You are on page 1of 13

Note

This drawing is not to be scaled. Use figured

Internal External dimensions only. All dimensions are to be


checked on site and any discrepancies, errors
or omissions are to be reported to the
architect prior to commencement of works.

DETAIL B9
AT ABOVE AND BELOW GROUND EXTERNAL WALL
13mm Plaster finish.

215mm Blockwork to Structural Engineers specification.

75mm Kingspan Kooltherm K8 insulation and 25mm air gap.

100mm Blockwork to Structural Engineers specification.

Render finish, 20mm at minimum, 50mm at maximum - reinforced as


necessary.
RIW Sheetseal 9000 DPC

RIW Flexiseal to manufacturers guidance (yellow dashed line) with 25mm x Weep hole.
25mm fillet of RIW Cementfill HB to internal corner of cavity.
50mm Portland stone paviours.

Floor finish - 25mm zone. Concrete bed to Structural Engineers specification.

65mm concrete screed to Structural Engineers specification. 50mm Kingspan Styrozone N300R insulation.

25mm Kingspan TF70 insulation. Geotextile layer to protect insulation.

Concrete deck to Structural Engineers specification. Earth.

FOR ALL DAMP PROOFING WORK AND FIXING TO


OR THROUGH DAMP PROOFING REFER TO RIW
SPECIFICATION AND RIW MANUFACTURERS
GUIDANCE. IF IN DOUBT OR IF FURTHER ADVICE IS
REQUIRED ON SPECIFIC DETAILS PLEASE
CONTACT CARL ORR AT RIW TECHNICAL TEL:
01344 397 777

RIW Cementseal to manufacturers guidance (blue dash-dot-dash line).

RIW Toughseal to manufacturers guidance (orange dashed line).

Services void. RIW Cavity Drain system 20mm.

RIW Cavity Drain system 5mm.

British Gypsum Casoline MF suspended ceiling system. RIW Sheetseal 9000 DPC.

RIW Sheetseal 226.

Plasterboard and skim finish. RIW Flexiseal.

Geotextile layer.

RIW Cavity Drain membrane sealed at top to underside of slab using RIW RIW Structureseal.

Sealing Rope to manufacturers guidance.

13mm Plaster finish.

100mm Blockwork to Structural Engineers specification.

25mm Kingspan TF70 insulation.

RIW Cavity drain membrane. DETAIL B5


Concrete structure to Structural Engineers specification. INTERNAL WALL JUNCTION AT EXTERNAL BASEMENT
WALL
Concrete piling and temporary retaining structure to Structural Engineers
specification. 13mm Plaster finish.
FOR
100mm Blockwork to Structural Engineers specification. CONSTRUCTION
25mm Kingspan TF70 insulation.
BB PARTNERSHIP LTD
RIW Cavity Drain system 5mm flixed together at corners using RIW Sheetseal 226. C H A R T E R E D A R C H I T E C T S

Concrete wall to Structural Engineers specification.

215mm Blockwork to Structural Engineers specification. Sri Lankan High Commission

35 Avenue Road
London
NW8

Basement Details 01

Jun 2010 1:100@A1 Mike M

A
EQR_DTL01

ALL RIGHTS RESERVED


Note
This drawing is not to be scaled. Use figured
dimensions only. All dimensions are to be
checked on site and any discrepancies, errors
Internal or omissions are to be reported to the
architect prior to commencement of works.

External
DETAIL B6
AT ABOVE AND BELOW GROUND EXTERNAL WALL IN
SERVICE STAIR AREA
13mm Plaster finish.

100mm Blockwork to Structural Engineers specification.

Cavity, sized as basement.

215mm Blockwork to Structural Engineers specification.

75mm Kingspan Kooltherm K8 insulation and 25mm air gap.

100mm Blockwork to Structural Engineers specification.

Render finish, 20mm at minimum, 50mm at maximum - reinforced as


necessary.

RIW Sheetseal 9000 DPC.


50mm Portland stone paviours.
Weep hole.
Concrete bed to Structural Engineers specification.
RIW Flexiseal to manufacturers guidance (yellow dashed line) with 25mm x
25mm fillet of RIW Cementfill HB to internal corner of cavity.
50mm Kingspan Styrozone N300R insulation.
Floor finish - 25mm zone.
Geotextile layer to protect insulation.
65mm concrete screed to Structural Engineers specification.
Earth.
25mm Kingspan TF70 insulation.

Concrete deck to Structural Engineers specification.

13mm Plaster finish.

FOR ALL DAMP PROOFING WORK AND FIXING TO


OR THROUGH DAMP PROOFING REFER TO RIW
SPECIFICATION AND RIW MANUFACTURERS
GUIDANCE. IF IN DOUBT OR IF FURTHER ADVICE IS
REQUIRED ON SPECIFIC DETAILS PLEASE
CONTACT CARL ORR AT RIW TECHNICAL TEL:
01344 397 777

RIW Cementseal to manufacturers guidance (blue dash-dot-dash line).

RIW Toughseal to manufacturers guidance (orange dashed line).

RIW Cavity Drain system 20mm.

RIW Cavity Drain system 5mm.


Services void.
RIW Sheetseal 9000 DPC.

RIW Sheetseal 226.


British Gypsum Casoline MF suspended ceiling system.
RIW Flexiseal.

Geotextile layer.
Plasterboard and skim finish.
RIW Structureseal.

13mm Plaster finish.

100mm Blockwork to Structural Engineers specification.

RIW Cavity Drain membrane sealed at top level with the underside of the
concrete slab using RIW Sealing Rope to manufacturers guidance.
DETAIL B4
13mm Plaster finish. EXTERNAL WALL DETAIL AT LIGHTWELL
100mm Blockwork to Structural Engineers specification. 13mm Plaster finish.
25mm Kingspan TF70 insulation. 100mm Blockwork to Structural Engineers specification.
RIW Cavity drain membrane. 25mm Kingspan TF70 insulation.
FOR
Concrete structure to Structural Engineers specification. RIW Cavity Drain system 5mm. CONSTRUCTION
Concrete piling and temporary retaining structure to Structural Engineers 215mm Blockwork to Structural Engineers specification.
specification. BB PARTNERSHIP LTD
C H A R T E R E D A R C H I T E C T S
RIW Toughseal to manufacturers guidance (orange dashed line) to over lap
past drained cavity by minimum 500mm, aggregate to be applied to surface in
all areas which are to have render applied.
Sri Lankan High Commission
Concrete wall to Structural Engineers specification.

'Rockwool Cavity' insulation full fill (100mm).


35 Avenue Road
100mm Blockwork to Structural Engineers specification. London
NW8
Render finish, 20mm at minimum, 50mm at maximum - reinforced as
necessary.
Basement Details 02

RIW Structureseal to exterior of concrete retaining structure continuing around


lightwell area and minimum 500mm past basement cavity wall (run behind
drained cavity mambrane) and minimum 500mm under concrete floor slab.
Jun 2010 1:100@A1 Mike M

A
EQR_DTL02

ALL RIGHTS RESERVED


Note
This drawing is not to be scaled. Use figured
dimensions only. All dimensions are to be
checked on site and any discrepancies, errors
or omissions are to be reported to the

DETAIL B2 architect prior to commencement of works.

