You are on page 1of 10

13.

0 ELECTRICAL SYSTEM HEALTHINESS

13.1 PARTIAL LOADING DETAILS

13.2 DETAILS OF ELECTRICAL TESTING (During the month)

13.3 STATION BATTERY SYSTEM STATUS

13.4 ACTION PLAN FOR ANY ABNORMALITY IN THE BATTERY SYSTEM

13.5 TRANSFORMERS DGA TEST STATUS

13.6. ERS COMPLIANCE

13.7 CRITICAL SPARES/REFURBISHING STATUS

13.1 PARTIAL LOADING DETAILS

Equiptment
Sl Gen Loss Root Cause And Remedial Measures
Data

1 Nil Nil Nil

13.2 DETAILS OF ELECTRICAL TESTING (During the month)

Equipt /
Test Observation Perodicity Responsibility
And Action Plan
DG Analysis of Power
AS PER 18.4
Transformers
Sywd
Monthly EM Swyd
Equiptment

GT Transformers
Monthly EM Trafo & Lab
Thermo Done
Vision Scanning.
LT Swgr & Motor Quartely EM LT
HT Swgr &
Monthly EM HT
Motors
Others
Observation

Transformers No abnormality

LT Swgr &
No abnormality
motors

13.3 STATION BATTERY SYSTEM STATUS

FORMAT No:OS-Q-ISO-P-010/F1-R1 SECTION 13 (ELECTRICAL) Sheet 1 of 1


OPERATION SERVICES
Single Earth
Result of capacity test
Fault in Battery Bank Voltage across total
LOCATION of batteries in % age
DC System Details Battery Bank
with date
(Y/N)

220V -1 100% 10-Nov-18 240.00


220V -2 100% 14-Nov-18 240.00
UNIT 1 N
24V-1 100% 18-Nov-16 27.97
24V-2 110% 22-Nov-16 28.08
220V -1 110% 4-Jul-17 239.30
220V -2 110% 29-Jun-17 240.40
UNIT 2 N
24V-1 110% 3-Jul-17 28.24
24V-2 110% 30-Jun-17 28.33
220V -1 110% 8-May-18 239.40
220V -2 110% 11-May-18 240.50
SG 24V-1 110% 8-May-18 27.11
SG 24V-2 110% 11-May-18 27.09
UNIT3 N
TG 24V-1 110% 8-May-18 27.05
TG 24V-2 110% 11-May-18 270.70
STN C&I 24V-1 110% 8-May-18 26.63
STN C&I 24V-2 100% 14-May-18 26.65
220V -1 120% 3-Aug-18 240.50
220V -2 120% 1-Aug-18 240.80
SG 24V-1 120% 4-Aug-18 26.99
SG 24V-2 120% 7-Aug-18 27.02
UNIT4 N
TG 24V-1 120% 4-Aug-18 27.11
TG 24V-2 120% 9-Aug-18 26.98
STN C&I 24V-1 110% 3-Aug-18 26.82
STN C&I 24V-2 110% 8-Aug-18 26.79
220V -1 110% 18-Jul-17 233.00
220V -2 100% 18-May-17 232.40
Swyd N
48V-1 110% 13-Oct-17 52.54
48V-2 110% 16-Oct-17 53.25
*Note: ORT Cordinator to check the above aspects personally (at random)

FORMAT No:OS-Q-ISO-P-010/F1-R1 SECTION 13 (ELECTRICAL) Sheet 1 of 1


OPERATION SERVICES
13.4 ACTION PLAN FOR ANY ABNORMALITY IN THE BATTERY SYSTEM

Unit / Battery Responsib Target


Problem Action plan
system ility Date

NIL

13.5 TRANSFORMERS DGA TEST STATUS


TRANSFORMERS LISTED FOR DGA TEST
SL NO TEST DATE
IN THE MONTH

1 GT-1R, 1Y, 1B, 3R, 3Y, 3B , 4R, 4Y, 4B 19.12.2018

Note: Include the name of transformers/reactors undergoing DGA analysis according to the Stations configuration

TRANSFORMER HEALTH ASSESSMENT


ORT Coordinator may check if the data is entered in ERP - TCODE ZPMTRF_REP
ORT Coordinator may check if the data is entered in ERP - TCODE ZPMDCS_REP

13.6. ERS COMPLIANCE

COMPLIANCE SCORE FOR THE MONTH

ERS NON COMPLIANCE


SL.NO Unit Action Plan (Pr)
(DESCRIPTION)

Field protection devices in EHV


1 & Critical Transformers/To be U2 Material available at stores
replaced in ten years

Conservator air cell of


U1 Material available at stores
transformer rupture causing
unit tripping. ( All stations).
4
Conservator air cell to be
replaced after every 10
-12years. U2 Material available at stores

