You are on page 1of 14

REFERENCES

1. Abernathy, W.J., Clark, K.V. and Kantrow, A.M., 1981. The New Industrial
Strategy. Harvard Business Review, September-October, pp. 68-81.

2. Adam, E.E. and Ebert, R.J., 2003. Production and Operations Management:
Concepts, Models and Behavior. New Delhi, Prentice-Hall of India.

3. Aggarwal, S.C., 1985. MRP, JIT, OPT, FMS: Making Sense of Production
Operations Systems. Harvard Business Review, Vol. 63, pp. 8-16.

4. Akturk, M. S. and Turkcan, A., 2000. Cellular Manufacturing System Design using
a Holonistic Approach. International Journal of Production Research (IJPR),
Vol. 38 (10), pp. 2327-2347.

5. Anwar, M.F. and Nagi, R., 1997. Integrated lot-sizing and scheduling for
just-in-time production of complex assemblies with finite set-ups. International
Journal of Production Research (IJPR), Vol.35, No.5, pp. 1447-1470.

6. Bartezzaghi, E. and Turco, F., 1989. The Impact of Just-in-time on Production


System Performance: An Analytical Framework. International Journal of
Operations & Production Research (IJOPR), Vol. 9, No. 8, pp. 40-61.

7. Beer, M., Spector, B., Lawrence, P.R., Quinn, Mills D. and Walton, R.E., 1984.
Managing Human Assets. New York, Free Press.

8. Besterfield, Dale H., Michna, C.B., Besterfield, G.H. and Sacre, M.B., 2001.
Total Quality Management. Singapore, Pearson Education.

9. Billesbach, T.J. and Schnierderjans, M.J., 1989. Applicability of just-in-time


techniques in administration. Production and Inventory Management Journal,
Vol. 30, pp. 40-45.

10. Billesbach, T.J., 1991. A study of the implementation of just-in-time in the United
States. Production and Inventory Management Journal, Vol. 32, No. 3, pp. 1-4.

11. Billington, P.J., 1986. Quality improvement through reduced lot sizes in Economic
Order Quantity Model. Decision Science Institute Proc., pp. 1159-1161.

12. Black, J.T., 1983. Cellular manufacturing systems reduce setup time, make small lot
production economical. Industrial Engineering, Vol. 15, pp. 36-48.
13. Blackhurst, J.V., Scheibe, K.P. and Johnson, D.J., 2008. Supplier risk management
and monitoring for the automotive industry. International Journal of Physical
Distribution and Logistics Management, Vol. 38, No. 2, pp. 143-165.

14. Blanchard, B. S., 1998. Logistics Engineering and Management, Fifth Edition.
Upper Saddle River, NJ, Prentice Hall.

15. Boynton, A.C., 1993. Achieving Dynamic Stability Through Information


Technology. California Management Review, Vol. 35 (2), Winter, pp. 58-77.

16. Bright, J. and Cooper, C.L., 1993. Organizational Culture and the Management of
Quality. Journal of Managerial Psychology, Vol. 8, pp. 21-27.

17. Brown, S., 2000. Manufacture the Future: Strategic Resonance For Enlightened
Manufacturing. Singapore, Addison Wesley Longman.

18. Brown, S., 1996. Strategic Manufacturing for Competitive Advantage. Hemel
Hempstead (UK), Prentice Hall.

19. Brown, S., Lamming, R., Bessant, J. and Jones, P., 2000. Strategic Operations
Management. Oxford, Butterworth-Heinemann.

20. Browne, J., Dubois, D., Rathmill, K., Sethi, S.P. and Steckle, K.E., 1984.
Classification of flexible manufacturing systems. The FMS Magazine, Vol. 2,
pp. 114-117.

21. Buffa, Elwood S. and Sarin, Rakesh K., 2000. Modern Production/Operations
Management, Eighth Edition. Singapore, John Wiley & Sons.

