From Thiruvananthapuram to Kanyakumari and Volume - IVA: EIA & EMP Report
NH 47B From Nagercoil to Kavalkinaru Package - II
NH 47B from Nagercoil to Kavalkinaru where it joins the NH 7 has been provided with a
new alignment except initial length of 600m starting just before the junction of Nagercoil
Bypass (km 82/181 of NH 47) and existing NH 47B.
M/s. SECON Pvt. Ltd has been entrusted for preparation of Detailed Project Report for
both stretches as a combined project.
The project is divided into two packages. This report is pertaining to Package II i.e. from
Karode (Kerala/Tamilnadu Border) to Kanyakumari (End of Kottaram Bypass joining
with Proposed NH 7 Bypass for Kanyakumari) and NH 47B from Nagercoil to
Kavalkinaru in the state of Tamilnadu.
1.2 Objectives
The objectives of the EIA include:
8. The proposed alignment of the road should be such that built-up area should be
least affected. Based upon this criteria and social screening analysis, hot spots
have been identified and represented as under:-
Table 1.2: ‘Hot Spots’ identified during Environmental / Social Screening Analysis
Sl. Design Chainage
Remark
No. (km)
NH 47
1 43.000 – 45.000 Coconut plantation, rubber estate
Rubber estate, Tambraparni River at km 48.186,
2 45.000 – 50.000
Tambrakulam Pond at km 49.500
Rubber Estate, coconut Plantation, Pudukalam Pond in
3 50.000 – 55.000
Nattalm village at km 54.625
Big pond, Nesarpuram, Nattalam at km 55.520, built up
4 55.000 – 60.000
area of Palliyadi at km 56.500
Rubber Estate and coconut Plantation, Ponds at km
5 60.000 – 65.000
63.440, 64.250 & 64.550
Coconut Plantation, Valliyar River at km 66.850, Pond at
6 65.000 – 70.000
km 68.000 & 68.510
Ponds at km 70.700, 71.300, 71.600, 72.000, 72.300,
7 70.000 – 75.000
73.500 & 73.900
8 75.000 – 82.200 Big Tank at km 77.650, Palayar River at km 80.706
9 82.200 – 90.000 Ponds at km 88.950 & 89.150
10 90.000 – 95.000 Ponds at km 90.120, 91.500, 92.450, 93.550 & 94.800
11 95.000 – 96.714 Ponds at km 95.250 & 96.250
NH 47B
12 0.000 – 5.000 Coconut Plantation, Ponds at km 1.050, 1.500 & 2.200
13 5.000 – 16.376 Pond at km 5.250
The EMP is prepared for avoidance, mitigation and management of the negative
impacts of the project. It also covers remedial measures required to be taken for hot
spots. EMP includes the list of all the project related activities, their chainage wise
impacts at different stages of project during pre-construction phase / design phase,
construction phase and operational phase on environment and remedial measures to be
undertaken to mitigate these impacts.