UND CANTIDAD COSTO POR

PARTIDA No D E S C R I P C I O N MONTO
CONTRATADA UNIDAD

1.0 OBRAS PRELIMINARES

C-1.1 INSTALACIONES PROVISIONALES. UND 1.00 1,070,813.67 1,070,813.67

C-1.2 REPLANTEO Y NIVELACIÓN TOPOGRÁFICA. UND 1.00 1,064,119.70 1,064,119.70

DEFORESTACIÓN LIVIANA Y LIMPIEZA. INCLUYE BOTE DE


C-1.3 HA 6.00 58,227.71 349,366.26
MATERIAL HASTA UNA DISTANCIA DE 10 KM.

REMOCIÓN DE CARPETA ASFÁLTICA Y BASE GRANULAR A


MÁQUINA EN VÍAS DE ACCESO Y PLATAFORMAS DE
C-1.4 M3 1,000.00 384.26 384,260.00
LOCALIZACION EXISTENTES. INCLUYE CARGA,
TRANSPORTE Y BOTE HASTA UNA DISTANCIA DE 10 Km.

2.0 MOVIMIENTO DE TIERRAS

REMOCIÓN DE CAPA VEGETAL Y DE MATERIAL


DESECHABLE EN BASE DE TERRAPLEN. INCLUYE CARGA,
C-2.1 M3 10,000.00 130.97 1,309,700.00
TRANSPORTE Y DESCARGA HASTA UNA DISTANCIA DE 200
M.
TRANSPORTE Y BOTE DE CAPA VEGETAL Y MATERIAL
C-2.2 M3XKM 35,000.00 9.69 339,150.00
DESECHABLE A DISTANCIA DE 201 M Y 10 M.
EXCAVACIÓN PARA BANQUEO EN CUALQUIER TIPO DE
C-2.3 MATERIAL. INCLUYE LA CARGA Y BOTE DE MATERIAL HASTA M3 1,500.00 111.33 166,995.00
UNA DISTANCIA DE 200 M.
TRANSPORTE Y BOTE DE MATERIAL PROVENIENTE DE
C-2.4 M3XKM 10,000.00 9.69 96,900.00
BANQUEO A DISTANCIA DE 201 M Y 10 KM.
CONSTRUCCIÓN DE TERRAPLÉN, MEDIANTE EQUIPO
C-2.5 PESADO. INCLUYE TRANSPORTE HASTA UNA DISTANCIA DE M3 10,000.00 113.18 1,131,800.00
200 M.
CORTE Y CARGA EN PRÉSTAMO MEDIANTE EQUIPO
C-2.6 PESADO, INCLUYE TRANSPORTE HASTA 200 M (NO M3 11,000.00 111.33 1,224,630.00
INCLUYE ROYALTY)
CORTE Y CARGA EN PRÉSTAMO MEDIANTE EQUIPO
C-2.7 PESADO, INCLUYE TRANSPORTE HASTA 200 M (INCLUYE M3 11,000.00 120.84 1,329,240.00
ROYALTY)
CONSTRUCCIÓN DE TERRAPLÉN CON MATERIAL DE
C-2.8 PRÉSTAMO TRANSPORTADO EN CAMIONES. NO INCLUYE M3 10,000.00 111.38 1,113,800.00
TRANSPORTE DE MATERIAL
TRANSPORTE DE MATERIAL DE PRÉSTAMO A DISTANCIA DE
C-2.9 M3XKM 35,000.00 9.69 339,150.00
0 KM A 10 KM
TRANSPORTE DE MATERIAL DE PRÉSTAMO A DISTANCIA DE
C-2.10 M3XKM 100,000.00 9.64 964,000.00
10 KM A 20 KM.
TRANSPORTE DE MATERIAL DE PRÉSTAMO A DISTANCIA DE
C-2.11 M3XKM 180,000.00 9.61 1,729,800.00
20 KM A 40 KM.
TRANSPORTE DE MATERIAL DE PRÉSTAMO A DISTANCIAS
C-2.12 M3XKM 350,000.00 9.60 3,360,000.00
MAYORES DE 40 KM.
CONSTRUCCIÓN DE RELLENO COMPACTADO CON PASO DE
C-2.13 M3 10,000.00 85.91 859,100.00
MÁQUINA.

CORTE Y CARGA EN PRÉSTAMO DE GRANZÓN NATURAL,


C-2.14 MEDIANTE EQUIPO PESADO. INCLUYE ROYALTI Y M3 26,880.00 120.50 3,239,040.00
TRANSPORTE HASTA UNA DISTANCIA DE 200 M.

CONSTRUCCIÓN DE BASE Y/O SUB-BASE DE GRANZÓN


C-2.15 M3 24,000.00 164.74 3,953,760.00
NATURAL. NO INCLUYE TRANSPORTE DEL MATERIAL.
TRANSPORTE DE GRANZÓN NATURAL A DISTANCIA DE 0 KM
C-2.16 M3XKM 100,000.00 9.69 969,000.00
A 10 KM.
TRANSPORTE DE GRANZÓN NATURAL A DISTANCIA DE 10
C-2.17 M3XKM 140,000.00 9.64 1,349,600.00
KM A 20 KM.
TRANSPORTE DE GRANZÓN NATURAL A DISTANCIA DE 20
C-2.18 M3XKM 300,000.00 9.61 2,883,000.00
KM A 40 KM.
TRANSPORTE DE GRANZÓN NATURAL A DISTANCIAS
C-2.19 M3XKM 900,000.00 9.60 8,640,000.00
MAYORES DE 40 KM.
CONSTRUCCIÓN DE CUNETAS EN TIERRA A MÁQUINA.
C-2.20 ML 2,000.00 69.38 138,760.00
INCLUYE BOTE DE MATERIAL SOBRANTE.
ACONDICIONAMIENTO DE VÍAS DE ACCESO A MAQUINA.
C-2.21 INCLUYE ESCARIFICACIÓN, NIVELACIÓN, COMPACTACIÓN Y M2 50,000.00 86.61 4,330,500.00
BOTE DEL MATERAL SOBRANTE.

3.0 OBRAS DE CONCRETO

CONSTRUCCIÓN DE CUNETAS, UTILIZANDO CONCRETO


HIDRÓFUGO. INCLUYE MALLA ELECTROSOLDADA 100 X 100
C-3.1 M3 7.00 17,577.45 123,042.15
X 4 mm, EXCAVACIÓN, CONFORMACIÓN, BOTE,
ENCOFRADO Y RELLENO.
CONSTRUCCIÓN DE CABEZAL PARA ALCANTARILLA DE
C-3.2 DIÁMETRO 10”- 36”. INCLUYE ACERO DE REFUERZO M3 16.00 16,212.06 259,392.96
EXCAVACIÓN Y ENCOFRADO.
4.0 OBRAS DE ASFALTADO
C-4.1 IMPRIMACIÓN ASFÁLTICA CON RC-250. M2 100,000.00 54.28 5,428,000.00
5.0 OBRAS COMPLEMENTARIAS
S/C CERCA DE 5 HILOS, DE ALAMBRE DE PÚAS,
C-5.1 MADRINERAS DE MADERA Y ESTANTES DE CONCRETO F´C ML 2,000.00 416.23 832,460.00
= 180 KG/CM2.

CONSTRUCCIÓN DE ATAJAGANADO. INCLUYE TRANSPORTE


C-5.2 UNID 3.00 84,235.15 252,705.45
DE MATERIAL, CORTE, SOLDADURA Y FABRICACIÓN.

