STATUS OF JNNURM PROJECTS

(A) Status of Projects under Urban Infrastructure & Governance, (UIG), JNNURM.

(i) Projects approved


(Rs. in Crores)
S. Name of Project Estimated Sent to Govt. Approved by Date of Remarks
No. cost of the of India on GoI on Start Completion
Project
1. 2 3 4 5 6 7 8
NDMC
1. Re-development of Connaught 253.78 28-03-2008 29-08-2008 Jan. 2009 Aug., 2010 -
Place
DJB
1. Modification of sewerage 285.11 6-01-2009 29-12-2008 Dec., 2009 Dec., 2011 The CSMC approved the
projects under JNNURM project with the condition
i) 20MGD STP at that the ULB should give
Nilothi time schedule of
ii) Const. of 20 MGD implementation of various
STP at Pappankalan reforms alongwith copy of
iii) Const. of 11 MGD minutes of SLSC, Council
SPS at Possangipur Resolution and Budgetary
iv) Const. of 48 MGD Provision. The informations
SPS at Raja Garden have already been
v) Allied works of submitted to GOI
Posangipur SPS
vi) Allied works of Raja
Garden SPS
TPT
1 Purchase of 1500 city Buses 3360.00 March 09 21-02-2009 - - In first phase 1500 buses at
an estimated cost of Rs 765
crores approved by Govt of
India.
(ii) Projects forwarded to govt. of India for covering under one time relaxation scheme.

Name of Name of proposal Est. cost of Modified / Decision of SLSC Comments of GOI
Agency/ the Project Revised cost received
Deptt.
(1) (2) (3) (4) (5) (6)
Delhi Jal 1. Rehabilitation of Trunk Sewer Recommended by -
Board (i) Rehabilitation of University Trunk Sewer 35.55 36.55 SLSC on -
(ii) Rehabilitation of Punjabi Bagh Trunk Sewer 48.78 50.41 20/06/2009 for -
(iii) Rehabilitation of Relieving Trunk Sewer 39.66 38.00 covering under -
(iv) Rehabilitation of Jail Road Trunk Sewer 63.76 58.81 one-time relaxation -
(v) Rehabilitation of North Trunk Sewer 36.00 36.00 scheme. -
(vi) Rehabilitation of West Delhi Trunk Sewer 62.73 61.24 -
Sub-Total 286.48 281.01

PWD 1. Flyover at Africa Avenue and Aruna Asaf Ali Road 82.70 127.33 -

2. Flyover at Vivekanand Marg, Nelson Mandela Marg, 104.75 127.33 -


Poorvi Marg
3. C/o. of Grade Separator at Raja Ram Kohli Marg 96.51 187.52 -
Intersection on Marginal Bund Road Geeta Colony Delhi
4. C/o. Grade Separator for free flow Traffic at T-Junction of 82.75 187.52 Recommended by -
Marginal Bund Road and Master Plan Road over Disused SLSC for covering
Canal near Shastri Nagar in East Delhi under one-time
5. C/o. Grade Separator at the Junction of G.T. Road and 88.48 226.47 relaxation scheme. -
Road No. 56 near Apsara Border
6. Upgradation of Street Light on Delhi PWD Roads 124.51 197.98 -
7. Construction of Bridge and its Approaches over River 464.00 1196.40 -
Yamuna Down stream of existing Bridge at Wazirabad,
Delhi.
8. Construction of Elevated Road over Barapullah 1202.00 1202.00 28.08.2009
Nala starting from Sarai Kale Khan to INA
Market
9. Ring Road Byepass from Salimgarh Fort to 654.69 654.69 28.08.2009
Velodrom Road Package-I Velodrom Road to
back of Rajghat Power Station Package-II Back
of Rajghat Power Station to Salimgarh Fort
10. Corridor Improvement of U.P. Link Road from 334.00 334.00 28.08.2009
NH-24 Crossing (Noida More) to Chilla
Regulator

Recommended by
SLSC for covering
under one-time
relaxation scheme.

Sub-Total 2334.39 4441.24

Grand Total 2620.87 4722.25

(iii) Projects already under consideration with govt. of India

Name of Name of proposal Est. cost of Modified cost Date of Remarks


Agency/ the Project of the project Start Completion
Deptt.
(1) (2) (3) (4) (5) (6) (7)
Delhi Jal Board 1. Interceptor Sewers along 3150.00 2454.80 DPR sent directly to GOI. Recommended by
Najafgarh drain, Supplementary The start time will be SLSC on 20-06-2009
Drain and Shahdara Drain decided on approval of the
project
MCD 1. Traffic Management Plan for 187.71 209.04 Aug., Aug., 2011 -do-
areas around proposed Civic 2009
Center near Minto Road, New
Delhi (DPR already submitted
to UD Department, GNCTD)
TPT Construction of BRT Corridor 685.34 685.34 DPR sent directly to GOI. -do-
The start time will be
decided on approval of the
project
NDMC Stg. of water supply in NDMC 54.36 54.36 DPR sent directly to GOI. Recommended by
Area by interconnection various The start time will be SLSC on 20-06-2009.
UGRs decided on approval of the
project The government of
India has refused to
consider this project
under JNNURM.

