Professional Documents
Culture Documents
ENGINEERING DESIGN
UNDERBALANCE DRILLING
POYEK PENGEMBANGAN GAS JAWA BAGI
LLING
JAWA BAGIAN TIMUR
BACKGROUND
@ BLOW OUT IN RBT-1 WELL, DUE TO GAS KICK
KTB WELL
LE LOGGING TOOL AT
ION US$)
WHY UBD PLANNED IN PPGJ PROJECT
@ SAFETY ISSUE
PERTAMINA IMAGE
BLOW OUT
H2S
CLOSE TO COMMUNITY
@ COST CONTROL
"AFE" ISSUE
@ REDUCTION COST
TERM CONDITION:
- NEVER OVER BALANCE
- NEVER KILLING THE WELL
EPT
PRACTICE
NE SAFELY!
OM KICK OFF TO TESTING
UCTION
WELL
RBT-C
HOW IMPORTANT UNDERBALANCE DRILLING IN RBT-C
- DEFINE GAS ZONE
- DEFINE GAS RESERVE
- USED FOR "POD" EAST JAVA GAS PROJECT (PPGJ)
CONCERNING :
- NEVER OVER BALANCE
NEED COMPLETE SET NITROGEN UNIT TO GET DRILLING FLUID
WITH SG BELOW 0,865 SG
- NEVER KILLING THE WELL
NEED "SPECIAL VALVE" TO BACK UP TRIP OPERATION
TURE ?? LIMESTONE
T DRILLING FLUID
ERATION
WELL DATA
WELL DEPTH +/- 3200 METER
OBJECTIVE FORMATION KUJUNG
LITHOLOGY OBJECTIVE ZONE LIMESTONE
RESSERVOIR PRESSURE 4300 PSI, OR EQ SG 0.8 - 0.9
RESSERVOIR TEMPERATUR 325 F
TESTING
KTB-2 Choke Rate Conds
2832 - 2852, 20 METER mmscfd bpd
24/64" 7
32/64" 14.2 84.5
48/64" 22 198.7
RBT-2
3100 - 3120, 20 METER 32/64" 12.5 ?
48/64" 24.48 ?
24/64" 9 ?
2985
140 20 5000 2800
228 20 5000 ?
MENTING
MPLETION STRING
E GAS IN ANNULUS
HAZID
OHIBITED
BY INNERJET
BLIND LINER PERFORATED/SL
20"
13-3/8"
LINER PACKER
CR
H2S ??
7" LINER
SUBJECT TO DISCUSS