CONSTRUCCIÓN DE PORTÓN METÁLICO. INCLUYE


C-5.3 TRANSPORTE DEL MATERIAL, CORTE, SOLDADURA Y UNID 3.00 78,244.78 234,734.34
FABRICACIÓN.

CONSTRUCCIÓN DE ALCANTARILLAS CON TUBOS DE 10” A


C-5.4 20” DE DIÁMETRO SUMINISTRADO POR PDVSA. INCLUYE ML 24.00 7,958.23 190,997.52
TRANSPORTE, CORTE, SOLDADURA Y COLOCACIÓN.

CONSTRUCCIÓN DE ALCANTARILLAS CON TUBOS DE 24” A


C-5.5 36” DE DIÁMETRO SUMINISTRADO POR PDVSA. INCLUYE ML 24.00 15,839.94 380,158.56
TRANSPORTE, CORTE, SOLDADURA Y COLOCACIÓN.

6.0 OBRAS DE PAISAJISMO 0.00


SUMINISTRO, SIEMBRA Y ESTABLECIMIENTO DE BARRERAS
C-6.1 M2 2,500.00 228.83 572,075.00
VIVAS SIMPLES DE PASTO.
CONSTRUCCIÓN DE ESTRUCTURA DISIPADORA DE
C-6.2 M3 4.00 9,576.28 38,305.12
ENERGÍA (ENROCADOS).
50,648,355.73

S-GC-SIYC-EV-G-FO-08
REVISIÓN N°:1
EMISIÓN: SEP/2006
FECHA 10/9/2013

CANTIDAD COSTO POR


CONTRATADA UNIDAD

1.00 1,070,813.67 1,070,813.67


1.00 1,064,119.70 1,064,119.70
6.00 58,227.71 349,366.26
1,000.00 384.26 384,260.00
10,000.00 130.97 1,309,700.00
35,000.00 9.69 339,150.00
1,500.00 111.33 166,995.00
10,000.00 9.69 96,900.00
10,000.00 113.18 1,131,800.00
11,000.00 111.33 1,224,630.00
11,000.00 120.84 1,329,240.00
10,000.00 111.38 1,113,800.00
35,000.00 9.69 339,150.00
100,000.00 9.64 964,000.00
180,000.00 9.61 1,729,800.00
350,000.00 9.60 3,360,000.00
10,000.00 85.91 859,100.00
26,880.00 120.50 3,239,040.00
24,000.00 164.74 3,953,760.00
100,000.00 9.69 969,000.00
140,000.00 9.64 1,349,600.00
300,000.00 9.61 2,883,000.00
900,000.00 9.60 8,640,000.00
2,000.00 69.38 138,760.00
50,000.00 86.61 4,330,500.00
7.00 17,577.45 123,042.15
58.00 16,212.06 940,299.48
29,700.00 35.92 1,066,824.00
1,800.00 233.16 419,688.00
3.00 59,635.26 178,905.78
3.00 54,282.04 162,846.12
12.00 6,366.20 76,394.40
252.00 6,670.39 1,680,938.28
1.00 164.28 164.28
1.00 9,585.10 9,585.10
46,995,172.22
Ingeniería y Construcción - Anaco

OBRA: PLAN ACELERADO DE INCREMENTO DE


PRODUCCIÓN 2013. CONTRUCCIÓN DE VÍAS DE ACCESO EN
CAMPO OLLAS.

AVANCE SEMANAL # 1

VIA EJE UNARE SUR CAMPO OLLAS


MUNICIPIO MACGREGOR EDO. ANZOATEGUI.

DESDE HASTA

10/7/2013 10/9/2013

POR LA EMPRESA
POR PDVSA
ING. RESIDENTE PLANIFICADOR
NOMBRE: ARLEVIS VALLADARES NOMBRE: FRANCISCO MENDOZA NOMBRE: CARLOS JARAMILLO
CI: 14.827.820 CI: 16.658.783 CI: 17.422.139
FIRMA FIRMA FIRMA
PLAN ACELERADO DE INCREMENTO DE PRODUCCIÓN
2013. CONTRUCCIÓN DE VÍAS DE ACCESO EN CAMPO
OLLAS.
Ingeniería y Construcción - Anaco

Semana 01

CONTRATO Nº : 4600014957 Contratista: SABRIMAR, C.A Ing. Residente: Fracisco Mendoza


UNIDAD: EDIFICACIÓN Y VIALIDAD Fecha de Corte: 10/9/2013 Ing.Planificador: Carlos Jaramillo

Contrato Monto (Bs.) Horas Hombre Directas Personal PDVSA


Original Bs 56,737,358.42 Totales Supervisor: Wilfredo Curapiaca
Variación neta. Programadas a la Fecha Ing. Inspector: Arlevis Valladares
Revisado Reales a la Fecha Planificador: Arelis Mendoza
Escalatorias Ganadas a la Fecha Personal en Obra
Proyectado Eficiencia (%) Mano de Obra Directa
F. Inicio F. Fin F. Pronóst Mano de Obra Indirecta
10/7/2013 2/3/2014 Total

Progreso Físico (%) Pagos en Proceso


Anterior Período Acumulado Valuación Monto (Bs.) Estatus Fecha
Planificado 0.00% 2.33% 2.33%
Real 0.00% 0.63% 0.63%
Desviación 0.00% 1.70% 1.70%

Progreso Financiero
Anterior Período Acumulado
Planificado 2662817.74275126 2962449.1724 8988793.91866414
Real 391,899.81 391,899.81 1,419,737.79

Actividades en Progreso

Seguridad Higiene y Ambiente Aseguramiento de la Calidad


Charla Diarias

Curva de Avance Físico de Obra Curva de Avance Financiero de Obra

100.00%
AVANCE

90.00%
80.00%
70.00%
60.00%
50.00%
40.00%
30.00%
20.00%
10.00%
0.00%
1 2 3 4 SEMANAS

Aspectos Resaltantes / Áreas de Atención

Ing. Residente: Francisco C Mendoza Inspector PDVSA: Arlevis Valladares


CI: 16.658.783 CI: 14.827.820
Fecha: 10/9/2013 Firma: Fecha: 10/9/2013 Firma:
TABLA DE AVANCE FISICO SEMANAL

PLAN ACELERADO DE INCREMENTO DE PRODUCCIÓN 2013. CONTRUCCIÓN DE VÍAS DE ACCESO EN CAMPO OLLAS.
FECHA DE INICIO :
FECHA ESTIMADA DE CULMINACION:

SEM N° 01 SEM N° 02 SEM N° 03 SEM N° 04 SEM N° 05 SEM N° 06 SEM N° 07 SEM N° 08 SEM N° 09 SEM N° 10 SEM N° 11 SEM N° 12 SEM N° 13 SEM N° 14 SEM N° 15 SEM N° 16 SEM N° 17 SEM N° 18 AVANCE
DESDE DESDE DESDE DESDE DESDE DESDE DESDE DESDE DESDE DESDE DESDE DESDE DESDE DESDE DESDE DESDE DESDE DESDE
10/7/2013 10-10-13 17-10-13 24-10-13 31-10-13 07-11-13 14-11-13 21-11-13 28-11-13 05-12-13 12-12-13 19-12-13 26-12-13 02-01-14 09-01-14 16-01-14 23-01-14 30-01-14
% Avance
Descripción HASTA HASTA HASTA HASTA HASTA HASTA HASTA HASTA HASTA HASTA HASTA HASTA HASTA HASTA HASTA HASTA HASTA HASTA
Fisico
Acumulado
09-10-13 16-10-13 23-10-13 30-10-13 06-11-13 13-11-13 20-11-13 27-11-13 04-12-13 11-12-13 18-12-13 25-12-13 01-01-14 08-01-14 15-01-14 22-01-14 29-01-14 03-02-14