INTERNAL LOADBEARING WALL AND FLOOR


JUNCTION WITH DRAINED CAVITY MEMBRANE
DETAIL B11
INTERNAL LOADBEARING CONCRETE COLUMN/WALL AT
13mm Plaster finish. JUNCTION WITH FLOOR AND DRAINED CAVITY
MEMBRANE
215mm Blockwork to Structural Engineers specification.
13mm Plaster finish.
2No. courses of engineering bricks.
Concrete column to Structural Engineers specification.
Weep holes, frequency to RIW guidance.
2No. coats of RIW Toughseal (Orange Line) 150mm horizontal and 500mm vertical
RIW Sheetseal 9000 DPC sealed to RIW Cavity Drain membrane using
application. RIW Grade 1 aggregate must be applied to the top 400mm of the vertical
RIW Double Sided Tape 150mm.
application while the second coat is still wet.
Floor finish - 25mm zone.
150mm wide band of RIW Sheetseal 226 (pink dotted line).
65mm concrete screed to Structural Engineers specification.
Floor finish - 25mm zone.
25mm Kingspan TF70 insulation.
65mm concrete screed to Structural Engineers specification.
RIW Cavity Drain system 20mm, studs filled with non-compressable material.
25mm Kingspan TF70 insulation.
Concrete slab to Structural Engineers specification primed with RIW
RIW Cavity Drain system 20mm, studs filled with non-compressable material.
Cementseal Primer.
Concrete slab to Structural Engineers specification primed with RIW Cementseal
Primer.

FOR ALL DAMP PROOFING WORK AND FIXING TO


OR THROUGH DAMP PROOFING REFER TO RIW
SPECIFICATION AND RIW MANUFACTURERS
GUIDANCE. IF IN DOUBT OR IF FURTHER ADVICE IS
REQUIRED ON SPECIFIC DETAILS PLEASE
CONTACT CARL ORR AT RIW TECHNICAL TEL:
01344 397 777

RIW Cementseal to manufacturers guidance (blue dash-dot-dash line).

LIGHT WELL DETAIL B1


RIW Toughseal to manufacturers guidance (orange dashed line).

RIW Cavity Drain system 20mm.


13mm Plaster finish.
RIW Cavity Drain system 5mm.

EXTERNAL BASEMENT WALL & FLOOR JUNCTION AT 215mm Blockwork to Structural Engineers specification. RIW Sheetseal 9000 DPC.

LIGHTWELL RIW Sheetseal 226.

RIW Flexiseal.
75mm Kingspan Kooltherm K8 insulation and 25mm air gap.
RIW Structureseal to exterior of concrete retaining structure continuing around Geotextile layer.

lightwell area and minimum 500mm past basement cavity wall (run behind 100mm Blockwork to Structural Engineers specification. RIW Structureseal.

drained cavity mambrane) and minimum 1000mm under concrete floor slab.
RIW Sheetseal 226 sealed to RIW Tooughseal and RIW Cavity Drain
Render finish, 20mm - reinforced as necessary. membrane.

RIW Sheetseal 9000 DPC. Floor finish - 25mm zone.

Weep Hole. 65mm concrete screed to Structural Engineers specification.

RIW Toughseal with surface aggregate to manufacturers guidance (orange 25mm Kingspan TF70 insulation.
dashed line) aggregate to be applied to surface areas which are to take a
rendered finish. RIW Cavity Drain system 20mm, studs filled with non-compressable material.

Concrete upstand.
FOR
Stone paving tbc. CONSTRUCTION
Solobloc Twin Leaf manhole cover on cement mortar bed to Structural
Engineers specification. BB PARTNERSHIP LTD
C H A R T E R E D A R C H I T E C T S

Sri Lankan High Commission


Concrete slab to Structural Engineers specification.

35 Avenue Road
London
NW8

Basement Details 03

Jun 2010 1:100@A1 Mike M

A B
EQR_DTL03

ALL RIGHTS RESERVED


Note
This drawing is not to be scaled. Use figured
dimensions only. All dimensions are to be
checked on site and any discrepancies, errors

DETAIL B3 or omissions are to be reported to the


architect prior to commencement of works.

DETAIL B10 EXTERNAL BASEMENT WALL AND FLOOR JUNCTION


WITH DRAINED CAVITY AND BLOCKWORK LINING
DAMP PROOFING AT LIFT PIT AND JUNCTION WITH
DRAINED CAVITY 13mm Plaster finish.

100mm Blockwork to Structural Engineers specification.


USE DETAIL B7 (OMITTING BLOCKWORK) FOR LIFT
DOOR THRESHOLD DAMP PROOFING DETAIL Concrete wall to Structural Engineers specification.

Concrete structure to Structural Engineers specification. 25mm Kingspan TF70 insulation.

Lift pit and interior of lift shaft to have applied RIW Cementseal to manufacturers RIW Cavity Drain system 5mm sealed to RIW Cavity Drain 5mm using RIW
guidance (blue dash-dot-dash line) with 25mm x 25mm fillet of RIW Cementfill HB 'Wall/Floor Junction'.
to horizontal and vertical internal corners, Cementseal should continue to 500mm
above main basement slab level (level with the RIW Toughseal noted below) LIFT SHAFT RIW Sheetseal 9000 DPC sealed to RIW Cavity Drain membrane using
RIW Double Sided Tape 150mm.
2No. coats of RIW Toughseal (Orange Line) 150mm horizontal and 500mm
vertical application. RIW Grade 1 aggregate must be applied to the top 400mm of 1No. course of Foamglas Perinsul insulating loadbearing blockwork.
the vertical application while the second coat is still wet.
Weep holes, frequency to RIW guidance.
RIW Sheetseal 226 (pink dotted line).
Floor finish - 25mm zone.
90mm concrete screed to Structural Engineers specification.
65mm concrete screed to Structural Engineers specification.
25mm Kingspan TF70 insulation.
25mm Kingspan TF70 insulation.
RIW Cavity Drain system 20mm, studs filled with non-compressable material.
RIW Cavity Drain system 20mm, studs filled with non-compressable material
Concrete slab to Structural Engineers specification primed with RIW Cementseal and sealed to RIW Cavity Drain 5mm at wall using RIW 'Wall/Floor Junction'.
Primer.
Concrete slab to Structural Engineers specification primed with RIW
Cementseal Primer.

FOR ALL DAMP PROOFING WORK AND FIXING TO


OR THROUGH DAMP PROOFING REFER TO RIW

DETAIL B7 SPECIFICATION AND RIW MANUFACTURERS


GUIDANCE. IF IN DOUBT OR IF FURTHER ADVICE IS
REQUIRED ON SPECIFIC DETAILS PLEASE
DAMP PROOFING AT LIFT PIT AND JUNCTION WITH
CONTACT CARL ORR AT RIW TECHNICAL TEL:
FLOOR DRAINED CAVITY 01344 397 777

13mm Plaster finish. RIW Cementseal to manufacturers guidance (blue dash-dot-dash line).

RIW Toughseal to manufacturers guidance (orange dashed line).

Concrete structure to Structural Engineers specification. RIW Cavity Drain system 20mm.

RIW Cavity Drain system 5mm.

RIW Cementseal to manufacturers guidance (blue dash-dot-dash line) with 25mm x RIW Sheetseal 9000 DPC.

25mm fillet of RIW Cementfill HB to horizontal and vertical internal corners. RIW Sheetseal 226.

RIW Flexiseal.

RIW Toughseal to manufacturers guidance (orange dashed line), apply grade 1


aggregate to surface to provide mechanical key.
LIFT SHAFT Geotextile layer.

DETAIL B8
RIW Structureseal.

RIW Sheetseal 226 (pink dotted line).


DAMP PROOFING AT LIFT PIT AND JUNCTION WITH
WALL DRAINED CAVITY
Floor finish - 25mm zone.

65mm concrete screed to Structural Engineers specification.


FOR
Concrete structure to Structural Engineers specification.

25mm Kingspan TF70 insulation. 100mm blockwork to Structural Engineers specification.