Total 3403.54

(iv) New projects recommended by SLSC on 20/06/2009 and forwarded to govt. of India.

Name of Name of proposal Est. cost Date of Remarks


Agency/ Start Completion
Deptt.
(1) (2) (3) (4) (5) (4)
MCD 1. Development of multilevel 469.80 April, 2009 March, 2011 Recommended by SLSC
underground unconventional
-do- parking at various locations
under the jurisdiction of MCD
(AL-Block, Shalimar Bagh,
Shiv Market Pitampura, QU
Pitampura, Central Market
Ashok Vihar, Mohammadpur
Village, Malviya Nagar Market,
PVR Basant Lok, PVR Saket,
G-8 Rajouri Garden, Block-10
Subhash Nagar, C-4
Janakpuri, Ajmal Khan PARK
Karol Bagh, Krishna Market
Kalkaji, Hauzrani, New
Friends Colony, Jangpura
Bhogal)
2. Improvement and 148.61 Oct., 2009 Dec., 2011 Recommended by SLSC
strengthening of roads of
Okhla Indl. Area Phase I & II,
Central Zone.
3. Covering of Nallah in 51.20 Oct., 2009 March, 2011 Recommended by SLSC
Nauroji Nagar from Africa
Avenue to Ring Road for
providing parking/ road cum
parking under the jurisdiction
of MCD.
4. Covering of nallah from 233.10 -do -do- Recommended by SLSC.
Press Enclave road passing
through Sheikh Sarai,
Chiragh Delhi, Panchsheel
Enclave, Greater Kailash-I,
Andrews Ganj upto Ring Road
behind Police Station Defence
Colony for providing
Parking/Road cum parking
under the Jurisdiction of
MCD.
MCD 5. Imp. of road of 60 ft. 165.10 July, 2009 June, 2010 Recommended by SLSC.
ROW and above by providing
RMC Pavement (Phase-I) in
various zones of MCD.
6. Construction of Grade 71.77 April, 2009 June, 2010 Recommended by SLSC for
Separator at intersection of onwards submission to Govt.
Shankar Road and Upper of India for consideration
Ridge Road
7. Construction of Grade 71.64 -do- -do- -do-
Separator at intersection of
Pusa Road, Dr. K.S. Krishnan
Marg and Patel Road.
8. Construction of 25 nos. 17.50 Dec., 2009 July, 2010 -do-
Foot Over Bridges at different
locations in Delhi City.
9. Re-modeling of SSBL 152.26 Jan., 2010 Jan., 2013 -do-
(Saharanpur Samli Branch
Line) drain in Shah.(N) Zone
10 Construction of Grade 55.44 April, 2009 June, 2010 -do-
Separator/ Underpass at
intersection of Pusa Road,
Arya Samaj Road, Faiz Road,
Upper Ridge Road and
Panchkuian Road.
Total 1436.42
PWD 1. C/o Clover Leaves at 86.77 Oct., 2009 Oct., 2010 Recommended by SLSC
Karkari More (Intersection of on 20/06/2009
Vikas Marg at Road No.57) (CWG Project)
and Widening of Existing
Bridge on Trunk Drain No.1
PWD 2. C/o Grade Separator on 163.00 Nov., 2008 Jan., 2010 Recommended by SLSC
Road No.56 ISBT Anand on 20/06/2009
Vihar, Delhi. (CWG Project)
3. C/o 3 additional clover 88.68 Oct., 2009 Oct., 2010 Recommended by SLSC
leaves at Noida More Flyover on 20/06/2009
i/c slip road, bridges, (CWG Project)
footpath, cycle track and
underpass
4. RUB & ROB at Railway 106.86 April, 2009 April, 2011 Recommended by SLSC
Level Crossing at Road No.68 (CWG Project)
Near Nand Nagri Delhi.
Total 447.31
Grand Total 1883.73

