Project : 400 KV S/s,Suratgarh, Rajasthan

Description
Unit -6
X-14 X-13 Y-1 Y-2 Y-3
(Interconn (Interconn (Interconn (Interconn Bus
ecting line ecting line ecting line ecting line reactor-1
-2 ) -1) -1) -2)
1 CB
a. Erection & gas filling ok ok ok ok ok
b. Earthing X X x X X
X X x x X
c. Pole to CB MK cabling
d. MOM Box to Panel cabling X X x X X
e. Glanding, ferulling & termination X X x X X
f. Internal testing by supplier's rep. X X x X X
g. Megger X X x X X
h. Timing X X x X X
i. Contact resistance X X x X X
j. DCRM X X x X X
k. C & Tan Delta X X x X X
l. Alarm annunciation X X x X X
2 Isolator
a. Erection ok ok ok ok ok
b. Earthing X X x x x
c. Pole to pole cabling X X ok ok ok
d. MOM Box to Panel cabling X X X X X
e. Glanding, ferulling & termination X X ok ok X
f. Megger X X X X X
g. Contact resistance X X X X X
h. Local op. X X X X X
i. Operating time, motor current etc. X X X X X
j. Remote op. X X X X X
k. Interlock X X X X X
3 CT
Erection X X ok ok ok
a. earthing X x ok ok X
b. Terminal Box to JB cabling X X OK ok X
c. JB to Panel cabling X X X X X
d. Glanding, ferulling & termination X X OK OK X
e. Megger X X OK OK X
f. Wdg Res. X X OK OK X
g. Knee point test X X OK OK X
X X OK OK X
h. Ratio
i. Polarity X X OK OK X
j. C & Tan Delta X X X X X
4 CVT
a. Erection x x OK ok
b. N2 pr.checking X X OK OK
c. Terminal Box to JB cabling X X OK ok
d. JB to Panel cabling X X X X
e. Glanding, ferulling & termination X X OK OK
f. Megger X X OK OK
g. Wdg Res. X X OK OK
h. Ratio X X X X
C & Tan Delta X X X X
5 LA
a. Erection x x OK OK
b. Megger X X X X
c. Earth resistance X X X X
d. Surge Counter testing X X X X
tan delta X X X X
6 REACTOR
a. N2 pr. check after receiving at site ok
b. Megger between Core, tank and limb X
c. Bushing CT testing before erection X
d. C & Tan Delta of Bushing before erection X
e. Trafo accessories to MK cabling X
f. MK to Panel cabling X
g. Glanding, ferulling & termination X
h. Megger X
i. Wdg resistance X
j. Ratio X
k. Mag Current X
l. Wdg continuity X
m. Vector group X
n. C & Tan Delta of winding X
o. OLTC operation X
p. RTCC commissioning X
q. Trafo. Alarm and annunciation X
r. CB tripping through Trf prot. X
SFRA(sweep frequency resonance ana) X

7 C & R Panel
a. Erection ok ok ok ok ok
b. Earthing X X X X X
c. Panel greening X X X X X
d. Aux. relay testing X X X X X
e. Annunciation X X X X X
f. Meter calibration X X X X X
g. Control and indication X X X X X
8 Bus bar prot.
a. Erection ok Busbar- I
b. Earthing X X X X X
c. Panel greening X X X X X
d. Aux. relay testing X X X X X
e. Main relay testing X X X X X
9 PLCC & Exchange
a. Cabling and termination X X X X
b. Speech X X X X
c. Line loss measurement X X X X
d. Noise measurement X X X X
e. Best phase selection X X X X
f. Interfacing with Prot. panel X X X X
10 TS & DR
a. Antena mounting and TS cabling to relays X X X X X
b. Time sync. X X X X X
c. Event logger programming X X X X X
d. External cabling and termination X X X X X
e. Event simulation and time stamping X X X X X
f. Relay networking X X X X X
g. Accessing relays from remote PC X X X X X

11 Battery Battery make -Excide (Acid fill cell)


220 B1 220 B2 OK 48 B2
a. Erection
a. Cabling and termination X X X X
b. Acid filling X X X X
c. Charging as per manufacturer's guide X X X X
d. Discharging for 10 hrs X X X X
e. Recharging X X X X
12 Battery Charger Charger make -statcon (Float cum boost,220 volt)
a. Erection (panel greening & earthing) ok ok ok ok
b. Cabling and termination X X X X
c. Charger voltage setting X X X X
d. Load testing X X X X
e. Battery charging X X X X
13 ACBD/DCDB ACDB1 ACDB2 DCDB1 DCDB2
a. Erection (panel greening & earthing) X X X X
b. Cabling and termination X X X X
c. Testing of panels and protection X X X X
14 BMK
a. Erection (panel greening & earthing) ok ok ok ok ok
b. Cabling and termination X X x x X
c. Testing of panels X X X X X
15 System commissioning
a. CT primary inj. X X X X X
b. CVT secondary Inj X X X X X
c. CB tripping through protection X X X X X
d. PLCC end to end testing X X X X X
e. Main relay testing with scheme X X X X X
f. Bus bar stability X X X X X
16