22. Burt, D.N., 1989. Managing Suppliers up to Speed, Harvard Business Review,
July-August, pp. 127-135.

23. Burt, D.N., Dobler, D.W. and Starling, S.L., 2009. World Class Supply
Management: The Key to Supply Chain Management, Ninth Edition. New York,
McGraw-Hill/Irwin.

24. Business Week, 1983. Can Chrysler Keep Its Comeback Rolling? February 14.

25. Carbone, J., 1996. Honda pushes suppliers toward six-sigma level. Purchasing,
Vol. 120, No. 1, pp. 52-54.

26. Carr, A. and Kaynak, H., 2007. Communication methods, information sharing,
supplier development and performance. International Journal of Operations &
Production Management (IJOPM), Vol. 27, No. 4, pp. 346-370.

27. Chary, S.N., 2005. Production and Operations Management, Third Edition.
New Delhi, Tata McGraw-Hill Publishing Company Limited.
28. Chase, Richard B., Shankar, Ravi and Jacobs, F. Robert, 2014. Operations and
Supply Chain Management, Fourteenth Edition. New Delhi, McGraw Hill Education
(India) Private Limited.

29. Chen, I.J. and Paulraj, A., 2004. Towards a theory of supply chain management: the
constructs and measurements. Journal of Operations Management, Vol. 22,
pp. 119-150.

30. Chopra, S. and Meindl, P., 2009. Supply Chain Management: Strategy, Planning
and Operation, Fourth Edition. Upper Saddle River, NJ, Prentice Hall.

31. Christopher, M., 1998. Logistics and Supply Chain Management. London,
Financial Times Pitman Publishing.

32. Christopher, M., 2001. Logistics and Supply Chain Management: Strategies for
Reducing Cost and Improving Service, Second Edition. London, Financial Times
Pitman Publishing.

33. Crama, Y. and Kluvert, J., 1999. Worst case performance of approximation
algorithms for tool management problems. Naval Research Logistics, Vol. 46,
pp.445-462.

34. Emery, C.R., Summers, T.P. and Surak, J.G., 1996. The role of Organizational
Climate in the implementation of Total Quality Management. Journal of Managerial
Issues, Vol. 8, pp. 484-496.

35. Flowers, S., 1996. Software Failure: Management Failure. U.K., John Wiley.

36. Flynn, B.B., Sakakibara, S. and Schroeder, R.G., 1995. Relationship between JIT
and TQM: Practices and Performance. Academy of Management Journal, Vol. 38,
pp. 1325- 1360.

37. Ford, H., 1926. Today and Tomorrow. London, William Heinemann Ltd.

38. Frazier, G. V. and Mark, T., 1996. Achieving Competitive Advantage through
Group Technology. Business Horizons, May-June, pp. 83-90.

39. Gaither, N., Frazier G. V. and Wei, J. C., 1990. From Job Shops to Manufacturing
Cells. Production and Inventory Management Journal, Vol. 31, No. 4,
Fourth Quarter, pp. 33-36.

40. Gaither, N. and Frazier, G., 2004. Operations Management, Ninth Edition.
New Delhi, Cengage Learning India Private Ltd.

41. Gamila, M.A. and Motavalli, S., 2003. A modeling technique for loading and
scheduling problems in FMS. Robotics and Computer-Integrated Manufacturing,
Vol. 19, No. 1-2, pp. 45-54.
42. Garwin, D., 1982. Do’s and Don’ts of Computerized Manufacture.
Harvard Business Review, March-April.

43. Garwin, D., 1987. An agenda for research on the flexibility of manufacturing
processes. International Journal of Operations & Production Management
(IJOPM), Vol. 7, pp. 38-49.

44. Garvin, D., 1993. Building a Learning Organization. Harvard Business Review,
July-August 1993, p.80.

45. Garwin, D., 1993. Manufacturing Flexibility: A Strategic Perspective.


Management Science, Vol. 39, No. 4, pp. 395-410.

