You are on page 1of 6

ANKIT

Proposed Position : Quantity Surveyor

Name of Firm : STERLING Indo tech Consultants Pvt. Ltd

Name of Staff : Ankit

Profession : Civil Engineer

Date of Birth : 19th October, 1989

Years with Firm/Entity : Contract to join

Nationality : Indian

Mobile No : 09729527178

E-Mail : ankit.goyal73@gmail.com

Detailed Task Assigned:


 Ensure the day to day activities of the construction is abide by the contract procedure, Formats and directed.
 Taking guidance from Sr. Contract Specialist. Act as contract specialist for the construction package.
 Ensure control of project cost and timely completion of activities.
 Document the quantities on daily basis.
 Prepare and submit cost analysis and quantity of each items of the construction package to R.E.
 Supervise and examine the claims from the contractor, variation orders and other over runs of the construction package.
 Checking and calculate the work measurements for payment purposes.
 Prepare and submit payment reports to R.E/ Team Leader.
 Prepare and submit monthly reports to R.E for the work completed and compare schedule activities.

S. Name of Post Held Project Name Period Assignment in Client of the Remark
No Employer From To the Project Project
1. Sterling Indo Quantity  Design and Construction Supervision Oct. to till Pls. refer the PWD, --
tech Surveyor Consultancy (Road Works) – 2014 date below mentioned Uttarakhand
Consultants Uttarakhand, Disaster Recovery Project Duties
Pvt. Ltd. DSC-04 in the state of Uttarakhand, 2
Lane; Project Length: 450 Km; Project
Cost: INR 220 Crore. Funded by: World
Bank, Client: PWD, Uttarakhand
 Consultancy services for Feasibility PWD,
study and Preparation of Detailed Rajasthan
Project Report for Two-laning of State
Highway (Highway-I to Highway-V)
through Public Private Partnership (the
“PPP”) on Design, Build, Finance,
Operate and Transfer (the "DBFOT")
basis (Package EWC-N); Client: PWD,
Rajasthan; 2 lane; Project Length: 174
Km; Project Cost: 261 Crore
 Consultancy Services for Preparation of
Feasibility study and Preparation of PWD,
Detailed Project Report for Two Rajasthan
Lanning of State Highway (Highway-I
to Highway-IV) through Public Private
Partnership (the “PPP”) on Design,
Build, Finance, Operate and Transfer
(the "DBFOT") basis. (Package-16)
Client: PWD Rajasthan; 2 Lane; Project
Length: 325 Km; Project Cost: INR 490
Crore;
 Consultancy Services for Preparation of
Feasibility study and Preparation of PWD,
Detailed Project Report for Two Rajasthan

PAGE-1
ANKIT

Lanning of State Highway (Highway-I


to Highway-VII) through Public Private
Partnership (the “PPP”) on Design,
Build, Finance, Operate and Transfer
(the "DBFOT") basis. (Package-11)
Client: PWD Rajasthan; 2 Lane; Project
Length: 290 Km; Project Cost: INR 460
Crore
 Consultancy Services for Preparation of
Feasibility study and Preparation of PWD,
Detailed Project Report for Two Rajasthan
Lanning of State Highway (Highway-I
to Highway-IV) through Public Private
Partnership (the “PPP”) on Design,
Build, Finance, Operate and Transfer
(the "DBFOT") basis. (Package-19)
Client: PWD Rajasthan; 2 Lane; Project
Length: 213 Km; Project Cost: INR 385
Crore;
 Pre Bid Study for the construction of the
new Zuari bridgeThe project will
involve the construction of a 640-metre-
long, 8-lane cable-stayed bridge across
the River Zuari and a 450-metre-long
elevated approach From Ch.Bridge
including approaches across River Zuari
on NH-17/NH-66 onPanjim-Mangalore
Section in the State of Goa.PACKAGE
2 (CH 530.850 TO CH 531.934)Project
Length: 1.084 Km; Project Cost: INR
820 Crore;
 Pre Bid Study for theWidening to two
lane with paved shoulders with
provision of 4 lane in urban stretches
and geometric improvement, wherever
required, as per accedpted alignment
from Km. 180+500 ( end of Nagaur Bye
Pass) to Km. 267+500 (Netra village
near Jodhpur))Project Length: 86 Km;
Project Cost: INR 250 Crore;
 Pre Bid Study for the Widening to 4-
lane in urban stretched along with
geometric improvement, wherever
required as per accepted alignment from
Km. 267+500 to 296+070 ( Netra
Village to Mandore Section)Project
Length: 29 Km; Project Cost: INR
240Crore;