CONSTRUCTION
RIW Cavity Drain system 20mm, studs filled with non-compressable material. 25mm Kingspan TF70 insulation. BB PARTNERSHIP LTD
C H A R T E R E D A R C H I T E C T S
Concrete slab to Structural Engineers specification primed with RIW Cementseal RIW Cavity Drain system 5mm (red line).
Primer.
RIW Sheetseal 9000 to manufacturers guidance sealed to RIW cementseal and
RIW Cavity Drain (purple dash-dot-dash line). Sri Lankan High Commission

Preformed metal drainage channel with falls towards stair area.

110mm Concrete upstand. 35 Avenue Road


London
NW8
RIW Cementseal to manufacturers guidance (blue dash-dot-dash line) with 25mm
x 25mm fillet of RIW Cementfill HB to horizontal and vertical internal corners.
Basement Details 04
Concrete slab to Structural Engineers specification.

Jun 2010 1:5@A1 Mike M

A B C
EQR_DTL04

ALL RIGHTS RESERVED


Note
This drawing is not to be scaled. Use figured
dimensions only. All dimensions are to be
checked on site and any discrepancies, errors
or omissions are to be reported to the
architect prior to commencement of works.

DETAIL R1
Hanson 129-250 square beaded rebated chimney pot
450mm high in slate bodymix (colour).

Painted concrete render detailing.

100mm Concrete slab to Structural Engineers spec.

215mm high air brick.

140mm Blockwork to Structural Engineers spec.


DETAIL R2 DETAIL R10 DETAIL R3
'Decothane Top Coat'. Proprietary 75mm diameter vent of contractors choice, 'Decothane Top Coat'.
20mm Painted render finish. colour to match roofing membrane (grey), contractor to
'Decothane Base Coat'. submit proposal for approval by architect. 'Decothane Base Coat'.

Liquid Plastics 'Carrier Membrane' bonded with Fully reinforced Liquid Plastics Decothane Liquid Plastics 'Carrier Membrane' bonded with
'Decostik'. Waterproofing System dressed on to prepared and 'Decostik'.
primed stanchions/penetrations in strict accordance with
75mm 'Decotherm' insulation from Liquid Plastics. Liquid Plastics Project Specification 75mm 'Decotherm' insulation from Liquid Plastics.
Acoustic louvres - see EEC standard drawing 'Typical
Louvre Roof Perimeter Support' Liquid Plastics Vapour Control Layer. 75mm 'Decotherm' insulation from Liquid Plastics. Liquid Plastics Vapour Control Layer.

Insulated cavity closer. Liquid Plastics Vapour Control Layer. Insulated cavity closer.

Decotrim Type C (100mm) angle piece from Liquid Concrete deck to Structural Engineers specification Decotrim Type C (100mm) angle piece from Liquid
Plastics, waterproofing system terminated in the integral prepared in strict accordance with Liquid Plastics Plastics, waterproofing system terminated in the integral
protected upstand. protected upstand.

Void. 50x100mm Timber fixing piece. 50x100mm Timber fixing piece.

140mm Blockwork to Structural Engineers spec. 100mm Blockwork to Structural Engineers spec. 100mm Blockwork to Structural Engineers spec.

Void. Concrete deck to Structural Engineers specification Concrete deck to Structural Engineers specification
prepared in strict accordance with Liquid Plastics prepared in strict accordance with Liquid Plastics
100mm Blockwork to Structural Engineers spec. Project Specification. Project Specification.

20mm Painted render finish. 75mm Kingspan Kooltherm K8 insulation with 25mm air 75mm Kingspan Kooltherm K8 insulation with 25mm air
gap to outside face. gap to outside face.
Painted render band 75mm high projecting 35mm beyond
surrounding render coat. 215mm Blockwork to Structural Engineers spec. 215mm Blockwork to Structural Engineers spec.

20mm Painted render finish. Liquid Plastics roofing system from green roof area
dressed up wall and behind Decotrim metal angle piece.
Lift shaft.
Lift shaft.

Acoustic louvres - see EEC standard drawing 'Typical


Louvre Roof Perimeter Support'

Schwelger Bat Tube 2FR, see elevation for positioning

Concrete slab to Structural Engineers spec.

Steelwork to Structural Engineers spec.

20mm Painted render finish.

DETAIL S1
Roofing system is Liquid Plastics 'Cold Fusion Delta 25' DETAIL R4
Concrete paving slabs or similar appropriately proportioned pre-cast concrete plinth Roofing system is Liquid Plastics 'Cold Fusion Delta 25'
used to evenly distribute loadings exerted by the item of plant supplied and positioned
as necessary for plant items. 2No. 'Decothane Root Resistant Detail Coats' applied to exposed upstands to overlap
horizontal by minimum 150mm.
Proprietary neoprene pad introduced to prevent abrasion of Decothane Waterproofing
System. Gravel ballast border.

215mm Blockwork to Structural Engineers spec. 50mm x 50mm treated timber sw fillet bonded with 'Decostik'.

75mm Kingspan Kooltherm K8 insulation with 25mm air gap to exterior face. Perforated Aluminium retaining angle.

100mm Blockwork to Structural Engineers spec. 'Decothane Root Resistant Inverted Top Coat'.

20mm Painted render finish. 'Decothane Base Coat' with embedded Reemat Premium GFM.
Render stop. Liquid Plastics 'Carrier Membrane' bonded with 'Decostik'.

'Decothane Waterproofing System dressed on to prepared and primed upstand Tapered 'Decotherm Insulation' from Liquid Plastics, for thicknesses and tapered
surface. layout see Liquid Plastics project drawing 18521-001.

50mm x 50mm treated timber SW fillet bonded with 'Decostik'. Liquid Plastics Vapour Control Layer.

'Decothane Top Coat'. Concrete deck to Structural Engineers specification prepared in strict accordance with
Liquid Plastics Project Specification.
'Decothane Base Coat'.
40mm thick pre grown Sedum Blanket.
Liquid Plastics 'Carrier Membrane' bonded with 'Decostik'.
Rooflight from www.Lonsdalemetal.co.uk Spangard range compliant with CDM
40mm thick Sedum Substrate.
Tapered 'Decotherm Insulation' from Liquid Plastics, for thicknesses and tapered non-fragility requirements, Class C resistant to person falling onto it.
layout see Liquid Plastics project drawing 18521-001. Liquid Plastics 'Filtration Layer'.

FOR
Minimum 50mm 75mm wide timber upstand to suit.
Liquid Plastics Vapour Control Layer. 38-40mm thick Biodrain water retention layer.
75mm Rockwool Cavity insulation.
Concrete deck to Structural Engineers specification prepared in strict accordance with
Minimum 150mm 18mm WBP Plywood.
Liquid Plastics Project Specification.

12.5mm British Gypsum plasterboard and skim finish.

Timber packing pieces to suit.

Steelwork to Structural Engineers specification.


CONSTRUCTION
BB PARTNERSHIP LTD
C H A R T E R E D A R C H I T E C T S

Sri Lankan High Commission

35 Avenue Road
London
NW8

Details 05
Superstructure

Dec 2010 1:10@A1 Mike M

A
EQR_DTL05

ALL RIGHTS RESERVED


Boundary
Note
This drawing is not to be scaled. Use figured
dimensions only. All dimensions are to be
checked on site and any discrepancies, errors
or omissions are to be reported to the
architect prior to commencement of works.

Mumford & Wood Casement Window with 60mm cill


extension.

Stone countertop (refer to bathroom interior drawings)


DETAIL R5
Roofing system is Liquid Plastics 'Cold Fusion Delta 25'
25mm timber packing piece.
Hanson 129-250 square beaded rebated chimney pot 450mm high in slate bodymix
Insulated cavity closer. (colour).
Recon stone window cill painted finish. Painted render detailing.

100mm Concrete slab to Structural Engineers spec.

DETAIL F1 215mm high air brick.

140mm Blockwork to Structural Engineers spec.