46. Gaudenzi, B. and Borghesi, A., 2006. Managing risks in the supply chain using the
AHP method. International Journal of Logistics Management, Vol. 17, No. 1,
pp. 114-136.

47. Gettel-Riehl, K. and Kleiner, B.H., 1987. Lessons from the Japanese Automotive
Industry. Industrial Management and Data Systems, U.K; pp. 3-6.

48. Glover, J., 1993. Achieving the Organizational Change necessary for Successful
TQM. International Journal of Quality and Reliability Management, Vol. 10,
pp. 47-64.

49. Gowen, C. and Pecenka, J., 1992. Impact of Technological Leadership on American
and Japanese Turnaround Strategies. The Journal of High Technology Management
Research, Vol. 3, Issue 2, pp. 263-287.

50. Gretton, I., 1993. Striving to succeed in a changing environment.


Professional Manager, July, pp. 15-17.

51. Gross, T. et al., 1993. The reinventing roller coaster: risking the present for a
powerful future. Harvard Business Review, November-December, pp. 97-108.

52. Gupta, Y.P. and Goyal, S., 1989. Flexibility of manufacturing systems: concepts
and measurements. European Journal of Operational Research, Vol. 43,
pp. 119-135.

53. Gupta, Y.P. and Goyal, S., 1992. Flexibility trade-offs in a random flexible
manufacturing system: a simulation study. International Journal of Production
Research (IJPR), Vol. 30, pp. 525-527.

54. Hammer, M., 2004. Deep Change: How Operational Innovation Can Transform
Your Company. Harvard Business Review, April, pp. 85-93.

55. Handfield, R. B. and Nichols, E. L., 1999. Introduction to Supply Chain


Management. Upper Saddle River, NJ, Prentice Hall.
56. Harber, D., Samson, D. A., Sohal, A. S. and Wirth, A., 1989. Just-in- time: the issue
of implementation. International Journal of Operations & Production Management
(IJOPM), Vol. 9, pp. 13-22.

57. Harmon, R.L. and Peterson, L.D., 1990. Reinventing the Factory: Productivity
Breakthroughs in Manufacturing Today. New York, Free Press.

58. Hartley, J.L. and Choi, T.Y., 1996. Supplier development: customers as a catalyst of
process change. Business Horizon, Vol. 39. No. 4, pp. 37-44.

59. Hartley, J.R., 1981. The World’s Greatest Production Line: The Japanese View.
Automotive Industries, Vol. 16, No. 12, December, pp. 53-54.

60. Hatch, M.J., 1993. The Dynamics of Organizational Culture. Academy of


Management Review, October, pp. 657- 693.

61. Hayes, R. and Wheelwright, S., 1984. Restoring Our Competitive Edge: Competing
Through Manufacturing. New York, Wiley.

62. Hayes, R. and Pisano, G., 1994. Beyond World-Class: The New Manufacturing
Strategy. Harvard Business Review, January-February, pp. 77-86.

63. Hill, C.W.L., 2007. International Business: Competing in the Global Market Places,
Sixth Edition. New York, McGraw-Hill.

64. Hill, T., 1995. Manufacturing Strategy. Basingstoke, UK, Macmillan.

65. Hitt, M.A., Keats, B.W. and DeMarie, S.M., 1998. Navigating in the New
Competitive Landscape: Building Strategic Flexibility and Competitive Advantage
in the 21st Century. Academy of Management Executive, November, pp. 22-42.

66. Hobbs, Dennis P., 2004. Lean Manufacturing Implementation: A Complete


Execution Manual for Any Size Manufacturer. New Delhi, Cengage Learning India
Private Limited.

67. Imai, M., 1986. Kaizen: The Key to Japan’s Competitive Success. New York,
Random House Business Division.

68. Industry Week, 1998. July 6.

69. Ishikawa, K., 1972. Guide to Quality Control. Tokyo, Asian Productivity
Organization.

70. Jarillo, J.C. and Stevenson, H.H., 1991. Co-operative Strategies: The payoffs and the
pitfalls. Long Range Planning, Vol. 24, No. 1, pp. 64-70.