2. Free Lancer Quantity  Pre Bid Study for the Widening


Surveyor
&strengthening of existing two-lane
carriageway to four lane with paved
shoulders of Harike-Zira-Faridkot
section of NH-15 (new NH-54) from
existing km 166.925 to km 221.380
including construction of Zira,
Talwandi&Mudki bypasses in
PunjabProject Length: 55Km; Project
Cost: INR 615Crore;
 Pre Bid Study for theWidening &
strengthening of existing two-lane

PAGE-2
ANKIT

carriageway to four lane with paved


shoulders of Faridkot-Kotkapura-
Bathinda section of NH-15 (new NH-
54) from existing km 221.380 to km
283.000 including construction of
combined Faridkot-Kotkapura bypass in
PunjabProject Length: 62Km; Project
Cost: INR 630 Crore;

3. KCC Buildcon Quantity  Construction for 4-Lane of Jhajjar-Badli Oct. Sep. Pls. refer the HSRDC --
Pvt. Ltd. Surveyor road from km 0.000 to 18.250 in 2011 2014 below mentioned
JhajjarDistt. in the state of Haryana, Duties
Client: Haryana State Roads & Bridges
Development Corporation Limited.;
Project Length: 18.250 Km; Project
Cost: INR 56.41 Crore;
 Construction of 4-Lane of various roads
in Rewari Town & construction of New
Roads in Rewari District (Package no.
HSRDC/NCR/C-11/2008) in the state of
Haryana, Project Length: 40Km approx,
Client: Haryana State Roads & Bridges
Development Corporation Limited
4. Zander Quantity Construction of 4-Lane of Rohtak-Panipat Sept. Oct. Pls. refer the NHAI --
Engineers Surveyor Section of NH-71A under NHDP Phase-III 2010 2011 below mentioned
Mohali from km. 0.000 To Km 81.000 on Design, Duties
(Punjab). Build, Finance, Operate and Transfer
(DBFOT) Basis in the state of Haryana.
Client: NHAI; 4 lane; Project Length: 81
Km; Project Cost: INR 800 Crore (Approx);
DBFOT project
5. Singla Quantity Up gradation of Deodhar to Nainawali Road Oct Sep. Pls. refer the HSRDC --
Engineers & Surveyor & Link Road in Yamuna Nagar Distt. In the 2009 2010 below mentioned
Contractor state of Haryana, Project Length: 32 Km Duties
Pvt. Ltd. approx, Client: Haryana State Roads &
Bridges Development Corporation Limited.
6. MG-Kundu- Quantity Improvement of JhajjarDhaurBeri Road, Dec Oct. Pls. refer the HSRDC --
Shivlaya (JV) Surveyor BahadurgarhBerikalanaur Road, 2008 2009 below mentioned
DighalBeriJahazgarh Road in Jhajjar Duties
District (Package No. HSRDC/NCR/C-
10/2008), 2-lane, Project Length: 40 Km
approx, Client: Haryana State Roads &
Bridges Development Corporation Limited
7. Wilbur Smith Site Construction Supervision for widening to July Dec Pls. refer the NHAI
Associates Engineer/As four lanes and rehabilitation of the existing 2006 2008 below mentioned
st. Quantity two lanes from km 449.150 to km 509.000 Duties
Surveyor on NH-76 in Rajasthan. (Package: EW-II
(RJ-10); Client: NHAI; Project Length:
59.85 Km; Funded By: ADB;

Educational Qualification:
 B.E Civil Engineering in 2009
 Diploma in Civil Engineering in 2006.

Other Training:
 Diploma in Auto Cad 2D & 3D, Pro-E form CADD Centre Pitampura Delhi.
 MS office – Microsoft EXCEL& WORD, Microsoft Project.
 Design software: - AUTO-CAD, Auto Plotter 6.5, Road Estimator.
 Diploma in MX-Road from CADD Centre Green Park Delhi.