PLAN 2.33% 7.96% 9.54% 9.03% 8.98% 8.66% 6.14% 10.34% 10.84% 8.33% 5.14% 2.24% 1.99% 0.74% 2.24% 2.24% 1.64% 1.64% 100.00%

Item PLAN ACU 2.33% 10.29% 19.83% 28.86% 37.83% 46.50% 52.63% 62.97% 73.81% 82.14% 87.28% 89.52% 91.51% 92.24% 94.48% 96.72% 98.36% 100.00%
PLAN ACELERADO DE INCREMENTO PESO
DE PRODUCCIÓN 2013. CONTRUCCIÓN FÍSICO REAL 0.63% 1.00% 1.00% 1.00% 1.00% 1.00% 1.00% 1.00% 1.00% 1.00% 1.00% 1.00% 1.00% 1.00% 1.00% 0.99% 1.07% 1.07% 17.82%
DE VÍAS DE ACCESO EN CAMPO OLLAS. (%)
REAL ACU 0.63% 1.63% 2.64% 3.64% 4.65% 5.65% 6.65% 7.66% 8.66% 9.67% 10.67% 11.68% 12.68% 13.69% 14.69% 15.68% 16.75% 17.82%

DESVIAC -1.70% -6.96% -8.53% -8.02% -7.97% -7.66% -5.13% -9.33% -9.83% -7.32% -4.13% -1.23% -0.98% 0.27% -1.24% -1.24% -0.57% -0.57%