71. Jones, G. R., 2000. Organizational Theory: Text and Cases. Singapore,
Addison Wesley Longman.
72. Juettner, U., 2005. Supply chain risk management. International Journal of Logistics
Management, Vol. 16, No. 1, pp.120-141.

73. Kalpakjian, S. and Schmid, S. R., 2000. Manufacturing Engineering and


Technology, Fourth Edition. Singapore, Addison Wesley Longman.

74. Karmarker, U., 1989. Getting Control of Just-in-time. Harvard Business Review,
September-October, pp. 122-131.

75. Kay, J., 1993. The Foundations of Corporate Success. Oxford, Oxford University
Press.

76. Kenney, M. and Florida, R., 1993. Beyond Mass Production. New York,
Oxford University Press.

77. Ketzenberg, M.E., Rosenzweig, E.D., Maruccheck, A.E. and Metters, R.D., 2007.
A framework for the value of information in inventory replenishment.
European Journal of Operational Research, Vol. 182, No. 3, pp. 1230-1250.

78. Khanna, V.K. and Shankar, R., 2008. Journey to Implement Toyota Production
System: A Case Study. Journal of Advances in Management Research, Vol. 5,
No. 1, pp. 80-88.

79. Kidd, P., 1994. Agile Manufacturing-Forging New Frontiers. USA, Addison
Wesley, Reading.

80. Koufteros, X.A., Vonderembse, M.A. and Doll, W.J., 1998. Developing Measures of
Time- Based Manufacturing. Journal of Operations Management, Vol. 16,
pp. 21-41.

81. Krajewski, L.J. and Ritzman, L.P., 2000. Operations Management: Strategy and
Analysis. Singapore, Addison Wesley Longman.

82. Lamming, R., 1993. Beyond Partnership. Hemel Hempstead (UK), Prentice Hall.

83. Lau, R.S.M., 1996. Strategic Flexibility: A New Reality for World-Class
Manufacturing. SAM Advanced Management Journal, Spring, pp. 11-15.

84. Lau, R.S.M. and Anderson, C.A., 1998. A Three-Dimensional Perspective of Total
Quality Management. International Journal of Quality and Reliability Management,
Vol. 5, pp. 85-98.

85. Lau, R. S. M., 1999. Critical factors for achieving manufacturing flexibility.
International Journal of Operations & Production Management (IJOPM), Vol. 19,
No. 3, pp. 328-341.
86. Lau, R.S.M., 2000. A Synergistic Analysis of joint JIT-TQM Implementation.
International Journal of Production Research (IJPR), Vol. 38 (9), pp. 2037-2049.

87. Lawler, E.E., 1994. From Job-based to Competency-based Organizations.


IEEE Engineering Management Review, Fall, pp. 83-90.

88. Lee, H.L., Padmanabhan, V. and Whang, S., 1997. Information distortion in a
supply chain: the bullwhip effect. Management Science, Vol. 43, No. 4,
pp. 546-558.

89. Lei, D., Slocum, J.W. and Pitts, R.A., 1999. Designing Organizations for
Competitive Advantage: The Power of Unlearning and Learning. Organizational
Dynamics, Winter, pp. 24-38.

90. Lundy, O. and Cowling, A., 1996. Strategic Human Resource Management.
London, Routledge.

91. Mabey, C. and Salaman, G., 1995. Strategic Human Resource Management.
Oxford, Blackwell.

92. Manoochehri, G.H., 1988. JIT for Small Manufacturers. Journal of Small Business
Management, Vol. 26, pp. 22-30.

93. Martinich, Joseph S., 2005. Production and Operations Management:


An Applied Modern Approach. Singapore, John Wiley & Sons.

