets, and the Safaniyah Producing Unit (as necessary and
DATE ___________
approved by Saudi Aramco) Community.
CERTIFIED

________________
Site access routes shall be constructed of all-weather material in accordance with
DATE ___________
SAEHC-S-03.

CONSTRUCTION 6.3.2 A site-security fence (Type V, Ref. SAES-M-006) and site-access gates shall
AGENCY

________________
be supplied and constructed to:
DATE ___________
Prevent wandering animals, and the public, entering the SWL for their own safety
OPERATIONS
and health;
________________

DATE ___________ Control receiving of waste consignments in line with KSA and SAUDI ARAMCO
standards referred to above;
CONTROL NUMBER

DATE _____________

The security fence shall remain in place until the landfill is capped, closed and
BY: ______________
VERIFICATION

until it is deemed safe to not have the security fence in place by the
EDSD

Competent Authority (GAMEP);


THIS INDICATES THAT REV. NO. ____________

APPROVAL/CERTIFICATION REQUIREMENTS,

(DCC)NO. _______________________________
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

FACILITIES SPECIFICATION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

FACILITIES SCOPE OF WORKS SPECIFICATION DOC 9


T80 A PP-312856
TANAJIB SOLID WASTE LANDFILL (SWL) OF B
SAUDI ARABIA JO / EWO: BI-10-09003 17
TANAJIB
T80-A-PP-312856 Rev B DOC CLASS: 4b DSN: 22810
Saudi Aramco 2616-ENG (03/99)

OPRNS SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

6.3.3 CONTRACTOR shall provide and install lockable security gates, suitable to be
CERT

controlled by the SWL Operator, to ensure only authorised persons, equipment,


EC

EC

and wastes enter and exit the site.


ENGG

CW

CW

6.3.4 Site entrance and fenceline security lighting, as required by SAES-S-007


and the SA Security assessment, solar PV powered.
ISSUED FOR COMMENT AND IFB ENQUIRY (AFW REV A1)

6.4 Waste Reception Area

6.4.1 Weigh bridge

A single weighbridge shall be supplied, installed and calibrated within the SWL
so that quantities of wastes either for disposal in landfills or for recycling can
be calculated.
ISSUED FOR IFB (REV B1)

Should by-passing of weighbridge be necessary for any reason (maintenance,


calibration etc.), a second access route shall be provided to by-pass the
DESCRIPTION

weighbridge, and two methods of estimating waste quantities (masses) shall


be assumed:
1. Use of the sulphur loading facility weighbridge prior to landfilling;
04/05/2018 BI-10-09003

04/18/2018 BI-10-09003

and/or
JO/EWO

2. Quantities shall be estimated by the Site Supervisor as volumes, which


along with density-schedules for differing types of Class II and III
DATE

wastes can be used for estimating waste mass.

6.4.2 Waste Inspection Area - Area allocated for inspecting incoming waste vehicles
REV. NO.

to ensure only Class II and III wastes are received, and from where Class I waste
DISCIPLINE
ENGINEER consignments can be redirected appropriately.
________________

DATE ___________ 6.4.3 Mobile Inspection Platform - Within this area a movable-step and platform with
PROJECT
single handrail, mounted upon on suitably durable castor-wheels, shall be
ENGINEER
provided to facilitate safe inspection of waste loads by the Site Supervisor (or
________________
their delegate).
DATE ___________

CERTIFIED 6.4.4 Tanker-truck refuelling service shall be assumed, and shall provide mobile
________________ spill-pans and clean-up kits.
DATE ___________

6.4.5 Cleaning Area for Waste Containers


CONSTRUCTION
AGENCY

________________ Cleaning area shall be located at a sufficient distance downwind of the


DATE ___________ predominant-northerly wind, and the Waste Supervisor Office described
OPERATIONS
below, to avoid nuisance insects impacting office activities. The cleaning area
________________ shall be compliant with the requirments of SAEHC-S3-Para: 7.1.
DATE ___________
Area to comprise separate water supply tank for supply to pressure-washer
and controlled drainage.
CONTROL NUMBER

DATE _____________
BY: ______________
VERIFICATION

CONTRACTOR shall provide and install a 0.4m3/hr 100 bar pressure-washer,


EDSD

capable of supplying hot water, and a water supply tank of 10m3 minimum
storage volume to provide 25hrs working storage capacity. Hard-standing
area, with controlled drainage to vacuum-tanker sump / evaporation area, a
minimium sump volume of 15m3 shall be provided, unless otherwise approved
THIS INDICATES THAT REV. NO. ____________

