You are on page 1of 9

KAR OIL & GAS CO.

Khurmala Field
FIELD DEPARTMENT
DRILLING DEVE. OIL WELLS PROJECT
TU Location

References RTKB
Well KDN-21(K-448)
Depth (mMD) 128
Upper Fars Formation
Current Formation

Continue Drilling Upper Fars Formati


Current Operation at 24:00:

Drill 26" section f/ 50 m t/ 77 m w/ WO


P/U, M/U & RIH 1 stnd 8" DC.
Drill 26" section f/ 77 m t/ 104 m w/ W
Operations last 24 hours(00:00 to 24:00) P/U, M/U & RIH 1X jar + 2X 8" DC.
Drill 26" section f/ 104 m t/ 128 m w/

Last Survey m MD

MW(kg/l)
MW(kg/l)
MW(kg/l)
MW(kg/l)
MW(kg/l)
GEO

Kar Oil Gas / Field DepartmentConfidentialDaily Geology Report (DGR)


Interval m. MD
Alternating of sandstone, clay stone (mu
stone : Vary colored hard to moderatly h
, argillacous
stone : Red to brown to lightly brown , sl
(50-128m)
with anhydrite nodules , grinding to silt st

Siltstone : fine to very fined grains grey

Interval m. MD

Gas Type Interval


(m)
Background Gas

Peak Gas
Trip Gas
Kick Gas
Connection Gas
Wiper Trip Gas
Prog. MD (m Prog. TVD (m
PROVISIONAL FORMATION PICKS
RTKB) Depth RTKB) Depth
Formations
Upper Midle Fars in part
Lower Fars (URB) 750
Upper Red Bed 750
Ao 750
R6
R7
R8
R9
Seepage Beds 802

Kar Oil Gas / Field DepartmentConfidentialDaily Geology Report (DGR)


B1
B2
B3
B4
Saliferous Beds 836
S1
Transition Beds 913
T1
T2
T3
T4
T5
BFC
Avana Dense 943
Avana Porous 1012
Khurmala A 1059
Total Depth
0
Depth (mMD) 146
Operations 00:00–06:00

Plan next 24 hrs

Overall Comments

Supervisor Geologist Ranjdar Ahmed


Wellsite Geologist Kovan Waleed
Wellsite Geologist Twana Alias
Signature

Kar Oil Gas / Field DepartmentConfidentialDaily Geology Report (DGR)


DAILY GEOLOGY REPORT (DGR)

ENTRY DATA
318 GL 309 Rig
Date 11/8/2018 day spud 10/8/2018
Depth (mTVD RT 128 Progress 78
per Fars Formation

ntinue Drilling Upper Fars Formation

ll 26" section f/ 50 m t/ 77 m w/ WOB: 7-8 klbs, RPM: 60, GPM: 820, SPP: 800 psi, ROP avg: 4.1 m/hr.
U, M/U & RIH 1 stnd 8" DC.
ll 26" section f/ 77 m t/ 104 m w/ WOB: 8-10 klbs, RPM: 60-70, GPM: 820, SPP: 850 psi, ROP avg: 4.2 m/hr.
U, M/U & RIH 1X jar + 2X 8" DC.
ll 26" section f/ 104 m t/ 128 m w/ WOB: 7-10 klbs, RPM: 75, GPM: 820, SPP: 900 psi, ROP avg: 2.8 m/hr.

Inc Azi
Inc Azi
Inc Azi
Inc Azi
Inc Azi
Inc Azi
Inc Azi
Inc Azi
Inc Azi
Inc Azi
Inc Azi
Inc Azi
Inc Azi
Csg Size (inch) Csg Depth (m)
Csg Size (inch) Csg Depth (m)
Csg Size (inch) Csg Depth (m)
Csg Size (inch) Csg Depth (m)
Csg Size (inch) Csg Depth (m)
GEOLOGICAL SUMMARY

Kar Oil Gas / Field DepartmentConfidentialDaily Geology Report (DGR)


Lithology Descriptions
andstone, clay stone (mudstone) salty and Anhydritic nodules.
olored hard to moderatly hard , rounded to sub rounded sub angular in part , coarse t

brown to lightly brown , slightly hard , soft in part , blocky to sub blocky , with differen
nodules , grinding to silt stone in part .

e to very fined grains grey to vary colored lightly hard , slihtly calcarous .

Shows
Description

GAS DATA
Total C1 C2 C3
(%) ppm ppm ppm

Well site Top MD Actual Depth Actual Difference


Depth TVDss Thickness
M m +/-

Kar Oil Gas / Field DepartmentConfidentialDaily Geology Report (DGR)


06:00 UPDATE
Depth (mTVD RT) 146 Current Activity
Drill 26" section f/ 128 m t/ 146 m w/ WOB: 7-10 klbs, RPM: 75, GPM: 820, SPP: 1050 psi, ROP av
Continues Drilling Upper Fars Formation

Team Crew
Days on Akram Maqsud
Days on Ahmed Adnan
Days on Hemn salh

Kar Oil Gas / Field DepartmentConfidentialDaily Geology Report (DGR)


GYP.8
Rpt No 3
ROP m/h 3.25

SPP: 800 psi, ROP avg: 4.1 m/hr.

: 820, SPP: 850 psi, ROP avg: 4.2 m/hr.

820, SPP: 900 psi, ROP avg: 2.8 m/hr.

Csg Depth (m)


Csg Depth (m)
Csg Depth (m)
Csg Depth (m)
Csg Depth (m)

Kar Oil Gas / Field DepartmentConfidentialDaily Geology Report (DGR)


tic nodules. Sand
nded sub angular in part , coarse to medium grains , calcarous
Clay
blocky to sub blocky , with different clay minerals type , and

d , slihtly calcarous .

ion

iC4 nC4 iC5 nC5


ppm ppm ppm ppm

Basis of Pick

BY ROP, CUTTING SAMPLE (LITHOLOGY) and correlation with around wells

Kar Oil Gas / Field DepartmentConfidentialDaily Geology Report (DGR)


Drilling
RPM: 75, GPM: 820, SPP: 1050 psi, ROP avg: 3.4 m/hr.

Akram Maqsud Days Off


Ahmed Adnan Days Off
Hemn salh Days Off

Kar Oil Gas / Field DepartmentConfidentialDaily Geology Report (DGR)

You might also like