94. Matook, S., Lasch, R. and Tamaschke, R., 2009. Supplier development with
benchmarking as part of a comprehensive supplier risk management framework.
International Journal of Operations & Production Management (IJOPM), Vol. 29,
No. 3, pp. 241-267.

95. Mazda, F., 2000. Engineering Management. Singapore, Addition Wesley Longman.

96. McCalman, J. and Paton, R.A., 1992. Change Management: A Guide to Effective
Implementation. London, Paul Chapman.

97. McGill, M.E. and Slocum, J.W., 1994. Unlearning the Organization. IEEE
Engineering Management Review, Summer, pp. 36-43.

98. McGrath, J.E., 1984. Groups: Interaction and Performance. Englewood Cliffs,
NJ, Prentice Hall.

99. McMohan, Chris and Browne, J., 2000. CADCAM: Principles, Practice and
Manufacturing Management. Singapore, Addison Wesley Longman.

100. Meredith, Jack R. and Shafer, Scott M., 2015. Operations Management,
Fifth Edition. Singapore, John Wiley & Sons.
101. Metters, R., 1997. Quantifying the Bullwhip Effect in Supply Chains. Journal of
Operations Management, Vol. 15 (2), pp. 89-100.

102. Miltenburg, J., 1997. Comparing JIT, MRP and TOC, and embedding TOC into
MRP. International Journal of Production Research (IJPR), Vol. 35, No. 4,
pp. 1147-1169.

103. Monden, Y., 1981. Adaptable Kanban System Helps Toyota Maintain Just-in-Time
Production. Journal of Industrial Engineering, May 1981, pp. 29-46.

104. Monden, Y., 1983. Toyota Production System, Institute of Industrial Engineers,
Atlanta, GA.

105. Morris, L., 1994. Organizational Culture and TQM implementation. Training and
Development, Vol. 48, pp. 69-71.

106. Mussel White, W.C., 1987. The Just-in-time Production Challenge. Training and
Development Journal, Vol. 41, pp. 27-29.

107. Narasimhan, S.L., Mcleavey, Dennis W. and Billington, Peter J., 2003. Production
Planning and Inventory Control, Second Edition. New Delhi, Prentice Hall of India
Private Limited.

108. Nilsson, C.H. and Nordhahl, H., 1995a. Making operational flexibility operational-
part 1: a framework. Integrated Manufacturing Systems, Vol. 6, No. 1, pp. 5-11.

109. Nilsson, C.H. and Nordhahl, H., 1995b. Making operational flexibility operational-
part 2: a framework. Integrated Manufacturing Systems, Vol. 6, No. 2, pp. 4-10.

110. Nishiguchi, T., 1994. Strategic Industrial Sourcing. New York, Oxford University
Press.

111. O’Brien, J. A., 2003. Management Information Systems, Fourth Edition. New Delhi,
Galgotia Publications.

112. Ohno, T., 1982. How the Toyota Production System was created. Japanese
Economic Studies, Summer, pp. 83-101.

113. O’Neal, C., 1985. Customer- Supplier Relationships for Just-in-time. CIV Review,
Vol. 2 (3), pp. 33- 40.

114. Orlicky, J., 1994. Orlicky’s Material Requirements Planning, Second Edition.
New York, McGraw-Hill.

115. Ouchi, William C., 1981.Theory Z: How American Business can meet the Japanese
Challenge. Massachusetts, Addison Wesley.
116. Oz Effy, 1999. Management Information Systems. New Delhi,
Galgotia Publications.

117. Pedler, M., Burgoyne, J. and Boydell, T., 1991. The Learning Company.
Maidenhead, McGraw-Hill.

118. Peters, T., 1991. Get innovative or get dead (Part 1). Engineering Management
Review, Vol. 19, Issue 4, pp. 4-11.

119. Peters, T., 1992. Get innovative or get dead (Part 2). Engineering management
Review, Vol. 19, Issue 5, pp. 7-14.

120. Pettigrew, A. and Whipp, R., 1991. Managing Change for Competitive Success.
Oxford, Blackwell.

121. Pine, B., Bart, V. and Boynton, A., 1993. Making Mass Customization Work.
Harvard Business Review, September-October, pp. 108-119.