U1
LT Motors >100 KW/Breaker is U2
5 to be provided for all motors > PR (200070622) Initiated.
100 KW. U3
U4
Failure of Generator tap-off
busduct seal-off bushing of
LAVT panel. Seal-off bushings U1,U2,U3,
6 Inspection during unit Overhaul
of Bus ducts to be physically U4
inspected for damages/ cracks
during shutdown of units
FORMAT No:OS-Q-ISO-P-010/F1-R1 SECTION 13 (ELECTRICAL) Sheet 1 of 1
OPERATION SERVICES
Failure of Generator tap-off
busduct seal-off bushing of
LAVT panel. Seal-off bushings U1,U2,U3,
6 Inspection during unit Overhaul
of Bus ducts to be physically U4
inspected for damages/ cracks
during shutdown of units

REPLACEMENT OF
ELECTROMECH. RELAYS/All STG-1 Distance Realys : 7 out of 8 replaced. PR to
GRP, Switchyard & be initiated for remaining 1 relay
7 Switchgears Electromechanical SWYD STANDBY TRF Relays along with panel : PR
relays are to be replaced by to be initiated.Approved under Capital Budget 2017-
Numerical Relays.Unit wise 18.
status/progr

U1

Safety/ELCB for welding & U2 All the material against the PO (4000177578)
8
hand held tools supplies received .Unit#1, 2,3, 4 completed.
U3

Cracks in bus-duct bellows


causing moisture ingress into
bus-duct and causing tripping.
(All stations). Replacement of U1,U2,U3,
9 Inspection during unit Overhaul
outdoor busduct bellows to be U4
decided on the basis of the
condition as checked during
unit O/H.

REPLACEMENT OF
ELECTROMECH. RELAYS/All
GRP Relay Panels for unit-1 : Material available at
GRP & Switchgears GRP and
10 site; Switchgear relay replacement :P.O Placement
Electromechanical relays are to Swgr
in Progress
be replaced by Numerical
Relays.Unit wise status/progr

13.7 CRITICAL SPARES/REFURBISHING STATUS

UNIT EQUIPMENT/SPARE STATUS

P.O : 4000210156 created, Availability expected


UNIT-4 CEP - 4B
by 31.03.2019

Motor Winding temp maintaining Hi after Stator


Stage-2 CW Motor - Spare capsule replacement. Under warranty. Sent to
BHEL-Bhopal for rectification work

Motor Winding Failure. PR Initiated for


Stage-1 TAC - B
rectification. File is with C&M.

FORMAT No:OS-Q-ISO-P-010/F1-R1 SECTION 13 (ELECTRICAL) Sheet 1 of 1


OPERATION SERVICES
FORMAT No:OS-Q-ISO-P-010/F1-R1 SECTION 13 (ELECTRICAL) Sheet 1 of 1 OPERATION SERVICES

FORMAT No:OS-Q-ISO-P-010/F1-R1 SECTION 13 (ELECTRICAL) Sheet 1 of 1


OPERATION SERVICES
Jan/2019

Target
Date

Nil

Target
Date

10-Dec-18

11-Dec-18

14-Oct-18

19-Dec-18

FORMAT No:OS-Q-ISO-P-010/F1-R1 SECTION 13 (ELECTRICAL) Sheet 1 of 1


OPERATION SERVICES
ge across total
attery Bank

240.00

240.00

27.97

28.08

239.30

240.40

28.24

28.33

239.40

240.50

27.11

27.09

27.05

270.70

26.63

26.65

240.50

240.80

26.99

27.02

27.11

26.98

26.82

26.79

233.00

232.40

52.54

53.25

FORMAT No:OS-Q-ISO-P-010/F1-R1 SECTION 13 (ELECTRICAL) Sheet 1 of 1


OPERATION SERVICES
Present Status

REASON IN CASE OF DEFFERMENT

Nil

ations configuration.

DGA
BATTERY HEALTHINESS

Score 95.96%

Responsibility Target Date

HOD EM Replaced in AOH 2017

HOD EM Replaced in AOH 2016

HOD EM Replaced in AOH 2017

HOD EM AOH - 19-20

HOD EM Completed

FORMAT No:OS-Q-ISO-P-010/F1-R1 SECTION 13 (ELECTRICAL) Sheet 1 of 1


OPERATION SERVICES
HOD EM Completed

Main-1,2 new differential cum


distance relays received at site for
kalpaka lines.Klp line-3 Main-1
relay changed.For other lines,
replacement will be done in phased
manner by availing line shutdowns.
HOD EM Will be completed by 30.06.2019

Standby Trf Relays :Technical


scrutiny in progress.

HOD EM Completed

U1,U4 Completed in AOH : 2016


HOD EM
U2,U3 Completed in AOH:2017

GRP U-1: AOH:2019-2020 U-


2: Completed

HOD EM
SWGR U-1: AOH:2019-2020
U-2 : AOH: 2019-2020

TARGET DATE

31.03.2019

31.03.2019

30.04.2019.

FORMAT No:OS-Q-ISO-P-010/F1-R1 SECTION 13 (ELECTRICAL) Sheet 1 of 1


OPERATION SERVICES
FORMAT No:OS-Q-ISO-P-010/F1-R1 SECTION 13 (ELECTRICAL) Sheet 1 of 1