You are on page 1of 9

CASE STUDY-1-DILLI HAAT JANAKPURI.

Contents………………………………………………………….........................Page no
A. SITE LEVEL
1. Site details………………………………………………………………………………………......2
1.1. Location………………………………………………………………………………………………....2

1.2. History & idea behind dilli haat ………………………………………………………………………2

1.3. site extent & shape……………………………………………………………………………………….2

1.4. major access to site – entry & exit……………………………………………………………………….2

1.5. Road geometrics in the site……………………………………………………………………………..2

1.6. Site features-hardscaping & landscaping elements………………………………………………………2

1.7. Parking facilities………………………………………………………………………………………….3

1.8. Nearest land marks…………………………………….………………………………………………...3

1.9. Surrounding context………………………….…………………………………………………………3

1.10. Topography………………………………………………………………………………………………4

B. BUILDING LEVEL
2. Planning & zoning study…………………………………………………………………………..4
2.1. Horizontal & vertical zoning of spaces……………………………………………………………………..4

2.2. Typology & hierarchy of spaces…………………………………………………………………………….4

3.parking level study


3.1. Entry & exit ramps……………………………………………………………………………….4
3.2. Spaces & numbers……………………………………………………………………………….4
3.3. signage………………………………………………………………………………………….4
3.4. security…………………………………………………………………………………………...4
3.5. circulation routes………………………………………………………………………………..5

4. Floor plan study……………………………………………………………………………………5


4.1. Space requirements & furniture study…………………………………………………………………5

5. Activity study…………………………………………………………............................................6
5.1. Study of different spaces………………………………………………………………………………6

5.2. Study and analysis based on anthropometrics………………………………………………………...6

5.3 Seating spaces & resting spaces,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,6


5.4 .food courts & recreational spaces ………………………………………………………………………….6

5.5.Activities in common spaces ,passages,,around elevators,,entrance & exit………………………………7

6. Material study……………………………………………………………………………………..7
Building level

At site level -pavements,steps,entrance flooring ,etc………………………………………………………….7

6.1. Flooring details………………………………………………………………………………………….7

6.2. Shops interiors…………………………………………………………………………………………..7

6.3. Roof details……………………………………………………………………………………………...7

6.4.Wall claddings……………………………………………………………………………………………8

6.5.flooring details of common spaces & passages…………………………………………………………..8


A. SITE LEVEL
1.Site details
1.1.location
The location is not central .this means the dilli haat could be a new hub that will attract
people away from the congested center &south of delhi. this new hub can also serve the western delhi.The
site is very well connected via public transport , for local , national & international links.

Conna Dilli haat -janakpuri


ught
place

Connaught place-17 kms

Delhi
airpor
t IGI.AIRPORT- 11kms

LOCATION Lal sai mandir marg,janakpuri,west

South delhi.

DATE OF COMPLETION 13th July ,2014

CLIENT Delhi tourism & municipal corpati-

-on

ARCHITECT ARCHOHM associates

NEAREST METRO STAT- Janakpuri east metro station

-ION

1.2. Idealogy behind dilli haat


Dilli haat is a joint venture of delhi tourism and ndmc supported by the development
commissioner .The main responsibility of operation of the HAAT lies with delhi tourism spread over an area
of 6 acres..the idea of opeing up to dilli haat is basically to provide marketing space/ platform for artisans to
Sell their crafts directly without indulging middle man .here the artisans directly come in contact without the
help of middleman.
Dilli Haat is an initiative by the Government to promote the rich crafts of India. It is conceived
as a crafts village where the local craftsmen have a chance to display their creative wares on a mainstream
platform, an exposure that will be equally beneficial for the urban population as well as the craftsman.

1.3 Site extent and shape

The dilli haat janakpuri site was

Similar to L-shape ,

1.4. .Nearest landmark

The site was a large 6 acre northwest


facing contiguous area that turns southeast towards the
end.the plot is bound by the main bus stop on one side ,
the tihar prison complex ( a national prison )greens on the
other side & a large commerciak road called LAL SAI
MANDIR MARG in the front side.At one side there is
educational hub called maharaja surajmal institute of tec-

-hology.
-janakpuri super speciality hospital

1.4 Major access to site – entry & exit -Maharaja surajmal institute
There are two service entries where one is at
-Tihar prison complex
West side of the site and the other one is near to parking.and two more entries for the parking
at west side of the site .There is a separate entry for pedestrians which was considered as
main entry .

VISITOR VEHICULAR

f SERVICE VEHICULAR
x
PEDESTRAIN
f
d
`

1.5.Road geometrics the site

PATHWAY CIRCULATION

VISITOR VEHICLE CIRCULATION

SERV VEHICLE CIRCULATION

You might also like