Test on SDLC and SCM

Empid:__________________
EmpName:_______________

Duration: 30 mins
Marks: 30

Answer the following

1. What is SDLC?
a. It is a conceptual model used in project management that describes the
stages in developing a quality product
b. It is a conceptual model used in project management that describes the
stages in maintenance phase
c. It is a conceptual model used in project management that describes the
stages in developing a quality product by reviewing every stage
d. It is a conceptual model used in project management that describes the
stages in developing a quality product and maintaining the quality of
the product

2. Design is an activity in the SDLC


a. True
b. False

3. Which model is not iterative and risk is high


a. Spiral model
b. Incremental model
c. Waterfall model
d. V-Model
e. None of the above

4. To use Water fall model, the product definition , and the technology used
should be well understood
a. True
b. False

5. Which model has a release at the end of every Test phase


a. Waterfall model
b. V-model
c. Incremental model

1
d. Spiral model

6. Total cost of complete system is very high in V-model


a. True
b. False

7. Spiral Model emphasizes on


a. Verification
b. Risk
c. Cost
d. Time

8. We can develop a complete product using RAD


a. True
b. False

9. In which model, testing activity is started in the requirements phase


a. RAD
b. V-Model
c. Spiral Model

10. Which is a evolutionary model


a. Prototype model
b. RAD
c. V-model

11. V-Model is cost effective, used when quality is given importance, iterative
a. Partially true
b. True
c. False

12. When do we identify the system Acceptance criteria in V-Model


a. Design phase
b. Build phase
c. Requirements phase

13. The environment for building a product and testing a product are the same
a. True
b. False

14. What is a milestone


a. End of every activity
b. End of every phase

2
c. End of every iteration
d. End of a set of activities

15. The Quality Assurance role is the role responsible for guaranteeing a level of
quality for the end client, and to help the software development team to
identify problems early in the process.
a. True
b. False

16. A test case represents a Business function in the AUT


a. True
b. False

17. low level design is a detailed design document


a. true b. False

18. There are Four phases in a project life cycle, Testing is one activity which will
be executed in all the phases to maintain the quality of the system
a. True b. False

19. The low level testing is


a. Unit testing
b. Structured testing
c. Component testing
d. All of the above

20. Testing activity should be started in the beginning of the project life cycle
a. To find defects in the early stages
b. Improve the quality
c. Reduce the risk
d. Improve the product efficiency
e. All of the above

21. What are the benefits of using v-mode


a. Cost effective
b. Better quality
c. Iterative development
d. Reduces risk
e. All of the above
22. SCM stands for
a. System Configuration management
b. Software Configuration management
23. What is baseline
a. Expected result

3
b. Version under change for further development

24. Define SCM process? Draw the flowchart. [3 marks]

25. Using IBM rational Clear Case we can implement SCM [true/false]

26. What is an SCI? give examples for the same [2 marks]

27. SCM process should be started in the beginning of the project life cycle
a. Yes
b. No