Key Qualification:
 Mr. Ankit is a BE in Civil Engineering having more than 9 years of professional experience in quantity surveying for major

PAGE-3
ANKIT

highways and other road projects etc. Also having good experience in construction of supervision of National
Highways/State Highway roads under well familiar with MOST&IRC/IS specification. Have experience in supervisions of
the works and Quantity surveying, Computation of quantities of various items of Road and Bridges, preparation of interim
payments certificates, preparation of Daily & Monthly Progress Report, Preparation of claims & variation orders of the extra
item and day to day monitoring of the Project. Well conversant with MoRTH, IS & IRC Specifications and its execution
details. He is responsible for of quantities executed from sites reports / records compare with approved RFI’s prepare IPC/
Monthly bills and timely submission to consultant. Liaise with Q.S of consultant to get bill prepared and get payment.
Interact with planning Engineer, Site Engineering to get inputs for bill preparation. Keep up to date record of work done,
billed, prepare data for future claims. Check / prepare sub-contractors bills and pass for payment. Reconciliation of materials
consumed. Preparation of detailed B.O.Q. on the basis of drawings and to rectify the B.O.Q. received from the consultants.
Preparation of Daily progress Report.Preparation & reporting the time to time status to the management. Preparation of all
type of drawing & Coordinate for setting out with Auto Cad

Employment Record:
From Oct. 2014 to till date STERLING Indo tech Consultants Pvt. Ltd.
Quantity Surveyor

 Design and Construction Supervision Consultancy (Road Works) – Uttarakhand, Disaster Recovery Project DSC-04 in
the state of Uttarakhand, 2 Lane; Project Length: 450 Km; Project Cost: INR 220 Crore. Funded by: World Bank, Client:
PWD, Uttarakhand
 Consultancy services for Feasibility study and Preparation of Detailed Project Report for Two-laning of State Highway
(Highway-I to Highway-V) through Public Private Partnership (the “PPP”) on Design, Build, Finance, Operate and
Transfer (the "DBFOT") basis (Package EWC-N); Client: PWD, Rajasthan; 2 lane; Project Length: 174 Km; Project
Cost: 261 Crore
 Consultancy Services for Preparation of Feasibility study and Preparation of Detailed Project Report for Two Lanning
of State Highway (Highway-I to Highway-IV) through Public Private Partnership (the “PPP”) on Design, Build,
Finance, Operate and Transfer (the "DBFOT") basis. (Package-16) Client: PWD Rajasthan; 2 Lane; Project Length: 325
Km; Project Cost: INR 490 Crore;
 Consultancy Services for Preparation of Feasibility study and Preparation of Detailed Project Report for Two Lanning
of State Highway (Highway-I to Highway-VII) through Public Private Partnership (the “PPP”) on Design, Build,
Finance, Operate and Transfer (the "DBFOT") basis. (Package-11) Client: PWD Rajasthan; 2 Lane; Project Length: 290
Km; Project Cost: INR 460 Crore
 Consultancy Services for Preparation of Feasibility study and Preparation of Detailed Project Report for Two Lanning
of State Highway (Highway-I to Highway-IV) through Public Private Partnership (the “PPP”) on Design, Build,
Finance, Operate and Transfer (the "DBFOT") basis. (Package-19) Client: PWD Rajasthan; 2 Lane; Project Length: 213
Km; Project Cost: INR 385 Crore;
 Pre Bid Study for the construction of the new Zuari bridge The project will involve the construction of a 640-metre-long,
8-lane cable-stayed bridge across the River Zuari and a 450-metre-long elevated approach From Ch. Bridge including
approaches across River Zuari on NH-17/NH-66 on Panjim-Mangalore Section in the State of Goa. PACKAGE 2 (CH
530.850 TO CH 531.934) Project Length: 1.084 Km; Project Cost: INR 820 Crore;
 Pre Bid Study for the Widening to two lane with paved shoulders with provision of 4 lane in urban stretches and
geometric improvement, wherever required, as per accedpted alignment from Km. 180+500 ( end of Nagaur Bye Pass) to
Km. 267+500 (Netra village near Jodhpur) Project Length: 86 Km; Project Cost: INR 250 Crore;
 Pre Bid Study for the Widening to 4-lane in urban stretched along with geometric improvement, wherever required as
per accepted alignment from Km. 267+500 to 296+070 ( Netra Village to Mandore Section)Project Length: 29 Km; Project
Cost: INR 240 Crore;
Preparation of detailed estimates for quantitiesas per designs and mass haul diagram, Calculate project cost for the entire project
(civil packages wise)that also include the cost of environmental and social safeguards preparation of documents based on
MORTH’s Standard Data Book and market rate analysis for the inputs. The estimation of quantities based on various
components of detailed design. Quantities estimation and costs calculation for each individual civil work as per TOR.
Computation of the unit rates for thedifferent items of works. Unit rate calculationon the basis of their basic rates, location of plants
and lead distances for mechanized construction.Unit rate worked out in terms of manpower, machinery and materials.
Costestimates on the basis of foreign exchange and local components, separately identifyingtaxes and customs duties. Review of the
Cost estimate Prepared.

