Attaching metal
7 22 500 0 0 22 1 10 10 1110
and plastic fixtures
9.5 19 24
Sr Run # of # of Workers
No Batch Set up Set up Std shift operators shift Capacity/
Parts time/unit
Size (min) time/unit time/unit week
(min)
Shaping plywood
1 3.15 1 0 0 3.15 1 4 4 3101
panels
2 Painting 2.6 1 2.6 1 2 2 1878
3 Attaching battens 1
Riveting,inserting
4 6.85 1 6.85 1 5 5 1782
studs
5 Mounting hinges 2.85 1 0 0 2.85 1 3 3 2571
6 Gluing carpet 13 1 0 0 13 1 9 9 1691
Attaching metal
7 22 1 0 0 22 1 14 14 1554
and plastic fixtures
6 37 37
Time for one floor lid (min)
3.15
Time for one floor lid (hr) Hr per day
0.0525 8.14
0.00644963 289
Kanban
1.863943