Professional Documents
Culture Documents
Khurmala Field
FIELD DEPARTMENT
DRILLING DEVE. OIL WELLS PROJECT
TU Location
References RTKB
Well KDN-21(K-448)
Depth (mMD) 780
Lower fars formation
Current Formation
Totco
432m
643
Last Survey m MD
MW(kg/l)
MW(kg/l)
MW(kg/l)
MW(kg/l)
MW(kg/l)
GEO
Interval m. MD
Interval m. MD
Peak Gas
Trip Gas
Kick Gas
Connection Gas
Wiper Trip Gas
Prog. MD (m Prog. TVD (m
PROVISIONAL FORMATION PICKS
RTKB) Depth RTKB) Depth
Formations
Upper Midle Fars in part
Lower Fars (URB) 750
Upper Red Bed 750
Operations 00:00–06:00
Overall Comments
ENTRY DATA
318 GL 309 Rig
Date80 28/08/2018 day spud 10/8/2018
Depth (mTVD RT 780 Progress 66
wer fars formation
ll 17 1/2" hole f/ 714 m. t/ 780 m. WOB: 10 - 15 klbs, Pump rate: 730 gpm, Rotary: 90-100, Pressure: 1100 psi, To
wn, yellowish brown, soft, moderately hard in parts, blocky to sub blocky, argillaceous
te, snow white, creamy, translucent, blocky to sub blocky, compacts, hard, occasional
ly: Grey, dark grey, greenish grey in parts, firm to moderately hard, fine crystalline to c
marly in parts grading to limestone
Shows
Description
GAS DATA
Total C1 C2 C3
(%) ppm ppm ppm
735 -417
735 -417
06:00 UPDATE
Depth (mTVD RT) 785 Current Activity
Cont. Drill 17 1/2" hole f/ 780 m. t/ 785 m.WOB: 15 - 17 klbs, Pump rate: 730 gpm, Rotary: 90 rpm,
5000 ft*lb.
Drill 17 1/2" section.
Team Crew
Days on Ranjdar Ahmed
Days on Kovan waleed
Days on twana alyas
gpm, Rotary: 90-100, Pressure: 1100 psi, Torque: 3500 - 5000 ft*lb.
ion
Basis of Pick