APPROVAL/CERTIFICATION REQUIREMENTS,

(DCC)NO. _______________________________

by COMPANY.
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

Where wastewater accumulates, and if needing emptying, it shall be vacuum-


tankered to the TGP Construction Camp STP, or operational plant STP inlet
FACILITIES SPECIFICATION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

FACILITIES SCOPE OF WORKS SPECIFICATION DOC 10


T80 A PP-312856
TANAJIB SOLID WASTE LANDFILL (SWL) OF B
SAUDI ARABIA JO / EWO: BI-10-09003 17
TANAJIB
T80-A-PP-312856 Rev B DOC CLASS: 4b DSN: 22810
Saudi Aramco 2616-ENG (03/99)

OPRNS SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

works for slowly feeding into the treatment system. This treatment and
CERT

disposal route assumes all pollutants washed-off Class II and III wastes are
EC

EC

non-hazardous and can therefore be treated in the STP systems, and are
ENGG

CW

CW

unlikely to represent significant risk to the STP process or environment.


Hazardous waste containers shall not be cleaned at site, so liquid
ISSUED FOR COMMENT AND IFB ENQUIRY (AFW REV A1)

wastewaters should be non-hazardous in character.

6.4.6 Insect and Vector Control

Design assumes Site Waste Operator shall provide manual spray apparatus
and consumables for controlling insect-vectors risks in standing-water and
other vector risk areas, and for control of all other vector risks (rodents,
snakes, etc.) in accordance with SAEHC-S-17 Insects, Rodents and Other
ISSUED FOR IFB (REV B1)

Vermin of Public Health Significance.

6.4.7 Designated storage areas:


DESCRIPTION

6.4.8 CONTRACTOR shall construct the designated area for temporary storage of
recyclables able to be received by the SWL for the purposes of identifying
suitable opportunities for recovery for reuse or recycling. The area that shall be
04/05/2018 BI-10-09003

04/18/2018 BI-10-09003
JO/EWO

assigned for this purpose is approximately 200m x 80m.

6.4.9 CONTRACTOR shall construct the designated area for storage solid-pellet or
equivalent diesel spill-kit and small fire-extinguisher response equipment
DATE

storage area (3m2). Shading and rain cover shall be provided for equipment
and consumables that are likely to perish or become damaged if weathered.
REV. NO.

DISCIPLINE
ENGINEER
6.4.10 For larger fires fire engines from TGP or elsewhere will be mobilised to support
________________
fire control, water will be provided from the main TGP plant by mobile/temporary
DATE ___________
means.
PROJECT
ENGINEER 6.5 Landfill Cells
________________

DATE ___________ 6.5.1 Class II Cells shall:


CERTIFIED

________________
Be used for Class II wastes, and may be used for Class III wastes at the discretion
DATE ___________ of the Site Supervisor;

CONSTRUCTION
Be constructed above the highest groundwater elevation to prevent direct contact
AGENCY
of the wastes with surface water or groundwater;
________________

DATE ___________ Have a stable foundation and provisions made for diversion of runoff;
OPERATIONS
Have leachate collection and evaporation area provisions. It shall be assumed a
________________
suitably impermeable liner is required for the Class II cells, with a permeability not
DATE ___________
to exceed 10-7 cm/s. The specific liner specification will be shown in the Contract
drawings and shall be constructed in sections with no break between sections, by
CONTROL NUMBER

DATE _____________

bevelling or step-cutting the edge of a section as sono as it is installed, so that the


BY: ______________
VERIFICATION

succeeding section can be tied in (i.e. overlapped0 with the previously installed
EDSD

section. Leachate control shall be constructed in line with SAEHC-S-03.


Design need for landfill gas collection system shall be agreed with Saudi Aramco
Environmental Engineering Division, but for the purposes of bidding it is proposed
THIS INDICATES THAT REV. NO. ____________

APPROVAL/CERTIFICATION REQUIREMENTS,

(DCC)NO. _______________________________

that no gas collection facilities will be provided due to the shallow depth of the
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

landfill cells proposed, the hyper-arid climate present at the Tanajib location, and
the Operating plan to provide regular / daily cover of dry organic content, as there
it not expected to be significant methane gas build up potential.
FACILITIES SPECIFICATION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

FACILITIES SCOPE OF WORKS SPECIFICATION DOC 11


T80 A PP-312856
TANAJIB SOLID WASTE LANDFILL (SWL) OF B
SAUDI ARABIA JO / EWO: BI-10-09003 17
TANAJIB
T80-A-PP-312856 Rev B DOC CLASS: 4b DSN: 22810
Saudi Aramco 2616-ENG (03/99)

OPRNS SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

6.5.2 Class III Cells:


CERT

EC

EC

Receive only Class III, inert wastes;


