SW W MOVIMIENTO DE TIERRAS:

S
1.- LIMPIEZA Y REMOCIÓN CAPA VEGETAL ESPESOR 30 cms ----- 571.86 m3

NW N
SE
E NE 2.- CORTE ------------------------------------------------------------------------------ 70.73 m3

3.- RELLENO-------------------------------------------------------------------------- 1774.64 m3

4.- MURO DE GAVIONES---------------------------------------------------------- 138.00 m3


CASETA DE
VIGILANCIA
X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

X
EDIFICIO DE CONTROL EXISTENTE

CANALETA EXISTENTE
BAHIAS DE 230KV
EXISTENTE

CERCO EXISTENTE

X
55.70 PLATAFORMA PENDIENTE 0.50%
P1
P2
6.35

X
A A

X
31.45
24.50

X
0.50% CERCO EXISTENTE

X
X B X X X X X X X X X X B X X X X

P4 5.70 10.00 10.00 10.00 10.00 10.00 P3

MURO DE GAVIONES
COTA EN CORONA
1128.942 m.s.n.m.

7 6 5 4 3 2 1

ESCALA 1:500
0m 5 10 15 20

PLANTA TOPOGRAFÍA DE PROYECTO SE TONCONTÍN