Roofing system is Liquid Plastics 'Cold Fusion Delta 25'
20mm Painted render finish.
'Decothane Waterproofing System dressed on to prepared and primed upstand
surface with code 5 lead flashing over. Render stop.
Render finish.
50mm x 50mm treated timber sw fillet bonded with 'Decostik'. 2No. 'Decothane Root Resistant Detail Coats' applied to exposed upstands to overlap
100mm Blockwork to Structural Engineers spec. horizontal by minimum 150mm.
'Decothane Top Coat'.
75mm Kingspan Kooltherm K8 insulation with 25mm air Gravel ballast border.
'Decothane Base Coat'. gap to outside face.
50mm x 50mm treated timber sw fillet bonded with 'Decostik'.
Liquid Plastics 'Carrier Membrane' bonded with 'Decostik'. 13mm Plaster finish.
Perforated Aluminium retaining angle.
60mm 'Decotherm Insulation' from Liquid Plastics. 140mm Blockwork to Structural Engineers spec.
'Decothane Root Resistant Inverted Top Coat'.
Floor finish.
Liquid Plastics Vapour Control Layer. 'Decothane Base Coat' with embedded Reemat Premium GFM.
65mm Screed.
Concrete deck to Structural Engineers specification prepared in strict accordance with Liquid Plastics 'Carrier Membrane' bonded with 'Decostik'. Void.
Minimum 150mm 25mm Kingspan TF70 insulation.
Liquid Plastics Project Specification.
Tapered 'Decotherm Insulation' from Liquid Plastics, for thicknesses and tapered 140mm Blockwork to Structural Engineers spec.
layout see Liquid Plastics project drawing 18521-001.
Void.
Liquid Plastics Vapour Control Layer.
100mm Blockwork to Structural Engineers spec.
Concrete deck to Structural Engineers specification prepared in strict accordance with
Liquid Plastics Project Specification. 20mm Painted render finish.

40mm thick pre grown Sedum Blanket. Painted render band 75mm high projecting 35mm beyond
surrounding render coat.
40mm thick Sedum Substrate.
75mm Kingspan Kooltherm K8 and 25mm air gap.
Liquid Plastics 'Filtration Layer'.
Recon stonework detailing painted finish. 75mm Kingspan Kooltherm K8 and 25mm air gap.
38-40mm thick Biodrain water retention layer.
100mm Blockwork to Structural Engineers spec.

50mm Painted render finish.

75mm Kingspan Kooltherm K8 insulation with 25mm air


gap to outside face.

Concrete lintel to Structural Engineers spec.


Steelwork to Structural Engineers spec.
Steel support bracket for window surround to Structural
Concrete slab to Structural Engineers spec.
Engineers spec.
Services void.

British Gypsum Casoline MF suspended ceiling system.

15mm British Gypsum plasterboard and skim finish.


Recon stone window surround painted finish.
Concrete lintels to Structural Engineers spec.

13mm plaster finish.


Front Doorset.
DETAIL S2
Services void.

140mm Blockwork to Structural Engineers spec.

75mm Kingspan Kooltherm K8 and 25mm air gap.

100mm Blockwork to Structural Engineers spec.

20mm Painted render finish.

British Gypsum Casoline MF suspended ceiling system.

British Gypsum 15mm plasterboard and skim finish.

Concrete lintels to Structural Engineers spec.

13mm plaster finish.

DETAIL G1
Front Doorset.

50mm Portland stone paviours.

2 coats of RIW Tougheseal to face of concrete stair


structure with RIW Grade 1 aggregate into second coat
while still wet to provide key for paving bed mortar.

Drainage channel.

Concrete slab to Structural Engineers spec.

Insulated movement joint reinforcement system to


Structural Engineers spec.

FOR
Floor finish.

65mm Screed.

25mm Kingspan TF70 insulation.

CONSTRUCTION
DETAIL S3
Conservation Bax Sash window by Mumford & Wood.

35mm Hardwood timber window cill.

60mm extended window cill.

Insulated cavity closer.

Stone exterior window cill painted finish.

13mm plaster finish.

140mm Blockwork to Structural Engineers spec.

75mm Kingspan Kooltherm K8 and 25mm air gap.


BB PARTNERSHIP LTD
75mm Kingspan Kooltherm K10 insulation. Services void. C H A R T E R E D A R C H I T E C T S
100mm Blockwork to Structural Engineers spec.
Knauf Aquapanel external cement board lining system consisting of Exterior British Gypsum Casoline MF suspended ceiling system.
grade steel frame system, Aquapanel exterior cement board, Aquapanel 20mm Painted render finish.
exterior joint filler, Aquapanel exterior primer, Aquapanel exterior reinforcing 15mm British Gypsum plasterboard and skim finish.
mesh, Aquapanel joint filler and skim coat - white.
215mm Blockwork to Structural Engineers specification.
100mm Blockwork to Structural Engineers specification.
Concrete lintels to Structural Engineers spec. Sri Lankan High Commission
Timber packing piece to suit.
13mm Plaster finish.
Render finish, 20mm - reinforced as necessary.
75mm Kingspan Kooltherm K8 insulation and 25mm air gap.
RIW Toughseal with surface aggregate to manufacturers guidance (orange
dashed line) aggregate to be applied to surface areas which are to take a Mumford & Wood Conservation Box Sash with 60mm cill extension.
rendered finish.
35 Avenue Road
Concrete retaining structure to Structural Engineers spec.
London
NW8

Details 06
Superstructure

Dec 2010 1:10@A1 Mike M

A
EQR_DTL06

ALL RIGHTS RESERVED


Note
This drawing is not to be scaled. Use figured
dimensions only. All dimensions are to be
checked on site and any discrepancies, errors
Recon stone detailing. or omissions are to be reported to the
architect prior to commencement of works.
Timber packing pieces.

18mm WBP Plywood.

DETAIL R6
Roofing system is Liquid Plastics 'Cold Fusion Delta 25'

Liquid Plastics type D Decotrim fixed to protect the corner bonded with Decostik.

2No. 'Decothane Root Resistant Detail Coats' applied to exposed upstands to overlap
horizontal by minimum 150mm.

30mm 'Decotherm Insulation' from Liquid Plastics.

50mm x 50mm treated timber sw fillet bonded with 'Decostik'.

Gravel ballast border.


Recon stone detailing. Perforated Aluminium retaining angle. DETAIL F3
Timber packing pieces. 50mm x 50mm treated timber sw fillet bonded with 'Decostik'.
Cast iron railings.
18mm WBP Plywood. 50mm x 50mm treated timber packing piece.
Mumford & Wood doorset.
Steelwork to Structural Engineers spec. 'Decothane Root Resistant Inverted Top Coat'.
Floor finish.
2No. 'Decothane Root Resistant Detail Coats' applied to 'Decothane Base Coat' with embedded Reemat Premium GFM.
exposed upstands to overlap horizontal by minimum 150mm. 65mm Screed.
Liquid Plastics 'Carrier Membrane' bonded with 'Decostik'.
30mm x 30mm treated timber sw fillet bonded with 'Decostik'. 25mm Kingspan TF70 insulation.
Tapered 'Decotherm Insulation' from Liquid Plastics, for thicknesses and tapered
30mm 'Decotherm Insulation' from Liquid Plastics. Insulated cavity closer.
layout see Liquid Plastics project drawing 18521-001.
50mm x 50mm treated timber sw fillet bonded with 'Decostik'. Concrete structure to Structural Engineers spec.
Liquid Plastics Vapour Control Layer.
'Decothane Base Coat' with embedded Reemat Premium GFM. Concrete deck to Structural Engineers specification prepared in strict accordance with
Liquid Plastics Project Specification.
Liquid Plastics 'Carrier Membrane' bonded with 'Decostik'.
40mm thick pre grown Sedum Blanket.
'Decotherm Insulation' from Liquid Plastics, for thicknesses and
tapered layout see Liquid Plastics project drawing 18521-001. 40mm thick Sedum Substrate.
Liquid Plastics Vapour Control Layer. Liquid Plastics 'Filtration Layer'.
Balcony support to Strucutral Engineers spec.
18mm WBP Plywood. 38-40mm thick Biodrain water retention layer.
Concrete encasement painted finish.