PLAN 6.53% 10.28% 2.78% 6.53% 11.53% 10.28% 2.78% 2.78% 12.78% 11.53% 2.78% 2.78% 2.78% 2.78% 2.78% 2.78% 2.78% 2.78% 100.00%
C.1 OBRAS PRELIMINARES 5.0%
REAL 5.56% 1.00% 1.00% 1.00% 1.00% 1.00% 1.00% 1.00% 1.00% 1.00% 1.00% 1.00% 1.00% 1.00% 1.00% 0.95% 1.02% 1.03% 22.56%
PLAN 5.56% 5.56% 5.56% 5.56% 5.56% 5.56% 5.56% 5.56% 5.56% 5.56% 5.56% 5.56% 5.56% 5.56% 5.56% 5.56% 5.56% 5.56% 100.00%
C.1.1 INSTALACIONES PROVISIONALES. 1.5%
REAL 5.00% 0.44% 0.44% 0.44% 0.44% 0.44% 0.44% 0.44% 0.44% 0.44% 0.44% 0.44% 0.44% 0.44% 0.44% 0.44% 0.48% 0.48% 12.56%
PLAN 5.56% 5.56% 5.56% 5.56% 5.56% 5.56% 5.56% 5.56% 5.56% 5.56% 5.56% 5.56% 5.56% 5.56% 5.56% 5.56% 5.56% 5.56% 100.00%
C.1.2 REPLANTEO Y NIVELACION. 1.5%
REAL 0.28% 0.28% 0.28% 0.28% 0.28% 0.28% 0.28% 0.28% 0.28% 0.28% 0.28% 0.28% 0.28% 0.28% 0.28% 0.26% 0.27% 0.27% 5.00%
DEFORESTACION LIVIANA Y LIMPIEZA. INCLUYE PLAN 15.00% 15.00% 20.00% 15.00% 20.00% 15.00% 100.00%
C.1.3 BOTE DE MATERIAL HASTA UNA DISTANCIA DE 10 1.0%
REAL 0.17% 0.17% 0.17% 0.17% 0.17% 0.17% 0.17% 0.17% 0.17% 0.17% 0.17% 0.17% 0.17% 0.17% 0.17% 0.14% 0.15% 0.16% 3.00%
KM.
REMOCIÓN DE CARPETA ASFÁLTICA Y BASE GRANULAR A PLAN 15.00% 15.00% 15.00% 15.00% 20.00% 20.00% 100.00%
C.1.4 MÁQUINA EN VÍAS DE ACCESO Y PLATAFORMA DE 1.0%
LOCALIZACIONES EXISTENTES REAL 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.12% 0.12% 2.00%
PLAN 2.27% 7.27% 8.64% 9.55% 8.18% 10.45% 10.91% 11.82% 11.82% 9.55% 4.55% 2.73% 2.27% 0.00% 0.00% 0.00% 0.00% 0.00% 100.00%
C.2 MOVIMIENTO DE TIERRAS 55.0%
REAL 0.11% 1.21% 1.21% 1.21% 1.21% 1.21% 1.21% 1.21% 1.21% 1.21% 1.21% 1.21% 1.21% 1.21% 1.21% 1.21% 1.32% 1.32% 20.90%
REMOCION DE CAPA VEGETAL Y DE MATERIAL PLAN 10.00% 10.00% 10.00% 10.00% 10.00% 10.00% 10.00% 10.00% 10.00% 10.00% 100.00%
C.2.1 DESECHABLE EN BASE DE TERRAPLEN.
5.0%
REAL 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.12% 0.12% 2.00%
EXCAVACION Y CARGA PARA BANQUEO EN PLAN 15.00% 15.00% 15.00% 15.00% 20.00% 20.00% 100.00%
C.2.3 CUALQUIER TIPO DE MATERIAL. INCLUYE LA 5.0%
REAL 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.12% 0.12% 2.00%
CARGA Y BOTE DE MATERIAL.
CONSTRUCCION DE TERRAPLEN, MEDIANTE PLAN 10.00% 5.00% 10.00% 10.00% 10.00% 10.00% 10.00% 10.00% 10.00% 15.00% 100.00%
C.2.5 5.0%
EQUIPO PESADO. REAL 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.12% 0.12% 2.00%
CORTE Y CARGA EN PRESTAMO MEDIANTE PLAN 5.00% 5.00% 5.00% 10.00% 10.00% 10.00% 10.00% 10.00% 15.00% 20.00% 100.00%
C.2.6 5.0%
EQUIPO PESADO. REAL 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.12% 0.12% 2.00%
PLAN 10.00% 5.00% 5.00% 10.00% 15.00% 10.00% 15.00% 15.00% 15.00% 100.00%
C.2.9 TRANSPORTE DE MATERIAL DE PRESTAMO. 5.0%
REAL 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.12% 0.12% 2.00%
CONSTRUCCION DE RELLENO COMPACTADO CON PLAN 20.00% 10.00% 10.00% 10.00% 10.00% 10.00% 10.00% 10.00% 10.00% 100.00%
C.2.13 5.0%
PASO DE MAQUINA. REAL 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.12% 0.12% 2.00%
CORTE Y CARGA EN PRESTAMO DE GRANZON PLAN 5.00% 5.00% 5.00% 5.00% 10.00% 15.00% 15.00% 10.00% 15.00% 10.00% 5.00% 100.00%
C.2.14 5.0%
NATURAL MEDIANTE EQUIPO PESADO. REAL 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.12% 0.12% 2.00%
CONSTRUCCION DE BASE Y/O SUB-BASE DE PLAN 5.00% 5.00% 10.00% 10.00% 10.00% 10.00% 10.00% 10.00% 10.00% 10.00% 10.00% 100.00%
C.2.15 5.0%
GRANZON NATURAL. REAL 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.12% 0.12% 2.00%
PLAN 15.00% 15.00% 15.00% 15.00% 15.00% 15.00% 10.00% 100.00%
C.2.19 TRANSPORTE DE GRANZON NATURAL. 5.0%
REAL 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.12% 0.12% 2.00%
CONSTRUCCION DE CUNETAS EN TIERRA A PLAN 5.00% 5.00% 10.00% 20.00% 20.00% 20.00% 20.00% 100.00%
C.2.20 MAQUINA. INCLUYE BOTE DE MATERIAL 5.0%
ACONDICIONAMIENTO DE VIAS DE ACCESO A REAL 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.12% 0.12% 2.00%
SOBRANTE.
MAQUINA. INCLUYE ESCARIFICACION, PLAN 5.00% 5.00% 10.00% 15.00% 15.00% 15.00% 15.00% 10.00% 10.00% 100.00%
C.2.21 5.0%
NIVELACION,COMPACTACION Y BOTE DE REAL 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.12% 0.12% 2.00%
MATERIAL SOBRANTE. PLAN 0.00% 10.00% 20.00% 10.00% 20.00% 20.00% 0.00% 10.00% 10.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 100.00%
C.3 OBRAS DE CONCRETO 12.0%
REAL 0.28% 0.28% 0.28% 0.28% 0.28% 0.28% 0.28% 0.28% 0.28% 0.28% 0.28% 0.28% 0.28% 0.28% 0.28% 0.26% 0.27% 0.27% 5.00%
CONSTRUCCION DE CUNETAS UTILIZANDO CONCRETO
HIDROFUGO. INCLUYE MALLA ELECTROSOLDADA PLAN 20.00% 20.00% 20.00% 20.00% 20.00% 100.00%
C.3.1 100X100X4 MM, EXCAVACIÓN, CONFORMACION, BOTE,
6.0%
REAL 0.28% 0.28% 0.28% 0.28% 0.28% 0.28% 0.28% 0.28% 0.28% 0.28% 0.28% 0.28% 0.28% 0.28% 0.28% 0.26% 0.27% 0.27% 5.00%
CONSTRUCCIÓN DE CABEZAL PARA
ENCOFRADO Y RELLENO. PLAN 20.00% 20.00% 20.00% 20.00% 20.00% 100.00%
C.3.2 ALCANTARILLA. INCLUYE ACERO DE REFUERZO, 6.0%
REAL 0.28% 0.28% 0.28% 0.28% 0.28% 0.28% 0.28% 0.28% 0.28% 0.28% 0.28% 0.28% 0.28% 0.28% 0.28% 0.26% 0.27% 0.27% 5.00%
EXCAVACIÓN Y ENCOFRADO.
PLAN 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 25.00% 25.00% 25.00% 25.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 100.00%
C.4 OBRAS DE ASFALTADO 10.0%
REAL 0.55% 0.55% 0.55% 0.55% 0.55% 0.55% 0.55% 0.55% 0.55% 0.55% 0.55% 0.55% 0.55% 0.55% 0.55% 0.55% 0.60% 0.60% 10.00%
PLAN 25.00% 25.00% 25.00% 25.00% 100%
C.4.1 IMPRIMACION ASFALTICA RC-250 10.0%
REAL 0.55% 0.55% 0.55% 0.55% 0.55% 0.55% 0.55% 0.55% 0.55% 0.55% 0.55% 0.55% 0.55% 0.55% 0.55% 0.55% 0.60% 0.60% 10%
PLAN 6.25% 18.75% 18.75% 18.75% 12.50% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 6.25% 6.25% 6.25% 6.25% 100.00%
C.5 OBRAS COMPLEMENTARIAS 12.0%
REAL 1.12% 1.12% 1.12% 1.12% 1.12% 1.12% 1.12% 1.12% 1.12% 1.12% 1.12% 1.12% 1.12% 1.12% 1.08% 1.08% 1.08% 1.08% 20.00%
S/C DE CERCA DE 5 HILOS DE ALAMBRE DE PUAS, PLAN 25.00% 25.00% 25.00% 25.00% 100.00%
C.5.1 MADRINERAS DE MADERA Y ESTANTES DE 3.0%
REAL 0.28% 0.28% 0.28% 0.28% 0.28% 0.28% 0.28% 0.28% 0.28% 0.28% 0.28% 0.28% 0.28% 0.28% 0.27% 0.27% 0.27% 0.27% 5.00%
CONCRETO F´C= 180
CONSTRUCCION KG/CM2
DE ATAJAGANADO, INCLUYE PLAN 25.00% 25.00% 25.00% 25.00% 100.00%
C.5.2 TRANSPORTE DE MATERIAL, CORTE, SOLDADURA 3.0%
REAL 0.28% 0.28% 0.28% 0.28% 0.28% 0.28% 0.28% 0.28% 0.28% 0.28% 0.28% 0.28% 0.28% 0.28% 0.27% 0.27% 0.27% 0.27% 5.00%
Y FABRICACION. DE PORTÓN METÁLICO. INCLUYE
CONSTRUCCIÓN PLAN 25.00% 25.00% 25.00% 25.00% 100.00%
C.5.3 TRANSPORTE DE MATERIAL, CORTE, SOLDADURA 3.0%
REAL 0.28% 0.28% 0.28% 0.28% 0.28% 0.28% 0.28% 0.28% 0.28% 0.28% 0.28% 0.28% 0.28% 0.28% 0.27% 0.27% 0.27% 0.27% 5.00%
Y FABRICACIÓN.
CONSTRUCCION DE ALCANTARILLAS CON TUBOS PLAN 25.00% 25.00% 25.00% 25.00% 100.00%
C.5.5 SUMINISTRADO POR PDVSA. INCLUYE TRANSPORTE, CORTE, 3.0%
SOLDADURA Y COLOCACION. REAL 0.28% 0.28% 0.28% 0.28% 0.28% 0.28% 0.28% 0.28% 0.28% 0.28% 0.28% 0.28% 0.28% 0.28% 0.27% 0.27% 0.27% 0.27% 5.00%
PLAN 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 10.00% 10.00% 10.00% 22.50% 22.50% 12.50% 12.50% 100.00%
C.6 OBRAS DE RESTAURACIÓN 6.0%
REAL 1.10% 1.10% 1.10% 1.10% 1.10% 1.10% 1.10% 1.10% 1.10% 1.10% 1.10% 1.10% 1.10% 1.10% 1.10% 1.10% 1.20% 1.20% 20.00%
SUMINISTRO, SIEMBRA Y ESTABLECIMIENTO DE PLAN 25.00% 25.00% 25.00% 25.00% 100.00%
C.6.1 3.0%
BARRERAS VIVAS SIMPLES DE PASTO. REAL 0.55% 0.55% 0.55% 0.55% 0.55% 0.55% 0.55% 0.55% 0.55% 0.55% 0.55% 0.55% 0.55% 0.55% 0.55% 0.55% 0.60% 0.60% 10.00%
CONSTRUCCIÓN DE ESTRUCTURA DISIPADORA DE PLAN 20.00% 20.00% 20.00% 20.00% 20.00% 100.00%
C.6.2 3.0%
ENERGÍA (ENROCADOS). REAL 0.55% 0.55% 0.55% 0.55% 0.55% 0.55% 0.55% 0.55% 0.55% 0.55% 0.55% 0.55% 0.55% 0.55% 0.55% 0.55% 0.60% 0.60% 10.00%

1.000 REVISADO POR: REVISADO POR: APROBADO POR:


ARELIS MENDOZA ARLEVIS VALLADARES WILFREDO CURAPIACA
ELABORADO POR: C.I. 8.494.263
ING. CARLOS JARAMILLO APROBADO POR: C.I. 10.291.962 C.I. 14.827.820
ING. FRANCISCO MENDOZA PLANIFICADOR INSPECTOR SUPERVISOR
C.I. 17.422.139
PLANIFICADOR C.I. 16.658.783
INGENIERO RESIDENTE
TABLA DE AVANCE FINANCIERO SEMANAL