122. Pine, B., 1993. Mass Customization- The New Frontier in Business Competition.
Harvard Business School Press.

123. Porter, M., 1980. Competitive Strategy. New York, Free Press.

124. Rajamani, D., Singh, N. and Aneja, Y.P., 1996. Design of cellular manufacturing
systems. International Journal of Production Research (IJPR), Vol. 34, No. 7,
pp. 1917-1928.

125. Richards, B., 1996. The Business Plan. Wall Street Journal, Nov. 11, p. R 10.

126. Ritchie, B. and Brindley, C., 2007. Supply chain risk management and performance:
a guiding framework for future development. International Journal of Operations
&Production Management (IJOPM), Vol. 27, No. 3, pp. 303-322.

127. Rubenstein, A.H., 1976. Factors influencing Success at the Project Level.
Research Management, Vol. 19 (3), pp. 15-20.

128. Russell, Roberta S. and Taylor III, Bernard W., 2006. Operations Management,
Fifth Edition. New Delhi, Wiley India (P) Ltd.

129. Sakurai, M. and Huang, P.Y., 1984. Japan’s Productivity Growth: A Managerial and
Accounting Analysis. Industrial Management, Vol. 26, pp. 11-18.

130. Salvador, F., Rungtusanatham, M., Forza, C. and Trentin, A., 2007.
Mix flexibility and volume flexibility in a build-to-order environment.
International Journal of Operations & Production Management (IJOPM),
Vol. 27, No. 11, pp. 1173-1191.
131. Schmenner, R.W. and Tatikonda, M.V., 2005. Manufacturing process flexibility
revisited. International Journal of Operations & Production Management (IJOPM),
Vol. 25, No. 12, pp. 1183-1189.

132. Schonberger, R., 1986. World Class Manufacturing. New York, Free Press.

133. Schwaller, R.L., 1988. EOQ under inspection costs. Production and Inventory
Management Journal, Vol. 29, No. 3, pp. 22-24.

134. Scott, B., 1994. Manufacturing Planning System. London, McGraw-Hill.

135. Sethi, A.K. and Sethi, S.P., 1990. Flexibility in manufacturing: a survey.
The International Journal of Flexible Manufacturing Systems, Vol. 2, pp. 289-328.

136. Shadur, K. and Kienzle N.A., 1999. The Relationship between Organizational
Climate and Employee Perceptions of Involvement. Group and Organization
Management, December, pp. 479- 503.

137. Shewchuk, J.P. and Moodie, C.L., 2000. Flexibility and manufacturing system
design: an experimental investigation. International Journal of Production Research
(IJPR), Vol. 38, No. 8, pp. 1801-1822.

138. Shingo, S., 1981. Study of Toyota Production System from Industrial Engineering
Viewpoint. Tokyo, Japan Management Association.

139. Simchi-Levi, D., Kaminsky, P., Simchi-Levi, E. and Shankar, R., 2016. Designing
and Managing the Supply Chain: Concepts, Strategies and Case Studies,
Third Edition. New Delhi, McGraw Hill Education (India) Private Limited.

140. Simons, R., 1995. Control in an age of empowerment. Harvard Business Review,
March-April, pp. 80-88.

141. Singh, D. K., 2007. JIT and TQM: Synergistic Approach Can Lead to World Class
Manufacturing. Prestige Journal of Management and Research, Vol.11, No. 1,
April, pp. 82-92.

142. Singh, D.K., 2008. A Study of Effect of Manufacturing Environment on JIT


Implementation. Rai Management Journal, Vol. VI, Issue II, October, pp.55-60.