ENGG

CW

CW

Provide little or no protection for underlying groundwater therefore shall direct


surface water adjacent to the disposal site to avoid contact with the landfilled waste
materials.
ISSUED FOR COMMENT AND IFB ENQUIRY (AFW REV A1)

6.6 Waste Supervisor Office and Ancillaries

6.6.1 All weather office with space for 2 desks and 2 p.c.’s (for recording waste
consignment monitoring data as required by SA EHC, with adequate mobile
phone coverage to send and receive simple spreadsheet and email data), with
sun-shade and small heat-pump system for heating and cooling as necessary.
ISSUED FOR IFB (REV B1)

Small food preparation area with microwave, and storage area for dispensing
imported bottled drinking water, and sanitary toilet, and hand- and face-washing
sink and tap, facilities;
DESCRIPTION

6.6.2 Utility water supply tank – Contractor shall provide and install a water supply
tank with minimum capacity of 5m3 and plumbing to support water supply to
office toilets and sink-washing ablution facilities, and elevated-structure support
04/05/2018 BI-10-09003

04/18/2018 BI-10-09003
JO/EWO

with if necessary foundation, for gravity supply to office ablution and sanitary
facilities.
DATE

Tank and distribution system shall comply with applicable requirements of


SAEHC-S-01 Water including section 11 relating to Disinfection of Water
Storage Tanks and SAEHC-S-02 Sanitary Wastewater and Sewerage
REV. NO.

Systems.
DISCIPLINE
ENGINEER

________________ 6.6.3 Wastewater System – A small septic-tank treatment system shall be supplied,
DATE ___________ installed and commissioned in accordance with SAES-A-104 and more
PROJECT
specifically Section 13, SAEHC-S-02 Sanitary Wastewater and Sewerage
ENGINEER
Systems, and any other applicable legal requirements. The system shall be
________________
procured and installed at site to receive, treat and enable SA EPD approved
DATE ___________
disposal of small flows of sanitary-only sewage black and grey wastewaters.
CERTIFIED
The system shall overflow to a purpose-built percolation field to serve the site
________________
operation and population as defined below, for a maximum design capacity of
DATE ___________
up to 30 personnel, and in accordance with SAES-A-104, Table 15 with a
CONSTRUCTION minimum working capacity of 13.2m3. Design Basis assumes:
AGENCY

________________
• 6 days per week, 12 hour / day operation
DATE ___________

OPERATIONS • 1 no. Full-time Site Supervisor and 4 No. Site Operators



________________
15-100 No. visiting waste haulage drivers and visitors per day potentially using
DATE ___________
facilities.
• Total population equivalent design volume = 4.9m3/week, which is expected to
CONTROL NUMBER

DATE _____________
BY: ______________
VERIFICATION

be conservatively high estimate.


EDSD

Contractor shall confirm size of the percolation field prior to construction by


performing sufficient field-determined percolation rates as part of their Scope.
Percolation field size shall then be set in accordance with SAES-A-104 Table 14 -
THIS INDICATES THAT REV. NO. ____________

APPROVAL/CERTIFICATION REQUIREMENTS,

(DCC)NO. _______________________________

Absorption Requirements for Septic Systems.


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

Contractor shall provide safe-access to top of the septic tank to facilitate periodic
removal of septage sludges using vacuum tanker, and for controlling odours and

FACILITIES SPECIFICATION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

FACILITIES SCOPE OF WORKS SPECIFICATION DOC 12


T80 A PP-312856
TANAJIB SOLID WASTE LANDFILL (SWL) OF B
SAUDI ARABIA JO / EWO: BI-10-09003 17
TANAJIB
T80-A-PP-312856 Rev B DOC CLASS: 4b DSN: 22810
Saudi Aramco 2616-ENG (03/99)

OPRNS SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

insect vectors, and shall locate the tank sufficiently close to all-weather road for
CERT

tanker access and egress.


EC

EC

Contractor shall provide checklist of requirements demonstrating as-built


ENGG

CW

CW

construction is compliant with requirements set out in SAES-A-104 Section 13,


SAEHC and any other applicable requirements.
ISSUED FOR COMMENT AND IFB ENQUIRY (AFW REV A1)

6.6.4 Electricity Supply

Comprising solar PV electricity supply with backup electrical generator and


switch gear etc. shall be supplied, installed and commissioned (including
calibrated as appropriate) site weighbridge, site offices, HVAC, pressure
washer, and site lighting etc. demand needs.
ISSUED FOR IFB (REV B1)

CONTRACTOR shall supply and maintain electrical generator with two-week


diesel storage tank for operating the building.
The building, generator and tanks shall be the property of SAUDI ARAMCO at
DESCRIPTION

the end of this Contract.