PLAN ACELERADO DE INCREMENTO DE PRODUCCIÓN 2013. CONTRUCCIÓN DE VÍAS DE ACCESO EN CAMPO OLLAS.
FECHA DE INICIO :
FECHA ESTIMADA DE CULMINACION:

SEM N° 01 SEM N° 02 SEM N° 03 SEM N° 04 SEM N° 05 SEM N° 06 SEM N° 07 SEM N° 08 SEM N° 09 SEM N° 10 SEM N° 11 SEM N° 12 SEM N° 13 SEM N° 14 SEM N° 15 SEM N° 16 SEM N° 17 SEM N° 18 AVANCE
DESDE DESDE DESDE DESDE DESDE DESDE DESDE DESDE DESDE DESDE DESDE DESDE DESDE DESDE DESDE DESDE DESDE DESDE
10/7/2013 10-10-13 17-10-13 24-10-13 31-10-13 07-11-13 14-11-13 21-11-13 28-11-13 05-12-13 12-12-13 19-12-13 26-12-13 02-01-14 09-01-14 16-01-14 23-01-14 30-01-14 Avance Financiero
Descripción HASTA HASTA HASTA HASTA HASTA HASTA HASTA HASTA HASTA HASTA HASTA HASTA HASTA HASTA HASTA HASTA HASTA HASTA Acumulado
09-10-13 16-10-13 23-10-13 30-10-13 06-11-13 13-11-13 20-11-13 27-11-13 04-12-13 11-12-13 18-12-13 25-12-13 01-01-14 08-01-14 15-01-14 22-01-14 29-01-14 03-02-14

PLAN 869,266.73 2,494,260.27 2,662,817.74 2,962,449.17 2,692,411.09 3,019,806.68 2,843,329.67 4,468,877.13 4,755,733.10 4,105,872.70 2,588,201.98 831,632.09 716,480.11 140,720.22 323,271.39 323,271.39 262,233.37 262,233.37 36,322,868.21

Item PLAN ACU 869,266.73 3,363,527.00 6,026,344.75 8,988,793.92 11,681,205.00 14,701,011.69 17,544,341.35 22,013,218.49 26,768,951.58 30,874,824.28 33,463,026.27 34,294,658.36 35,011,138.47 35,151,858.69 35,475,130.08 35,798,401.46 36,060,634.84 36,322,868.21 36,322,868.21
PLAN ACELERADO DE INCREMENTO PESO
DE PRODUCCIÓN 2013. CONTRUCCIÓN FINANCIERO REAL 244,038.35 391,899.81 391,899.81 391,899.81 391,899.81 391,899.81 391,899.81 391,899.81 391,899.81 391,899.81 391,899.81 391,899.81 391,899.81 391,899.81 391,219.79 389,709.02 422,946.42 423,233.27 6,965,844.42
DE VÍAS DE ACCESO EN CAMPO OLLAS. (%)
REAL ACU 244,038.35 635,938.16 1,027,837.97 1,419,737.79 1,811,637.60 2,203,537.41 2,595,437.22 2,987,337.04 3,379,236.85 3,771,136.66 4,163,036.48 4,554,936.29 4,946,836.10 5,338,735.92 5,729,955.71 6,119,664.73 6,542,611.14 6,965,844.42 6,965,844.42

DESVIAC -625,228.38 -2,102,360.46 -2,270,917.93 -2,570,549.36 -2,300,511.27 -2,627,906.87 -2,451,429.85 -4,076,977.32 -4,363,833.28 -3,713,972.89 -2,196,302.17 -439,732.27 -324,580.30 251,179.59 67,948.40 66,437.64 160,713.04 160,999.90

