https://www.jkrwpp.gov.my
Agenda
OBJECTIVE
01 Maintenance lesson learnt
INTRODUCTION
02 The Iceberg Analogy
Life Cycle Engineering & Costing
Asset Life Cycle
05 CONCLUSION
OBJECTIVE
Maintenance lesson learnt
Understanding of FMM
concept and
Objective issues related to
Maintenance and
Maintainability
INTRODUCTION
The Iceberg Analogy
Life Cycle Engineering & Costing
Asset Life Cycle
The Iceberg Analogy
What is life cycle engineering & costing?
When Life Cycle Costing (LCC) becomes an integral part of the
iterative engineering design process, life cycle engineering and
life cycle costing merge into a unified process termed life cycle
Acquisition
engineering and costing (LCE&C)
cost
Poor management
This process clearly and quantitatively considers the life cycle
performance of a structure and all of the associated costs
Training Inspection
Operation
Whole life costs consist of:
End of life and
Special Facilities disposal
testing 1. Acquisition costs 2. Operational costs
Costs incurred between Costs incurred during
Repair Transportation
decision to proceed with operational life of the
and Handling
procurement and entry of structure
Maintenance structure into operational use
Human
Downtime resources 3. End of life costs
Costs associated with
Upgrade disposal, termination, or
replacement of structure
Life Cycle Cost (30 year period)
2013-2020:
2010-2015: Roll-out plan, Implementation,
2009: Documentations, Governance
Developing applications,
2008: Establish AM best competencies & • Training • Monitoring
policy, vision & practices & trainings • Facilitating • Auditing
strategies awareness
>(TPATA) • Coordinating • Improvement
2007: > (DPAK) 2nd NAFAM
>(mySPATA) • Implementing
1st NAFAM & > (MPAM)
JPAK Formed >(Guidelines)
2006 > (JPAK)
National NAFAM3
maintenance
issues in 2018
Info from:
"Hala Tuju Pengurusan Aset Kerajaan"
Ir. MOHD SABRI B. MAT DERIS, Jabatan Kerja Raya Malaysia
02/Aug/2018
TRANFORMASI: Pengurusan Aset Kerajaan (PAK)
ke arah Pengurusan Aset Menyeluruh (PAM)
Comprehensive Integrated
Total Asset
Breakdown Maintenance Facilities Management
Current Maintenance New
Management Management (TAM) Approach
Practices
(Manage Crisis) (Manage Asset) (Manage Users) (Manage Business)
1. Run to failure, 1. Asset Registry /Inventory 1. Asset & Facility Planning 3. Asset Design/ Creation toward
Durability, Maintainability, Optimization
2. Attend as request/ 2. Proper Maintenance 2. Reliable Asset operation & & Sustainability
complains Planning, Costing & maintenance
Budgeting 4. Asset Utilization/Usage by maintaining
3. Repair & 3. Care the users need & asset performance & value, delighting
Replacement work 3. Preventive Maintenance providing their facilities users, monetisation of asset
Practices, Responsive
4. Fire Fighting/ Ad 4. Achieving SLA/ KPI & 5. Good investment: value for money,
hoc 4. Competency Customer Satisfaction Satisfying stakeholders
Reactive Approach Proactive Approach Customer Focus Approach ROI Approach
BUILDING DESIGN vs.
MAINTENANCE
PERSPECTIVE
Putrajaya - sustainable development
Building design : active, passive,
hybrid, BIM
Federal Government
Administrative Center Putrajaya
sustainable development
4G7
Functions
Min. direct sunlight into building
Providing daytime lighting
‘Sustainable Malaysian Tropical Architecture’ Max. windows facing north and
south
Lot Ministry Design Concepts
Less cooling capacity required
4G7 Jabatan Peguam Negara Kacip Pinang Enhancing appearance & aesthetic
4G8 Kementerian Kemajuan Luar Bandar dan Wilayah Bunga Kantan values
4G9 Kementerian Komunikasi dan Multimedia Malaysia Batu Purba Maintenance Perspective
Kementerian Kesejahteraan Bandar, Perumahan dan Kerajaan Min. utility usage (TNB and GDC)
4G10 Rebung
Tempatan Optimise usage of air conditioning
4G11 Kementerian Pembangunan Wanita, Keluarga dan Masyarakat Songket & Tengkolok and lighting system
Increase life cycle of the
4G1 & 4G2 Kementerian Pertanian dan Industri Asas Tani Daun
equipment/parts
Building design: Passive
Daylight Concept
* Light
Functions Maintenance Perspective
Max. natural lighting to building Min. utility usage (TNB and GDC)
Max. visual comfort while reducing Control air conditioning and lighting
energy consumption system operating at optimum level
effectively and efficiently
Increase life cycle of the
equipment/parts
Building design: Passive
Shading Devices
Functions
Shading devices avoiding direct sunlight
Occupancy Comfortness and Condusiveness
(thermal comfort and visual)
Functioning as heat shield
Maintenance Perspective
Min. utility usage (TNB and GDC)
Optimise usage of air conditioning
and lighting system
Increase life cycle of the
equipment/parts
Functions
Produces cold water for building air conditioners and
generates electricity for GDC 1 and GDC 2 plants
combination of configuration :
Electrical centrifugal chiller
Steam absorption chiller
Direct fired absorption chiller
Thermal energy storage
Auxiliary gas boiler
Cogeneration is a scenario where simultaneous production of two kind of Heat recovery steam generator
energy from the same source at the same time. Electricity is generated from Gas turbine generator
an alternator attached to the gas turbine output shaft. Waste heat from the
gas turbine exhaust is channeled to a waste heat boiler to generate steam - Maintenance Perspective
which is used as primary energy source to generate chilled water.
