Professional Documents
Culture Documents
Function-3
You are taking over in singapore , what all u will check from last mate
Next port , Ship is having all survey How will u prepare
How will u prepare for load line survey
Where do u get freeboard heights for various drafts
Your ship is supposed to carry certain nav equipment , where can u get that from ?
List of LSA & FFA ? where do u get that from
Difference between amendment & Protocol
What is Code and Convention & some more normal questions
---------------------------------------------------------------------------------
Capt Bharadwaj
You are sailing vessel , you dont have engines , No wind , Are u still sailing
vessel or Vessel not under command ??
ECDIS is Anticollision tool or Anti grounding tool
Why its Anti Grounding tool
---------------------------------------------------------------------------------
Capt Sundaram
Function-1
Vessel Aground action as a mate
Length of lead line ? How is it marked
000 course north cardinal mark right a head action
Entering japan , buoyage colour & shapes
Gyro, GPS , DGPS principle
Transitting singapore straits Master medically unfit , Company asks u to run the
show till malaysia , Action
Transitting singapore steering failure Action
Open sea Ch. Engr calls and tells Engine needs to be immobilized action,Lightsto be
displayed , What all lights from stop Engines till the vessel is stopped and after
vessel is stopped,
Aground vessel sound signal , shapes
Carrying Iron on deck , How magnetic compass is showing constant heading or with
little change in deviation
Aghulas , Gulf stream , Labrador , current characteristics
Running moor & Standing moor
TRS southern hemisphere , Dangerous semi circle , Action
-----------------------------------------------------------------------------------
---
Function-3
Does Sewage certificate as annual endorsement , Does SMC have ?
Difference between International sewage discharge & ISC connection
ISM key elements & Objectives
Explain MLC , contents , how related or benefited us
Load line survey preparations
Form E, Form R etc explain
Dry dock preparations
Critical period & Critical instant
Location of transducer
Undocking preparations
Docking & Inwater survey regulations
Thats all I could recollect guys , Any thing if it comes in mind I will add up
Thanks Again !!!!!!!!!!
All the best guys