143. Singh, D.K., 2008. Manufacturing Flexibility and JIT. PCTE Journal of Business
Management, Vol. 5, Issue 1, Jan.-June, pp. 103-106.

144. Singh, D.K., 2009. Manufacturing Competitiveness through JIT. Industrial


Engineering Journal, Vol. II, Issue 5, November, pp. 26-29.

145. Singh, D.K., 2009. Quality Management: An Essential Ingredient for JIT
Implementation. Productivity, Vol. 49, No. 4, January-March, pp. 327-334.
146. Slack, N., 1991. The Manufacturing Advantage. London, Mercury Business Books.

147. Smircich, L., 1983. Concepts of Culture and Organizational Analysis.


Administrative Science Quarterly, September, p. 339.

148. Sohal, A.S., Keller, A.Z. and Fouad, R.H., 1988. A Review of Literature Relating to
JIT. International Journal of Operations & Production Management (IJOPM),
Vol. 9, No. 3, pp. 15-25.

149. Soroor, T., Tarokh, M.J. and Keshtgary, M., 2009. Preventing failure in IT-enabled
systems for Supply Management. International Journal of Production Research
(IJPR), Vol. 47 (23), pp. 6543-6557.

150. Spekman, R.E. and Davis, E.W., 2004. Risky business: expanding the discussion on
risk and the extended enterprise. International Journal of Physical Distribution and
Logistics Management, Vol. 34, No. 5, pp. 414-433.

151. Spencer, M.S. and Guide, V.D., 1995. An Exploration of the components of JIT:
Case study and Survey results. International Journal of Operations &Production
Management (IJOPM), Vol. 15, pp. 72-83.

152. Stacey, R., 1993. Strategy as order emerging from chaos. IEEE Engineering
Management Review, Fall, pp. 106-112.

153. Stein, T., 1996. Inventory Control Online. Information Week, December 9, p.28.

154. Stertz, B., 1992. Detroit’s New Strategy to Beat Back Japanese Is to Copy Their
Ideas. Wall Street Journal, October 1.

155. Stevenson, M. and Spring, M., 2009. Supply chain flexibility: an inter-firm
empirical study. International Journal of Operations & Production Management
(IJOPM), Vol. 29, No. 9, pp. 946-971.

156. Stevenson, William J., 2015. Operations Management, Eleventh Edition.


New Delhi, McGraw Hill Education (India) Private Limited.

157. Storey, J. and Sisson, K., 1993. Managing Human Resources and Industrial
Relations. Buckingham, Open University Press.

158. Templin, N. and Cole, J., 1994. Manufacturers Use Suppliers to Help Them Develop
New Products. Wall Street Journal, December 9.

159. Tersine, R.J., 1994. Principles of Inventory and Materials Management.


Englewood Chiffs, NJ, Prentice Hall.
160. Tersine, R.J. and Schwarzkopt, A.B., 1989. Optimal stock replenishment strategies
in response to temporary price reductions. Journal Business Logistics, Vol. 10,
No. 2, pp. 123-145.

161. Tersine, R.J. and Barman, S., 1991. Economic inventory/transport lot sizing with
quantity and freight rate discounts. Decision Sciences, Vol. 22, No. 5,
pp. 1171-1179.

162. Tersine, R.J., Barman, Samir and Morris, J.S., 1992. A Composite EOQ model for
Situational Decomposition. Computers and Industrial Engineering, Vol. 22, No. 3,
pp. 283-295.

163. Tersine, R.J. and Barman, S., 1995. Economic purchasing strategies for temporary
price discounts. European Journal of Operational Research, Vol. 80, pp. 328-343.

164. Trott, P., 2000. Innovation Management and New Product Development. Singapore,
Addison Wesley Longman.

165. Upton, D.M., 1995a. What really makes factories flexible? Harvard Business
Review, July-August, pp. 74-84.

166. Upton, D., 1995b. Flexibility as process mobility: the management of plant
capabilities for quick response manufacturing. Journal of Operations Management,
Vol. 12, pp. 205-224.