PLAN 6.53% 10.28% 2.78% 6.53% 11.53% 10.28% 2.78% 2.78% 12.78% 11.53% 2.78% 2.78% 2.78% 2.78% 2.78% 2.78% 2.78% 2.78% 100.00%
C.1 OBRAS PRELIMINARES 2,868,559.63
REAL 5.56% 1.00% 1.00% 1.00% 1.00% 1.00% 1.00% 1.00% 1.00% 1.00% 1.00% 1.00% 1.00% 1.00% 1.00% 0.95% 1.02% 1.03% 22.56%
PLAN 5.56% 5.56% 5.56% 5.56% 5.56% 5.56% 5.56% 5.56% 5.56% 5.56% 5.56% 5.56% 5.56% 5.56% 5.56% 5.56% 5.56% 5.56% 100.00%
C.1.1 INSTALACIONES PROVISIONALES. 1,070,813.67
REAL 5.00% 0.44% 0.44% 0.44% 0.44% 0.44% 0.44% 0.44% 0.44% 0.44% 0.44% 0.44% 0.44% 0.44% 0.44% 0.44% 0.48% 0.48% 12.56%
PLAN 5.56% 5.56% 5.56% 5.56% 5.56% 5.56% 5.56% 5.56% 5.56% 5.56% 5.56% 5.56% 5.56% 5.56% 5.56% 5.56% 5.56% 5.56% 100.00%
C.1.2 REPLANTEO Y NIVELACION. 1,064,119.70
REAL 0.28% 0.28% 0.28% 0.28% 0.28% 0.28% 0.28% 0.28% 0.28% 0.28% 0.28% 0.28% 0.28% 0.28% 0.28% 0.26% 0.27% 0.27% 5.00%
DEFORESTACION LIVIANA Y LIMPIEZA. INCLUYE PLAN 15.00% 15.00% 20.00% 15.00% 20.00% 15.00% 100.00%
C.1.3 BOTE DE MATERIAL HASTA UNA DISTANCIA DE 10 349,366.26
REAL 0.17% 0.17% 0.17% 0.17% 0.17% 0.17% 0.17% 0.17% 0.17% 0.17% 0.17% 0.17% 0.17% 0.17% 0.17% 0.14% 0.15% 0.16% 3.00%
KM.
REMOCIÓN DE CARPETA ASFÁLTICA Y BASE GRANULAR A PLAN 15.00% 15.00% 15.00% 15.00% 20.00% 20.00% 100.00%
C.1.4 MÁQUINA EN VÍAS DE ACCESO Y PLATAFORMA DE 384,260.00
LOCALIZACIONES EXISTENTES REAL 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.12% 0.12% 2.00%
PLAN 2.27% 7.27% 8.64% 9.55% 8.18% 10.45% 10.91% 11.82% 11.82% 9.55% 4.55% 2.73% 2.27% 0.00% 0.00% 0.00% 0.00% 0.00% 100.00%
C.2 MOVIMIENTO DE TIERRAS 25,333,435.00
REAL 0.11% 1.21% 1.21% 1.21% 1.21% 1.21% 1.21% 1.21% 1.21% 1.21% 1.21% 1.21% 1.21% 1.21% 1.21% 1.21% 1.32% 1.32% 20.90%
REMOCION DE CAPA VEGETAL Y DE MATERIAL PLAN 10.00% 10.00% 10.00% 10.00% 10.00% 10.00% 10.00% 10.00% 10.00% 10.00% 100.00%
C.2.1 DESECHABLE EN BASE DE TERRAPLEN.
1,309,700.00
REAL 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.12% 0.12% 2.00%
EXCAVACION Y CARGA PARA BANQUEO EN PLAN 15.00% 15.00% 15.00% 15.00% 20.00% 20.00% 100.00%
C.2.3 CUALQUIER TIPO DE MATERIAL. INCLUYE LA 166,995.00
REAL 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.12% 0.12% 2.00%
CARGA Y BOTE DE MATERIAL.
CONSTRUCCION DE TERRAPLEN, MEDIANTE PLAN 10.00% 5.00% 10.00% 10.00% 10.00% 10.00% 10.00% 10.00% 10.00% 15.00% 100.00%
C.2.5 1,131,800.00
EQUIPO PESADO. REAL 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.12% 0.12% 2.00%
CORTE Y CARGA EN PRESTAMO MEDIANTE PLAN 5.00% 5.00% 5.00% 10.00% 10.00% 10.00% 10.00% 10.00% 15.00% 20.00% 100.00%
C.2.6 1,224,630.00
EQUIPO PESADO. REAL 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.12% 0.12% 2.00%
PLAN 10.00% 5.00% 5.00% 10.00% 15.00% 10.00% 15.00% 15.00% 15.00% 100.00%
C.2.9 TRANSPORTE DE MATERIAL DE PRESTAMO. 339,150.00
REAL 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.12% 0.12% 2.00%
CONSTRUCCION DE RELLENO COMPACTADO CON PLAN 20.00% 10.00% 10.00% 10.00% 10.00% 10.00% 10.00% 10.00% 10.00% 100.00%
C.2.13 859,100.00
PASO DE MAQUINA. REAL 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.12% 0.12% 2.00%
CORTE Y CARGA EN PRESTAMO DE GRANZON PLAN 5.00% 5.00% 5.00% 5.00% 10.00% 15.00% 15.00% 10.00% 15.00% 10.00% 5.00% 100.00%
C.2.14 3,239,040.00
NATURAL MEDIANTE EQUIPO PESADO. REAL 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.12% 0.12% 2.00%
CONSTRUCCION DE BASE Y/O SUB-BASE DE PLAN 5.00% 5.00% 10.00% 10.00% 10.00% 10.00% 10.00% 10.00% 10.00% 10.00% 10.00% 100.00%
C.2.15 3,953,760.00
GRANZON NATURAL. REAL 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.12% 0.12% 2.00%
PLAN 15.00% 15.00% 15.00% 15.00% 15.00% 15.00% 10.00% 100.00%
C.2.19 TRANSPORTE DE GRANZON NATURAL. 8,640,000.00
REAL 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.12% 0.12% 2.00%
CONSTRUCCION DE CUNETAS EN TIERRA A PLAN 5.00% 5.00% 10.00% 20.00% 20.00% 20.00% 20.00% 100.00%
C.2.20 MAQUINA. INCLUYE BOTE DE MATERIAL 138,760.00
ACONDICIONAMIENTO DE VIAS DE ACCESO A REAL 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.12% 0.12% 2.00%
SOBRANTE.
MAQUINA. INCLUYE ESCARIFICACION, PLAN 5.00% 5.00% 10.00% 15.00% 15.00% 15.00% 15.00% 10.00% 10.00% 100.00%
C.2.21 4,330,500.00
NIVELACION,COMPACTACION Y BOTE DE REAL 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.11% 0.12% 0.12% 2.00%
MATERIAL SOBRANTE. PLAN 0.00% 10.00% 20.00% 10.00% 20.00% 20.00% 0.00% 10.00% 10.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 100.00%
C.3 OBRAS DE CONCRETO 382,435.11
REAL 0.28% 0.28% 0.28% 0.28% 0.28% 0.28% 0.28% 0.28% 0.28% 0.28% 0.28% 0.28% 0.28% 0.28% 0.28% 0.26% 0.27% 0.27% 5.00%
CONSTRUCCION DE CUNETAS UTILIZANDO CONCRETO
HIDROFUGO. INCLUYE MALLA ELECTROSOLDADA PLAN 20.00% 20.00% 20.00% 20.00% 20.00% 100.00%
C.3.1 100X100X4 MM, EXCAVACIÓN, CONFORMACION, BOTE,
123,042.15
REAL 0.28% 0.28% 0.28% 0.28% 0.28% 0.28% 0.28% 0.28% 0.28% 0.28% 0.28% 0.28% 0.28% 0.28% 0.28% 0.26% 0.27% 0.27% 5.00%
CONSTRUCCIÓN DE CABEZAL PARA
ENCOFRADO Y RELLENO. PLAN 20.00% 20.00% 20.00% 20.00% 20.00% 100.00%
C.3.2 ALCANTARILLA. INCLUYE ACERO DE REFUERZO, 259,392.96
REAL 0.28% 0.28% 0.28% 0.28% 0.28% 0.28% 0.28% 0.28% 0.28% 0.28% 0.28% 0.28% 0.28% 0.28% 0.28% 0.26% 0.27% 0.27% 5.00%
EXCAVACIÓN Y ENCOFRADO.
PLAN 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 25.00% 25.00% 25.00% 25.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 100.00%
C.4 OBRAS DE ASFALTADO 5,428,000.00
REAL 0.55% 0.55% 0.55% 0.55% 0.55% 0.55% 0.55% 0.55% 0.55% 0.55% 0.55% 0.55% 0.55% 0.55% 0.55% 0.55% 0.60% 0.60% 10.00%
PLAN 25.00% 25.00% 25.00% 25.00% 100%
C.4.1 IMPRIMACION ASFALTICA RC-250 5,428,000.00
REAL 0.55% 0.55% 0.55% 0.55% 0.55% 0.55% 0.55% 0.55% 0.55% 0.55% 0.55% 0.55% 0.55% 0.55% 0.55% 0.55% 0.60% 0.60% 10%
PLAN 6.25% 18.75% 18.75% 18.75% 12.50% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 6.25% 6.25% 6.25% 6.25% 100.00%
C.5 OBRAS COMPLEMENTARIAS 1,700,058.35
REAL 1.12% 1.12% 1.12% 1.12% 1.12% 1.12% 1.12% 1.12% 1.12% 1.12% 1.12% 1.12% 1.12% 1.12% 1.08% 1.08% 1.08% 1.08% 20.00%
S/C DE CERCA DE 5 HILOS DE ALAMBRE DE PUAS, PLAN 25.00% 25.00% 25.00% 25.00% 100.00%
C.5.1 MADRINERAS DE MADERA Y ESTANTES DE 832,460.00
REAL 0.28% 0.28% 0.28% 0.28% 0.28% 0.28% 0.28% 0.28% 0.28% 0.28% 0.28% 0.28% 0.28% 0.28% 0.27% 0.27% 0.27% 0.27% 5.00%
CONCRETO F´C= DE
CONSTRUCCION 180 ATAJAGANADO,
KG/CM2 INCLUYE PLAN 25.00% 25.00% 25.00% 25.00% 100.00%
C.5.2 TRANSPORTE DE MATERIAL, CORTE, SOLDADURA 252,705.45
REAL 0.28% 0.28% 0.28% 0.28% 0.28% 0.28% 0.28% 0.28% 0.28% 0.28% 0.28% 0.28% 0.28% 0.28% 0.27% 0.27% 0.27% 0.27% 5.00%
Y FABRICACION. DE PORTÓN METÁLICO. INCLUYE
CONSTRUCCIÓN PLAN 25.00% 25.00% 25.00% 25.00% 100.00%
C.5.3 TRANSPORTE DE MATERIAL, CORTE, SOLDADURA 234,734.34
REAL 0.28% 0.28% 0.28% 0.28% 0.28% 0.28% 0.28% 0.28% 0.28% 0.28% 0.28% 0.28% 0.28% 0.28% 0.27% 0.27% 0.27% 0.27% 5.00%
Y FABRICACIÓN.
CONSTRUCCION DE ALCANTARILLAS CON TUBOS PLAN 25.00% 25.00% 25.00% 25.00% 100.00%
C.5.5 SUMINISTRADO POR PDVSA. INCLUYE TRANSPORTE, CORTE, 380,158.56
SOLDADURA Y COLOCACION. REAL 0.28% 0.28% 0.28% 0.28% 0.28% 0.28% 0.28% 0.28% 0.28% 0.28% 0.28% 0.28% 0.28% 0.28% 0.27% 0.27% 0.27% 0.27% 5.00%
PLAN 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 10.00% 10.00% 10.00% 22.50% 22.50% 12.50% 12.50% 100.00%
C.6 OBRAS DE RESTAURACIÓN 610,380.12
REAL 1.10% 1.10% 1.10% 1.10% 1.10% 1.10% 1.10% 1.10% 1.10% 1.10% 1.10% 1.10% 1.10% 1.10% 1.10% 1.10% 1.20% 1.20% 20.00%
SUMINISTRO, SIEMBRA Y ESTABLECIMIENTO DE PLAN 25.00% 25.00% 25.00% 25.00% 100.00%
C.6.1 572,075.00
BARRERAS VIVAS SIMPLES DE PASTO. REAL 0.55% 0.55% 0.55% 0.55% 0.55% 0.55% 0.55% 0.55% 0.55% 0.55% 0.55% 0.55% 0.55% 0.55% 0.55% 0.55% 0.60% 0.60% 10.00%
CONSTRUCCIÓN DE ESTRUCTURA DISIPADORA DE PLAN 20.00% 20.00% 20.00% 20.00% 20.00% 100.00%
C.6.2 38,305.12
ENERGÍA (ENROCADOS). REAL 0.55% 0.55% 0.55% 0.55% 0.55% 0.55% 0.55% 0.55% 0.55% 0.55% 0.55% 0.55% 0.55% 0.55% 0.55% 0.55% 0.60% 0.60% 10.00%