Painted render finish.

100mm Blockwork to Structural Engineers spec.

75mm Kingspan Kooltherm K8 insulation and 25mm air


gap.

Services void

British Gypsum Casoline MF suspended ceiling system.

15mm British Gypsum plasterboard and skim finish.

Support structure for stonework and lintel to Structural


Engineers spec.

13mm Plaster finish.

Recon stone window surround painted finish.

Insulated cavity closer.

Mumford & Wood door/window set.

DETAIL G3
Stone Balustrading

Concrete structure to Structural Engineers spec.

50mm Portland stone paviours.


DETAIL S4 Earth.

Mumford & Wood Conservation Box Sash with 85mm


cill extension.

5mm wbp Plywood painted with a matt black paint and


secured to behind.

75mm blockwork to Structural Engineers spec.

Timber packing piece to suit.

Insulated cavity closer.

Recon stone window surround painted finish.


DETAIL G2
100mm Blockwork to Structural Engineers spec. Mumford & Wood doorset with mobility cill.

20mm Painted render finish. Floor finish.

Recon stone detailing painted finish. 65mm Screed.

13mm Plaster finish.

140mm Blockwork to Structural Engineers spec.

25mm Painted render finish.


25mm Kingspan TF70 insulation.

Concrete structure to Structural Engineers spec.

50mm Portland stone paviours.


FOR
75mm Kingspan Kooltherm K8 insulation with 25mm air F.F.L

CONSTRUCTION
gap to outside face.

140mm Blockwork to Structural Engineers spec.

Steel support for stonework to Structural Engineers


spec.

Concrete bed to Structural Engineers specification.

Recon stone detailing painted finish.


Aco drain 'Modular 125' with 'Heelsafe' grate and
80/125 channel.
BB PARTNERSHIP LTD
50mm Kingspan Styrozone N300R insulation.
C H A R T E R E D A R C H I T E C T S
Floor finish.

65mm Screed. Geotextile layer to protect insulation.

25mm Kingspan TF70 insulation. RIW Flexiseal to manufacturers guidance (yellow


dashed line) with 25mm x 25mm fillet of RIW Cementfill
Concrete structure to Structural Engineers spec. HB to internal corner of cavity.

Earth. Sri Lankan High Commission

DETAIL F2 35 Avenue Road


London
100mm Blockwork to Structural Engineers spec. NW8
20mm Painted render finish.

Details 07
Services void.
Superstructure
British Gypsum Casoline MF suspended ceiling system.

15mm British Gypsum plasterboard and skim finish.

Concrete lintels to Structural Engineers spec.

Steel support bracket for window surround to Structural Dec 2010 1:10@A1 Mike M
Engineers spec.

A
EQR_DTL07
Recon stone window surround.

13mm Plaster finish.

Mumford & Wood Conservation Box Sash with 85mm


cill extension. ALL RIGHTS RESERVED
Note
DETAIL F4 DETAIL R7 This drawing is not to be scaled. Use figured
50mm Painted render band. Roofing system is Liquid Plastics 'Cold Fusion Delta 25'
dimensions only. All dimensions are to be
checked on site and any discrepancies, errors
20mm Painted render finish. Leadwork code 5.
or omissions are to be reported to the
140mm Blockwork to Structural Engineers spec. Recon Portland Stone coping 75mm at maximum and 50mm at minimum with 32mm architect prior to commencement of works.
throated overhang to each side.
75mm Kingspan Kooltherm K8 insulation with 25mm air
gap to outside face. 50mm x 50mm treated timber sw fillet bonded with 'Decostik'.

100mm Blockwork to Structural Engineers spec. 30mm 'Decotherm Insulation' from Liquid Plastics.

Steelwork to Structural Engineers spec. 2No. 'Decothane Root Resistant Detail Coats' applied to exposed upstands to overlap
horizontal by minimum 150mm.
Steel support bracket for window surround to Structural
Engineers spec. Concrete slab to Structural Engineers spec. Gravel ballast border.

Concrete lintel to Structural Engineers spec. Services void. 50mm x 50mm treated timber sw fillet bonded with 'Decostik'.

Recon stone window surround painted finish. British Gypsum Casoline MF suspended ceiling system. Perforated Aluminium retaining angle.

15mm British Gypsum plasterboard and skim finish. 'Decothane Root Resistant Inverted Top Coat'.

Timber packing pieces to suit. 'Decothane Base Coat' with embedded Reemat Premium GFM.

12.5mm plasterboard and skim finish, 8mm skim to Liquid Plastics 'Carrier Membrane' bonded with 'Decostik'.
underside of window head.
Tapered 'Decotherm Insulation' from Liquid Plastics, for thicknesses and tapered
Mumford & Wood Conservation Box Sash with 85mm layout see Liquid Plastics project drawing 18521-001.
cill extension.
Liquid Plastics Vapour Control Layer.

Concrete deck to Structural Engineers specification prepared in strict accordance with 25mm Kingspan Kooltherm K8 insulation.
Liquid Plastics Project Specification.
Lead flashing code 5 dressed over Airtrak ventilator.
40mm thick pre grown Sedum Blanket.
Nicholson (tel 0845 0098 980) Airtrak AB abutment ventilator.
40mm thick Sedum Substrate.
DETAIL F5 Liquid Plastics 'Filtration Layer'. 18
Lead covered (code 5) wood core roll maximum spacing is
600mm.

150
Mumford & Wood Conservation Box Sash with 60mm 38-40mm thick Biodrain water retention layer.

minimum 225mm
Leadwork code 5 on separating membrane.

75

minimum 150mm
cill extension.
25 25

75 18mm WBP Plywood.


35mm thick hardwood timber window cill.

minimum 75mm
Insulated cavity closer.

Recon stone window cill painted finish.

13mm Plaster finish.

215mm Blockwork to Structural Engineers spec.

75mm Kingspan Kooltherm K8 insulation with 25mm air


gap to outside face.

100mm Blockwork to Structural Engineers spec.

Metal windowbox planter supported off metal bracket -


detail yet to be confirmed.

20mm Painted render finish.

Timber firring piece 25mm at minimum 135mm at maximum and


Floor finish. stepped in the middle.

65mm Screed. Tyvek roofing membrane.

25mm Kingspan TF70 insulation. 125mm Kingspan TP10 insulation between 200x50mm timber
joists to Structural Engineers spec.
Concrete structure to Structural Engineers spec.
50x50mm Timber battens at 450c/c.

82.5mm Kingspan Kooltherm K18 insulation backed plasterboard


with plaster skim finish.

Services void.

215mm Blockwork to Structural Engineers spec.

13mm Plaster finish.


DETAIL G4 British Gypsum Casoline MF suspended ceiling system.

70mm Painted render band. British Gypsum 15mm plasterboard and skim finish.

20mm Painted render finish. 13mm plaster finish.

50mm Painted render finish.

Services void.

British Gypsum Casoline MF suspended ceiling system.

15mm British Gypsum plasterboard and skim finish.

Concrete lintels to Structural Engineers spec.

Steel support bracket for window surround to Structural


Engineers spec.

Recon stone window surround painted finish.

13mm Plaster finish thickens to 18mm across window head.

Mumford & Wood Conservation Box Sash with 85mm cill


extension.

DETAIL G5 DETAIL G6 FOR


Mumford & Wood Conservation Box Sash with 85mm Stone Balustrading.