Oct.2011 to Sep. 2014. KCC Buildcon Pvt. Ltd.


Quantity Surveyor

 Construction for 4-Lane of Jhajjar-Badli road from km 0.000 to 18.250 in JhajjarDistt. in the state of Haryana, Client:
Haryana State Roads & Bridges Development Corporation Limited.; Project Length: 18.250 Km; Project Cost: INR 56.41
Crore;
 Construction of 4-Lane of various roads in Rewari Town & construction of New Roads in Rewari District (Package no.
HSRDC/NCR/C-11/2008) in the state of Haryana, Project Length: 40Km approx, Client: Haryana State Roads & Bridges

PAGE-4
ANKIT

Development Corporation Limited

Responsible for Involved in Preparation of Interim and Final Payment, preparation of revised estimate, Bill of Quantities, rate
analysis, cost estimate and tender document evaluation of sub-contractor bids, appointment of sub-contractor, monitoring day to day
activity, preparation of work schedule and monthly progress report, dealing with issues related to claims, variations, time extension
and contract administration, checking of levels and measurements of all items of work executed in different stage. Also responsible
for resource planning, scheduling, cost control of work, preparation of bills, claims etc. Rate analysis for non – schedule item,
preparation of drawing showing cross-section & L-section for vertical profile, structural details and layout drawings of bridges,
culverts, drains and all other highways related structures, design and drawing of alignment for existing and proposed road,
topography survey design of Road and Bridge, submission of As-Build Drawings for completed works. Also responsible for
making progress monitoring chart along with daily, weekly and monthly progress reports with environmental and other existing
structural reports, identifying extra items analyzing the same and getting it approved from Consultant.

From Sept. 2010 to Oct.2011 Zander Engineers Mohali (Punjab).


Quantity Surveyor

Construction of 4-Laneof Rohtak-Panipat Section of NH-71A under NHDP Phase-III from km. 0.000 To Km 81.000 on
Design, Build, Finance, Operate and Transfer (DBFOT) Basis in the state of Haryana, Total Project Length: 81.00 Km, Total
Project Cost: INR 800 Crore, Client: National Highway Authority of India.

As a Quantity Surveyor, Responsible for Preparation of detailed B.O.Q. on the basis of drawings and to rectify the B.O.Q. received
from the consultants. Preparation of Daily progress Report. responsible of quantities executed from sites reports / records compare
with approved RFI’s prepare IPC/ Monthly bills and timely submission to consultant. Liaise with Q.S of consultant to get bill
prepared and get payment. Interact with planning Engineer, Site Engineering to get inputs for bill preparation. Keep up to date
record of work done, billed, prepare data for future claims. Check / prepare sub-contractors bills and pass for pavement.
Reconciliation of materials consumed. Measurement for different items of works, computerized billing, bill checking and
verification. Maintaining all official records pertaining to bills/quotations, visits etc.

Oct 2009 to Sep. 2010 Singla Engineers & Contractor Pvt. Ltd.
Quantity Surveyor

Project: Up gradation of Deodhar to Nainawali Road & Link Road in Yamuna Nagar Distt. In the state of Haryana, Project
Length: 32 Km approx, Client:Haryana State Roads & Bridges Development Corporation Limited.

As a Quantity Surveyor Responsible for Preparation and submitting the bills to the Client. Scrutinize the bills of the sub
Contractors. Prepare weekly and Monthly progress report and submitting the same to the Clients Finalizing the agencies for the
materials required for the project. Prepare RFI/RFA and take approvals for the same. Preparation of Bill of Quantities, Variation
orders and getting approval for the same.Monitoring the site for the execution as per the specification given in the tender. Routine
inspection of the site with the Clients and discuss major issues pertaining to the designs and drawings and taking approvals of the
same.