6.6.5 Vehicle parking area for parking 5 cars, with sun shad(s) (and possible PV
array mountings) shall be constructed;
04/05/2018 BI-10-09003

04/18/2018 BI-10-09003
JO/EWO

6.6.6 Daily-cover soil storage area - suitable to store minimum of 3 days of daily-
cover requirements, estimated minimum of 50m3 of soil storage;
DATE

6.6.7 Lime storage area – Contractor shall provide an area suitable for storage of
lime to facilitate adhoc lime application needs within the SWL, and for
REV. NO.

maintaining the onsite STP, washdown, and any evaporation-sump areas, as


DISCIPLINE
ENGINEER
required.
________________

DATE ___________
6.6.8 Litter fences:
PROJECT
ENGINEER Portable Litter fences a minimum of 4m high shall be provided for
________________ management of wind-blown litter as necessary to manage waste front wind
DATE ___________ blown litter.
CERTIFIED
Boundary Litter Netting a minimum of 6m high shall be provided to prevent
________________
litter being wind-blown offsite and across the SA PMT temporary access road
DATE ___________
located to the south of the SWL, until operational cells are capped.
CONSTRUCTION
AGENCY Examples of both types of litter fences presented in Secton 7 Appendix 1.
________________

DATE ___________ 6.6.9 Signs


OPERATIONS

________________
CONTRACTOR shall provide clearly visible, legible signs in accordance with
DATE ___________
SAES-S-007 and able to be viewed from high-level equipment operators (front
end loaders, and waste spreaders, waste haulage trucks), by operators of
4WD vehicles and personnel at ground level.
CONTROL NUMBER

DATE _____________
BY: ______________
VERIFICATION

Signage shall be provided at the entrance to the site and shall contain, in
EDSD

Arabicand English, all details specified in SAEHC-S-03-Para:15.

6.6.10 Groundwater Contaminant Monitoring Wells


THIS INDICATES THAT REV. NO. ____________

APPROVAL/CERTIFICATION REQUIREMENTS,

(DCC)NO. _______________________________

GW monitoring wells at the locations on the WFM Plot plan shall be installed,
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

developed and maintained by the CONTRACTOR in accordance with SAES-A-


115 Groundwater Monitoring Well Design, Installation and Decommissioning.

FACILITIES SPECIFICATION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

FACILITIES SCOPE OF WORKS SPECIFICATION DOC 13


T80 A PP-312856
TANAJIB SOLID WASTE LANDFILL (SWL) OF B
SAUDI ARABIA JO / EWO: BI-10-09003 17
TANAJIB
T80-A-PP-312856 Rev B DOC CLASS: 4b DSN: 22810
Saudi Aramco 2616-ENG (03/99)

OPRNS SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

Borehole logs, and well development information as field notes shall be put on
CERT

permanent record with Saudi Aramco, and copies shall be available at site for
EC

EC

the GW monitoring consultant to inspect and comment upon as changes might


ENGG

CW

CW

be noted in the field.


ISSUED FOR COMMENT AND IFB ENQUIRY (AFW REV A1)

ISSUED FOR IFB (REV B1)


DESCRIPTION

04/05/2018 BI-10-09003

04/18/2018 BI-10-09003
JO/EWO
DATE
REV. NO.

DISCIPLINE
ENGINEER

________________

DATE ___________

PROJECT
ENGINEER

________________

DATE ___________

CERTIFIED

________________

DATE ___________

CONSTRUCTION
AGENCY

________________

DATE ___________

OPERATIONS

________________

DATE ___________
CONTROL NUMBER

DATE _____________
BY: ______________
VERIFICATION
EDSD
THIS INDICATES THAT REV. NO. ____________

APPROVAL/CERTIFICATION REQUIREMENTS,

(DCC)NO. _______________________________
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

FACILITIES SPECIFICATION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

FACILITIES SCOPE OF WORKS SPECIFICATION DOC 14


T80 A PP-312856
TANAJIB SOLID WASTE LANDFILL (SWL) OF B
SAUDI ARABIA JO / EWO: BI-10-09003 17
TANAJIB
T80-A-PP-312856 Rev B DOC CLASS: 4b DSN: 22810
REVISION CERTIFICATE EDSD REV. NO. DATE JO/EWO DESCRIPTION ENGG CERT PMT OPRNS
THIS INDICATES THAT REV. NO. ____________ VERIFICATION

OF THIS DRAWING IS COVERED, FOR ALL A 04/05/2018 BI-10-09003 ISSUED FOR COMMENT AND IFB ENQUIRY (AFW REV A1) CW EC
CONTROL NUMBER
APPROVAL/CERTIFICATION REQUIREMENTS,
B 04/18/2018 BI-10-09003 ISSUED FOR IFB (REV B1) CW EC

AGENCY
PROJECT
ENGINEER
ENGINEER

CERTIFIED
DISCIPLINE
BY DRAWING COMPLETION CERTIFICATE BY: ______________

OPERATIONS
CONSTRUCTION

DATE ___________
DATE ___________
DATE ___________
DATE ___________
DATE ___________

________________
________________
________________
________________
________________
(DCC)NO. _______________________________
DATE _____________
7.