CONSTRUCTION
cill extension.
Planting.
35mm thick hardwood timber window cill.
Blockwork to Structural Engineers spec.
Timber packing piece to suit.
20mm Painted render finish.
13mm Plaster finish.
Concrete structure to Structural Engineers spec.
Concrete structure to Structural Engineers spec.
Earth.
Floor finish.

65mm Screed. BB PARTNERSHIP LTD


25mm Kingspan TF70 insulation. C H A R T E R E D A R C H I T E C T S
Concrete structure to Structural Engineers spec.
Cast iron balcony railings.

Balcony support to Strucutral Engineers spec.

Concrete encasement painted finish.

50mm Painted render finish. Sri Lankan High Commission

Steel support bracket for blockwork to Structural


Engineers spec.

35 Avenue Road
20mm Painted render finish.
London
NW8

Details 08
Superstructure

Concrete slab to Structural Engineers spec.


Dec 2010 1:10@A1 Mike M
Services void.

British Gypsum Casoline MF suspended ceiling system. A


15mm British Gypsum plasterboard and skim finish.
EQR_DTL08
Concrete lintels to Structural Engineers spec.

13mm plaster finish.

Mumford & Wood Conservation Box Sash with 85mm


cill extension. ALL RIGHTS RESERVED
Note
This drawing is not to be scaled. Use figured
dimensions only. All dimensions are to be
checked on site and any discrepancies, errors
or omissions are to be reported to the
architect prior to commencement of works.

DETAIL R8
Lead covered (code 5) wood core roll maximum spacing
is 600mm.

Leadwork code 5 on separating membrane.

18mm WBP Plywood.

Torus roll lead detail (code 5) with timber packer.

Leadwork code 5.

25mm air gap.

25x50mm Timber batten.

Slate roof tiles.

18mm WBP Plywood.


DETAIL S5
Stone balustrade painted finish.
Tyvek roofing membrane.
Lead lined gulley.
Two layers of 22mm WBP plywood trim.
Mumford & Wood Conservation Box Sash with 85mm
175x50mm timber dormer framework to Structural cill extension.
Engineers spec.
80x15mm Treated timber finishing trim.
Timber firring piece 25mm at minimum 135mm at
maximum and stepped in the middle. 80x15mm timber finishing trim.
Lead code 5 on separating membrane.
Tyvek roofing membrane. Mumford & Wood Conservation Box Sash with 85mm
18mm WBP Plywood.
cill extension.
125mm Kingspan TP10 insulation between 200x50mm 25mm Air gap.
timber joists to Structural Engineers spec.
Tyvek roofing membrane.
50x50mm Timber battens at 450c/c.
175x50mm timber dormer framework to Structural
82.5mm Kingspan Kooltherm K18 insulation backed Engineers spec.
plasterboard with plaster skim finish.
Slate tiles.
80mm + 70mm Kingspan Kooltherm K12 insulation with
25mm air gap to interior side between 200x50mm 25x50mm Treated timber batten.
timber mansard rafters to Structural Engineers spec.
25x50mm Treated timber counter batten.
32.5mm Kingspan Kooltherm K18 insulation backed
plasterboard with plaster skim finish. 80mm + 70mm Kingspan Kooltherm K12 insulation with
minimum 25mm air gap to interior side.
125mm Kingspan TP10 insulation between 150x50mm
timber framework to Structural Engineers spec. 200x50mm timber mansard rafters to Structural
Engineers spec.
82.5mm Kingspan Kooltherm K18 insulation backed
plasterboard with plaster skim finish. 38x38mm timber trim.

35mm thick hardwood timber window cill.

32.5mm Kingspan Kooltherm K18 insulation backed


plasterboard with plaster skim finish.

100mm Kingspan Kooltherm K7 insulation between


100x50mm Timber studwork to Structural Engineers
spec.

32.5mm Kingspan Kooltherm K18 insulation backed


plasterboard with plaster skim finish.

Timber architrave (see finishes schedule).

DETAIL R9
Mumford & Wood Conservation Box Sash with 85mm
cill extension.

35mm thick hardwood timber window cill.

Treated timber packing piece to suit.

32.5mm Kingspan Kooltherm K18 insulation backed


plasterboard with plaster skim finish. DETAIL R10
18mm WBP Plywood. Lead covered (code 5) wood core roll on separating membrane.

Lead flashing code 5. Treated timber ridge piece to suit.

Slate tiles. Treated timber firring battens 50mm at maximum and 25mm at
minimum.
175x50mm timber dormer framework to Structural
Engineers spec. Leadwork code 5 on separating membrane.

25x50mm Treated timber batten. 18mm WBP Plywood.

25x50mm Treated timber counter batten. 25x50mm Treated timber softwood batten.

Tyvek roofing membrane. 25mm air gap.

SW Treated timber tilting fillet to suit. 125mm Kingspan TP10 insulation between 150x50mm timber
framework to Structural Engineers spec.
18mm WBP Plywood.
Two layers of 22mm WBP plywood trim.
SW Treated timber tilting fillet to suit.
Recon stone balustrading. 18mm WBP Plywood.
80mm + 70mm Kingspan Kooltherm K12 insulation with
25mm air gap to interior side. Tyvek roofing membrane.
Leadwork guttering using T-pren jointing system and
200x50mm timber mansard rafters to Structural laid to fall 75mm at maximum.
Leadwork code 5 on separating membrane.
Engineers spec.
Lead flashing code 5 on separating membrane.
100mm Kingspan Kooltherm K7 insulation between studwork.
Floor finish.
Cavity closer.
Vapour control layer.
65mm Screed.
Recon Stone detailing painted finish.
82.5mm Kingspan Kooltherm K18 insulation backed
25mm Kingspan TF70 insulation. plasterboard with plaster skim finish.
25mm Kingspan TR26 insulation.
Concrete structure to Structural Engineers spec.
50x50mm Treated SW timber fillet.

18mm WBP Plywood.


80mm + 70mm Kingspan Kooltherm K12 insulation with
Kingspan TR26 insulation tapered, 60mm at minimum, minimum 25mm air gap to interior side.
135mm at maximum.
200x50mm timber mansard rafters to Structural Engineers
100mm Blockwork to Structural Engineers spec. spec.

Concrete structure to Structural Engineers spec.

20mm Painted render finish thickening to 50mm below


stone element.

140mm Blockwork to Structural Engineers spec.

Services void.
100x50mm Timber studwork to Structural Engineers spec.
British Gypsum Casoline MF suspended ceiling system.
32.5mm Kingspan Kooltherm K18 insulation backed

FOR
75mm Kingspan Kooltherm K8 insulation and 25mm air plasterboard with plaster skim finish.
gap.

15mm British Gypsum plasterboard and skim finish.

Support structure for stonework and lintel to Structural


Engineers spec.

12.5mm plasterboard and skim finish with 8mm skim


finish to underside of window head.

Timber packing pieces.

Recon stone window surround painted finish.


CONSTRUCTION
Mumford & Wood Conservation Box Sash.
BB PARTNERSHIP LTD
C H A R T E R E D A R C H I T E C T S
DETAIL R10
Proprietary 75mm diameter vent of contractors choice,
colour to match roofing membrane (grey), contractor to
submit proposal for approval by architect.

Fully reinforced Liquid Plastics Decothane


Waterproofing System dressed on to prepared and
Sri Lankan High Commission
primed stanchions/penetrations in strict accordance with
Liquid Plastics Project Specification

75mm 'Decotherm' insulation from Liquid Plastics.

Liquid Plastics Vapour Control Layer.

Concrete deck to Structural Engineers specification


35 Avenue Road
prepared in strict accordance with Liquid Plastics London
Project Specification. NW8

Details 09
Superstructure

Lift shaft.