Dec 2008to Oct. 2009 MG-Kundu- Shivlaya (JV)


Quantity Surveyor

Project: Improvement of JhajjarDhaurBeri Road,BahadurgarhBerikalanaurRoad, DighalBeriJahazgarh Road in Jhajjar


District(Package No.HSRDC/NCR/C-10/2008), 2-lane,Project Length: 40 Km approx, Client: Haryana State Roads & Bridges
Development Corporation Limited

As Quantity Surveyor, is responsible for monitoring & management of Work done Certificates , Preparation of Proposal for Extra
Items and Variation Orders in concurrence with Agreement & Specification, monitoring & Preparation of Working Drawing, As
Built Drawing, Cross Section etc., management & monitoring , Planning, Correspondence, Also responsible preparation of cost
estimate, 0variation and comparative statements, planning and scheduling of work according to given target and programme for all
section, planning & co-ordination for site with Client; Responsible for quantity & billing, co-ordination with all other experts of
construction project

July 2006to Dec 2008 Wilbur Smith Associates


Site Engineer/Asst. Quantity Surveyor

Project: Construction Supervision for widening to four lanes and rehabilitation of the existing two lanes from km 449.150 to
km 509.000 on NH-76 in Rajasthan. (Package: EW-II (RJ-10); Client: NHAI; Project Length: 59.85 Km; Funded By: ADB;

Responsible for Construction Supervision Control and other allied works; Involved in Preparation of Interim Payment & Final Bill

PAGE-5
ANKIT

paid to the Contractor; Assisting Team Leader in preparation of Project Completion report, Monthly progress report and Inception
report; Maintaining records of bills and actual works; Planning, Preparation of Various report.

Languages & Degree of Proficiency:


Language Read Write Speak
English Excellent Excellent Excellent
Hindi Excellent Excellent Excellent

Certification by the Candidate

I, the undersigned, Ankit,M/s Sterling Indo tech Consultants Pvt. Ltd., undertake that this CV correctly describes myself, my
qualifications and my experience, PWD B&R would be at liberty to debar me if any information given in the CV, in particular the
Summary of Qualification & Experience vis-à-vis the requirements as per TOR is found incorrect. I further undertake that I have
neither been debarred by RAJASTHAN, PWD B&R nor left any assignment with the consultants engaged by RAJASTHAN, PWD
B&R / contracting firm (firm to be supervised now) for any continuing work of RAJASTHAN, PWD B&R without completing my
assignment. I will be available for the entire duration of the current project(--------------------------------------). If I leave this
assignment in the middle of the work, RAJASTHAN, PWD B&R would be at liberty to debar me from taking any assignment in
any of the RAJASTHAN, PWD B&R works for an appropriate period of time to be decided by RAJASTHAN, PWD B&R. I have
no objection if my services are extended by RAJASTHAN, PWD B&R for this work in future.

I further undertake that if due to my inability to work on this project due to unavoidable circumstances, due to which consultant’s
firm is forced to seek replacement. In such unavoidable circumstances, I shall not undertake any employment in RAJASTHAN,
PWD B&R projects during the period of assignment of this project and RAJASTHAN, PWD B&R shall consider my CV invalid
till such time.

…………………………………………………………..……………..Date: 14/ 12 /2015


(Day/Month/Year)
(Signature of Key Personnel)

Certification by the Firm

The undersigned on behalf of M/s Sterling Indo tech Consultants Pvt. Ltd. certify that the qualification and experience details of
Shri Ankit,M/s Sterling Indo tech Consultants Pvt. Ltd.as described in the CV has been checked and found to be correct. It is
also certified that ShriAnkit to the best of our knowledge has neither been debarred by RAJASTHAN, PWD B&R nor left his
assignment with any other consulting firm engaged by RAJASTHAN, PWD B&R Contracting firm (firm to be supervised now) for
the ongoing projects. We understand that if the information about leaving the past assignment is known to RAJASTHAN, PWD
B&R would be at liberty to remove the personnel from the present assignment and debar him for an appropriate period to be
decided by RAJASTHAN, PWD B&R.

…………………………………………………………..……………..Date: 14/ 12 /2015


(Day/Month/Year)
[Signature of authorized representative of the Firm]

PAGE-6

You might also like