Minutes of Post-Final Defense Checking

Title of the Study: Proposed Sanitary Landfill for Bacolod City


Date of Defense: March 5, 2018
Time of Defense: 2:30pm – 3:30pm
Proponents: Dela Cruz, Sasheen T.
Gonzales, Marriz V.
Macaya, Jenieve A.
Magbanua , Andrew P.
Yap, Richel Joy E.
Suggestions:
1. Recommend planting of trees inside the landfill premises. For composting, recommend a
study on providing a Material Recovery Facility. (Page 145)
2. Attach the type of scale used for weighing of trucks and weight recording process. Also
attach the installation and layout of the scale. (Appendix D)
3. For the financing study, compute the number of bulldozer and compactor for the daily
operation. Compare the cost in renting equipment against purchase & operate. (Page 134)
4. Create a graphical timeline for the schedule of construction and operation of the landfill.
(Page 135)
5. Edit “Unit cost” in the Operation Phase in the Financing Study to “Salary and wages per
month per person”. (Page 138)
6. In the Management Study, edit the Organizational Structure and place the foreman and its
subordinates under the civil engineer. (Page 94)
7. Plans & Specifications
 Connect the cross section of pump to cross section of leachate collection
 Provide roof for panel of leachate pump
 Slope of the drainage
 Add “THICK” e.g. 290 mm Thick
 Roadway Drainage Plan (Overall)
 Entrance and exit of truck
 Change W.C. to U (Urinal)
 Weld
 Darken line weight of reinforcement in the foundation Plans

Adviser:
_____________________
Engr. Joaquin Valladarez