Dec 2010 1:10@A1 Mike M

A
EQR_DTL09

ALL RIGHTS RESERVED


Note
This drawing is not to be scaled. Use figured
dimensions only. All dimensions are to be
checked on site and any discrepancies, errors
or omissions are to be reported to the
architect prior to commencement of works.

DETAIL F7
Roofing system is Liquid Plastics 'Cold Fusion Delta 25'
Roofing system is Liquid Plastics 'Cold Fusion Delta 25'
Recon Portland Stone coping 75mm at maximum and 50mm at

DETAIL F6 Recon Portland Stone cill painted finish.

20mm Painted render finish.


minimum with 32mm throated overhang to each side.

20mm Painted render finish. 100mm Blockwork to Structural Engineers spec.


Mumford & Wood Conservation Box Sash with 85mm
cill extension. Render stop. Render stop. 100mm Cavity with 75mm Kingspan Kooltherm K8 insulation terminating a minimum
of 150mm above the finished surface of the concrete slab structure.
35mm thick hardwood timber window cill. 'Decothane Waterproofing System dressed on to prepared and 'Decothane Waterproofing System dressed on to prepared and
primed upstand surface. primed upstand surface. 100mm Blockwork to Structural Engineers spec.
13mm Plaster finish.
50mm x 50mm treated timber sw fillet bonded with 'Decostik'. 50mm x 50mm treated timber sw fillet bonded with 'Decostik'. 20mm Painted render finish.
215mm Blockwork to Structural Engineers spec.
'Decothane Top Coat'. 'Decothane Top Coat'. Recon Stonework (painted finish) secured in place by steelwork in cavity to Structural
75mm Kingspan Kooltherm K8 insulation with 25mm air Engineers spec.
gap to outside face. 'Decothane Base Coat'. 'Decothane Base Coat'.

100mm Blockwork to Structural Engineers spec. Liquid Plastics 'Carrier Membrane' bonded with 'Decostik'. Liquid Plastics 'Carrier Membrane' bonded with 'Decostik'.

Steelwork to Structural Engineers spec. Tapered 'Decotherm Insulation' from Liquid Plastics, for thicknesses Tapered 'Decotherm Insulation' from Liquid Plastics, for thicknesses
Minimum 50mm and tapered layout see Liquid Plastics project drawing 18521-001. and tapered layout see Liquid Plastics project drawing 18521-001. Minimum 50mm
Floor finish.
Liquid Plastics Vapour Control Layer. Liquid Plastics Vapour Control Layer.
65mm Screed.
Minimum 150mm Concrete deck to Structural Engineers specification prepared in Concrete deck to Structural Engineers specification prepared in Minimum 150mm

25mm Kingspan TF70 insulation. strict accordance with Liquid Plastics Project Specification. strict accordance with Liquid Plastics Project Specification.

Concrete structure to Structural Engineers spec.

DETAIL G7
50mm Painted render finish over window surround.

Services void.

British Gypsum Casoline MF suspended ceiling system.

75mm Kingspan Kooltherm K8 insulation and 25mm air gap.

15mm British Gypsum plasterboard and skim finish.


Concrete structure to Structural Engineers spec.

Steel support for recon stone window surround to Structural Engineers spec.

13mm Plaster finish.

Recon stone window surround painted finish.

Insulated cavity closer.

Mumford & Wood door/window set.

FOR
CONSTRUCTION
BB PARTNERSHIP LTD
C H A R T E R E D A R C H I T E C T S

Sri Lankan High Commission

35 Avenue Road
London
NW8

Details 10
Superstructure

Dec 2010 1:10@A1 Mike M

A
EQR_DTL10

ALL RIGHTS RESERVED


Note
This drawing is not to be scaled. Use figured
dimensions only. All dimensions are to be
checked on site and any discrepancies, errors
or omissions are to be reported to the
DETAIL B12 DETAIL G8 architect prior to commencement of works.

13mm plaster finish. Timber window cill.

215mm Blockwork to Structural Engineers spec. Mumford & Wood 'Conservation Box Sash Window'.

Architrave (see finishes schedule). Architrave (see finishes schedule).

75mm Kingspan Kooltherm K8 insulation and 25mm air 13mm plaster finish.
gap.
215mm Blockwork to Structural Engineers spec.
Insulated cavity closer.
Insulated cavity closer.
Timber window cill.
75mm Kingspan Kooltherm K8 insulation and 25mm air
Mumford & Wood 'Conservation Box Sash Window'. gap.

100mm Blockwork to Structural Engineers spec.

Recon stone cill painted finish. 20mm Painted render finish.

140mm Blockwork to Structural Engineers spec. Recon stone window surround painted finish.

20mm Painted render finish. Concrete cill to Strucutral Engineers spec.

Metal window box planter.

DETAIL G9
13mm plaster finish.
DETAIL F8
215mm Blockwork to Structural Engineers spec.
Timber window cill.
Architrave (see finishes schedule). DETAIL G10 Mumford & Wood 'Conservation Box Sash Window'.
75mm Kingspan Kooltherm K8 insulation and 25mm air
gap. 13mm plaster finish. Architrave (see finishes schedule).

Insulated cavity closer. 215mm Blockwork to Structural Engineers spec. 13mm plaster finish.

Timber window cill. Architrave (see finishes schedule). 140mm Blockwork to Structural Engineers spec.

Mumford & Wood 'Conservation Box Sash Window'. 75mm Kingspan Kooltherm K8 insulation and 25mm air Insulated cavity closer.
gap.
75mm Kingspan Kooltherm K8 insulation and 25mm air
Insulated cavity closer. gap.
Front Doorset.

Recon stone cill painted finish.

100mm Blockwork to Structural Engineers spec.


100mm Blockwork to Structural Engineers spec.
20mm Painted render finish.
20mm Painted render finish.
Recon stone window surround painted finish. Recon stone window surround painted finish.
100mm Blockwork to Structural Engineers spec. Recon stone cill painted finish.
20mm Painted render finish. Metal window box planter.

DETAIL F9 DETAIL F10


FOR
DETAIL S6
13mm plaster finish.

140mm Blockwork to Structural Engineers spec.

Architrave (see finishes schedule).


13mm plaster finish.

140mm Blockwork to Structural Engineers spec.

Architrave (see finishes schedule).


Timber window cill.

Mumford & Wood 'Conservation Box Sash Window'.

Architrave (see finishes schedule).


CONSTRUCTION
75mm Kingspan Kooltherm K8 insulation and 25mm air 75mm Kingspan Kooltherm K8 insulation and 25mm air
13mm plaster finish.
gap. gap.
215mm Blockwork to Structural Engineers spec.
Insulated cavity closer. Insulated cavity closer.

Timber window cill. Timber window cill.


Insulated cavity closer.

75mm Kingspan Kooltherm K8 insulation and 25mm air


BB PARTNERSHIP LTD
Mumford & Wood 'Conservation Box Sash Window'. Mumford & Wood French Doorset. C H A R T E R E D A R C H I T E C T S
gap.

Sri Lankan High Commission

35 Avenue Road
London
NW8
Recon stone cill painted finish. Recon stone window surround painted finish.
100mm Blockwork to Structural Engineers spec.
100mm Blockwork to Structural Engineers spec. Recon stone cill painted finish.

20mm Painted render finish. 100mm Blockwork to Structural Engineers spec.


20mm Painted render finish. Details 11
Recon stone window surround painted finish.
Superstructure
20mm Painted render finish.
Window Jambs
Recon stone detailing painted finish.

Dec 2010 1:10@A1 Mike M

A
EQR_DTL11

ALL RIGHTS RESERVED


Note
This drawing is not to be scaled. Use figured
dimensions only. All dimensions are to be
checked on site and any discrepancies, errors
or omissions are to be reported to the
architect prior to commencement of works.