T80-A-PP-312856 Rev B
TANAJIB
Saudi Aramco 2616-ENG (03/99)

FACILITIES SPECIFICATION

TANAJIB SOLID WASTE LANDFILL (SWL)


FACILITIES SCOPE OF WORKS SPECIFICATION
DOC
DWG.TYPE

SAUDI ARABIA
APPENDIX 1: LITTER-FENCE EXAMPLES

T80
PLANT .NO

A
INDEX
SAUDI ARABIAN OIL COMPANY

JO / EWO: BI-10-09003
DOC CLASS: 4b
DRAWING NO.

PP-312856

17
15
OF

DSN:
SHT. NO.

B
22810
REV. NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Saudi Aramco 2616-ENG (03/99)

OPRNS SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
CERT

EC

EC

8. APPENDIX 2: TYPICAL LANDFILL OPERATING EQUIPMENT


ENGG

CW

CW

Waste Spreaders and Compactors (Tamping-foot) and Dozers (Tracks)


ISSUED FOR COMMENT AND IFB ENQUIRY (AFW REV A1)

ISSUED FOR IFB (REV B1)


DESCRIPTION

04/05/2018 BI-10-09003

04/18/2018 BI-10-09003
JO/EWO

Typical Front-end Loader


DATE
REV. NO.

DISCIPLINE
ENGINEER

________________

DATE ___________

PROJECT
ENGINEER

________________

DATE ___________

CERTIFIED

________________

DATE ___________

CONSTRUCTION
AGENCY

________________

DATE ___________

OPERATIONS

________________

DATE ___________
CONTROL NUMBER

DATE _____________
BY: ______________
VERIFICATION
EDSD
THIS INDICATES THAT REV. NO. ____________

APPROVAL/CERTIFICATION REQUIREMENTS,

(DCC)NO. _______________________________
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

FACILITIES SPECIFICATION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

FACILITIES SCOPE OF WORKS SPECIFICATION DOC 16


T80 A PP-312856
TANAJIB SOLID WASTE LANDFILL (SWL) OF B
SAUDI ARABIA JO / EWO: BI-10-09003 17
TANAJIB
T80-A-PP-312856 Rev B DOC CLASS: 4b DSN: 22810
REVISION CERTIFICATE EDSD REV. NO. DATE JO/EWO DESCRIPTION ENGG CERT PMT OPRNS
THIS INDICATES THAT REV. NO. ____________ VERIFICATION

OF THIS DRAWING IS COVERED, FOR ALL A 04/05/2018 BI-10-09003 ISSUED FOR COMMENT AND IFB ENQUIRY (AFW REV A1) CW EC
CONTROL NUMBER
APPROVAL/CERTIFICATION REQUIREMENTS,
B 04/18/2018 BI-10-09003 ISSUED FOR IFB (REV B1) CW EC

AGENCY
PROJECT
ENGINEER
ENGINEER

CERTIFIED
DISCIPLINE
BY DRAWING COMPLETION CERTIFICATE BY: ______________

OPERATIONS
CONSTRUCTION

DATE ___________
DATE ___________
DATE ___________
DATE ___________
DATE ___________

________________
________________
________________
________________
________________
(DCC)NO. _______________________________
DATE _____________
9.

T80-A-PP-312856 Rev B
TANAJIB
Saudi Aramco 2616-ENG (03/99)

FACILITIES SPECIFICATION
APPENDIX 3:

TANAJIB SOLID WASTE LANDFILL (SWL)


FACILITIES SCOPE OF WORKS SPECIFICATION
DOC
DWG.TYPE

SAUDI ARABIA
T80
PLANT .NO

A
INDEX
SAUDI ARABIAN OIL COMPANY

TANAJIB SWL - PLOT PLAN SKETCH

JO / EWO: BI-10-09003
DOC CLASS: 4b
DRAWING NO.

PP-312856

17
17
OF

DSN:
SHT. NO.

B
22810
REV. NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

You might also like