36322868.210 REVISADO POR: REVISADO POR: APROBADO POR:


ARELIS MENDOZA ARLEVIS VALLADARES WILFREDO CURAPIACA
ELABORADO POR: C.I. 8.494.263
ING. CARLOS JARAMILLO APROBADO POR: C.I. 10.291.962 C.I. 14.827.820
ING. FRANCISCO MENDOZA PLANIFICADOR INSPECTOR SUPERVISOR
C.I. 17.422.139
PLANIFICADOR C.I. 16.658.783
INGENIERO RESIDENTE
PLAN ACELERADO DE INCREMENTO DE PRODUCCIÓN 2013.
CONTRUCCIÓN DE VÍAS DE ACCESO EN CAMPO OLLAS.

GRAFICA AVANCE FISICO


TIEMPO (SEMANAS)
% AVANCE FISICO % AVANCE FISICO % AVANCE % AVANCE FISICO
PLANIFICADO PLANIFICADO FISICO REAL REAL EJECUTADO VARIACION
Sem Desde Hasta SEMANAL ACUMULADO EJECUTADO ACUMULADO

1 10/7/2013 10/9/2013 2.33% 2.33% 0.63% 0.63% -1.70%


2 10/10/2013 10/16/2013 7.96% 10.29% 1.00% 1.63% -8.66%
3 10/17/2013 10/23/2013 9.54% 19.83% -19.83%
4 10/24/2013 10/30/2013 9.03% 28.86% -28.86%
5 10/31/2013 11/6/2013 8.98% 37.83% -37.83%
6 11/7/2013 11/13/2013 8.66% 46.50% -46.50%
7 11/14/2013 11/20/2013 6.14% 52.63% -52.63%
8 11/21/2013 11/27/2013 10.34% 62.97% -62.97%
9 11/28/2013 12/4/2013 10.84% 73.81% -73.81%
10 12/5/2013 12/11/2013 8.33% 82.14% -82.14%
11 12/12/2013 12/18/2013 5.14% 87.28% -87.28%
12 12/19/2013 12/25/2013 2.24% 89.52% -89.52%
13 12/26/2013 1/1/2014 1.99% 91.51% -91.51%
14 1/2/2014 1/8/2014 0.74% 92.24% -92.24%
15 1/9/2014 1/15/2014 2.24% 94.48% -94.48%
16 1/16/2014 1/22/2014 2.24% 96.72% -96.72%
17 1/23/2014 1/29/2014 1.64% 98.36% -98.36%
18 1/30/2014 2/3/2014 1.64% 100.00% -100.00%
100.00% 1.63%

100.00%

90.00%

80.00%
AVANCE

70.00%

60.00% Column J
Avance
50.00% Plan

40.00%

30.00%

20.00%

10.00%

0.00%
1 2 3 4 SEMANAS
100.00%

90.00%

80.00%

AVANCE
70.00%

60.00% Column J
Avance
50.00% Plan

40.00%

30.00%

20.00%

10.00%

0.00%
1 2 3 4 SEMANAS

REVISADO POR:
APROBADO POR: ING. REVISADO POR: ING. ARLEVIS VALLADARES APROBADO POR:
ELABORADO POR: WILFREDO CURAPIACA
ING. CARLOS JARAMILLO FRANCISCO MENDOZA ARELIS MENDOZA C.I. 14.827.820.
CI: 16.658.783 C.I.10.291.962 INSPECTOR DE CONSTRUCCIÓN. C.I. 8.494.263
C.I. 17.422.139 SUPERVISOR .
PLANIFICADOR . INGENIERO RESIDENTE. PLANIFICADOR.
PLAN ACELERADO DE INCREMENTO DE PRODUCCIÓN 2013.
CONTRUCCIÓN DE VÍAS DE ACCESO EN CAMPO OLLAS.

GRAFICA AVANCE FISICO


TIEMPO (SEMANAS)
% AVANCE FISICO % AVANCE FISICO % AVANCE % AVANCE FISICO
PLANIFICADO PLANIFICADO FISICO REAL REAL EJECUTADO VARIACION
Sem Desde Hasta SEMANAL ACUMULADO EJECUTADO ACUMULADO

1 10/7/2013 10/9/2013 2.33% 2.33% 0.63% 0.63% -1.70%


2 10/10/2013 10/16/2013 7.96% 10.29% 1.00% 1.63% -8.66%
3 10/17/2013 10/23/2013 9.54% 19.83% -19.83%
4 10/24/2013 10/30/2013 9.03% 28.86% -28.86%
5 10/31/2013 11/6/2013 8.98% 37.83% -37.83%
6 11/7/2013 11/13/2013 8.66% 46.50% -46.50%
7 11/14/2013 11/20/2013 6.14% 52.63% -52.63%
8 11/21/2013 11/27/2013 10.34% 62.97% -62.97%
9 11/28/2013 12/4/2013 10.84% 73.81% -73.81%
10 12/5/2013 12/11/2013 8.33% 82.14% -82.14%
11 12/12/2013 12/18/2013 5.14% 87.28% -87.28%
12 12/19/2013 12/25/2013 2.24% 89.52% -89.52%
13 12/26/2013 1/1/2014 1.99% 91.51% -91.51%
14 1/2/2014 1/8/2014 0.74% 92.24% -92.24%
15 1/9/2014 1/15/2014 2.24% 94.48% -94.48%
16 1/16/2014 1/22/2014 2.24% 96.72% -96.72%
17 1/23/2014 1/29/2014 1.64% 98.36% -98.36%
18 1/30/2014 2/3/2014 1.64% 100.00% -100.00%
100.00% 1.63%