FOR ALL DAMP PROOFING WORK AND FIXING TO


OR THROUGH DAMP PROOFING REFER TO RIW
SPECIFICATION AND RIW MANUFACTURERS
GUIDANCE. IF IN DOUBT OR IF FURTHER ADVICE IS
REQUIRED ON SPECIFIC DETAILS PLEASE
CONTACT CARL ORR AT RIW TECHNICAL TEL:
01344 397 777

RIW Cementseal to manufacturers guidance (blue dash-dot-dash line).

RIW Toughseal to manufacturers guidance (orange dashed line).

RIW Cavity Drain system 20mm.

RIW Cavity Drain system 5mm.

RIW Sheetseal 9000 DPC.

RIW Sheetseal 226.


DETAIL G1 RIW Flexiseal.

Front Doorset. Geotextile layer.

50mm Portland stone paviours. RIW Structureseal.

2 coats of RIW Tougheseal to face of concrete stair


structure with RIW Grade 1 aggregate into second coat
while still wet to provide key for paving bed mortar.

Drainage channel.

Concrete slab to Structural Engineers spec.

Insulated movement joint reinforcement system to


Structural Engineers spec.

Floor finish.

65mm Screed.

25mm Kingspan TF70 insulation.

75mm Kingspan Kooltherm K10 insulation. Services void.

Knauf Aquapanel external cement board lining system consisting of Exterior British Gypsum Casoline MF suspended ceiling system.
grade steel frame system, Aquapanel exterior cement board, Aquapanel
exterior joint filler, Aquapanel exterior primer, Aquapanel exterior reinforcing 15mm British Gypsum plasterboard and skim finish.
mesh, Aquapanel joint filler and skim coat - white.
215mm Blockwork to Structural Engineers specification.
100mm Blockwork to Structural Engineers specification.
Concrete lintels to Structural Engineers spec.
Timber packing piece to suit.
13mm Plaster finish.
Render finish, 20mm - reinforced as necessary.
75mm Kingspan Kooltherm K8 insulation and 25mm air gap.
RIW Toughseal with surface aggregate to manufacturers guidance (orange
dashed line) aggregate to be applied to surface areas which are to take a Mumford & Wood Conservation Box Sash with 60mm cill extension.
rendered finish.

Concrete retaining structure to Structural Engineers spec.

LIGHT WELL DETAIL B1 13mm Plaster finish.


EXTERNAL BASEMENT WALL & FLOOR JUNCTION AT
215mm Blockwork to Structural Engineers specification.
LIGHTWELL
75mm Kingspan Kooltherm K8 insulation and 25mm air gap.
RIW Structureseal to exterior of concrete retaining structure continuing around
lightwell area and minimum 500mm past basement cavity wall (run behind 100mm Blockwork to Structural Engineers specification.
drained cavity mambrane) and minimum 1000mm under concrete floor slab.
RIW Sheetseal 226 sealed to RIW Tooughseal and RIW Cavity Drain
Render finish, 20mm - reinforced as necessary. membrane.

RIW Sheetseal 9000 DPC. Floor finish - 25mm zone.

Weep Hole. 65mm concrete screed to Structural Engineers specification.

RIW Toughseal with surface aggregate to manufacturers guidance (orange 25mm Kingspan TF70 insulation.
dashed line) aggregate to be applied to surface areas which are to take a
rendered finish. RIW Cavity Drain system 20mm, studs filled with non-compressable material.

Concrete upstand.

Stone paving tbc.

Solobloc Twin Leaf manhole cover on cement mortar bed to Structural


Engineers specification.

Concrete slab to Structural Engineers specification.

PUMP CHAMBER
TO STRUCTURAL
ENGINEERS
SPECIFICATION
FOR
CONSTRUCTION
BB PARTNERSHIP LTD
C H A R T E R E D A R C H I T E C T S

RIW Toughseal to manufacturers guidance.

Concrete structure to Structural Engineers specification.

RIW Hydrophillic waterstop at all horizontal & vertical day joints.


Sri Lankan High Commission
RIW Structureseal laid to over concrete blinding layer and to manufacturers
guidance over concrete blinding layer.

35 Avenue Road
London
NW8

Basement Details 12

Mar 2011 1:10@A1 Mike M

A
EQR_DTL12

ALL RIGHTS RESERVED


Note
This drawing is not to be scaled. Use figured
dimensions only. All dimensions are to be
checked on site and any discrepancies, errors
or omissions are to be reported to the
architect prior to commencement of works.

FOR ALL DAMP PROOFING WORK AND FIXING TO


OR THROUGH DAMP PROOFING REFER TO RIW
SPECIFICATION AND RIW MANUFACTURERS
GUIDANCE. IF IN DOUBT OR IF FURTHER ADVICE IS
REQUIRED ON SPECIFIC DETAILS PLEASE
CONTACT CARL ORR AT RIW TECHNICAL TEL:
01344 397 777

RIW Cementseal to manufacturers guidance (blue dash-dot-dash line).

RIW Toughseal to manufacturers guidance (orange dashed line).

RIW Cavity Drain system 20mm.

RIW Cavity Drain system 5mm.

RIW Sheetseal 9000 DPC.

RIW Sheetseal 226.

RIW Flexiseal.

Geotextile layer.

RIW Structureseal.

DETAIL B7
DAMP PROOFING AT LIFT PIT AND JUNCTION WITH
FLOOR DRAINED CAVITY
13mm Plaster finish.

Concrete structure to Structural Engineers specification.

RIW Cementseal to manufacturers guidance (blue dash-dot-dash line) with 25mm x


25mm fillet of RIW Cementfill HB to horizontal and vertical internal corners.

RIW Toughseal to manufacturers guidance (orange dashed line), apply grade 1


aggregate to surface to provide mechanical key.
LIFT SHAFT
RIW Sheetseal 226 (pink dotted line).
DETAIL B8
DAMP PROOFING AT LIFT PIT AND JUNCTION WITH
DETAIL B8P Floor finish - 25mm zone. WALL DRAINED CAVITY
DRAINAGE GULLEY DETAIL AT SERVICE LIFT SHAFT 65mm concrete screed to Structural Engineers specification. Concrete structure to Structural Engineers specification.

Service lift shaft. 25mm Kingspan TF70 insulation. 100mm blockwork to Structural Engineers specification.

100mm Blockwork to Structural Engineers specification. RIW Cavity Drain system 20mm, studs filled with non-compressable material. 25mm Kingspan TF70 insulation.

25mm Kingspan TF70 insulation. Concrete slab to Structural Engineers specification primed with RIW Cementseal RIW Cavity Drain system 5mm (red line).
Primer.
RIW Cavity Drain system 5mm. RIW Sheetseal 9000 to manufacturers guidance sealed to RIW cementseal and
RIW Cavity Drain (purple dash-dot-dash line).
Concrete wall to Structural Engineers specification.
Preformed metal drainage channel with falls towards stair area.
Green shading shows extent of Aluminium drainage channel, which is to fall
from the centre of the run to either end, drainage channel to be sealed to 110mm Concrete upstand.
surrounding structure using RIW cavity drain sealant to manufacturers
guidance. RIW Cementseal to manufacturers guidance (blue dash-dot-dash line) with 25mm
x 25mm fillet of RIW Cementfill HB to horizontal and vertical internal corners.

Concrete slab to Structural Engineers specification.

FOR
CONSTRUCTION
BB PARTNERSHIP LTD
C H A R T E R E D A R C H I T E C T S

Sri Lankan High Commission

35 Avenue Road
London
NW8

Basement Details 13

Mar 2011 1:10@A1 Mike M

EQR_DTL13

ALL RIGHTS RESERVED

You might also like