You are on page 1of 7

Project : Proposed Construction of 3rd Line between Gudur to Vijayawada

Bridge No: 516 A


Location Name: P-1 (Ref BH-01)
Started On : 23/09/2016; Ended On : 25/09/2016 G.W.T: 15.50m
SPT - Details Graphical Representation of SPT

Density/Consistency
0 10 2030405060708090
R.L of Layer (m)

Type of Sample
Depth of SPT
below E.G.L
Soil Profile
G.W.T. (m)

Engineering Description of

15-30 cm
30-45 cm

Relative
N-Value
0-15 cm
Soil

(m)
Brownish
Silty Sandy Clay

1.50 1.50 1 2 2 4 o Loose SS

3.00 3 6 7 13 o Loose SS
Brownish
Silty Fine Sand

4.50 7 9 13 22 o M.Dense SS

6.00 6.00 WASHING SAMPLE

7.50 5 7 10 17 o M.Dense SS

9.00 WASHING SAMPLE

10.50 UDS COLLECTED


Brownish
Silty Sandy Gravels

12.00 WASHING SAMPLE

13.50 4 5 7 12 o Loose SS

15.00 WASHING SAMPLE

16.50 16.50 SPT Hammer Rebound V.Dense CS

Boulders 18.00 SPT Hammer Rebound V.Dense CS


(Pebbels)
19.50 19.50 SPT Hammer Rebound V.Dense CS
Rock Core Recovery: 07%
21.00 SPT Hammer Rebound V.Dense CS

Rock Core Recovery: 12%


22.50 SPT Hammer Rebound V.Dense CS

Rock Core Recovery: 17%


24.00 SPT Hammer Rebound V.Dense CS
Soft
Rock Rock Core Recovery: 22%
25.50 SPT Hammer Rebound V.Dense CS

Rock Core Recovery: 24%


27.00 SPT Hammer Rebound V.Dense CS

Rock Core Recovery: 28%


28.50 SPT Hammer Rebound V.Dense CS

Rock Core Recovery: 31%


30.00 30.00 SPT Hammer Rebound V.Dense CS
Bore Hole Terminated at a depth of 30.00m below the existing ground level
Fig. 2.1 Soil Profile at P-1 (Ref BH-01) Location
Project : Proposed Construction of 3rd Line between Gudur to Vijayawada
Bridge No: 516 A
Location Name: A-2 (Ref BH-02)
Started On : 21/09/2016; Ended On : 23/09/2016 G.W.T: 14.50m
SPT - Details Graphical Representation of SPT

Density/Consistency
0 10 2030405060708090
R.L of Layer (m)

Type of Sample
Depth of SPT
below E.G.L
Soil Profile
G.W.T. (m)

Engineering Description of

15-30 cm
30-45 cm

Relative
N-Value
0-15 cm
Soil

(m)
Greyish
Silty Clay

1.50 1.50 2 3 4 7 o Loose SS

3.00 7 10 13 23 o M.Dense SS

4.50 8 12 15 27 o M.Dense SS
Brownish to Reddish
Silty Sand

6.00 WASHING SAMPLE

7.50 UDS COLLECTED

9.00 9.00 WASHING SAMPLE

10.50 3 4 6 10 o Stiff SS
Brownish
Silty Sandy Clay

12.00 WASHING SAMPLE

14.00 14.00 SPT Hammer Rebound V.Dense CS

15.50 SPT Hammer Rebound V.Dense CS


Boulders
(Pebbels)

17.00 SPT Hammer Rebound V.Dense CS


18.00 18.00 SPT Hammer Rebound V.Dense CS

Rock Core Recovery: 04%


19.50 SPT Hammer Rebound V.Dense CS

Rock Core Recovery: 07%


21.00 SPT Hammer Rebound V.Dense CS

Rock Core Recovery: 11%


22.50 SPT Hammer Rebound V.Dense CS

Rock Core Recovery: 15%


Soft 24.00 SPT Hammer Rebound V.Dense CS
Rock
Rock Core Recovery: 18%
25.50 SPT Hammer Rebound V.Dense CS

Rock Core Recovery: 21%


27.00 SPT Hammer Rebound V.Dense CS

Rock Core Recovery: 24%


28.50 SPT Hammer Rebound V.Dense CS

Rock Core Recovery: 28%


30.20 30.20 SPT Hammer Rebound V.Dense CS
Bore Hole Terminated at a depth of 30.20m below the existing ground level
Fig. 2.2 Soil Profile at A-2 (Ref BH-02) Location
Location Name: P-3 (Ref BH-03)
Started On : 19/09/2016; Ended On : 21/09/2016 G.W.T: 14.50m
SPT - Details Graphical Representation of SPT

Density/Consistency
0 10 2030405060708090
R.L of Layer (m)

Type of Sample
Depth of SPT
below E.G.L
Soil Profile
G.W.T. (m)

Engineering Description of

15-30 cm
30-45 cm

Relative
N-Value
0-15 cm
Soil

(m)
Brownish to Reddish 1.50 2 3 3 6 o M.Stiff SS
Clayey Gravels

3.00 3.00 6 9 10 19 o M.Dense SS

4.50 8 11 14 25 o M.Dense SS
Brownish
Silty Sand Gravels

6.00 WASHING SAMPLE

7.50 7.50 1 1 2 3 o Soft SS

Brownish to Greyish 9.00 WASHING SAMPLE


Silty Sandy Clay

10.50 10.50 9 11 13 24 o M.Dense SS

Reddish to Brownish 12.00 WASHING SAMPLE


Silty Sandy Gravels

13.50 13.50 SPT Hammer Rebound V.Dense CS

Boulders 15.50 SPT Hammer Rebound V.Dense CS


(Pebbels)

16.50 16.50 SPT Hammer Rebound V.Dense CS

Rock Core Recovery: 01%


18.00 SPT Hammer Rebound V.Dense CS

Rock Core Recovery: 03%


19.50 SPT Hammer Rebound V.Dense CS

Rock Core Recovery: 06%


21.00 SPT Hammer Rebound V.Dense CS

Soft Rock Core Recovery: 10%


Rock 22.50 SPT Hammer Rebound V.Dense CS

Rock Core Recovery: 13%


24.00 SPT Hammer Rebound V.Dense CS

Rock Core Recovery: 16%


25.50 SPT Hammer Rebound V.Dense CS

Rock Core Recovery: 17%


27.00 SPT Hammer Rebound V.Dense CS

Rock Core Recovery: 24%


28.00 28.00 SPT Hammer Rebound V.Dense CS
Bore Hole Terminated at a depth of 28.00m below the existing ground level