Industry & Facilities Division By Ammar/12.June.2016:


Note these comments is
applied for our version of Completely
this document. Partially

RELEASE NOTE N° 01
BV Job nr: DBA.4.15.124

PROJECT: Umm Lulu Full Field Development Project Package 1 Ref: DBA.4.15.124/RN-01

BV Client: ADMA OPCO P/o nr: TBA


(client to BV)
Manufacturer: MIDDLE EAST SPECIALIZED CABELS CO P/o nr: PO. 2207-2013-31698-A, Rev-18
(client to Manufacturer)
Inspection requested by: BV ,Abu Dhabi

SUPPLY / SUBJECT OF INSPECTION ITEM / TAG Nr QTY

Instrument Cables as per attached Packing List As per Packing List As per Packing List

CONCLUSIONS / REMARKS :

The above items have been released in accordance with specifications and purchase order requirements in force at
the time of inspection.Refer IR01 for more details.
This note is issued further to an inspection whose duration and scope were limited by the terms and conditions of the
contract with BV principal. This note is NOT an indication that the item(s) is (are) fit for any specific purpose and does
not release the manufacturer, supplier and any party from their respective duty, guarantee, obligation and/or indemnity
relating to, without limitation, patents, workmanship, materials, safety, performance in operation and/or reliability.

Inspected by: Checked by:

Name: Smitesh Patil Name: Krishnaraj Sankaran

Signature Signature:

Date of issue:24.03.2016

Inspection centre: BV , Dubai


Distribution: CLIENT MANUFACTURER BV

This note is subject to the General Conditions of Service of Bureau Veritas in force on the day of its issuance.

INSP 004 En
GM SI 101 Copyright Bureau Veritas 09/2006

You might also like