You are on page 1of 21

Dec 7, 2010

• Profile
• O&M Role in new projects
• Operation Strategies
• Maintenance Strategies
• Safety/Training
• Conclusion
• Subsidiary of Saudi Tabreed

• Accumulated O&M experience from more than


34 plants

• Achieve a non interruptible service of chilled


water supply 24/7 for the last 10 years

• Achieved 100% reliability for all Tabreed


plants for the last 10 years
• Integration between design, construction,
operation & maintenance for high efficient
scheme

• O&M will be acting on behalf of the client in the


project during the design, construction,
testing and commissioning of the plant
• Feedback of O&M team will improve the:

• Design

• Equipment selection

• Accessibility

• O&M team knowledge of the scheme components

• Workable and reliable scheme

• O&M plays vital role in pre- commissioning, during


commissioning, and post commissioning to
ascertain receiving a reliable plant
• Plant Optimization to improve results:

• Operation target to improve scheme efficiency( KW/TR)


• Reliable and non interruptible CW supply 24/7

• Control of operating cost:

• Improve the efficiency, KW/TR leads to reduced power consumption

• Optimize the cooling towers water treatment, C/C

• Installing VFDs in motors


• Online data collection/logging ( SCADA)
• Oversight and continuous monitoring:
• Monthly Performance report and analysis

• Periodic Technical Audit

• Educate customers on the DC process leads to better


efficiency

• customer satisfaction feedback program

• Continuous Operators training program


• Application of MMS:
•Maint. Work Control
•Proper planning and scheduling of maintenance to
eliminate any interruption
• PM program
• Equipment data history

• Analyze maintenance activities to improve reliability


and eliminate repetitive works
• Implement Quality & Reliability Program
to reduce:
• initial failure rate
• extend equipment useful life

• limit the random failure rate


• Take necessary actions before wear out period

• in house maintenance shop


•equipment repairs
• major overhauls

• in house spare parts store


Maintain reliability of plant equipment:

Bath Tub Curve

Initial failure Random failure Wear out


Equip. useful life

Time
• Oversight and performance monitoring:
• Vibration Analysis
• Infrared thermograph
• Ultrasound detection

• Motor current analysis


• Oil analysis
• leak detection system
• MP Training:
• Continuous training
• Incentive Program
• Recognition Program

• Safety Program:
• OSHAA
• On going safety training
• Work permit procedures
O&M Company carries a vast experience
in DC and its vision to be a
“ BEST in CLASS” leading organization.