Reduce GDC operating costs
Building design: Active
Ice Thermal Energy Storage (ITES)
Functions
Advanced technology for heat
applications to cool buildings
Storing ice at night (off-peak)
and to be channeled as a
chilled water for buildings
during the day (peak hour)
Maintenance Perspective
Reducing the cost of using
electricity during night (off-peak)
compared to the use of daytime
electricity (peak hour)
Functions
A device that is specially
designed as an efficient
heat transfer medium in
chilled water system
Maintenance Perspective
Reduce risk of cold water
leakage and contamination -,
Chilled water flowing in a
closed loop system that uses Counter heat current exchange:
a continuous loop of pipes Note the gradually declining
separating supply and differential and that the once hot
demand side at HEX i.e and cold streams exit at the
(Primary looping and reversed temperature difference;
secondary looping). the hotter entering stream
Thermal heat transfer occurs becomes the exiting cooler
at HEX stream and vice versa.
e.g Precint 1 w/o HEX
Precint 2,3,4 & 5 c/w HEX
Heat Exchanger (HEX)
Building design: Active
Heat Recovery Wheel (HRW)
Functions
Ventilation rehabilitation system
(air-to-air heat flow conversion)
Conceptualize the opposite heat
exchange flow between the air in
the system and also the air from
the outside environment
Maintenance Perspective
Improve the efficiency of
maximum energy saving and
heat load needed for the
cooling process
Airflow at HRW
Maintenance Perspective
online BCS Facility management more efficient
Effectiveness of utility utilization saving
Building design: Hybrid
Portfolio Designed * Fan
New landmark in September 2009
Air Conditioning System at
Contemporary concept design, up to
Masjid Tuanku Mizan Zainal Abidin
a maximum of 20,000 people.
01 02 03
Collection /
04 05
Clash detection, Incorporation with
Visualization of composition of Deriving as-built
analysis and Facility
project prior actual appropriate data model
coordination of the Management for
construction and/or information progressively
project the operation
with respect to
Asset Management purposes
Outline 3D With LOD300 BIM for FMM information system Maintenance Perspective
Develop 3D Model – Design Model Inclusion of LOD500
A finalized BIM model provides an
Design Coordination – Clash Analysis Integration of BIM Model And BIM-FMIS
Covering Module: accurate source of information about
Construction Management – Construction Model
Constructed Project – As Built Model a) Space Management the as-built spaces and systems. It also
b) Asset Management serves as a useful starting point for
c) Building Operation & Maintenance (KPI & APD) managing and operating the building.
d) Complaint Management
FMM Solution, Collaboration Platform, Software And Hardware
BIM Execution Plan
FMM CONCEPTS &
ISSUES
• Facility management and maintenance
concept, best element practice
• FMM issues related to design,
operation & maintenance
FMM concept & issue
No access to
01 urinal basin
service room
Design issues wrt
Maintenance work
Small
service room
02 – difficult for
maintenance
Design issues wrt
Maintenance work
Sub DB
lighting
03 difficult to
access
Design issues wrt
Maintenance work
Difficult to
access water
04 tank ladder
narrow space
Design issues wrt
Maintenance work
Small space,
05 panel inside
ceiling
Design issues wrt
Maintenance work
ACSU
opening
06 blocked by
ducting
Design issues wrt
Maintenance work
No access
05 for
maintenance
Helping
Buildings
Succeed
04
There must be close interaction
W.R.T the maintenance throughout the design and
issues, what can be done to construction phases, including
make our facilities more input to and review of design
drawings and specifications by
maintainable and, thus, less maintenance personnel.
costly to operate during the
building life?
Consider the following : One valuable input to the 03
opening meetings and
throughout the design process is
the maintenance standards for
01 the organization.
Conclusion
There is no doubt that everyone in the design and build process has
the same goal in mind: to build an attractive and functional facility
that is pleasing for everyone to occupy and use. The final step is to