Category / Product: AIR CONDITIONAL COSTING 2019

UNIT PRICE DISC


No. Category Description Qty UOM * Company Name
RM
PRICE
A Option To Supply and Install 4.0 HP AIR COND CASSETTE

A 1) Brand : DAIKIN Ceiling Cassette Air Conditioner


1.1.1 1 Set
2) Model :

B 1) Brand : PANASONIC
1.1.2 1 Set
2) Model :

To Supply labour & Material to install 4.0HP Air Cond c/w copper piping, PVC drain pipe,bracket, insulation pipe, cable tray, fittings,
1.2.1 1 Lot
recharging gas R22, Testing & commissioning. (standard length of 10 feet)

1.2.2 Additional copper piping (per meter) 1 feet

1.3 To supply & install 3 Phase D.O.L Starter C/W cabling from DB to outdoor unit per unit

1.4 Supply PC Board 1 Set

1.5 To Supply & install grille for outdoor unit (please provide drawing proposal) 1 Set

1.6 Transportation Charges Outstation Only (From : office to Destination) per KM

1.7 Day work charges 1 Lot

1.8 Night work charges 1 Lot

1.9 Warranty for indoor unit (compressor & parts)

1.10 Warranty for outdoor unit (compressor & parts)

1.11 Coverage Area/States

B Option To Supply and Install 5.0 HP AIR COND CASSETTE


A 1) Brand : DAIKIN Ceiling Cassette Air Conditioner
2.1.1 1 Set
2) Model :

B 1) Brand : PANASONIC
2.1.2 1 Set
2) Model :

To Supply labour & Material to install 4.0HP Air Cond c/w copper piping, PVC drain pipe,bracket, insulation pipe, cable tray, fittings,
2.2.1 1 Lot
recharging gas R22, Testing & commissioning. (standard length of 10 feet)

2.2.2 Additional copper piping (per meter) 1 feet

2.3 To supply & install 3 Phase D.O.L Starter C/W cabling from DB to outdoor unit per unit

2.4 Supply PC Board 1 Set

2.5 To Supply & install grille for outdoor unit (please provide drawing proposal) 1 Set

2.6 Transportation Charges Outstation Only (From : office to Destination) per KM

2.7 Day work charges 1 Lot

2.8 Night work charges 1 Lot

2.9 Warranty for indoor unit (compressor & parts)

2.10 Warranty for outdoor unit (compressor & parts)

2.11 Coverage Area/States

Note :
1)Above costing included supply and install charges
2)Above costing included any materials wastage
3)Above costing included labour and transportation charges for site measurement / Site Survey