100.00%

90.00%

80.00%
AVANCE

70.00%

60.00% Column J
Avance
50.00% Plan

40.00%

30.00%

20.00%

10.00%

0.00%
1 2 3 4 SEMANAS
100.00%

90.00%

80.00%

AVANCE
70.00%

60.00% Column J
Avance
50.00% Plan

40.00%

30.00%

20.00%

10.00%

0.00%
1 2 3 4 SEMANAS

REVISADO POR:
APROBADO POR: ING. REVISADO POR: ING. ARLEVIS VALLADARES APROBADO POR:
ELABORADO POR: WILFREDO CURAPIACA
ING. CARLOS JARAMILLO FRANCISCO MENDOZA ARELIS MENDOZA C.I. 14.827.820.
CI: 16.658.783 C.I.10.291.962 INSPECTOR DE CONSTRUCCIÓN. C.I. 8.494.263
C.I. 17.422.139 SUPERVISOR .
PLANIFICADOR . INGENIERO RESIDENTE. PLANIFICADOR.
10/7/2013 2/3/2014 -119
10/8/2013
10/9/2013
10/10/2013
10/11/2013
10/12/2013
10/13/2013
10/14/2013
10/15/2013
10/16/2013
10/17/2013
10/18/2013
10/19/2013
10/20/2013
10/21/2013
10/22/2013
10/23/2013
10/24/2013
10/25/2013
10/26/2013
10/27/2013
10/28/2013
10/29/2013
10/30/2013
10/31/2013
11/1/2013
11/2/2013
11/3/2013
11/4/2013
11/5/2013
11/6/2013
11/7/2013
11/8/2013
11/9/2013
11/10/2013
11/11/2013
11/12/2013
11/13/2013
11/14/2013
11/15/2013
11/16/2013
11/17/2013
11/18/2013
11/19/2013
11/20/2013
11/21/2013
11/22/2013
11/23/2013
11/24/2013
11/25/2013
11/26/2013
11/27/2013
11/28/2013
11/29/2013
11/30/2013
12/1/2013
12/2/2013
12/3/2013
12/4/2013
12/5/2013
12/6/2013
12/7/2013
12/8/2013
12/9/2013
12/10/2013
12/11/2013
12/12/2013
12/13/2013
12/14/2013
12/15/2013
12/16/2013
12/17/2013
12/18/2013
12/19/2013
12/20/2013
12/21/2013
12/22/2013
12/23/2013
12/24/2013
12/25/2013
12/26/2013
12/27/2013
12/28/2013
12/29/2013
12/30/2013
12/31/2013
1/1/2014
1/2/2014
1/3/2014
1/4/2014
1/5/2014
1/6/2014
1/7/2014
1/8/2014
1/9/2014
1/10/2014
1/11/2014
1/12/2014
1/13/2014
1/14/2014
1/15/2014
1/16/2014
1/17/2014
1/18/2014
1/19/2014
1/20/2014
1/21/2014
1/22/2014
1/23/2014
1/24/2014
1/25/2014
1/26/2014
1/27/2014
1/28/2014
1/29/2014
1/30/2014
1/31/2014
2/1/2014
2/2/2014
2/3/2014
PLAN ACELERADO DE INCREMENTO DE PRODUCCIÓN 2013. CONTRUCCIÓN DE VÍAS DE ACCESO
EN CAMPO OLLAS.

GRAFICA AVANCE FINANCIERO

TIEMPO (SEMANAS)
% AVANCE % AVANCE % AVANCE % AVANCE
PLANIFICADO FINANCIERO FÍNANCIERO REAL EJECUTADO REAL EJECUTADO FINANCIERO FINANCIERO REAL
PLANIFICADO VARIACION
Sem Desde Hasta INICIAL PLANIFICADO PLANIFICADO BS ACUMULADO BS REAL EJECUTADO
INICIAL BS. SEMANAL ACUMULADO EJECUTADO ACUMULADO
ACUMULADO. BS.

1 2.33% 2.33% 244,038.347 244,038.347 0.63% 0.63%


10/7/2013 10/9/2013 869,266.731 869,266.731 -1.70%

2 7.96% 10.29% 391,899.813 635,938.160 1.00% 1.63%


10/10/2013 10/16/2013 2,494,260.272 3,363,527.003 -6.96%

3 9.54% 19.83% 391,899.813 1,027,837.973 1.00% 2.64%


10/17/2013 10/23/2013 2,662,817.743 6,026,344.746 -8.53%
4
10/24/2013 10/30/2013 2,962,449.172 8,988,793.919 9.03% 28.86% 391,899.813 1,419,737.786 1.00% 3.64% -8.02%

5 8.98% 37.83% 391,899.813 1,811,637.599 1.00% 4.65%


10/31/2013 11/6/2013 2,692,411.086 11,681,205.005 -7.97%
6 11/7/2013 11/13/2013 3,019,806.683 14,701,011.688 8.66% 46.50% 391,899.813 2,203,537.412 1.00% 5.65% -7.66%
7 11/14/2013 11/20/2013 2,843,329.666 17,544,341.355 6.14% 52.63% 391,899.813 2,595,437.225 1.00% 6.65% -5.13%
8 11/21/2013 11/27/2013 4,468,877.132 22,013,218.487 10.34% 62.97% 391,899.813 2,987,337.038 1.00% 7.66% -9.33%
9 11/28/2013 12/4/2013 4,755,733.095 26,768,951.582 10.84% 73.81% 391,899.813 3,379,236.851 1.00% 8.66% -9.83%
10 12/5/2013 12/11/2013 4,105,872.702 30,874,824.284 8.33% 82.14% 391,899.813 3,771,136.664 1.00% 9.67% -7.32%
11 12/12/2013 12/18/2013 2,588,201.985 33,463,026.269 5.14% 87.28% 391,899.813 4,163,036.477 1.00% 10.67% -4.13%
12 12/19/2013 12/25/2013 831,632.088 34,294,658.356 2.24% 89.52% 391,899.813 4,554,936.290 1.00% 11.68% -1.23%
13 12/26/2013 1/1/2014 716,480.110 35,011,138.467 1.99% 91.51% 391,899.813 4,946,836.102 1.00% 12.68% -0.98%
14 1/2/2014 1/8/2014 140,720.224 35,151,858.691 0.74% 92.24% 391,899.813 5,338,735.915 1.00% 13.69% 0.27%
15 09-01-2014- 1/15/2014 323,271.386 35,475,130.077 2.24% 94.48% 391,219.790 5,729,955.705 1.00% 14.69% -1.24%
16 1/16/2014 1/22/2014 323,271.386 35,798,401.462 2.24% 96.72% 389,709.023 6,119,664.728 0.99% 15.68% -1.24%
17 1/23/2014 1/29/2014 262,233.374 36,060,634.836 1.64% 98.36% 422,946.417 6,542,611.144 1.07% 16.75% -0.57%
18 1/30/2014 2/3/2014 262,233.374 36,322,868.210 1.64% 100.00% 423,233.273 6,965,844.417 1.07% 17.82% -0.57%
36,322,868.210 424,409,201.169 100.00% 6,965,844.42 17.82%

40,000,000.000

35,000,000.000

30,000,000.000

25,000,000.000

20,000,000.000 Pl ani ficad


o
Real
15,000,000.000

10,000,000.000

5,000,000.000

0.000
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

REVISADO POR:
APROBADO POR: ING. FRANCISCO REVISADO POR: ING. ARLEVIS VALLADARES APROBADO POR:
ELABORADO POR: WILFREDO CURAPIACA
ING. CARLOS JARAMILLO MENDOZA ARELIS MENDOZA C.I. 14.827.820.
CI: 16.658.783 C.I.10.291.962 INSPECTOR DE CONSTRUCCIÓN. C.I. 8.494.263
C.I. 17.422.139 SUPERVISOR .
PLANIFICADOR . INGENIERO RESIDENTE. PLANIFICADOR.