Note-:X13 and X14 bays are extention


bays of existing unit 6
Prepared by -vijay kumar rabidas (TBTS),camp- Suratgarh, rajsthan
Commissioning progress report for 400 KV S/s suratgarh, rajsthan

Bays to be tested
Unit -7 & 8
Y-4 Y3Y4 Y-5 Y-6 Y5Y6 Y-7 Y-8 Y-9 Y-10 Y10Y11

Bus Bikaner Bikaner


reactor-2 TIE Line-1 Line-2 TIE GT-7 TIE line-1 line-2 TIE

supplied bu CGL
ok ok x x ok ok ok x x ok
X X X X X X X X X X
X X X X X X X X X X

X X X X X X X X X X
X X X X X X X X X X
X X X X X X X X X X
X X X X X X X X X X
X X X X X X X X X X
X X X X X X X X X X
X X X X X X X X X X
X X X X X X X X X X
X X X X X X X X X X
supplied by seimens
ok ok ok ok ok ok ok ok ok ok
x x X X x X x x x x
ok ok ok ok ok ok ok ok ok ok
X X X X X X X X X X
X X X X X X X X X X
X X X X X X X X X X
X X X X X X X X X X
X X X X X X X X X X
X X X X X X X X X X
X X X X X X X X X X
X X X X X X X X X X
Supplied by CGL
ok ok ok ok ok ok ok ok ok ok
X X X X X X ok X X X
X X X X X X X X X X
X X X X X X X X X X
X X X X X X X X X X
X X X X X X X X X X
X X X X X X X X X X
X X X X X X X X X X
X X X X X X X X X X

X X X X X X X X X X
X X X X X X X X X X
Supplied by BHEL
ok ok ok ok
X X X X
X X X ok
X X X X
X X X X
X X X X
X X X X
X X X X
X X X X

ok ok ok ok
X X X X
X X X X
X X X X
X X X X
supplied by Bhel
ok ok ok ok ok
X X X X X
X X X X X
X X X X X
X X X X X
X X X X X
X X X X X
X X X X X
X X X X X
X X X X X
X X X X X
X X X X X
X X X X X
X X X X X
X X X X X
X X X X X
X X X X X
X X X X X
X X X X X

Supplied by bhel
ok ok ok ok ok ok ok ok ok ok
X X X X X X X X X X
X X X X X X X X X X
X X X X X X X X X X
X X X X X X X X X X
X X X X X X X X X X
X X X X X X X X X X
Supplied by bhel
Busbar- I ok Busbar-II
X X X X X X X X X X
X X X X X X X X X X
X X X X X X X X X X
X X X X X X X X X X

X X X X
X X X X
X X X X
X X X X
X X X X
X X X X

X X X X X X X
X X X X X X X
X X X X X X X
X X X X X X X
X X X X X X X
X X X X X X X
X X X X X X X

OK

volt)

ok ok ok ok ok ok ok ok ok ok
X X X X X X X X X X
X X X X X X X X X X

X X X X X X X X X X
X X X X X X X X X X
X X X X X X X X X X
X X X X X X X X X X
X X X X X X X X X X
X X X X X X X X X X

periorities bays : X-13, X-14 ,Y1, Y2, Y7, and Y8


Period : 14/09/2016

Remarks

Y-11 Y-12

TIE GT-8

ok ok Erection of intruptter unit is in progress.


X X
X X interpool cabling schedule yet not received at
site.
X X
X X
X X
X X
X X
X X
X X
X X
X X

ok ok
X X Earthing is in progress
ok ok
X X
X X Only termination pending for interpole
X X
X X
X X
X X
X X
X X

ok ok
X X
X X
X X
X X
X X
X X
X X
X X ratio is pending due to unavaibality of correct
leakage tester
X X
X X

ok ok
X X
X X
X X
X X
X X
X X

bar-II
X X
X X
X X
X X

plcc panel not arrived at site yet , it is in


customer scope

X X
X X
X X
X X
X X
X X
X X

ok ok
X X
X X

X X
X X
X X
X X
X X
X X