167. Upton, D., 1997. Process range in manufacturing: an empirical study of flexibility.
Management Science, Vol. 43, No. 8, pp. 1079-1092.

168. Vanpoucke, E., Boyer, Kenneth K. and Vereecke, A., 2009. Supply chain
information flow strategies: an empirical taxonomy. International Journal of
Operations & Production Management (IJOPM), Vol. 29, No. 12, pp. 1213-1241.

169. Vereecke, A. and Muylle, S., 2006. Performance improvement through supply chain
collaboration in Europe. International Journal of Operations & Production
Management (IJOPM), Vol. 26, No. 11, pp. 1176-1198.

170. Verwijmeren, M., 2004. Software Component Architecture in Supply Chain


Management. Computers in Industry, Vol. 53 (2), pp. 165-178.

171. Vollmann, T.E., Berry, W.L. and Whybark, D.C., 1999. Manufacturing Planning
and Control Systems. New Delhi, Galgotia Publications.

172. Vuppalapati, K., Ahire, S.L. and Gupta, T., 1995. JIT and TQM: a case for joint
implementation. International Journal of Operations & Production Management
(IJOPM), Vol. 15, No. 5, pp. 84-94.
173. Wafa, M.A., Yasin, M.M. and Swinehart, K., 1996. The impact of supplier
proximity on JIT success: an informational perspective. International Journal of
Physical Distribution and Logistics Management, Vol. 26, No. 4, pp. 23-34.

174. Wagner, S.M. and Bode, C., 2006. An empirical investigation into supply chain
vulnerability. Journal of Purchasing & Supply Management, Vol. 12, No. 6,
pp. 301-312.

175. Walker, W.T. and Alber, K.L., 1999. Understanding Supply Chain Management.
APICS-The Performance Advantage, Vol. 9, January, pp. 38-43.

176. Wang, S., Chew, S.F. and Lawley, M., 2009. Guidelines for implementing robust
supervisors in flexible manufacturing systems. International Journal of Production
Research (IJPR), Vol. 47, No. 23 (1), pp. 6499-6524.

177. Ward, P., 1994. Logistics: A Simple Guide. Professional Manager, May, pp. 10-11.

178. Wendell, L. F., 1998. Human Resource Management, Fourth Edition. Boston,
Houghton Mifflin.

179. Wheelen, Thomas L. and Hunger J. D., 2002. Concepts in Strategic Management
and Business Policy. Singapore, Pearson Education.

180. Wheelwright, S. and Clark, K., 1992. Revolutionizing Product Development.


New York, Free Press.

181. White, R.E., Pearson, J.N. and Wilson, J.R., 1999. JIT Manufacturing: A survey of
implementation in Small and Large U.S. Manufacturers. Management Science,
Vol. 45, pp. 1-15.

182. Wilson, T.G., 1985. Kanban Scheduling - Boon or Bane. Production and Inventory
Management, Vol. 26 (3), pp. 134-143.

183. Wisner, Joel D., Tan, Keah-Choon and Leong, G. K., 2015. Supply Chain
Management: A Balanced Approach, Third Edition. New Delhi, Cengage Learning
India Private Limited.

184. Womack, J. and Jones, D., 1990. The Machine that Changed the World. New York,
Macmillan.

185. Yamaya, E., Wendy, C. and Seltsikas, P., 2002. Delivering Enterprise Resource
Planning Systems through Application Service Providers. Logistics Information
Management, Vol. 15 (3), pp. 192-203.

186. Zhang, Q., Vonderembse, M. A. and Lim, J. S., 2003. Manufacturing flexibility:
Defining and analyzing relationship among competence, capability, and customer
satisfaction. Journal of Operations Management, Vol. 21, pp. 173-191.
187. Zipkin, Paul H., 2000. Foundations of Inventory Management. Boston,
McGraw-Hill.

You might also like