SAO VANG AND DAI NGUYET

DEVELOPMENT PROJECT

VENDOR FRONT SHEET

DOCUMENT TITLE NDT PROCEDURE ACCU

TOTAL NO. OF PAGES


10
(INCLUDING FRONTSHEETS)

VENDOR'S ORDER NO. 100104

VENDOR'S OWN DOCUMENT NO REV. NO DATE VENDOR'S APPROVAL

100104-6011 00 15.11.18 VMA

Submitted For: ☒ REVIEW ☒ APPROVAL ☐ INFO ☐ FINAL DOCUMENTATION

REVIEW DOES NOT CONSTITUTE ACCEPTANCE VENDOR NAME: NOVENCO MARINE AND OFFSHORE
OF DESIGN DETAILS, CALCULATIONS, TEST
METHODS OR MATERIALS DEVELOPED OR
SELECTED BY VENDOR NOR DOES IT RELIEVE VENDOR
FROM FULL COMPLIANCE WITH CONTRACTUAL OR OTHER PACKAGE
OBLIGATIONS. AIR COOLED CONDENSING UNITS – TB & LQ
DESCRIPTION:

C1. ACCEPTED. PO NO. / LOI NO.: 060/2018/SVDN-LOI

C2. ACCEPTED, PROCEED WITH WORK,


INCORPORATE COMMENTS AND RE-SUBMIT. SV-97-GB-001A
SV-97-GB-001B
C3. NOT ACCEPTED. REVISE AND RE-SUBMIT. TAG NO. / PO ITEM NO.: SV-97-GB-002A
SV-97-GB-002B

C4. FOR INFORMATION ONLY.


NO SIGNATURE REQUIRED.

SEQUENCE
PACKAGE NO. VDRL CODE: Rev.
NO.:
Name Date Sign

AEI

PTSC M&C SVDN-CPP-M-0032 P11 0001 00

IKC
TITLE DOCUMENT NUMBER REVISION

NDT PROCEDURE (REFRIGERANT PIPEWORK) AND FINAL CHECK MB-0083 2

NDT PROCEDURE (REFRIGERANT PIPEWORK) AND FINAL CHECK

DOCUMENT TITLE DOCUMENT NUMBER DOC.REVISION


NDT PROCEDURE (REFRIGERANT PIPEWORK) AND FINAL CHECK 2
REVISION DESCRIPTION PREPARED CHECKED APPROVED MB-0083 DOC.REVISION DATE
IO-0033 REPLACES MB-0119 GL SM MT 25/05/2018
JOB NUMBER / INTERNAL DOCUMENT REPLACES LANGUAGE SHEET DOC.CREATION DATE
CL - CONTROL PROCEDURES - ENG 1 of 9 02/11/2016