2 MARKS

1. NAME ANY TWO PRE STRESSED METHODS

2. DEFINE MODULAR COORDINATION

3. LIST ANY FOUR MODERN CONSTRUCTION MATERIALS.

4. HIGHLIGHT THE METHODS OF TRANSPORTATION OF PRE CAST COMPONENTS TO THE SITE.

5. WTITE SHORT NOTES ON ADVANTAGES OF BELT CONVEYORS.

6. DEFINE RMC

7. WRITE A BRIEF NOTE ON ADVANTAGES OF SCHEDULING THE CONSTRUCTION PROCESS.

8. EXPLAIN THE TERM CONSTRUCTION CYCLE

9. WHAT IS THE IMPORTANCE OF CONSTRUCTION MANAGEMENT.

10. DEFINE " BREAKEVEN POINT"

11.DEFINE BUILDING AS PER NBC

12.LIST OUT VARIOUS PARTS OF THE BUILDING

13.ADVANTAGES OF RMC

14.ENUMERATE THE VARIOUS TYPES OF SCAFFOLDINGS USED FOR PRECAST CONCRETE.

15. STATE THE FUNCTIONS OF LIFTING INSERT

16. WRITE A NOTE ON CABLEWAYS.

17.LIST OUT VARIOUS TYPES OF CRANES.

18.WTITE IMPORTANCE OF VALUE ENGINEERING.

19. DEFINE CAST INSITU CONSTRUCTION.

20. MENTION ANY TWO FACTORS TO BE CONSIDERED WHILE DISMANTLING THE PRECAST STRUCTURE

21.MENTION SOME USES OF GUNITING EQUIPMENTS.

22.HOW ARE CONVEYOR BELTS USEFUL IN CONSTRUCTION

23. DEFINE FRAMED STRUCTURE WITH EXAMPLES.

24. WHAT ARE THE CRITERIA FOR CHOICE OF TECHNOLOGY IN CONSTRUCTION.


25. WHAT DO YOU MEAN BY SCAFFOLDING

26. DEFINE ESTIMATION

27. HOW IS QUALITY CONTROL APPLIED IN CONSTRUCTION MANAGEMENT?

28. WRITE THE IMPORTANCE OF ESTIMATION AND COST CONTROL.

16 MARKS

1. WHAT ARE THE STEPS TO BE FOLLOWED IN ERECTING PREFABRICATION SYSTEMS?

2. EXPLAIN THE TRANSIT MIXER AND AGITATOR TRUCKS USED FOR READY MIX CONCRETE PUMPS IN
DETAIL.

3. WTITE IN DETAIL THE MANUFACTURE AND STORAGE PROCESS OF PRECAST COMPONENT FORMS.

4. WITH SKETCHES EXPLAIN THE GUINTING EQUIPMENTS IN DETAIL

5. CLASSIFY THE EQUIPMENTS FOR CONSTRUCTION ON FUNCTIONAL BASIS WITH SUBGROUPS.

6. WHAT ARE THE DIFFERENT TYPES OF CRANES USED IN CONSTRUCTION INDUSTRY?. EXPLAIN BRIEFLY
THEIR APPLICATION AND OPERATIONS.

7. WRITE SHORT NOTES ON AIR COMPRESSORS AND LIFTING DEVICES AND THEIR FUNTIONS.

8. ENUMERATE THE IMPORTANCE OF QUALITY CONTROL IN CONSTRUCTION MANAGEMENT.

9. WHILE CONSTRUCTION A PUBLIC BUILDING, WHAT ARE THE LEGAL ISSUES TO BE TAKEN CARE ?
NARRATE THEM.

10. WRITE THE DIFFERENCE BETWEEN PRECAST CONCRETE AND PRESTRESSED CONCRETE.

11. WTITE THE CHOICE OF CONSTRUCTION EQUIPMENT FOR DIFFERENT TYPES OF WORKS.

12. EXPLAIN THE LEGAL ISSUES FOLLOWED IN PLANNING AND SCHEDULING.

13. WRITE SHORT NOTES ON -

QUALITY CONTROL

SAFETY AND PRODUCTIVITY.

14. EXPLAIN THE TRANSPORTATION AND ERECTION OF PRECAST COMPONENTS FORMS.

15. EXPLAIN HOW CONSTRUCTION MANAGEMENT IS USEFUL IN CONCRETE TECHNOLOGY.

16. EXPLAIN THE FACTORS TO BE EVALUATED WHILE ESTIMATING THE CONSTUCTION PROJECTS.
DISCUSS IN DETAIL.
17. DISCUSS ABOUT THE CONTROL OF PROJECT COSTS WITH RESPECT TO VARIOUS FUNCTIONAL
ACTIVITIES APPEARING IN THE PROJECT.

18. WRITE THE MERITS AND SEMERITS OF PRESTRESSED CONSTRUCTION.

19. WRITE SHORT NOTES ON PRE ENGINEERED BUILDINGS AND THEIR APPLICATION.

20. ENNUMERATE THE PRELIMINARY CONSIDERATIONS REQUIRED FOR DESIGNING STRUCTURAL


SYSTEMS.

21. BRIEFLY EXPLAIN THE TYPES OF PRECAST SYSTEMS.

22. BRIEFLY EXPLAIN WITH DIAGRAMS, THE PROCESS OF TRANSPORTING THE PRECAST ELEMENTS TO
THE SITE.

23. ENUMERATE THE SAFETY MEASURES TO BE TAKEN WHILE ERECTION AND DISMANTLING
CONSTRUCTIONS.

24. CLASSIFY CONSTRUCTION EQUIPMENTS BASED ON FUNCTION OPERATION AND PURPOSE.

ENUMERATE THE FACTORS BEHIND THE SELECTION OF CONSTRUCTION EQUIPMENTS.

25. WHAT IS WBS? HOW IS THIS HELPING IN PLANNING, MONITORING AND CONTROLLING PROJECT?

26. WHAT ARE THE DIFFERENT STEPS TAKEN FOR PROJECT COST MANAGEMENT? DISCUSS BRIEF.

27. DISCUSS THE CONCEPT “QUALITY" FOR CONSTRUCTION INDUSTRY. HOW DO YOU DEFINE
CONSTRUCTION QUALITY?