(B) Status of approved projects under Basic Services to the Urban Poor (BSUP).
(Rs.in Lakhs)
Name of the Project No. of flats Project Cost Central Share Share Released Status of projects
Approx Current (50% of State Share to Central State Expenditure Physical Achievement
Carpet estimate Total Project be made incurred as
area d cost of Cost) available on 30th June
of the (50% of 2009
the dwellin Total Project
dwellin g unit Cost)
g unit
(sq.
mtrs.)
1 2 3 4 5 6 7 8 9 10 11
(A) DSIIDC
1. Housing for urban LIG 3232 9.74 2.99 11327.39 4616.67 6710.72 1154.17 3300.00 9699.00 Completed-3868
Poor at Bawana, EWS 636 31.93 2.72 (25%) (49.17%) (85.62%)
Narela and Total 3868
Bhorgarh, Delhi
under BSUP
2. Housing for EWS13392 25.00 2.26 30296.88 13378.18 16918.70 3344.54 - - a) Land acquisition under
Urban Poor at process
Poothkhurd, Delhi (b) DDA did not finalise
under BSUP the road alignment, so
planning could not be
done
(c) The carpet area of the
houses much lesser than
25 sqm
(d) DSIIDC has
suggested to surrender
this project and a fresh
DPR would be prepared
and submitted for
Approval of GOI.
3. Slum Relocation EWS10720 25.00 1.88 20103.60 8828.48 11275.12 2207.12 600.00 8022.00 Completed-4032
Project at (25%) (5.32%) (39.90%)
Kanjhawala, Ghogha In progress-2912
and Bapraula, Delhi
4. Slum Relocation EWS 6512 25.00 2.68 17436.61 6966.61 10470.00 1741.65 - - Work awarded – Court
Project at Samaspur, (25%) stay
Delhi
5. Slum Relocation EWS 9312 25.00 2.68 24929.91 10170.45 14759.46 2542.61 - - No clearance from
Project at (25%) Environment Deptt due to
Deramandi, Delhi ridge area. Decided to be
dropped in a meeting
under Chief Secretary
Delhi on 15-12-2008
6. Slum Relocation EWS 6144 3.07 18868.50 7666.17 11202.33 1916.54 - - Clearance from Forest
Project at Jonapur, (25%) Deptt. GNCTD is awaited
Delhi
7. Slum Relocation EWS 592 25.00 3.32 1964.62 811.32 1153.30 202.83 - - No clearance from
Project at Neb Sarai, (25%) Environment Deptt due to
Delhi ridge area. Decided to be
dropped in a meeting
under Chief Secretary
Delhi on 15-12-2008
8.Slum Relocation EWS 2144 25.00 4.59 9845.48 4095.50 5749.99 1023.87 - 5.70 Ministry’s Approval
Project at Bapraula, (25%) (November-2008) is
Phase-II, Delhi subject to approval of
SLSC. Now the approval
of SLSC taken on 20-06-
2009
9.Slum Relocation EWS 704 25.00 4.1 2886.90 1184.09 1702.82 296.02 - 1.05 -do
Project at Bawana, (25%)
Delhi
10.Slum Relocation EWS 480 25.00 4.87 2337.94 1031.63 1306.32 257.91 - 0.10 -do-
Project at Nangli (25%)
Sakrawati,
Najafgarh, Delhi
SUB TOTAL 53868 139997.83 58749.1 81248.76 14687.26 3900.00 18406.00 Completed-4032
In progress-2912
(B) DDA
11. Slum Relocation EWS 4740 26.47 4.14 19605.57 7731.21 (B) DDA 1932.80 - - Tender invited
Project at Narela, (25%)
Phase-III, Near
Siraspur Village,
Delhi
SUB TOTAL 4740 19605.57 7731.21 11874.36 1932.80 - -

(C) Slum & JJ


12. Construction of EWS 1200 25.00 2.77 3312.08 1571.07 393.00 - 2.00 Under process of Tender
four storied EWS (25%)
Housing for Slum
Dwellers at Sector-
23, Rohini Extn.

13. Construction of EWS 768 25.00 2.66 2045.80 972.97 1741.07 243.00 - 1.00 --do--
four storied EWS (25%)
Housing for Slum
Dwellers at 16-B,
Site No.2, Dwarka
14. Construction of EWS 288 25.00 2.77 798.50 376.90 1072.83 94.00 - 0.00 --do--
four storied EWS (25%)
Housing for Slum
Dwellers at 16-B,
Site No.3, Dwarka
15. Construction of EWS 4672 25.00 2.33 15689.00 7472.00 421.60 - - - Approval of MCD House
four storied EWS is awaited for inviting
Housing for Slum tenders
Dwellers at Savda
Ghevra, Ph-III
Sub Total 6928 21845.38 10392.94 8217.00 730.00 - 3.00
(25%)
GRAND TOTAL 65536 181453.78 76873.25 11452.50 17350.06 3900.00 18409.00 Completed-7900
In progress-2912

104580.55